I want to search for...

Permit #2022040448

Permit Details

Status: COED

Parcel Id: 27-11-31-5906-00000-0040
CONDITIONED SPACE: 2808 sqft
ALUMINUM ENCLOSURE (SCREEN ROOF) : 396 sqft
OPENED PORCH (WITH ROOF) : 56 sqft
GARAGE: 621 sqft
GARAGE: 133 sqft
Total Square Footage: 4014 sqft
Block: 00000
Subdivision: 1211 - VILLAGE J-3 AT GRAND HAVEN
Job Phone: 386-445-2012
Location Address: 9 EASTLAKE DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 04/22/2022
NOC: RECORDED
Applicant name: JOHN NICHOLAS CORDASCI
Owner: VOIGHT TIM M & JO ANN H VOIGHT H&W

Address

9 EASTLAKE DRIVE

PALM COAST, FL 32137

Lot: 0040
Contracted Stated Job Value: ¤556,617.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SKYWAY BUILDERS INC
Status Location Address State License Number Phone
INACTIVE

PO BOX 354786

PALM COAST, FL 32135

CBC1263769 (Exp: 08/31/2024) 386-445-2012

Sub Contractors

MARK JOHN LUTCZA
Status Location Address State License Number Phone
ACTIVE

26 ROYAL LEAF LANE

PALM COAST, FL 32164

EC13005145 (Exp: 08/31/2026) 386-586-0770
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001
RICHARD GARY WILSON JR
Status Location Address Mailing Address State License Number Phone
ACTIVE

1504 OLD MOODY BLVD

BUNNELL, FL 32110

UNIT 6

BUNNELL, FL 32110

CAC1817645 (Exp: 08/31/2026) 386-586-6290
MARK B SOWERS
Status Location Address State License Number Phone
ACTIVE

