Permit #2022040300
Permit Details
Status: FINAL
| Parcel Id: 48-11-31-1710-00000-1270 |
| CONDITIONED SPACE: 2255 sqft |
| GARAGE: 612 sqft |
| OPENED PORCH (WITH ROOF) : 380 sqft |
| OPENED PORCH (WITH ROOF) : 100 sqft |
| OPENED PORCH (WITH ROOF) : 100 sqft |
| Total Square Footage: 3447 sqft |
| Block: 00000 |
| Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II |
| Job Phone: 386-527-5887 |
| Location Address: 13 TURKEY OAK LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/08/2022 |
| NOC: RECORDED |
| Applicant name: DAVID A DIXON |
| Owner: BENNETT FRANCES |
|
Address 17 DEBRA LANE PALM COAST, FL 32137 |
| Lot: 1270 |
| Contracted Stated Job Value: ¤525,000.00 |
| Job Description: Single family residence |
| Type: CN |
Contractor
DAVID DIXON CUSTOM HOMES & REMODELING INC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
DAVID A DIXON PALM COAST, FL 32137 |
263 BEACHWAY DRIVE PALM COAST, FL 32137 |
CBC1258501 (Exp: 08/31/2026) | 386-527-5887 |
Sub Contractors
THOMAS WALTER ALBANO
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P. O. BOX 352075 Palm Coast, FL 32135 |
CFC045991 (Exp: 08/31/2024) | 386-437-2795 | (386)437-2781 |
STEVEN DUANE DENSLOW
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
317 RIO PINR DR Ormond Beach, FL 32174 |
EC0001678 (Exp: 08/31/2026) | 386-233-1553 | 386-673-5994 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
LEONARD E GASPARY
| Status | Location Address | Phone | Fax |
| INACTIVE |
400 NORTH US HWY #1 ORMOND BEACH, FL 32174 |
(386)672-8494 | (386)673-7856 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/18/2023 | FINAL APPROVED | TSTAUFFACHER |
| Note: 7/14/2023 - PREVIOUS INSPECTION NOTES 07-14-2023 1. AHU in attic workspace not as per code.WORKING SPACE for electric equipment…. E3405.2 36in. MINIMUM DEPTH AND 30in. MINIMUM WIDTH OR THE WIDTH OF THE EQUIPMENT (WICH EVER IS GREATER) THE WORK SPACE SHALL BE CLEAR AND EXTEND FROM THE FLOOR OR PLATFORM TO A HIGHT OD 6.5ft OR THE HIGHT OF THE EQUIPMENT, WHICHEVER IS GREATER 2. Back right bathrrom vanity lights do not work. 3. AHU and electrical panel breakers do not match. 4. Garage attic light not installed, wire is not cut in. 5. Holes in garage. HOLES IN CEILING MUST BE SEALED: FBC ENERGY CONSERVATION RESIDENTIAL PROVISIONS CHAPTER 4- R402.4.1 BUILDING THERMAL ENVELOPE Inspection stopped. | |||
| ROW - STORMWATER FINAL | 07/14/2023 | APPROVED - AS NOTED | RGROSS |
| Note: On site with the construction manager (Kevin Howell). Great job on the Final Grade! | |||
| U -UTILITY RESIDENTIAL FINAL | 07/14/2023 | FINAL APPROVED | LFITZGERALD |
| BLD - BUILDING FINAL | 07/14/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 07-14-2023 1. AHU in attic workspace not as per code.WORKING SPACE for electric equipment…. E3405.2 36in. MINIMUM DEPTH AND 30in. MINIMUM WIDTH OR THE WIDTH OF THE EQUIPMENT (WICH EVER IS GREATER) THE WORK SPACE SHALL BE CLEAR AND EXTEND FROM THE FLOOR OR PLATFORM TO A HIGHT OD 6.5ft OR THE HIGHT OF THE EQUIPMENT, WHICHEVER IS GREATER 2. Back right bathrrom vanity lights do not work. 3. AHU and electrical panel breakers do not match. 4. Garage attic light not installed, wire is not cut in. 5. Holes in garage. HOLES IN CEILING MUST BE SEALED: FBC ENERGY CONSERVATION RESIDENTIAL PROVISIONS CHAPTER 4- R402.4.1 BUILDING THERMAL ENVELOPE Inspection stopped. | |||
| WATER METER INSTALLATION REQUEST | 07/13/2023 | APPROVED | CSTONE |
| U-CROSS CONNECTION | 07/13/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has reclaim irrigation-no cross connection | |||
| ELEVATION CERTIFICATE-FINAL APPROVAL | 07/13/2023 | APPROVED | JMYERS |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/10/2023 | APPROVED | GBERTOLA |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/10/2023 | APPROVED | GBERTOLA |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW - FINAL APRON (AFTER POUR) | 07/10/2023 | APPROVED | GBERTOLA |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/21/2023 | APPROVED | PFLANAGAN |
| Note: LOOKS GOOD AT THIS TIME READY TO POUR DRIVEWAY AND PAVER RESTRAINTS FOR THE DECORATIVE PAVER ON THE EDGE OF DRIVEWAY | |||
| ROW- PAVER RESTRAINTS | 06/21/2023 | APPROVED | PFLANAGAN |
| Note: READY TO POUR FOR THE PAVER RESTRAINTS FOR THE DECORTIVE PAVERS ON THE SIDES OF DRIVEWAY | |||
