Permit #2022041123
Permit Details
Status: COED
| Parcel Id: 07-11-31-7028-00640-0050 |
| CONDITIONED SPACE: 1797 sqft |
| OPENED PORCH (WITH ROOF) : 124 sqft |
| SCREEN PORCH (SOLID ROOF) : 128 sqft |
| GARAGE: 587 sqft |
| Total Square Footage: 2636 sqft |
| Block: 00640 |
| Subdivision: 2199 - SECTION 28-WYNNFIELD |
| Job Phone: 407-580-2657 |
| Location Address: 17 POST VIEW DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/13/2022 |
| NOC: RECORDED |
| Applicant name: GENE WARREN SLONE |
| Owner: GANTZ ARNOLD JAMES & INGA MADRID H&W |
|
Address 3300 N W 177 TERR MIAMI GARDENS, FL 33056 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤400,000.00 |
| Job Description: SINGLE FAMILY HOME |
| Type: CN |
Contractor
FLORIDA GREEN CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
870 E RETTA STREET DELEON SPRINGS, FL 32130 |
CBC1260957 (Exp: 08/31/2026) | 407-580-2657 |
Sub Contractors
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
KERRY DWAIN AYLESWORTH II
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2820 LEWIS SPEEDWAY ST AUGUSTINE, FL 32084 |
STE B ST AUGUSTINE, FL 32084 |
CAC1820713 (Exp: 08/31/2026) | 904-342-5709 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ERIC FRANCO
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
840 DELTONA BLVD DELTONA, FL 32725 |
STE F2 DELTONA, FL 32725 |
CCC1327280 (Exp: 08/31/2026) | 386-575-4007 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 11/02/2023 | FINAL APPROVED | KSANDOE |
| Note: 10/30/2023 - PREVIOUS INSPECTION NOTES 1. The bidet need to have a temprature limiting device installed. Water temp is to be limited to 110 degrees. P-408. 2. The one of two required kitchen branch circuits at the kitchen island can serve no other outlets. The island outlets for the counter top is also supplying the built in microwave. NEC 210.52 (B) 2. | |||
| BLD - BUILDING FINAL | 10/30/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. The bidet need to have a temprature limiting device installed. Water temp is to be limited to 110 degrees. P-408. 2. The one of two required kitchen branch circuits at the kitchen island can serve no other outlets. The island outlets for the counter top is also supplying the built in microwave. NEC 210.52 (B) 2. | |||
| U-CROSS CONNECTION | 10/12/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irrigation with PVB installed | |||
| ROW - FINAL APRON (AFTER POUR) | 10/12/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 10/12/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| U -UTILITY RESIDENTIAL FINAL | 10/12/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: need stone for pep tank lid-utility informed | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/11/2023 | APPROVED | FSLADISH |
| Note: 10/11/23 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ WILL NOT ALLOW ME TO DO THIS INSPECTION SAYS CONTRACTOR NOT ACTIVE | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/09/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ----------------------------------------------------------------- 9/26/2023 - PREVIOUS INSPECTION NOTES 1) Sec 300.03 C1c When grading against a developable vacant lot a 'Common Swale' (meaning the drainage conveyance is on the property line) is required. 2) Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’. Florida Building Code, Residential, Chapter 4, R401.3 3) Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan and can not be pitch against the flow of the roadside swale. | |||
| ROW- PROJECT STATUS | 10/05/2023 | APPROVED | PFLANAGAN |
| Note: GRADES OK NEED TO MAKE THE CULVERT IN TOLERANCE | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/26/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) Sec 300.03 C1c When grading against a developable vacant lot a 'Common Swale' (meaning the drainage conveyance is on the property line) is required. 2) Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’. Florida Building Code, Residential, Chapter 4, R401.3 3) Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan and can not be pitch against the flow of the roadside swale. | |||
| ELECTRIC - EARLY POWER | 09/26/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 0951. Release Power 9/22/2023 - PREVIOUS INSPECTION NOTES 9/22/23: * Main feeds cannot be landed at Meter Panel for underground feed prior to approved Early Power Inspection. Inspector Notes from Inspection 2200 Emailed FPL @ 1156. Release Power Inspector Notes from Inspection 2170 THIS IS A REINSPECTION Temp pole needs to be grounded. NEC 2017 250.52 7/8/22 Emailed FPL at 8:41 am | |||
| ELECTRIC - EARLY POWER | 09/22/2023 | Disapproved - NO FEE | RSIMS |