609 FOURTH ST

BUNNELL, FL 32110

35616 (Exp: 08/31/2026) 386-225-1753

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/02/2024 FINAL APPROVED RSIMS
Note: 2/1/2024 - PREVIOUS INSPECTION NOTES 2/1/24: Cancelled by Applicant. 1/31/2024 - PREVIOUS INSPECTION NOTES 01-30-2024 1. Gas final not approved. 2. Electrical panels have both Eaton and Square D breakers installed. Homeline panels installed. Please provide documentation that Eaton breakers can be installed. Please submit to the building department.
BLD - BUILDING FINAL 02/01/2024 CANCELLED BY APPLICANT RSIMS
Note: 2/1/24: Cancelled by Applicant. 1/31/2024 - PREVIOUS INSPECTION NOTES 01-30-2024 1. Gas final not approved. 2. Electrical panels have both Eaton and Square D breakers installed. Homeline panels installed. Please provide documentation that Eaton breakers can be installed. Please submit to the building department.
BLD - BUILDING FINAL 01/31/2024 Disapproved - NO FEE AGAETANO
Note: 01-30-2024 1. Gas final not approved. 2. Electrical panels have both Eaton and Square D breakers installed. Homeline panels installed. Please provide documentation/ manufactuter's specs that Eaton breakers can be installed in a Homeline panel. Please submit to the building department and have on site.
U-CROSS CONNECTION 01/31/2024 APPROVED - AS NOTED LFITZGERALD
Note: has potable irrigation with PVB -no cross connection
GAS FINAL 01/31/2024 FINAL APPROVED MGIBSON
ROW - FINAL APRON (AFTER POUR) 01/31/2024 APPROVED - AS NOTED FSLADISH
Note: 1/31/24 PAVERS GLUED, NO DAMAGE, SIDEWALK GOOD. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 1/30/24 UPON CONDUCTIG FIELD SURVEY FOUND MULCH ALONG THE LEFT SIDE PROPERTY LINE WHERE THE DRAINAGE CONVEYANCE RUNS. GOING TO SPEAK TO GABE AND/OR ROBERT TO FIND OUT IF THIS IS ACCEPTABLE. COPC USUALLY DOES NOT ALLOW LANDSCAPING IN ANY DRAINAGE CONVEYANCE. I AM GOING TO APPROVE THIS FIELD SURVEY AS NOTED SO THAT THEY MAY MOVE FORWARD WITH INSPECTIONS WHILE WE MAKE A DETERMINATION REGARDING THE DRAINAGE CONVEYANCE . SPOKE WITH JOHN THE CM AND WE AGREED THAT WE WOULD INVESTIGATE THIS ISSUE. PHOTO FOR REFERENCE.
ROW - STORMWATER FINAL 01/31/2024 APPROVED - AS NOTED FSLADISH
Note: 1/31/24 CORRECTION MADE. SOD ALONG COMMON SWALE AREA. EVERYTHING MEETS COPC MINIMUM STANDARDS AT THE TIME OF THIS ROW FINAL INSPECTION.At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 1/30/24 UPON CONDUCTIG FIELD SURVEY FOUND MULCH ALONG THE LEFT SIDE PROPERTY LINE WHERE THE DRAINAGE CONVEYANCE RUNS. GOING TO SPEAK TO GABE AND/OR ROBERT TO FIND OUT IF THIS IS ACCEPTABLE. COPC USUALLY DOES NOT ALLOW LANDSCAPING IN ANY DRAINAGE CONVEYANCE. I AM GOING TO APPROVE THIS FIELD SURVEY AS NOTED SO THAT THEY MAY MOVE FORWARD WITH INSPECTIONS WHILE WE MAKE A DETERMINATION REGARDING THE DRAINAGE CONVEYANCE . SPOKE WITH JOHN THE CM AND WE AGREED THAT WE WOULD INVESTIGATE THIS ISSUE. PHOTO FOR REFERENCE.
U -UTILITY RESIDENTIAL FINAL 01/31/2024 FINAL APPROVED LFITZGERALD
ROW FIELD SURVEY /GRADING CERTIFICATION 01/30/2024 APPROVED - AS NOTED FSLADISH
Note: 1/30/24 UPON CONDUCTIG FIELD SURVEY FOUND MULCH ALONG THE LEFT SIDE PROPERTY LINE WHERE THE DRAINAGE CONVEYANCE RUNS. GOING TO SPEAK TO GABE AND/OR ROBERT TO FIND OUT IF THIS IS ACCEPTABLE. COPC USUALLY DOES NOT ALLOW LANDSCAPING IN ANY DRAINAGE CONVEYANCE. I AM GOING TO APPROVE THIS FIELD SURVEY AS NOTED SO THAT THEY MAY MOVE FORWARD WITH INSPECTIONS WHILE WE MAKE A DETERMINATION REGARDING THE DRAINAGE CONVEYANCE . SPOKE WITH JOHN THE CM AND WE AGREED THAT WE WOULD INVESTIGATE THIS ISSUE. PHOTO FOR REFERENCE.
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/29/2024 APPROVED FSLADISH
Note: Inspector Notes from Inspection 9270 1/19/24 SIDEWALK IS READY TO POUR AT THE TIME OF THIS INSPECTION. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 12/11/23 SPREAD AND COMPACTION COMPLETE READY FOR PAVERS ______________________________________________________________________________ 11/27/2023 - PREVIOUS INSPECTION NOTES 11/27/23 DRIVEWAY APRON AND PAVER RESTAINTS ARE READY TO BE POURED AT THE TIME OF THIS INSPECTION. DO NOT LAY ANY PAVERS UNTIL SPREAD AND COMPACTION INSPECTION HAS PASSED. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. ___________________________________________________________________________________________________________________________ 11/22/2023 - PREVIOUS INSPECTION NOTES
GAS ROUGH 01/26/2024 APPROVED BTAYLOR
ROW- PRE-APRON (PRE-POUR) 01/19/2024 APPROVED - AS NOTED FSLADISH
Note: 1/19/24 SIDEWALK IS READY TO POUR AT THE TIME OF THIS INSPECTION. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 12/11/23 SPREAD AND COMPACTION COMPLETE READY FOR PAVERS ______________________________________________________________________________ 11/27/2023 - PREVIOUS INSPECTION NOTES 11/27/23 DRIVEWAY APRON AND PAVER RESTAINTS ARE READY TO BE POURED AT THE TIME OF THIS INSPECTION. DO NOT LAY ANY PAVERS UNTIL SPREAD AND COMPACTION INSPECTION HAS PASSED. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. ___________________________________________________________________________________________________________________________ 11/22/2023 - PREVIOUS INSPECTION NOTES
ROW- PRE-APRON (PRE-POUR) 12/11/2023 APPROVED - AS NOTED TPOLACEK
Note: 12/11/23 SPREAD AND COMPACTION COMPLETE READY FOR PAVERS ______________________________________________________________________________ 11/27/2023 - PREVIOUS INSPECTION NOTES 11/27/23 DRIVEWAY APRON AND PAVER RESTAINTS ARE READY TO BE POURED AT THE TIME OF THIS INSPECTION. DO NOT LAY ANY PAVERS UNTIL SPREAD AND COMPACTION INSPECTION HAS PASSED. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. ___________________________________________________________________________________________________________________________ 11/22/2023 - PREVIOUS INSPECTION NOTES