| ELECTRIC - EARLY POWER | 05/17/2023 | APPROVED - AS NOTED | TSTAUFFACHER |
| Note: Approved/ Release to FPL at 1:17 PM Inspector Notes from Inspection 2200 10/27/2022 - PREVIOUS INSPECTION NOTES Service conduit must bne Schedule 80 PVC. NEC 2017 300.5 11.15.22 - Notification sent to FPL | |||
| GRAVITY SEWER TEST | 05/10/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 05/10/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 03/28/2023 | APPROVED | TSTAUFFACHER |
| INSULATION | 02/17/2023 | APPROVED | TSTAUFFACHER |
| Note: 2/15/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2420 Check door and window install at insulation//A few missing at time of all rough 02/15/2023 Install windows that are on site and cover missing slider area Insulation installers on site and just started at time of arrival | |||
| INSULATION | 02/15/2023 | Disapproved -FEE REQUIRED | TSTAUFFACHER |
| Note: Inspector Notes from Inspection 2420 Check door and window install at insulation//A few missing at time of all rough 02/15/2023 Install windows that are on site and cover missing slider area Insulation installers on site and just started at time of arrival | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/13/2023 | APPROVED | TSTAUFFACHER |
| Note: 2/1/2023 - PREVIOUS INSPECTION NOTES Need Engineering repair for broken truss T13 Missing ties from load bearing wall to block detail-plans are not labeled Detail and expose area where garage gable conventional framing ties in to truss roof Knee wall tiedown detail for over slider missing Missing gable end bracing over entry | |||
| ALL ROUGH | 02/13/2023 | APPROVED - AS NOTED | TSTAUFFACHER |
| Note: Check door and window install at insulation//A few missing at time of all rough | |||
| WALL SHEATHING | 02/01/2023 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/01/2023 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Need Engineering repair for broken truss T13 Missing ties from load bearing wall to block detail-plans are not labeled Detail and expose area where garage gable conventional framing ties in to truss roof Knee wall tiedown detail for over slider missing Missing gable end bracing over entry | |||
| ELECTRIC-TUG | 11/15/2022 | APPROVED - AS NOTED | DCUSHING |
| Note: 10/27/2022 - PREVIOUS INSPECTION NOTES Service conduit must bne Schedule 80 PVC. NEC 2017 300.5 11.15.22 - Notification sent to FPL | |||
| ROOF VALLEY & METAL | 11/08/2022 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2460 11-01-2022 Inspection is for roof sheathing only. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/01/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: 11-01-2022 Inspection is for roof sheathing only. | |||
| FOUND SURVEY APPROVED (OFFICE) | 10/31/2022 | APPROVED | TBAKER |
| ELECTRIC-TUG | 10/27/2022 | Disapproved -FEE REQUIRED | JMUNSON |
| Note: Service conduit must bne Schedule 80 PVC. NEC 2017 300.5 | |||
| ELEV CERT-FOUNDATION APPROVAL | 10/26/2022 | APPROVED | DRAMIREZ |
| TIE BEAM / LINTEL | 09/09/2022 | APPROVED | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Cancelled per Dave 9-6-22 1. Clearance from masonry FBC, R606.3.4 minimum wall reinforcing steel coverage not met (.75 inch) 2. FBC, R606.3.5.3 (3) CELLS CONTAINING REINFORCEMENT SHALL BE FILLED SOLIDLY WITH GROUT. (soil in cells) 3. missing dowels (drill and epoxy) see orange paint for all 9.7.22 - Some epoxied dowels did not adhere. Follow epoxy manufactureres instructions, blow holes out before epoxying dowels in Dirt still in some cells 9-8-22 1. Aditional gradwork has been performed and not the cells on each side t=of the window between the garage and entry have soil in them. 2. The drilled and epoxied verticle bar on right side close to rear was not drilled deep enough to meet the minimum required, and the hole was not blown out therfore the concrete dust did not allow the epoxy to adhere 9-9-22 notes above resolved | |||
