I want to search for...
Permit #2022041018
Permit Details
Status: COED
| Parcel Id: 15-11-31-2970-00000-0660 |
| CONDITIONED SPACE: 4345 sqft |
| OPENED PORCH (WITH ROOF) : 1169 sqft |
| GARAGE: 1169 sqft |
| Total Square Footage: 6683 sqft |
| Block: 00000 |
| Subdivision: 2070 - GRAND HAVEN NORTH PHASE 1 |
| Job Phone: 386-445-2012 |
| Location Address: 63 WATERVIEW DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/11/2022 |
| NOC: RECORDED |
| Applicant name: JOHN NICHOLAS CORDASCI |
| Owner: DOLGIN RICHARD T & JULIA E H&W & DEIRDRE JTWROS |
|
Address 22 OASIS CIRCLE PALM COAST, FL 32137 |
| Lot: 0660 |
| Contracted Stated Job Value: ¤909,777.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
SKYWAY BUILDERS INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 354786 PALM COAST, FL 32135 |
CBC1263769 (Exp: 08/31/2024) | 386-445-2012 |
Sub Contractors
MARK JOHN LUTCZA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
26 ROYAL LEAF LANE PALM COAST, FL 32164 |
EC13005145 (Exp: 08/31/2026) | 386-586-0770 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
RICHARD GARY WILSON JR
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
1504 OLD MOODY BLVD BUNNELL, FL 32110 |
UNIT 6 BUNNELL, FL 32110 |
CAC1817645 (Exp: 08/31/2026) | 386-586-6290 |
MARK B SOWERS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
609 FOURTH ST BUNNELL, FL 32110 |
35616 (Exp: 08/31/2026) | 386-225-1753 |
SANTOS L HERNANDEZ
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
946 SHADDICK DRIVE ORANGE CITY, FL 32763 |
CCC1328011 (Exp: 08/31/2026) | 386-218-4942 | 386-218-4937 |
Inspection History
| Type | Request Date | Result | Inspector |
| GAS ROUGH | 02/20/2024 | APPROVED | BTAYLOR |
| GAS FINAL | 02/20/2024 | FINAL APPROVED | BTAYLOR |
| BLD - BUILDING FINAL | 02/20/2024 | FINAL APPROVED | BTAYLOR |
| U-CROSS CONNECTION | 02/16/2024 | APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 02/16/2024 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| U -UTILITY RESIDENTIAL FINAL | 02/16/2024 | FINAL APPROVED | DHANEY |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/15/2024 | APPROVED | FSLADISH |
| Note: Inspector Notes from Inspection 9270 11/07/23 CORRECTIONS MADE. READY TO LAY PAVERS. YOU MAY NOW LAY YOUR PAVERS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _______________________________________________________________________________________________________________________ 11/6/2023 - PREVIOUS INSPECTION NOTES 11/06/23 THERE IS TOO MUCH PAVER BASE STILL IN THE PAVER AREA AND THAT AREA IS NOT PROPERLY COMPACTED AT THE TIME OF THIS INSPECTION. I AM NOT GOING TO FEE YOU TODAY. PLEASE REMOVE EXCESS PAVER BASE AND MAKE SURE YOU HAVE ACCEPTABLE COMPACTION BEFORE CALLING IN FOR YOUR FINAL PREPOUR. PLEASE SEE PHOTOS FOR REFERENCE. Inspector Notes from Inspection 9271 10/17/23 READY TO POUR PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. DO NOT LAY ANY PAVERS AT THIS TIME. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/15/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/15/24 PASSING THIS FIELD SURVEY AS NOTED. SPOKE WITH JOHN CM AND HAVE SETTLED ON SOD AND SWALE MOVING DRAINAGE FORWARD ON THE RIGHT SIDE ABUTTING SIDEWALK. SOD AND SLOPED IN THE REAR OF THE PROPERTY ABUTTING REAR PROPERTY OWNER. APPROVAL TO LEAVE MULCH ON RIGHT SIDE PROPERTY LINE AS THERE IS EDGING KEEPING MULCH ON PROPERTY. AS A COURTESY WILL BE APPROVING SO YOU CAN MOVE FORWARD WITH INSPECTION. YOU WILL BE RESPONSIBLE FOR THESE CHANGES BEFORE ROW FINAL PASSAGE. | |||
| ROW- PROJECT STATUS | 02/15/2024 | APPROVED | GBERTOLA |
| Note: meeting with the inspoector and the Cm 2/15/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ___________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 2/15/24 PASSING THIS FIELD SURVEY AS NOTED. SPOKE WITH JOHN CM AND HAVE SETTLED ON SOD AND SWALE MOVING DRAINAGE FORWARD ON THE RIGHT SIDE ABUTTING SIDEWALK. SOD AND SLOPED IN THE REAR OF THE PROPERTY ABUTTING REAR PROPERTY OWNER. APPROVAL TO LEAVE MULCH ON RIGHT SIDE PROPERTY LINE AS THERE IS EDGING KEEPING MULCH ON PROPERTY. AS A COURTESY WILL BE APPROVING SO YOU CAN MOVE FORWARD WITH INSPECTION. YOU WILL BE RESPONSIBLE FOR THESE CHANGES BEFORE ROW FINAL PASSAGE. Meeting with the builder and Frank stormwater inspector | |||
