Permit #2022040956

Permit Details

Status: COED

Parcel Id: 07-11-31-7037-01030-0240
CONDITIONED SPACE: 807 sqft
Total Square Footage: 807 sqft
Block: 01030
Subdivision: 2176 - SECTION 37-LAKEVIEW
Job Phone: 386-864-2199
Location Address: 28 LOUISBURG LN
Type: BA - BUILDING ADDITION
Issue Date: 07/19/2022
NOC: RECORDED
Applicant name: MAXIM TARANNIK
Owner: CONEV OLEG & OLGA PASECINIC H&W

Address

28 LOUISBURG LANE

PALM COAST, FL 32137

Lot: 0240
Contracted Stated Job Value: ¤160,000.00
Job Description: Addition
Type: CN

Contractor

GOLDEN MAGNOLIA, INC
Status Location Address State License Number Phone
INACTIVE

1 ROCKEFELLER DRIVE

PALM COAST, FL 32164

RR282811984 (Exp: 08/31/2025) 386-447-7007

Sub Contractors

FERNANDO MEZA SR
Status Location Address State License Number Phone
ACTIVE

457 CHELSEA PLACE AVE

ORMOND BEACH, FL 32174

EC13003906 (Exp: 08/31/2026) 386-241-5211
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
THOMAS JOSEPH WALL
Status Location Address State License Number Phone
ACTIVE

