Permit #2022031492
Permit Details
Status: COED
| Parcel Id: 39-12-31-0000-04030-0000 |
| Total Square Footage: 13452 sqft |
| Block: 04030 |
| Subdivision: - |
| Job Phone: 407-384-1909 |
| Location Address: 511 OLD KINGS RD |
| Type: CA - COMM ADDITION |
| Issue Date: 10/13/2022 |
| NOC: RECORDED |
| Applicant name: RICHARD LEROY HAINES |
| Owner: SE COMBINED SERVICES OF FLORIDA LLC |
|
Address 1929 ALLEN PARKWAY HOUSTON, TX 77019 |
| Lot: 0000 |
| Contracted Stated Job Value: ¤1,500,000.00 |
| Job Description: ADDITION - NTERIOR & EXTERIOR RENOVATION " FLAGLER PALMS" |
| Type: CN |
Contractor
RLH CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
5700 DOT COM CT SUITE 1070 OVIEDO, FL 32765 |
CGC1521696 (Exp: 08/31/2024) | 407-384-1908 |
Sub Contractors
ROBERT C DRURY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
430 ANDALUSIA AVE , 0 |
CAC1820800 (Exp: 08/31/2024) | 386-679-7090 |
DAVID SCOTT MORRIS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
63 LEIDEL DR PALM COAST, FL 32137 |
ER13015750 (Exp: 08/31/2026) | 386-569-7262 |
LEWIS G WALKER
| Status | Location Address | State License Number |
| INACTIVE |
PO BOX 2147 LAKE CITY, FL 32025 |
CCC1333551 (Exp: 08/31/2024) |
JEFFREY DALE KNIGHT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
923 ASHMEADE CT PORT ORANGE, FL 32127 |
CFC057351 (Exp: 08/31/2026) | 386-345-3857 | 386-345-4443 |
Inspection History
| Type | Request Date | Result | Inspector |
| LDSC- LANDSCAPE FINAL | 12/21/2023 | APPROVED | RPICATAGI |
| Note: 12/15/2023 2:55:02 PM- PREVIOUS INSPECTION NOTES | |||
| U - UTILITY COMMERCIAL FINAL | 12/20/2023 | FINAL APPROVED | LFITZGERALD |
| BUILDING FINAL | 12/20/2023 | FINAL APPROVED | FWILLIS |
| FIRE FINAL | 12/15/2023 | APPROVED | RMARTIN |
| Note: 12/14/2023 - PREVIOUS INSPECTION NOTES 10/19/2023 - PREVIOUS INSPECTION NOTES phase 1 is good | |||
| LDSC- LANDSCAPE FINAL | 12/15/2023 | Disapproved - NO FEE | RPICATAGI |
| Note: LDC Sec. 13.03.02 A -1 requires an 8 feet wide foundation planting with double row of shrubs for 70% of building facade(except for doorways, garage doors, paving etc.) Additional plantings are required in gravel beds of front facade that are north of the main entry and also along the rear facade in gravel beds in order to comply with the referencde code section. | |||
| ELECTRIC FINAL | 12/15/2023 | APPROVED | RMARTIN |
| Note: 12/14/2023 - PREVIOUS INSPECTION NOTES 10/19/2023 - PREVIOUS INSPECTION NOTES phase 1 is good | |||
| HVAC FINAL | 12/15/2023 | FINAL APPROVED | CPISCITELLI |
| Note: 12/14/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 3140 Will look at wrap and grill cconnections on above ceiling inspection 7/5/2023 - PREVIOUS INSPECTION NOTE 6/21/2023 - PREVIOUS INSPECTION NOTES Inspected exhaust duct to roof 5/2/2023 - PREVIOUS INSPECTION NOTES Inspected metal duct to be able to wrap and inspected ductboard trunkline | |||
| ELECTRIC FINAL | 12/14/2023 | CANCELLED BY APPLICANT | RMARTIN |
| Note: 10/19/2023 - PREVIOUS INSPECTION NOTES phase 1 is good | |||
| FIRE FINAL | 12/14/2023 | CANCELLED BY APPLICANT | RMARTIN |
| Note: 10/19/2023 - PREVIOUS INSPECTION NOTES phase 1 is good | |||
| HVAC FINAL | 12/14/2023 | CANCELLED BY APPLICANT | CPISCITELLI |
| Note: Inspector Notes from Inspection 3140 Will look at wrap and grill cconnections on above ceiling inspection 7/5/2023 - PREVIOUS INSPECTION NOTE 6/21/2023 - PREVIOUS INSPECTION NOTES Inspected exhaust duct to roof 5/2/2023 - PREVIOUS INSPECTION NOTES Inspected metal duct to be able to wrap and inspected ductboard trunkline | |||
| ABOVE CEILING | 12/12/2023 | APPROVED | RMARTIN |
| Note: 8/11/2023 - PREVIOUS INSPECTION NOTES phase 1 | |||
| PLUMBING FINAL | 12/11/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: 12/1/2023 - PREVIOUS INSPECTION NOTES 1. Men and womes restrooms. The lavatories are to be a minimum of 60" off of the finished wall from side of the toilet to edge of lav. P-604.3.2 2. The baby changing stations are to be a maximum of 3' 10 1/2" to top of the station see page A-400 of the prints. and see FBCA-902.1 advisory 3. The ADA sinage at the restrooms are to be a max distance of 60" to center of the sign off of the finished floor. NEED TO CHANGE PLUMBING CONTRACTOR TO CORECT ONE | |||