ROW- PRE-APRON (PRE-POUR) 11/27/2023 PARTIALLY APPROVED FSLADISH
Note: 11/27/23 DRIVEWAY APRON AND PAVER RESTAINTS ARE READY TO BE POURED AT THE TIME OF THIS INSPECTION. DO NOT LAY ANY PAVERS UNTIL SPREAD AND COMPACTION INSPECTION HAS PASSED. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. ___________________________________________________________________________________________________________________________ 11/22/2023 - PREVIOUS INSPECTION NOTES
ROW- PAVER RESTRAINTS 11/27/2023 APPROVED FSLADISH
Note: 11/27/23 PAVER RESTAINTS ARE READY TO BE POURED AT THE TIME OF THIS INSPECTION. DO NOT LAY ANY PAVERS UNTIL SPREAD AND COMPACTION INSPECTION HAS PASSED. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. 11/22/2023 - PREVIOUS INSPECTION NOTES
ROW- PAVER RESTRAINTS 11/22/2023 CANCELLED BY APPLICANT FSLADISH
ROW- PRE-APRON (PRE-POUR) 11/22/2023 CANCELLED BY APPLICANT FSLADISH
GRAVITY SEWER TEST 11/06/2023 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 THIS IS A REINSPECTION 2'' P-TRAP INSIDE OF PANTRY AREA NEEDS TO HAVE A TRAP PRIMER INSTALLED , WHERE SECONDARY REFRIDGERATOR WILL BE . LINE GOING TO PANTRY AREA HAS BEEN CAP OFF THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 11/06/2023 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2075 Inspector Notes from Inspection 2060 THIS IS A REINSPECTION 2'' P-TRAP INSIDE OF PANTRY AREA NEEDS TO HAVE A TRAP PRIMER INSTALLED , WHERE SECONDARY REFRIDGERATOR WILL BE . LINE GOING TO PANTRY AREA HAS BEEN CAP OFF THIS WAS A VIRTUAL INSPECTION
ELECTRIC - EARLY POWER 05/26/2023 APPROVED - AS NOTED BTAYLOR
Note: Inspector Notes from Inspection 2200 3-28-23 1. Emailed FPL at 11:37. 5-26-23 1. Emailed FPL at 2:26.
INSULATION 03/29/2023 APPROVED BTAYLOR
Note: 3/28/2023 - PREVIOUS INSPECTION NOTES
INSULATION 03/28/2023 CANCELLED BY APPLICANT BTAYLOR
ELECTRIC-TUG 03/28/2023 APPROVED - AS NOTED BTAYLOR
Note: 3-28-23 1. Emailed FPL at 11:37.
GAS ROUGH 03/21/2023 APPROVED MGIBSON
LATH/BRICK/ WATER BARRIER 03/15/2023 APPROVED TSTAUFFACHER
ALL ROUGH 03/07/2023 APPROVED BTAYLOR
WALL SHEATHING 12/13/2022 APPROVED LMILLER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/13/2022 APPROVED - AS NOTED LMILLER
Note: PiggyBack trusses not attached per plans (see highlighted)
ROOF VALLEY & METAL 12/13/2022 APPROVED LMILLER
ROOF VALLEY & METAL 12/12/2022 CANCELLED BY APPLICANT WEB
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/12/2022 CANCELLED BY APPLICANT WEB
WALL SHEATHING 12/12/2022 CANCELLED BY APPLICANT WEB
FOUND SURVEY APPROVED (OFFICE) 12/09/2022 APPROVED TBAKER
ROW - DRAINAGE 10/12/2022 APPROVED RGROSS
Note: 10/5/2022 - PREVIOUS INSPECTION NOTES NEED TO RE ESTABLISH SILT FENCE AROUND THE ENTIRE CONSTRUCTION SITE INCLUDING THE FRONT ON BOTH SIDES OF TEMP. DRIVEWAY NEED TO CLEAN ALL SAND THAT HAS WASHED DOWN THE CURB AND GUTTER IN FRONT OF ADDRESS #11 NEXT INSPECTION 10/12/22
ROW - DRAINAGE 10/05/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: NEED TO RE ESTABLISH SILT FENCE AROUND THE ENTIRE CONSTRUCTION SITE INCLUDING THE FRONT ON BOTH SIDES OF TEMP. DRIVEWAY NEED TO CLEAN ALL SAND THAT HAS WASHED DOWN THE CURB AND GUTTER IN FRONT OF ADDRESS #11 NEXT INSPECTION 10/12/22
TIE BEAM / LINTEL 09/21/2022 APPROVED LMILLER
MONOLITHIC SLAB 08/22/2022 APPROVED DCUSHING
PLUMBING 1ST ROUGH UNDERGROUND 08/16/2022 APPROVED - AS NOTED MGIBSON
Note: THIS IS A REINSPECTION 2'' P-TRAP INSIDE OF PANTRY AREA NEEDS TO HAVE A TRAP PRIMER INSTALLED , WHERE SECONDARY REFRIDGERATOR WILL BE . LINE GOING TO PANTRY AREA HAS BEEN CAP OFF
PLUMBING 1ST ROUGH UNDERGROUND 08/15/2022 Disapproved - NO FEE MGIBSON
Note: 2'' P-TRAP INSIDE OF PANTRY AREA NEEDS TO HAVE A TRAP PRIMER INSTALLED , WHERE SECONDARY REFRIDGERATOR WILL BE
STEM WALL FOUNDATION 07/20/2022 APPROVED DCUSHING
Note: Inspector Notes from Inspection 2270 2 sides stem reataining wall
FOOTER 07/05/2022 APPROVED - AS NOTED DCUSHING
Note: 2 sides stem reataining wall
WATER METER INSTALLATION REQUEST 04/26/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 01/26/2024 01/29/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 01/25/2024 01/25/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 01/24/2024 01/25/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
GAS COMPLETE 01/24/2024 01/25/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON HOLD 01/24/2024 01/25/2024
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please show LP tank on site plan (it should have been shown on the previously approved site plan) along with the setbacks from the tank to side property line.
ENGIN1 COMPLETE 12/08/2022 12/09/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/08/2022 12/08/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 06/27/2022 06/27/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD COMPLETE 04/11/2022 04/11/2022
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
CUSVC COMPLETE 04/11/2022 04/14/2022
Note: Released By: ALYSSA ROSCOE - -
ELEC COMPLETE 04/11/2022 04/11/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/11/2022 04/11/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 04/11/2022 04/11/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 04/11/2022 04/11/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 04/11/2022 04/18/2022
Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 04/11/2022 04/11/2022
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM
URB COMPLETE 04/11/2022 04/13/2022
Note: Released By: JOHN BEAUDET - (386)986-2456 -