PO BOX 314

PALAKTKA, FL 32177

CFC037193 (Exp: 08/31/2026) 386-336-9050

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/22/2023 FINAL APPROVED JSTEWART
Note: 6/13/2023 - PREVIOUS INSPECTION NOTES 6/13/23--Please obtain revision of energy calcs for equipment installed. Smoke detectors in addition needs to be connected to the existing smoke detectors as the addition is not a seperate Building.
BLD - BUILDING FINAL 06/13/2023 Disapproved - NO FEE JSTEWART
Note: 6/13/23--Please obtain revision of energy calcs for equipment installed. Smoke detectors in addition needs to be connected to the existing smoke detectors as the addition is not a seperate Building.
U -UTILITY RESIDENTIAL FINAL 06/06/2023 FINAL APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 05/25/2023 APPROVED EMADISON
ROW - FINAL INSPECTION 05/25/2023 FINAL APPROVED EMADISON
Note: ** 05/25/23 SPOKE TO HOMEOWNER AT INSPECTION I ASKED IF ANY ISSUES IN REGARD TO DRAINAGE OF WATER AFTER HEAVY RAINS THE LAST FEW DAYS FLOWING BACK TO HOUSE , HOMEOWNER STATED NO ISSUES AT ALL
FINAL SURVEY (OFFICE USE ONLY) 05/25/2023 APPROVED EMADISON
MONOLITHIC SLAB 05/05/2023 APPROVED FWILLIS
Note: 5/2/2023 - PREVIOUS INSPECTION NOTES SLAB NEEDS TO BE AS PER PLAN 8"x8" THICKEN SLAB ALL AROUND. IS THERE A DETAIL FOR TIEING IN TO EXISTING BUILDING. IF SO HAVE ON SITE.
MONOLITHIC SLAB 05/02/2023 CANCELLED BY APPLICANT WEB
MONOLITHIC SLAB 05/02/2023 Disapproved - NO FEE FWILLIS
Note: SLAB NEEDS TO BE AS PER PLAN 8"x8" THICKEN SLAB ALL AROUND. IS THERE A DETAIL FOR TIEING IN TO EXISTING BUILDING. IF SO HAVE ON SITE.
LATH/BRICK/ WATER BARRIER 03/31/2023 APPROVED FWILLIS
WINDOW NAILING 02/08/2023 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 2490 New inspection due to canceled inspection Inspector Notes from Inspection 2420 Window nailing inspection added 12/15/2022 - PREVIOUS INSPECTION NOTES 12-15-2022 1. Head test failed. 5' head pressure test failed P2503.5.1 2. Mid point bracing on vent. PIPING SUPPORT - MID STORY SUPPRORT (BRACING ON A VERTICAL / HORIZONTAL VENT) TABLE P2605.1 PIPING SUPPORT – 2” AND SMALLER REQUIRE MID POINT BRACING. 10b VERTICAL 3. Mechanical drawings not on site.NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. Inspection stopped. 1/11/23 WILL NEED TO SCHEDULE THE WINDOW NAILING WHEN READY
WINDOW NAILING 02/08/2023 APPROVED FWILLIS
Note: New inspection due to canceled inspection Inspector Notes from Inspection 2490 New inspection due to canceled inspection Inspector Notes from Inspection 2420 Window nailing inspection added 12/15/2022 - PREVIOUS INSPECTION NOTES 12-15-2022 1. Head test failed. 5' head pressure test failed P2503.5.1 2. Mid point bracing on vent. PIPING SUPPORT - MID STORY SUPPRORT (BRACING ON A VERTICAL / HORIZONTAL VENT) TABLE P2605.1 PIPING SUPPORT – 2” AND SMALLER REQUIRE MID POINT BRACING. 10b VERTICAL 3. Mechanical drawings not on site.NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. Inspection stopped. 1/11/23 WILL NEED TO SCHEDULE THE WINDOW NAILING WHEN READY
INSULATION 01/11/2023 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 2420 Window nailing inspection added 12/15/2022 - PREVIOUS INSPECTION NOTES 12-15-2022 1. Head test failed. 5' head pressure test failed P2503.5.1 2. Mid point bracing on vent. PIPING SUPPORT - MID STORY SUPPRORT (BRACING ON A VERTICAL / HORIZONTAL VENT) TABLE P2605.1 PIPING SUPPORT – 2” AND SMALLER REQUIRE MID POINT BRACING. 10b VERTICAL 3. Mechanical drawings not on site.NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. Inspection stopped.
INSULATION 01/11/2023 APPROVED - AS NOTED RMARTIN
Note: New inspection due to canceled inspection Inspector Notes from Inspection 2420 Window nailing inspection added 12/15/2022 - PREVIOUS INSPECTION NOTES 12-15-2022 1. Head test failed. 5' head pressure test failed P2503.5.1 2. Mid point bracing on vent. PIPING SUPPORT - MID STORY SUPPRORT (BRACING ON A VERTICAL / HORIZONTAL VENT) TABLE P2605.1 PIPING SUPPORT – 2” AND SMALLER REQUIRE MID POINT BRACING. 10b VERTICAL 3. Mechanical drawings not on site.NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. Inspection stopped. 1/11/23 WILL NEED TO SCHEDULE THE WINDOW NAILING WHEN READY