| HVAC ROUGH | 12/06/2023 | APPROVED - AS NOTED | CPISCITELLI |
| Note: Will look at wrap and grill cconnections on above ceiling inspection 7/5/2023 - PREVIOUS INSPECTION NOTE 6/21/2023 - PREVIOUS INSPECTION NOTES Inspected exhaust duct to roof 5/2/2023 - PREVIOUS INSPECTION NOTES Inspected metal duct to be able to wrap and inspected ductboard trunkline | |||
| PLUMBING FINAL | 12/01/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. Men and womes restrooms. The lavatories are to be a minimum of 60" off of the finished wall from side of the toilet to edge of lav. P-604.3.2 2. The baby changing stations are to be a maximum of 3' 10 1/2" to top of the station see page A-400 of the prints. and see FBCA-902.1 advisory 3. The ADA sinage at the restrooms are to be a max distance of 60" to center of the sign off of the finished floor. | |||
| PLUMBING FINAL | 12/01/2023 | APPROVED | JWALKER |
| Note: Disreguard this inspection was appoved accidentially. A new plumbing final has been added. | |||
| ELECTRIC 2ND ROUGH | 11/28/2023 | APPROVED | RMARTIN |
| Note: 11/21/2023 - PREVIOUS INSPECTION NOTES sofit cans in large room | |||
| FRAMING | 11/21/2023 | APPROVED | FWILLIS |
| ELECTRIC 2ND ROUGH | 11/21/2023 | PARTIALLY APPROVED | RMARTIN |
| Note: sofit cans in large room | |||
| ELECTRIC FINAL | 10/19/2023 | PARTIALLY APPROVED | RMARTIN |
| Note: phase 1 is good | |||
| FIRE FINAL | 10/19/2023 | PARTIALLY APPROVED | RMARTIN |
| Note: phase 1 is good | |||
| HVAC FINAL | 10/12/2023 | PARTIALLY APPROVED | CPISCITELLI |
| ABOVE CEILING | 08/11/2023 | PARTIALLY APPROVED | RMARTIN |
| Note: phase 1 | |||
| ELECTRIC 2ND ROUGH | 08/09/2023 | APPROVED | RMARTIN |
| LATH/BRICK/WATER BARRIER | 08/03/2023 | APPROVED | FWILLIS |
| ELECTRIC 2ND ROUGH | 07/26/2023 | APPROVED | RMARTIN |
| Note: 7/24/2023 - PREVIOUS INSPECTION NOTES 7/24/23 large room by porch 7/20/2023 - PREVIOUS INSPECTION NOTES porch area | |||
| ELECTRIC 2ND ROUGH | 07/24/2023 | PARTIALLY APPROVED | RMARTIN |
| Note: 7/24/23 large room by porch 7/20/2023 - PREVIOUS INSPECTION NOTES porch area | |||
| ELECTRIC 2ND ROUGH | 07/20/2023 | PARTIALLY APPROVED | RMARTIN |
| Note: porch area | |||
| HVAC ROUGH | 07/05/2023 | PARTIALLY APPROVED | CPISCITELLI |
| Note: inspected connections above hard ceiling 6/21/2023 - PREVIOUS INSPECTION NOTES Inspected exhaust duct to roof 5/2/2023 - PREVIOUS INSPECTION NOTES Inspected metal duct to be able to wrap and inspected ductboard trunkline | |||
| FRAMING | 06/23/2023 | APPROVED | FWILLIS |
| Note: 5/25/2023 - PREVIOUS INSPECTION NOTES 5/24/2023 - PREVIOUS INSPECTION NOTES NO ONE ON SITE AT THE TIME OF MY VISIT. ENTRY DOOR WAS LOCKED AND LIGHTS OFF. NO APPROVED DRAWINGS OUTSIDE. 6/23/23 - CHIMNEY IN THE OUTDOOR ROOM. ALSO FRAME INSIDE. | |||
| HVAC ROUGH | 06/21/2023 | PARTIALLY APPROVED | CPISCITELLI |
| Note: Inspected exhaust duct to roof 5/2/2023 - PREVIOUS INSPECTION NOTES Inspected metal duct to be able to wrap and inspected ductboard trunkline | |||
| PLUMBING 2ND ROUGH | 06/15/2023 | APPROVED | JWALKER |
| Note: Check for correct floor drains and trap seals | |||
| ROOF IN PROGRESS | 06/09/2023 | APPROVED | FWILLIS |
| Note: 6/8/2023 - PREVIOUS INSPECTION NOTES 6/9/23 - NEED PRODUCT APPROVAL SHEET AND AFFIDAVIT AT NEXT INSPECTION. | |||
| ROOF IN PROGRESS | 06/08/2023 | CANCELLED BY APPLICANT | FWILLIS |
| INSULATION | 06/08/2023 | APPROVED | FWILLIS |
| FRAMING | 05/25/2023 | PARTIALLY APPROVED | FWILLIS |
| Note: 5/24/2023 - PREVIOUS INSPECTION NOTES NO ONE ON SITE AT THE TIME OF MY VISIT. ENTRY DOOR WAS LOCKED AND LIGHTS OFF. NO APPROVED DRAWINGS OUTSIDE. | |||
| FRAMING | 05/24/2023 | Disapproved - NO FEE | FWILLIS |