| TIE BEAM / LINTEL | 09/08/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Cancelled per Dave 9-6-22 1. Clearance from masonry FBC, R606.3.4 minimum wall reinforcing steel coverage not met (.75 inch) 2. FBC, R606.3.5.3 (3) CELLS CONTAINING REINFORCEMENT SHALL BE FILLED SOLIDLY WITH GROUT. (soil in cells) 3. missing dowels (drill and epoxy) see orange paint for all 9.7.22 - Some epoxied dowels did not adhere. Follow epoxy manufactureres instructions, blow holes out before epoxying dowels in Dirt still in some cells 9-8-22 1. Aditional gradwork has been performed and not the cells on each side t=of the window between the garage and entry have soil in them. 2. The drilled and epoxied verticle bar on right side close to rear was not drilled deep enough to meet the minimum required, and the hole was not blown out therfore the concrete dust did not allow the epoxy to adhere | |||
| TIE BEAM / LINTEL | 09/07/2022 | Disapproved -FEE REQUIRED | DCUSHING |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION Cancelled per Dave 9-6-22 1. Clearance from masonry FBC, R606.3.4 minimum wall reinforcing steel coverage not met (.75 inch) 2. FBC, R606.3.5.3 (3) CELLS CONTAINING REINFORCEMENT SHALL BE FILLED SOLIDLY WITH GROUT. (soil in cells) 3. missing dowels (drill and epoxy) see orange paint for all 9.7.22 - Some epoxied dowels did not adhere. Follow epoxy manufactureres instructions, blow holes out before epoxying dowels in Dirt still in some cells | |||
| TIE BEAM / LINTEL | 09/06/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION Cancelled per Dave 9-6-22 1. Clearance from masonry FBC, R606.3.4 minimum wall reinforcing steel coverage not met (.75 inch) 2. FBC, R606.3.5.3 (3) CELLS CONTAINING REINFORCEMENT SHALL BE FILLED SOLIDLY WITH GROUT. (soil in cells) 3. missing dowels (drill and epoxy) see orange paint for all | |||
| TIE BEAM / LINTEL | 09/02/2022 | CANCELLED BY APPLICANT | AGAETANO |
| Note: THIS IS A REINSPECTION Cancelled per Dave | |||
| TIE BEAM / LINTEL | 09/01/2022 | CANCELLED BY APPLICANT | LMILLER |
| Note: Cancelled per Dave | |||
| MONOLITHIC SLAB | 07/18/2022 | APPROVED | AGAETANO |
| PLUMBING 1ST ROUGH UNDERGROUND | 06/15/2022 | APPROVED | MGIBSON |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 04/17/2024 | 04/17/2024 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Please submit termite certificate. | |||
| PLFM | COMPLETE | 07/13/2023 | 07/13/2023 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved. | |||
| PLFM | HOLD | 07/12/2023 | 07/12/2023 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM Per the new elevation certificate instructions, BFE in B9 needs to be written to the nearest tenth of a foot. According to the final survey, there are lower elevations than 10.1 adjacent to the building. Make sure C2f is noting the lowest adjacent grade. | |||
| PLFM | HOLD | 07/07/2023 | 07/10/2023 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM A new elevation certificate has been release by FEMA and must be used as well as new instructions on how to fill it out. | |||
| MECH | COMPLETE | 01/23/2023 | 01/23/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 10/26/2022 | 10/26/2022 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/11/2022 | 10/11/2022 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 10/11/2022 | 10/11/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM As mentioned in previous comment, B9 needs to have a measurement mark for the Base Flood Elevation, 8.0' would be acceptable. Please revise elevation certificate. | |||
| SW1 | COMPLETE | 10/11/2022 | 10/18/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 05/11/2022 | 05/11/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Construction elevation certificate has been accepted. However, if B9 is not formatted as 8.0' on the Foundation elevation certificate, it will not be approved. | |||
| PLFM | HOLD | 05/04/2022 | 05/04/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM B1 still has incorrect information the community number is not 120085 it is 120684. B9 needs to be 8.0' | |||
| SW1 | COMPLETE | 05/04/2022 | 05/11/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/04/2022 | 05/04/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/04/2022 | 05/04/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/20/2022 | 04/20/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 04/18/2022 | 04/18/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/18/2022 | 04/19/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/18/2022 | 04/18/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM Please Provide the front set back from the garage to the closest distance to front property line. | |||
