I want to search for...
Permit #2022031626
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7003-00080-0210 |
| CONDITIONED SPACE: 1050 sqft |
| PATIO/DECK (NO ROOF) : 672 sqft |
| Total Square Footage: 1722 sqft |
| Block: 00080 |
| Subdivision: 2190 - SECTION 3-COUNTRY CLUB COVE |
| Job Phone: (386)547-0991 |
| Location Address: 15 CLOVERDALE CT S |
| Type: BA - BUILDING ADDITION |
| Issue Date: 06/27/2022 |
| NOC: RECORDED |
| Applicant name: STEVE HARKINS |
| Owner: FORTE SHARON MARIE & ALAN CHRISTOPHER FORTE W&H |
|
Address 15 CLOVERDALE COURT S PALM COAST, FL 32137 |
| Lot: 0210 |
| Contracted Stated Job Value: ¤151,000.00 |
| Job Description: ADDITION AND 42X16 CONCRETE PATIO |
| Type: CN |
Contractor
HARKINS CUSTOM CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
665 STREET TRAIL BUNNELL, FL 32110 |
CBC1253997 (Exp: 08/31/2026) | 386-449-9413 |
Sub Contractors
GREGORY A HAGEMAN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
545 Parque Drive Ormond Beach, FL 32174 |
CCC021394 (Exp: 08/31/2026) | (386) 672-2821 |
ROBERT JOHN TROWBRIDGE
| Status | Location Address | State License Number | Phone |
| INACTIVE |
3801 Long Grove Lane Port Orange, 32119 |
CAC057234 (Exp: 08/31/2024) | (386) 767-9735 |
MARK E SMITH
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 351482 PALM COAST, FL 32164 |
EC0002128 (Exp: 08/31/2026) | (386) 437-8496 | 386-586-3612 |
ROBERT BERTOLINI JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
15 WEBWOOD PLACE PALM COAST, FL 32164 |
RF11067617 (Exp: 08/31/2027) | 386-627-0560 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 01/23/2023 | FINAL APPROVED | DHANEY |
| BLD - BUILDING FINAL | 01/19/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 01-19-2023 Bedroom and living room smoke alarms need to be interconnected. | |||
| BLD - BUILDING FINAL | 01/19/2023 | FINAL APPROVED | AGAETANO |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/13/2023 | APPROVED | GBERTOLA |
| Note: 1/12/23= Correction were made 1/12/2023 - PREVIOUS INSPECTION NOTES ** 01/12/23 NEED TO READ PREVIOUS INSPECTOR NOTES AND SUBMIT A TOPOGRAPHIC SURVEY NOT A BOUNDARY SURVEY 1/4/2023 - PREVIOUS INSPECTION NOTES THIS IS A BOUNDARY SURVEY, WE NEED A TOPOGRAPHIC SURVEYS | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/13/2023 | APPROVED | EMADISON |
| ROW - FINAL INSPECTION | 01/13/2023 | FINAL APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/12/2023 | CANCELLED BY INSPECTOR | GBERTOLA |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/12/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 01/12/23 NEED TO READ PREVIOUS INSPECTOR NOTES AND SUBMIT A TOPOGRAPHIC SURVEY NOT A BOUNDARY SURVEY 1/4/2023 - PREVIOUS INSPECTION NOTES THIS IS A BOUNDARY SURVEY, WE NEED A TOPOGRAPHIC SURVEYS | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/04/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: THIS IS A BOUNDARY SURVEY, WE NEED A TOPOGRAPHIC SURVEYS | |||
| INSULATION | 11/15/2022 | APPROVED | DCUSHING |
| Note: 11/14/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 10/26/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 11-14-2022 Multiple batts in ceiling and walls are not fastened. Multiple gaps in ceiling. 9/26/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2250 Inspector Notes from Inspection 2280 THIS IS A REINSPECTION The stem wall was already inspected. 09-08-2022 Homeowner built a birm at on the slab to reroute water. He will remove it prior to the slab pour. 09-26-2022 1. Valley rafter shoe plate not installed as per drawings. Please submit a revision to the building department or install as per drawings. 2. 1/F interior stud bearing at existing wall calls for dbl top plate. Pleae submit a revision for the blocking and straps used. 3. Provide details of valley rafter and scabbing. 4. Missed T01 & T04. 5. H25 missed at utility room sleepers. Roof sheathing OK and approved. Inspection stopped. Contractor not ready. 10-25-2022 1. Please submit revision Sheet 1 of 2 to the building department for review. 2. Please submit Sheet 1 of 2 1F Typical Block Wall Section. Top plate not installed as per plans. Each truss has one PT. block under each truss. 10-26-2022 1. Please install larger nail plates on the vent in bathroom. 2. Mechanical drawings not on site. 3. Detail 1/3 Typical block wall section not installed as per plan on existing CMU to new trusses. Straps used. Please revise and reflect on drawings. 4. Roof vent not wired and not shown on drawings. Please submit to the bulding department. 5. Please revise and submit to the building department all electrical including the two new outlets added in the existing bedroom. 11-07-2022 Exterior outets grounds need to be connected. All grounds need to be connected – NEC 110.14A. Check at insulation inspection. | |||