| ROW - FINAL APRON (AFTER POUR) | 02/15/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/15/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ___________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 2/15/24 PASSING THIS FIELD SURVEY AS NOTED. SPOKE WITH JOHN CM AND HAVE SETTLED ON SOD AND SWALE MOVING DRAINAGE FORWARD ON THE RIGHT SIDE ABUTTING SIDEWALK. SOD AND SLOPED IN THE REAR OF THE PROPERTY ABUTTING REAR PROPERTY OWNER. APPROVAL TO LEAVE MULCH ON RIGHT SIDE PROPERTY LINE AS THERE IS EDGING KEEPING MULCH ON PROPERTY. AS A COURTESY WILL BE APPROVING SO YOU CAN MOVE FORWARD WITH INSPECTION. YOU WILL BE RESPONSIBLE FOR THESE CHANGES BEFORE ROW FINAL PASSAGE. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 02/12/2024 | CANCELLED BY APPLICANT | FSLADISH |
| ROW- PRE-APRON (PRE-POUR) | 11/07/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/07/23 CORRECTIONS MADE. READY TO LAY PAVERS. YOU MAY NOW LAY YOUR PAVERS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _______________________________________________________________________________________________________________________ 11/6/2023 - PREVIOUS INSPECTION NOTES 11/06/23 THERE IS TOO MUCH PAVER BASE STILL IN THE PAVER AREA AND THAT AREA IS NOT PROPERLY COMPACTED AT THE TIME OF THIS INSPECTION. I AM NOT GOING TO FEE YOU TODAY. PLEASE REMOVE EXCESS PAVER BASE AND MAKE SURE YOU HAVE ACCEPTABLE COMPACTION BEFORE CALLING IN FOR YOUR FINAL PREPOUR. PLEASE SEE PHOTOS FOR REFERENCE. Inspector Notes from Inspection 9271 10/17/23 READY TO POUR PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. DO NOT LAY ANY PAVERS AT THIS TIME. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/06/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 11/06/23 THERE IS TOO MUCH PAVER BASE STILL IN THE PAVER AREA AND THAT AREA IS NOT PROPERLY COMPACTED AT THE TIME OF THIS INSPECTION. I AM NOT GOING TO FEE YOU TODAY. PLEASE REMOVE EXCESS PAVER BASE AND MAKE SURE YOU HAVE ACCEPTABLE COMPACTION BEFORE CALLING IN FOR YOUR FINAL PREPOUR. PLEASE SEE PHOTOS FOR REFERENCE. Inspector Notes from Inspection 9271 10/17/23 READY TO POUR PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. DO NOT LAY ANY PAVERS AT THIS TIME. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/17/2023 | PARTIALLY APPROVED | FSLADISH |
| Note: 10/17/23 READY TO POUR APRON AND PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. YOUR NEXT INSPECTION WILL BE FOR SPEADING AND COMPACTING PAVER BASE. DO NOT LAY ANY PAVERS UNTIL AFTER THE SPREAD AND COMPACTION PREPOUR INSPECTION. | |||
| ROW- PAVER RESTRAINTS | 10/17/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 10/17/23 READY TO POUR PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. DO NOT LAY ANY PAVERS AT THIS TIME. | |||
| ELECTRIC - EARLY POWER | 06/14/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: Inspector Notes from Inspection 2200 Approved//release to FPL at 8:23 AM-02/23/2023 6-14-23 1. Emailed FPL at 9:20. | |||
| LATH/BRICK/ WATER BARRIER | 04/28/2023 | APPROVED | TSTAUFFACHER |
| INSULATION | 04/21/2023 | APPROVED | TSTAUFFACHER |
| ALL ROUGH | 04/20/2023 | APPROVED | BTAYLOR |
| Note: 2/27/2023 - PREVIOUS INSPECTION NOTES 02/27/2023-Above top plate inspection and slider jamb approved. Allow for spray foam insulation. the rest of the all rough not complete | |||
| ALL ROUGH | 02/27/2023 | PARTIALLY APPROVED | TSTAUFFACHER |
| Note: 02/27/2023-Above top plate inspection and slider jamb approved. Allow for spray foam insulation. the rest of the all rough not complete | |||
| ELECTRIC-TUG | 02/23/2023 | APPROVED - AS NOTED | TSTAUFFACHER |
| Note: Approved//release to FPL at 8:23 AM-02/23/2023 | |||
| GRAVITY SEWER TEST | 01/11/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ROOF VALLEY & METAL | 01/11/2023 | APPROVED | BTAYLOR |
| WALL SHEATHING | 01/11/2023 | APPROVED | BTAYLOR |
| U - SEWER TIE IN | 01/11/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/24/2022 | APPROVED | DCUSHING |
| TIE BEAM / LINTEL | 09/21/2022 | FINAL APPROVED | LMILLER |
| FOUND SURVEY APPROVED (OFFICE) | 09/06/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 07/12/2022 | APPROVED | DCUSHING |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/11/2022 | APPROVED | AGAETANO |