ALL ROUGH 12/20/2022 APPROVED - AS NOTED KSANDOE
Note: Window nailing inspection added 12/15/2022 - PREVIOUS INSPECTION NOTES 12-15-2022 1. Head test failed. 5' head pressure test failed P2503.5.1 2. Mid point bracing on vent. PIPING SUPPORT - MID STORY SUPPRORT (BRACING ON A VERTICAL / HORIZONTAL VENT) TABLE P2605.1 PIPING SUPPORT – 2” AND SMALLER REQUIRE MID POINT BRACING. 10b VERTICAL 3. Mechanical drawings not on site.NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. Inspection stopped.
ALL ROUGH 12/15/2022 Disapproved - NO FEE AGAETANO
Note: 12-15-2022 1. Head test failed. 5' head pressure test failed P2503.5.1 2. Mid point bracing on vent. PIPING SUPPORT - MID STORY SUPPRORT (BRACING ON A VERTICAL / HORIZONTAL VENT) TABLE P2605.1 PIPING SUPPORT – 2” AND SMALLER REQUIRE MID POINT BRACING. 10b VERTICAL 3. Mechanical drawings not on site.NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1. Inspection stopped.
ROOF VALLEY & METAL 11/18/2022 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/08/2022 APPROVED FWILLIS
Note: 10/28/2022 - PREVIOUS INSPECTION NOTES 10/24/2022 - PREVIOUS INSPECTION NOTES NO ROOF SHEATHING INSTALLED. WORKERS ARE STILL FRAMING AT THE TIME OF MY VISIT. 10/28/22 - TRUSS LAYOUT SHOWS A34 CLIP ON BEARING WALL. NEED TO SEE DETAIL FOR ROOF FRAMING CONNECTING TO EXISTING HOUSE.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/28/2022 Disapproved - NO FEE FWILLIS
Note: 10/24/2022 - PREVIOUS INSPECTION NOTES NO ROOF SHEATHING INSTALLED. WORKERS ARE STILL FRAMING AT THE TIME OF MY VISIT. 10/28/22 - TRUSS LAYOUT SHOWS A34 CLIP ON BEARING WALL. NEED TO SEE DETAIL FOR ROOF FRAMING CONNECTING TO EXISTING HOUSE.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/24/2022 Disapproved -FEE REQUIRED FWILLIS
Note: NO ROOF SHEATHING INSTALLED. WORKERS ARE STILL FRAMING AT THE TIME OF MY VISIT.
TIE BEAM / LINTEL 10/06/2022 APPROVED DCUSHING
Note: 10/4/2022 - PREVIOUS INSPECTION NOTES 10/2/2022 9:59:14 AM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd and been rescheduled to October 4th. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. Please reschedule for another day. 9/22/2022 - PREVIOUS INSPECTION NOTES NEED TO SEE DETAIL HOW MASONRY IS TIEING INTO EXISTENT MASONRY WALL. BOTH AREAS. ALSO WILL NEED TO TIE IN. 10/4/22 - AS PER PREVIOUS NOTES THE DETAIL CONNECTING WALLS NEED TO BE VIEWED. WHERE EVER NEW MASONRY MEETS EXISTING MASONRY. Detail on file, in box, all items addressed
TIE BEAM / LINTEL 10/04/2022 Disapproved -FEE REQUIRED FWILLIS
Note: 10/2/2022 9:59:14 AM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd and been rescheduled to October 4th. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. Please reschedule for another day. 9/22/2022 - PREVIOUS INSPECTION NOTES NEED TO SEE DETAIL HOW MASONRY IS TIEING INTO EXISTENT MASONRY WALL. BOTH AREAS. ALSO WILL NEED TO TIE IN. 10/4/22 - AS PER PREVIOUS NOTES THE DETAIL CONNECTING WALLS NEED TO BE VIEWED. WHERE EVER NEW MASONRY MEETS EXISTING MASONRY.
TIE BEAM / LINTEL 10/03/2022 CANCELLED BY APPLICANT BBEMBRY
Note: Inspections requested for October 3rd and been rescheduled to October 4th. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. Please reschedule for another day. 9/22/2022 - PREVIOUS INSPECTION NOTES NEED TO SEE DETAIL HOW MASONRY IS TIEING INTO EXISTENT MASONRY WALL. BOTH AREAS. ALSO WILL NEED TO TIE IN.
TIE BEAM / LINTEL 09/22/2022 Disapproved - NO FEE FWILLIS
Note: NEED TO SEE DETAIL HOW MASONRY IS TIEING INTO EXISTENT MASONRY WALL. BOTH AREAS. ALSO WILL NEED TO TIE IN.
MONOLITHIC SLAB 08/17/2022 APPROVED RMARTIN
PLUMBING 1ST ROUGH UNDERGROUND 08/15/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 08/15/2022 APPROVED MGIBSON
U - SEWER TIE IN 08/15/2022 APPROVED - AS NOTED MGIBSON
Note: SPOKE WITH CONTRACTOR AND IVAN FROM UTILITIES ABOUT PEP TANK ALARM THAT NEEDS TO BE RELOCATED, INFORMED CONTRACTOR THAT A 3 ''FOOT'' CLEARENCE IS REQUIRED FOR MAINTENANCE