| INSULATION | 11/14/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Inspector Notes from Inspection 2420 10/26/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 11-14-2022 Multiple batts in ceiling and walls are not fastened. Multiple gaps in ceiling. 9/26/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2250 Inspector Notes from Inspection 2280 THIS IS A REINSPECTION The stem wall was already inspected. 09-08-2022 Homeowner built a birm at on the slab to reroute water. He will remove it prior to the slab pour. 09-26-2022 1. Valley rafter shoe plate not installed as per drawings. Please submit a revision to the building department or install as per drawings. 2. 1/F interior stud bearing at existing wall calls for dbl top plate. Pleae submit a revision for the blocking and straps used. 3. Provide details of valley rafter and scabbing. 4. Missed T01 & T04. 5. H25 missed at utility room sleepers. Roof sheathing OK and approved. Inspection stopped. Contractor not ready. 10-25-2022 1. Please submit revision Sheet 1 of 2 to the building department for review. 2. Please submit Sheet 1 of 2 1F Typical Block Wall Section. Top plate not installed as per plans. Each truss has one PT. block under each truss. 10-26-2022 1. Please install larger nail plates on the vent in bathroom. 2. Mechanical drawings not on site. 3. Detail 1/3 Typical block wall section not installed as per plan on existing CMU to new trusses. Straps used. Please revise and reflect on drawings. 4. Roof vent not wired and not shown on drawings. Please submit to the bulding department. 5. Please revise and submit to the building department all electrical including the two new outlets added in the existing bedroom. 11-07-2022 Exterior outets grounds need to be connected. All grounds need to be connected – NEC 110.14A. Check at insulation inspection. | |||
| ALL ROUGH | 11/07/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: 10/26/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 9/26/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2250 Inspector Notes from Inspection 2280 THIS IS A REINSPECTION The stem wall was already inspected. 09-08-2022 Homeowner built a birm at on the slab to reroute water. He will remove it prior to the slab pour. 09-26-2022 1. Valley rafter shoe plate not installed as per drawings. Please submit a revision to the building department or install as per drawings. 2. 1/F interior stud bearing at existing wall calls for dbl top plate. Pleae submit a revision for the blocking and straps used. 3. Provide details of valley rafter and scabbing. 4. Missed T01 & T04. 5. H25 missed at utility room sleepers. Roof sheathing OK and approved. Inspection stopped. Contractor not ready. 10-25-2022 1. Please submit revision Sheet 1 of 2 to the building department for review. 2. Please submit Sheet 1 of 2 1F Typical Block Wall Section. Top plate not installed as per plans. Each truss has one PT. block under each truss. 10-26-2022 1. Please install larger nail plates on the vent in bathroom. 2. Mechanical drawings not on site. 3. Detail 1/3 Typical block wall section not installed as per plan on existing CMU to new trusses. Straps used. Please revise and reflect on drawings. 4. Roof vent not wired and not shown on drawings. Please submit to the bulding department. 5. Please revise and submit to the building department all electrical including the two new outlets added in the existing bedroom. 11-07-2022 Exterior outets grounds need to be connected. All grounds need to be connected – NEC 110.14A. Check at insulation inspection. | |||