| WATER METER INSTALLATION REQUEST | 05/19/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 02/15/2024 | 02/16/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/15/2024 | 02/16/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| GAS | COMPLETE | 03/10/2023 | 03/13/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/02/2022 | 09/02/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/02/2022 | 09/06/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/18/2022 | 08/18/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/18/2022 | 08/18/2022 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Concrete pad on left side encroaching in 12.5' platted easement. | |||
| ELEC | COMPLETE | 05/06/2022 | 05/09/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/28/2022 | 05/05/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/28/2022 | 04/28/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 04/28/2022 | 04/28/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Generator must be 5ft away from openings. Per NFPA 37 ch4 2. Still need electric riser for generator | |||
| ELEC | HOLD | 04/28/2022 | 04/28/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Generator must be 5ft away from openings. Per NFPA 37 ch4 | |||
| BLD | COMPLETE | 04/28/2022 | 04/28/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/28/2022 | 04/28/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 04/27/2022 | 04/27/2022 |
| Note: Held By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM Proposed elevations are to be clearly noted and discernible from the existing survey data. (A)?The proposed elevations shall be shown at all locations of existing elevations per the topographic survey. (A) A.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(5) The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) | |||
| BLD | HOLD | 04/20/2022 | 04/20/2022 |
| Note: Held By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM Product approval specification sheet shows asphalt shingles as the roofing matererial but roofing worsheet shows tile roof. Coordinate and submit correction for clarity per FBC 7th Ed. Sec. 107.3. | |||
| CUSVC | COMPLETE | 04/20/2022 | 04/22/2022 |
| Note: Released By: ALYSSA ROSCOE - - | |||
| ELEC | HOLD | 04/20/2022 | 04/20/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need smoke alarm outside of bed 2. FRC 2020 314 & 315 2. Submit electric riser diagram for generator and manufacture specs. 3. Generator must be 5 ft from any opening door or window per manufacture specs. | |||
| ENGIN1 | COMPLETE | 04/20/2022 | 04/20/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 04/20/2022 | 04/25/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/20/2022 | 04/20/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 04/20/2022 | 04/27/2022 |
| Note: Held By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) THE BACK PROPERTY NEEDS TO DRAIN TO FRONT |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 02/20/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 02/20/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 02/20/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/11/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/11/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤96.72) | 05/11/2022 |
| SEWER INSPECTION | ¤25.00 | 05/11/2022 |
| SITE PLAN 30 | ¤30.00 | 05/11/2022 |
| WATER-METER | ¤467.09 | 05/11/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/11/2022 |
| INSPECTION - RESIDENTIAL | ¤2,502.50 | 05/11/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤709.80 | 05/11/2022 |
| CONNECTION FEES | ¤25.00 | 05/11/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 05/11/2022 |
| IMPACT FEE FIRE | ¤388.65 | 05/11/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 05/11/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/11/2022 |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | 05/11/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 05/11/2022 |
| SURCHARGE FS 533.721 | ¤26.28 | 05/11/2022 |
| SURCHARGE - FS 468.631 | ¤39.42 | 05/11/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/11/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/11/2022 |
| SW ENG PRE APRON | ¤30.00 | 05/11/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤12,805.84 |