| Note: 9/22/23: * Main feeds cannot be landed at Meter Panel for underground feed prior to approved Early Power Inspection. Inspector Notes from Inspection 2200 Emailed FPL @ 1156. Release Power Inspector Notes from Inspection 2170 THIS IS A REINSPECTION Temp pole needs to be grounded. NEC 2017 250.52 7/8/22 Emailed FPL at 8:41 am | |||
| ROW- PRE-APRON (PRE-POUR) | 08/14/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 08/14/23 you need to remove all dirt from the culvert pipe before pouring. you need to remove all concrete, concrete chips and any concrete chunks against garage slab before pouring. Pipe is good. Approving as noted, it is builders responsibility to make sure these are done. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. PHOTOS FOR REFERENCE. 8/11/2023 - PREVIOUS INSPECTION NOTES 08/11/23 THIS IS NOT READY FOR POURING. THERE IS TO MUCH WATER IN THE POURING AREA. NEED TO PUMP ALL WATER OUT. THE POUR AREA IS TOO SOFT. THE CULVERT ENDS ARE WASHED IN AND FULL OF DIRT AND SEDIMENT, CANNOT CHECK PIPE. WASHED OUT BEHIND ROW NEEDS TO BE FILLED BACK IN AND COMPACTED, PLEASE SEE PHOTOS FOR REFERENCE. _______________________________________________________________________________________________________________________ SITE NEEDS TO BE PREPPED TO POUR AT THE TIME OF THE INSPECTION 7/31/2023 - PREVIOUS INSPECTION NOTES THIS IS NOT READY FOR INSPECTION THERE IS TO MUCH WATER IN THE POURING AREA. NEED TO PUMP ALL WATER OUT. SITE NEEDS TO BE PREPPED TO POUR AT THE TIME OF THE INSPECTION ANY LESS IT WILL FAIL. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/11/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 08/11/23 THIS IS NOT READY FOR POURING. THERE IS TO MUCH WATER IN THE POURING AREA. NEED TO PUMP ALL WATER OUT. THE POUR AREA IS TOO SOFT. THE CULVERT ENDS ARE WASHED IN AND FULL OF DIRT AND SEDIMENT, CANNOT CHECK PIPE. WASHED OUT BEHIND ROW NEEDS TO BE FILLED BACK IN AND COMPACTED, PLEASE SEE PHOTOS FOR REFERENCE. _______________________________________________________________________________________________________________________ SITE NEEDS TO BE PREPPED TO POUR AT THE TIME OF THE INSPECTION 7/31/2023 - PREVIOUS INSPECTION NOTES THIS IS NOT READY FOR INSPECTION THERE IS TO MUCH WATER IN THE POURING AREA. NEED TO PUMP ALL WATER OUT. SITE NEEDS TO BE PREPPED TO POUR AT THE TIME OF THE INSPECTION ANY LESS IT WILL FAIL. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/31/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THIS IS NOT READY FOR INSPECTION THERE IS TO MUCH WATER IN THE POURING AREA. NEED TO PUMP ALL WATER OUT. SITE NEEDS TO BE PREPPED TO POUR AT THE TIME OF THE INSPECTION ANY LESS IT WILL FAIL. | |||
| U - SEWER TIE IN | 06/05/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 06/05/2023 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 NEED TO CORRECT PLUMBING CONTRACTOR FOR WARRANTY PURPOSE | |||
| ELECTRIC-TUG | 05/05/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 1156. Release Power Inspector Notes from Inspection 2170 THIS IS A REINSPECTION Temp pole needs to be grounded. NEC 2017 250.52 7/8/22 Emailed FPL at 8:41 am | |||
| PEP TANK INSTALLATION REQUEST | 05/03/2023 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 04/24/2023 | APPROVED | KSANDOE |
| INSULATION | 04/10/2023 | APPROVED | KSANDOE |
| ALL ROUGH | 04/04/2023 | APPROVED | KSANDOE |
| ROOF VALLEY & METAL | 01/13/2023 | APPROVED | KSANDOE |
| WALL SHEATHING | 12/22/2022 | APPROVED | KSANDOE |
| TIE BEAM / LINTEL | 12/20/2022 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/20/2022 | APPROVED | KSANDOE |
| Note: 12/16/2022 - PREVIOUS INSPECTION NOTES Multiple trusses missing nailing on straps. Check all Reschedule and Meet inspector on site to discuss garage bearing wall | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/16/2022 | Disapproved - NO FEE | KSANDOE |
| Note: Multiple trusses missing nailing on straps. Check all Reschedule and Meet inspector on site to discuss garage bearing wall | |||
| TIE BEAM / LINTEL | 10/05/2022 | APPROVED | KSANDOE |
| Note: 10/4/2022 - PREVIOUS INSPECTION NOTES 10/2/2022 12:03:12 PM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd and been rescheduled to October 4th. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. 9/26/2022 - PREVIOUS INSPECTION NOTES Not ready for inspection 10/4/22 Per sheet 6 Horizontal rebar #4 should be run 16" up from bottom of wall. Unable to verify as is. Contractor reschedule inspection and meet with inspector on site to provide visual verification. | |||
| TIE BEAM / LINTEL | 10/04/2022 | Disapproved - NO FEE | KSANDOE |