| ALL ROUGH | 10/26/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Inspector Notes from Inspection 2460 9/26/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2250 Inspector Notes from Inspection 2280 THIS IS A REINSPECTION The stem wall was already inspected. 09-08-2022 Homeowner built a birm at on the slab to reroute water. He will remove it prior to the slab pour. 09-26-2022 1. Valley rafter shoe plate not installed as per drawings. Please submit a revision to the building department or install as per drawings. 2. 1/F interior stud bearing at existing wall calls for dbl top plate. Pleae submit a revision for the blocking and straps used. 3. Provide details of valley rafter and scabbing. 4. Missed T01 & T04. 5. H25 missed at utility room sleepers. Roof sheathing OK and approved. Inspection stopped. Contractor not ready. 10-25-2022 1. Please submit revision Sheet 1 of 2 to the building department for review. 2. Please submit Sheet 1 of 2 1F Typical Block Wall Section. Top plate not installed as per plans. Each truss has one PT. block under each truss. 10-26-2022 1. Please install larger nail plates on the vent in bathroom. 2. Mechanical drawings not on site. 3. Detail 1/3 Typical block wall section not installed as per plan on existing CMU to new trusses. Straps used. Please revise and reflect on drawings. 4. Roof vent not wired and not shown on drawings. Please submit to the bulding department. 5. Please revise and submit to the building department all electrical including the two new outlets added in the existing bedroom. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/25/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: 9/26/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2250 Inspector Notes from Inspection 2280 THIS IS A REINSPECTION The stem wall was already inspected. 09-08-2022 Homeowner built a birm at on the slab to reroute water. He will remove it prior to the slab pour. 09-26-2022 1. Valley rafter shoe plate not installed as per drawings. Please submit a revision to the building department or install as per drawings. 2. 1/F interior stud bearing at existing wall calls for dbl top plate. Pleae submit a revision for the blocking and straps used. 3. Provide details of valley rafter and scabbing. 4. Missed T01 & T04. 5. H25 missed at utility room sleepers. Roof sheathing OK and approved. Inspection stopped. Contractor not ready. 10-25-2022 1. Please submit revision Sheet 1 of 2 to the building department for review. 2. Please submit Sheet 1 of 2 1F Typical Block Wall Section. Top plate not installed as per plans. Each truss has one PT. block under each truss. | |||
| ROOF VALLEY & METAL | 10/11/2022 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/26/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Inspector Notes from Inspection 2250 Inspector Notes from Inspection 2280 THIS IS A REINSPECTION The stem wall was already inspected. 09-08-2022 Homeowner built a birm at on the slab to reroute water. He will remove it prior to the slab pour. 09-26-2022 1. Valley rafter shoe plate not installed as per drawings. Please submit a revision to the building department or install as per drawings. 2. 1/F interior stud bearing at existing wall calls for dbl top plate. Pleae submit a revision for the blocking and straps used. 3. Provide details of valley rafter and scabbing. 4. Missed T01 & T04. 5. H25 missed at utility room sleepers. Roof sheathing OK and approved. Inspection stopped. Contractor not ready. | |||
| MONOLITHIC SLAB | 09/08/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: Inspector Notes from Inspection 2280 THIS IS A REINSPECTION The stem wall was already inspected. 09-08-2022 Homeowner built a birm at on the slab to reroute water. He will remove it prior to the slab pour. | |||
| STEM WALL FOUNDATION | 09/07/2022 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 09-07-2022 Most of the stem wall has been filled with concrete. Please submit engineering to the building department stating that the work was completed properly. | |||
| STEM WALL FOUNDATION | 09/07/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: THIS IS A REINSPECTION The stem wall was already inspected. | |||
| STEM WALL FOUNDATION | 08/23/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION Please provided a large readable Approved set of drawings for revision. NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. | |||
| STEM WALL FOUNDATION | 08/22/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Please provided a large readable Approved set of drawings for revision. NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. | |||
| STEM WALL FOUNDATION | 08/09/2022 | APPROVED | LMILLER |
| DOWN CELL | 08/05/2022 | APPROVED | LMILLER |
| GRAVITY SEWER TEST | 08/02/2022 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 08/02/2022 | APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION WRONG INSPECTION CALLED, NEEDED GRAVITY SEWER, U-SEWER IS WHEN TAP IS MADE INTO EXISTING SEWER | |||