Review History

Department Status Date In Date Out
MECH COMPLETE 06/15/2023 06/16/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 04/28/2023 05/01/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 02/06/2023 02/06/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
BLD COMPLETE 02/01/2023 02/07/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD COMPLETE 12/07/2022 12/08/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD COMPLETE 11/07/2022 11/07/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD COMPLETE 11/03/2022 11/07/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD COMPLETE 09/23/2022 09/26/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/13/2022 09/13/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 09/13/2022 09/13/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 07/14/2022 07/15/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ZON HOLD 07/07/2022 07/07/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM your email to me : : This is an existing house and that equipment was put in place at the time the house was built. We are not adding AC equipment to the addition. Thank you! Please update your plans as requested via email on thurs 6./30 my response: Hey Jon Plans show ac on the back of the addition. Please take it off your plan and submit as revision. Thank you, Site plan , addidtion plans must match
ZON HOLD 06/29/2022 06/29/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM A/C mechanical equiptment missing from site plan please include
ZON HOLD 06/28/2022 06/28/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Repeat Comment: Impervious: Site plan: please provide the total impervious including driveways, walkways, patios, entry ways and mechanical pads on your site plan. Please know that the maximum impervios is 70% for this Zone
MECH COMPLETE 06/10/2022 06/10/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 06/10/2022 06/13/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON HOLD 06/10/2022 06/13/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Repeat Comment: Impervious: Site plan: please provide the total impervious including driveways, walkways, patios, entry ways and mechanical pads on your site plan. Please know that the maximum impervios is 70% for this Zone
BLD COMPLETE 06/10/2022 06/13/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
SW1 COMPLETE 06/10/2022 06/17/2022
Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM
BADMIN INFORMATION 06/10/2022 06/10/2022
Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM PLEASE CHECK ALL DEPTS FOR THIS REVISION
BLD HOLD 04/19/2022 04/20/2022
Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Provide product approval of skylight per F.S. 553.842.
ELEC HOLD 04/19/2022 04/20/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need correct outlet spacing in bed 2. NEC 2017 210.52
MECH HOLD 04/19/2022 04/20/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Plans show R30 insulation with vented attic. Energy Calcs say R20 with unvented attic. Revise to match 2. Energy Calcs need to be signed by the builder
PLUM COMPLETE 04/19/2022 04/20/2022
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
SW1 HOLD 04/19/2022 04/26/2022
Note: Held By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM NEED TO SHOW FLOW ARROWS AND GIVE US ELEVATIONS TO DETERMIND DRAINAGE
ZON HOLD 04/19/2022 04/20/2022
Note: Held By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM floor plan: Please provide the square footage being added to the home. Color sheet: Please add to the color sheet if the entire residence will be painted or if you are matching to the existing paint color of the home. Site plan: Site plan provided shows pavers in the 5 ft utility easmenrs which is not allowed. Please provide the impervous calculation. Please note that the impervious calculation may not exceed 70%

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 06/21/2023
REINSPECTION RESIDENTIAL ¤40.00 06/06/2023
REINSPECTION RESIDENTIAL ¤40.00 06/06/2023
PLAN REVIEW - REVISION ¤32.50 06/06/2023
PLAN REVIEW - REVISION ¤32.50 06/06/2023
PLAN REVIEW - REVISION ¤32.50 06/06/2023
PLAN REVIEW - REVISION ¤32.50 06/06/2023
PLAN REVIEW - REVISION ¤32.50 06/06/2023
CONTRACTOR CHANGE ¤40.00 06/06/2023
CONTRACTOR CHANGE ¤20.00 06/06/2023
SURCHARGE FS 533.721 ¤5.13 07/19/2022
SURCHARGE - FS 468.631 ¤7.69 07/19/2022
SW ENG - INSPECTION 20 ¤20.00 07/19/2022
SW ENG - REVIEW 20 ¤20.00 07/19/2022
SITE PLAN 30 ¤30.00 07/19/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/19/2022
INSPECTION - RESIDENTIAL ¤440.00 07/19/2022
PLAN REVIEW - RESIDENTIAL ¤124.80 07/19/2022
CONTRACTOR CHANGE ¤40.00 07/19/2022
Fees Total Due: ¤0.00 Total Paid: ¤1,052.62