| Note: NO ONE ON SITE AT THE TIME OF MY VISIT. ENTRY DOOR WAS LOCKED AND LIGHTS OFF. NO APPROVED DRAWINGS OUTSIDE. | |||
| CONCRETE FORM WORK | 05/19/2023 | APPROVED | DHANEY |
| HVAC ROUGH | 05/02/2023 | PARTIALLY APPROVED | CPISCITELLI |
| Note: Inspected metal duct to be able to wrap and inspected ductboard trunkline | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 04/26/2023 | APPROVED | FWILLIS |
| Note: 4/24/2023 - PREVIOUS INSPECTION NOTES NOT READY YET. | |||
| ROOF SHEATHING / BRACE / TIE DOWN | 04/24/2023 | Disapproved - NO FEE | FWILLIS |
| Note: NOT READY YET. GAVE THE OKAY TO DRY-IN THE ROOF. JUST THE PEEL AND STICK.. | |||
| LINTEL | 04/17/2023 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 3280 3/29/23 Please have engineer letter submitted to the building department regarding the compaction testing. 2/27/2023 - PREVIOUS INSPECTION NOTES NEED PROOF OF COMPACTION. INSPECTED FOOTER AND IT IS GOOD. | |||
| FOUND SURVEY APPROVED (OFFICE) | 04/14/2023 | APPROVED | DLEAP |
| MONOLITHIC SLAB | 03/30/2023 | APPROVED | JWALKER |
| Note: Mono slab at the exterior and the interior footing under shearwall approved | |||
| FOOTER | 03/29/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 3/29/23 Please have engineer letter submitted to the building department regarding the compaction testing. 2/27/2023 - PREVIOUS INSPECTION NOTES NEED PROOF OF COMPACTION. INSPECTED FOOTER AND IT IS GOOD. | |||
| PLUMBING 1ST ROUGH | 03/16/2023 | APPROVED | JWALKER |
| FOOTER | 02/27/2023 | Disapproved - NO FEE | FWILLIS |
| Note: NEED PROOF OF COMPACTION. INSPECTED FOOTER AND IT IS GOOD. |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 12/18/2023 | 12/18/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 12/18/2023 | 12/18/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 12/18/2023 | 12/18/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 12/18/2023 | 12/18/2023 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/02/2023 | 08/11/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/12/2023 | 06/21/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/05/2023 | 06/12/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Drawing needs to be signed and sealed with a verfiable signature. | |||
| ELEC | COMPLETE | 06/05/2023 | 06/06/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/17/2023 | 06/01/2023 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/27/2023 | 05/02/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLENG | COMPLETE | 04/13/2023 | 04/14/2023 |
| Note: Released By: DENNIS R. LEAP, P.E. - (386)986-2482 - DLEAP@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/30/2023 | 04/12/2023 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 09/08/2022 | 09/08/2022 |
| Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM THE FIRE SUBCONTRACTOR NEEDS A SEPERATE PERMIT YOU NEED TO SUBMIT A ROOFING SUBCONTRACTOR | |||
| BLD | COMPLETE | 05/10/2022 | 05/10/2022 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| BLD | HOLD | 04/26/2022 | 04/26/2022 |
| Note: Held By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Provide shoring plan as noted per FS 553 Sec.79. designed by a licensed Florida Engineer. Harold Allen. | |||
| DSD | COMPLETE | 04/26/2022 | 04/26/2022 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| BADMIN | HOLD | 04/26/2022 | 04/26/2022 |
| Note: Held By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM A permit application signed by the licensed contractor and includes all subcontractors to be submitted before the permit can be made ready. | |||
| ARCHR | COMPLETE | 04/12/2022 | 04/13/2022 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM See DSD comments. | |||
| DSD | HOLD | 04/12/2022 | 04/13/2022 |
| Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM 1. Wall colors. a. Light pastel colors and white. Acceptable light pastel colors and white shall have LRV of 80 or greater. b. Earth tones. Earth tones include shades of brown, brown-taupe or sandy-taupe, beige, terra cotta, olive, sage and gray. Acceptable earth tone shades shall have a LRV of 25 or greater. 1. Wall color combinations. b. Multi-family and non-residential buildings may vary wall color vertically between building masses, horizontally between stories, or a combination thereof, but no more than three colors can be used per building. 2. Accent color combinations. Accent colors should offer some contrast, and can therefore be darker, lighter, brighter, or richer than wall colors. However, the main consideration in choosing accent colors shall be compatibility with the wall color. Two accent colors shall be allowed per building. Accent colors shall complement the building's wall color. Accent colors shall not exceed 20 percent of any one elevation. Unpainted natural stone, brick, roof material or natural appearing substitutes are excluded from exterior color requirements. | |||
| MECH | COMPLETE | 04/12/2022 | 04/14/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLUM | COMPLETE | 04/12/2022 | 04/19/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/12/2022 | 04/19/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/12/2022 | 04/13/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| FI1 | COMPLETE | 04/12/2022 | 04/13/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ARCHR | HOLD | 03/28/2022 | 03/29/2022 |
| Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM Update the "Color Schedule" table on sheet A200.1 with colors to be used for the wall and trim. Add linear width of the addition. Add roof pitch. | |||
| BLD | HOLD | 03/28/2022 | 04/11/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Sheet S2.1 – Existing Construction Note #1, Shore existing roof framing as required. Shoring is to be designed by a licensed Florida Engineer. Provide shoring plan as noted per FS 553 Sec.79. 2. Office space is calculated at 100 sf per occupant. Per Table 1004..5, the correct occupant load is to be calculated at 150 per sf. | |||
| DSD | HOLD | 03/28/2022 | 03/29/2022 |
| Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM On Sheet A010 Provide new pad addition dimensions. Provide new impervious and pervious calculation in percentages. Provide a landscape plan. Add addition height. | |||
| ELEC | COMPLETE | 03/28/2022 | 03/31/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| FI1 | COMPLETE | 03/28/2022 | 04/11/2022 |
| Note: Released By: LEE MILLER - (386)986-3783 - WMILLER@PALMCOASTGOV.COM Please add a Fire Extinguisher (with Cabinet) in the addtion area so that the extinguisher is not obscurted from view per NFPA 10, 6.1.3.1 | |||
| MECH | HOLD | 03/28/2022 | 04/01/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide Heatload Calculation per C403.2.1 FBC Energy Conservation 2020 7Th edition 2. Tempstar 5 ton system is on a permit that was never finaled. Will the final be under this permit or will the previous contractor be reopening the permit and have it finaled. (Permit # 2021061323) | |||
| PLUM | HOLD | 03/28/2022 | 04/05/2022 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Provide service sink per FBCP 7th Ed. Sec. 403.1. If it is existing, identify it on plumbing plan for clarity - FBC 7th Ed. Sec. 107.3. | |||
| UD1 | COMPLETE | 03/28/2022 | 03/29/2022 |
| Note: Released By: CHRIS JOHNSON - (386)986-2384 - CJOHNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 12/27/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 12/27/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 10/13/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤19.34) | 10/13/2022 |
| IMPACT FEE FIRE | ¤644.80 | 10/13/2022 |
| SURCHARGE FS 533.721 | ¤63.39 | 10/13/2022 |
| SURCHARGE - FS 468.631 | ¤95.08 | 10/13/2022 |
| SW ENG REVIEW- 40 | ¤40.00 | 10/13/2022 |
| SITE PLAN 30 | ¤30.00 | 10/13/2022 |
| ADJUSTMENT 50% | (¤6,150.00) | 10/13/2022 |
| ADMINISTRATIVE - COMMERCIAL | ¤75.00 | 10/13/2022 |
| INSPECTION COMMERCIAL | ¤10,500.00 | 10/13/2022 |
| PLAN REVIEW - COMMERCIAL | ¤1,725.00 | 10/13/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤7,088.93 |