| U - SEWER TIE IN | 08/01/2022 | Disapproved - NO FEE | MGIBSON |
| Note: WRONG INSPECTION CALLED, NEEDED GRAVITY SEWER, U-SEWER IS WHEN TAP IS MADE INTO EXISTING SEWER,, GRAVITY SEWER APPROVED | |||
| MONOLITHIC SLAB | 07/08/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION Compaction test not posted. | |||
| MONOLITHIC SLAB | 07/07/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Compaction test not posted. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/06/2022 | APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION W/C FITTING IS A HEEL OUTLET 90 DESIGNED FOR VENTING NOT DRAINAGE, FITTING STILL IN PLACE AND HAS TO BE REMOVED TO PASS FIRST ROUGH PLUMBING INSPECTION, FITTING IS DESIGNED FOR VERTICAL TO HORIZONIAL ''ONLY'' AS VENT, AND DRY VENT DOESN'T MEET CRITERIA FOR DRY VENT APPLICATION. CUT HEEL OUT-LET TEE COMPLETELY AND USE A DIFFERENT METHOD OF W/C CONNECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/05/2022 | Disapproved - NO FEE | MGIBSON |
| Note: THIS IS A REINSPECTION W/C FITTING IS A HEEL OUTLET 90 DESIGNED FOR VENTING NOT DRAINAGE, FITTING STILL IN PLACE AND HAS TO BE REMOVED TO PASS FIRST ROUGH PLUMBING INSPECTION, FITTING IS DESIGNED FOR VERTICAL TO HORIZONIAL ''ONLY'' AS VENT, AND DRY VENT DOESN'T MEET CRITERIA FOR DRY VENT APPLICATION. CUT HEEL OUT-LET TEE COMPLETELY AND USE A DIFFERENT METHOD OF W/C CONNECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/01/2022 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: W/C FITTING IS A HEEL OUTLET 90 DESIGNED FOR VENTING NOT DRAINAGE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 11/04/2022 | 11/04/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 11/03/2022 | 11/04/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 11/03/2022 | 11/04/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/31/2022 | 10/31/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/31/2022 | 10/31/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Unable to draw on engineered drawings. Provide layout without engineered seal | |||
| BLD | COMPLETE | 10/25/2022 | 10/26/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 10/25/2022 | 10/27/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/19/2022 | 10/24/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/03/2022 | 10/03/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/01/2022 | 08/02/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/20/2022 | 08/01/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/14/2022 | 06/15/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/14/2022 | 06/15/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/14/2022 | 06/15/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/14/2022 | 06/21/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/07/2022 | 06/07/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: Repeat Comment 1. Typical Detail 1/F on Sheet calls-out 2 x 6 rafters. Truss drawings where submitted for the same roof. A revise plans to reflect the correct roof framing method used. Provide which is to be installed. FBC [A] 107.3 2. Provide a Roof Framing Plan. The Roofing Plan was removed from the drawings. FBC [A] 107.3. | |||
| ZON | HOLD | 06/07/2022 | 06/07/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM You submitted two site plans. They do not match. One doesn't show setbacks and the storage area. The other doesn't have all the dimensions. Please submit one site plan with all this information for approval. It must match plans submitted and have dimensions and setbacks of addition and concrete patio. | |||
| PLFM | COMPLETE | 06/07/2022 | 06/07/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM According to the Revised Site Plan submitted on 6/6/22, the addition does not fall within the SFHA. No elevation certificates are required. | |||
| ENGIN1 | COMPLETE | 06/07/2022 | 06/07/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/07/2022 | 06/14/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/20/2022 | 05/23/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code – Residential REVIEW COMMENTS: Repeat Comment 1. Roof Framing Plan calls-out 2 x 6 rafters. Truss drawings where submitted for the same roof. A revise plans to reflect the correct roof framing method used. FBC [A] 107.3 | |||