| PLFM | HOLD | 04/18/2022 | 04/18/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The same elevation certificate was submitted, comments not addressed. A8 a,b,c need to be N/A not 0. A9 b,c need to be N/A not 0. B1 is missing the community number. B9 needs to be 8.0' . Section D needs to be signed in the space provided as well as in the seal box. | |||
| SW1 | HOLD | 04/18/2022 | 04/25/2022 |
| Note: Held By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM NEED TO READ INPECTORS NOTES FROM FIRST SW1 THERE ARE NO PROPOSED ELEVATION ON SITE PLAN | |||
| PLFM | HOLD | 04/08/2022 | 04/08/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The following comments are in regards to the Elevation Certificate: A8 a,b,c need to be N/A not 0. A9 b,c need to be N/A not 0. B1 is missing the community number. B9 needs to be 8.0' . Section D needs to be signed in the space provided as well as in the seal box. | |||
| BLD | HOLD | 04/07/2022 | 04/07/2022 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM 1. Plan sheet S-1: a. Plan incorrectly named foundation plan and roof framing plan. Revise for clarity per FBC 7th Ed. Sec. 107.3. 2. Product approval specification sheet per F.S. 553.842: a. FL 10674 - R15 indicates asphalt shingles and manufactured by Tamko. The FL number given is made by Owens Corning. Please clarify. b. Provide FL number for truss plates. 3. Roofing Worksheet: a. Provide Correct Form for Asphalt Shingles available at City's website. | |||
| CUSVC | COMPLETE | 04/07/2022 | 04/12/2022 |
| Note: Released By: ALYSSA ROSCOE - - | |||
| ELEC | HOLD | 04/07/2022 | 04/07/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in Nook. NEC 2017 210.52 2. Need smoke alarms outside of all bedrooms. FRC 2020 314 & 315 3. Outlets in garage and laundry need to be GFCI protected. NEC 2017 210.8 4. Electric load calcs do not match the square footage of the house. | |||
| ENGIN1 | COMPLETE | 04/07/2022 | 04/08/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 04/07/2022 | 04/11/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/07/2022 | 04/07/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 04/07/2022 | 04/11/2022 |
| Note: Held By: KALEN RUTH - (386)566-1273 - KRUTH@PALMCOASTGOV.COM there are no proposed elevations to show drainage and no flow arrows | |||
| ZON | HOLD | 04/07/2022 | 04/08/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM On site plan and survey submitted the A/C pad is missing.Please add it to match landscape and floor plan | |||
| URB | COMPLETE | 04/07/2022 | 04/08/2022 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/18/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/18/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/18/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/18/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/18/2023 |
| CONNECTION FEES | ¤25.00 | 06/08/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 06/08/2022 |
| IMPACT FEE FIRE | ¤388.65 | 06/08/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 06/08/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/08/2022 |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | 06/08/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 06/08/2022 |
| SURCHARGE FS 533.721 | ¤15.42 | 06/08/2022 |
| SURCHARGE - FS 468.631 | ¤23.14 | 06/08/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/08/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/08/2022 |
| SW ENG PRE APRON | ¤30.00 | 06/08/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/08/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/08/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤96.72) | 06/08/2022 |
| SEWER INSPECTION | ¤25.00 | 06/08/2022 |
| SITE PLAN 30 | ¤30.00 | 06/08/2022 |
| WATER-METER | ¤467.09 | 06/08/2022 |
| WATER-METER | ¤388.04 | 06/08/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/08/2022 |
| INSPECTION - RESIDENTIAL | ¤1,443.75 | 06/08/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤409.50 | 06/08/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤11,922.69 |