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 01/31/2024
SW ENG - INSPECTION 20 ¤20.00 01/31/2024
SW ENG - INSPECTION 20 ¤20.00 01/31/2024
SW ENG INSPECTION 80 ¤80.00 04/22/2022
SW ENG PRE APRON ¤30.00 04/22/2022
SW ENG - REVIEW 20 ¤20.00 04/22/2022
SW ENG RES REVIEW 200 ¤200.00 04/22/2022
3% TRANS IMPACT FEE CREDIT (¤96.72) 04/22/2022
SEWER INSPECTION ¤25.00 04/22/2022
SITE PLAN 30 ¤30.00 04/22/2022
CONNECTION FEES ¤25.00 04/22/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 04/22/2022
IMPACT FEE FIRE ¤388.65 04/22/2022
IMPACT FEE PARKS ¤1,455.13 04/22/2022
IMPACT FEE SCHOOL ¤3,600.00 04/22/2022
IMPACT FEE TRANSPORTATION ¤3,224.00 04/22/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 04/22/2022
SURCHARGE FS 533.721 ¤20.78 04/22/2022
SURCHARGE - FS 468.631 ¤31.17 04/22/2022
SW ENG - FOUNDATION SURVEY ¤20.00 04/22/2022
WATER-METER ¤467.09 04/22/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 04/22/2022
INSPECTION - RESIDENTIAL ¤1,531.75 04/22/2022
PLAN REVIEW - RESIDENTIAL ¤434.46 04/22/2022
Fees Total Due: ¤0.00 Total Paid: ¤11,533.50