| ELEC | COMPLETE | 05/20/2022 | 05/23/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/20/2022 | 05/23/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan/survey must show the dimensions of addition and the uncovered patio addition with the setback from that concrete slab to rear property line | |||
| PLFM | HOLD | 05/20/2022 | 05/23/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Please provide updated site plan that shows the flood zone line on the property (3rd request). Staff provided Long Surveying, Inc. with the correct Elevation Certificate form to complete. | |||
| ELEC | HOLD | 05/17/2022 | 05/17/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit new electrical plan | |||
| ZON | HOLD | 05/17/2022 | 05/17/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: Please provide side and rear setbacks from the proposed addition to property lines on site plan for review Windows and doors facing canal must have banding. Plans must show this | |||
| PLFM | HOLD | 05/17/2022 | 05/17/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Please provide updates site plan that shows the flood zone line on the property. What was submitted was not a complete elevation certificate, please submit a complete elevation certificate on the correct form. | |||
| BLD | HOLD | 05/17/2022 | 05/17/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code – Residential REVIEW COMMENTS: 1. Roof Framing Plan calls-out 2 x 6 rafters. Truss drawings where submitted for the same roof. Provide if raters are to be conventionally framed or truss system is to be installed. FBC [A] 107.3 2. Provide Product Approval for wood connectors and wood anchors. Per F.S. 471.025 and F.A.C. 61 G15-23.005.Roofing Worksheet per City's requirement. Repeat Comment | |||
| PLFM | HOLD | 03/31/2022 | 03/31/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Please provide updates site plan that shows the flood zone line on the property. If this addition is part of the livable structure and falls inside the Special Flood Hazard Area, elevation certificates are required. Construction, foundation, and final. | |||
| BLD | HOLD | 03/30/2022 | 03/31/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code – Residential REVIEW COMMENTS: 1. Proposed 2 x 6 SYP #2 rafters, appear over spanned per the 2018 Wood Frame Construction Manual. A revision is required. FC 107 2. Provide Product Approval for wood connectors and wood anchors. Per F.S. 471.025 and F.A.C. 61 G15-23.005. | |||
| ELEC | HOLD | 03/30/2022 | 03/30/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. List electrical sub contractor 2. Need correct outlet spacing in bedroom. NEC 2017 210.52 3. Outlet in bathroom need to be GFCI protected. NEC 2017 210.8 4. Need smoke alarm inside and outside of bedroom. FRC 2020 314.3 & 315.1 5. Need to show size of existing service and prove that it can accomondate the new addition. NEC 2017 220.83 | |||
| MECH | COMPLETE | 03/30/2022 | 03/30/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLUM | CANCEL | 03/30/2022 | 04/01/2022 |
| SW1 | COMPLETE | 03/30/2022 | 04/05/2022 |
| Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 03/30/2022 | 03/31/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide side and rear setbacks from the proposed addition to property lines on site plan for review Windows and doors facing canal must have banding. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 01/20/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 01/20/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 01/20/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 01/20/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 01/20/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 01/20/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/20/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 01/20/2023 |
| SURCHARGE FS 533.721 | ¤4.87 | 06/27/2022 |
| SURCHARGE - FS 468.631 | ¤7.31 | 06/27/2022 |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/27/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/27/2022 |
| SITE PLAN 30 | ¤30.00 | 06/27/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/27/2022 |
| INSPECTION - RESIDENTIAL | ¤415.25 | 06/27/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤117.78 | 06/27/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 06/27/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 06/27/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤980.21 |