| Note: 10/2/2022 12:03:12 PM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd and been rescheduled to October 4th. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. 9/26/2022 - PREVIOUS INSPECTION NOTES Not ready for inspection 10/4/22 Per sheet 6 Horizontal rebar #4 should be run 16" up from bottom of wall. Unable to verify as is. Contractor reschedule inspection and meet with inspector on site to provide visual verification. | |||
| TIE BEAM / LINTEL | 10/03/2022 | CANCELLED BY APPLICANT | BBEMBRY |
| Note: Inspections requested for October 3rd and been rescheduled to October 4th. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. 9/26/2022 - PREVIOUS INSPECTION NOTES Not ready for inspection | |||
| TIE BEAM / LINTEL | 09/26/2022 | Disapproved - NO FEE | KSANDOE |
| Note: Not ready for inspection | |||
| FOUND SURVEY APPROVED (OFFICE) | 09/15/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/16/2022 | APPROVED | LMILLER |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/01/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: NEED TO CORRECT PLUMBING CONTRACTOR FOR WARRANTY PURPOSE | |||
| ELECTRIC TEMP POLE | 07/08/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: THIS IS A REINSPECTION Temp pole needs to be grounded. NEC 2017 250.52 7/8/22 Emailed FPL at 8:41 am | |||
| ELECTRIC TEMP POLE | 07/06/2022 | Disapproved - NO FEE | JMUNSON |
| Note: Temp pole needs to be grounded. NEC 2017 250.52 | |||
| WATER METER INSTALLATION REQUEST | 06/17/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 10/26/2023 | 10/27/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 10/25/2023 | 10/26/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide Updated Energy calcs. Not altered ones. | |||
| ENGIN1 | COMPLETE | 07/21/2023 | 07/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/21/2023 | 07/21/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/21/2023 | 07/21/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/27/2023 | 06/27/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/27/2023 | 07/05/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/27/2023 | 06/27/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/15/2022 | 09/15/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/15/2022 | 09/15/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/25/2022 | 05/25/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| PLUM | CANCEL | 05/25/2022 | 05/31/2022 |
| BLD | COMPLETE | 04/21/2022 | 04/21/2022 |
| Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 04/21/2022 | 04/25/2022 |
| Note: Released By: ALYSSA ROSCOE - - | |||
| ELEC | HOLD | 04/21/2022 | 04/22/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need outlets under switches in bed 2 and 3. NEC 2017 210.52 2. Submit manufacture specs and riser diagram for generator. | |||
| ENGIN1 | COMPLETE | 04/21/2022 | 04/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 04/21/2022 | 04/26/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/21/2022 | 04/22/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/21/2022 | 04/28/2022 |
| Note: Released By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/21/2022 | 04/22/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 04/21/2022 | 06/22/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 11/02/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 10/25/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 10/25/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 10/25/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/13/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/13/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 06/13/2022 |
| SEWER CREDIT | (¤650.00) | 06/13/2022 |
| SEWER INSPECTION | ¤25.00 | 06/13/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 06/13/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 06/13/2022 |
| SITE PLAN 30 | ¤30.00 | 06/13/2022 |
| CONNECTION FEES | ¤1,077.88 | 06/13/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 06/13/2022 |
| IMPACT FEE FIRE | ¤388.65 | 06/13/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 06/13/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/13/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 06/13/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/13/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 06/13/2022 |
| SURCHARGE FS 533.721 | ¤11.90 | 06/13/2022 |
| SURCHARGE - FS 468.631 | ¤17.85 | 06/13/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/13/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/13/2022 |
| SW ENG PRE APRON | ¤30.00 | 06/13/2022 |
| WATER- TURN ON | ¤25.00 | 06/13/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/13/2022 |
| INSPECTION - RESIDENTIAL | ¤1,100.00 | 06/13/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤312.00 | 06/13/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,132.94 |