I want to search for...

Permit #2022041147

Permit Details

Status: COED

Parcel Id: 07-11-31-7009-00450-0100
CONDITIONED SPACE: 1749 sqft
OPENED PORCH (WITH ROOF) : 70 sqft
OPENED PORCH (WITH ROOF) : 233 sqft
GARAGE: 498 sqft
Total Square Footage: 2550 sqft
Block: 00450
Subdivision: 2208 - SECTION 9-FLORIDA PARK
Job Phone: 407-580-2657
Location Address: 78 FENIMORE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/24/2022
NOC: RECORDED
Applicant name: GENE WARREN SLONE
Owner: STAMM GARY

Address

61 W PALM AVE

LAKE WORTH, FL 33467

Lot: 0100
Contracted Stated Job Value: ¤350,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

FLORIDA GREEN CONSTRUCTION INC.
Status Location Address State License Number Phone
INACTIVE

870 E RETTA STREET

DELEON SPRINGS, FL 32130

CBC1260957 (Exp: 08/31/2026) 407-580-2657

Sub Contractors

JOHN EDWARD GAMBONE
Status Location Address Mailing Address State License Number Phone
ACTIVE

15 HARGROVE LN

PALM COAST, FL 32137

1G

PALM COAST, FL 32137

EC13006037 (Exp: 08/31/2026) 386-586-9144
KERRY DWAIN AYLESWORTH II
Status Location Address Mailing Address State License Number Phone
ACTIVE

2820 LEWIS SPEEDWAY

ST AUGUSTINE, FL 32084

STE B

ST AUGUSTINE, FL 32084

CAC1820713 (Exp: 08/31/2026) 904-342-5709
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ERIC FRANCO
Status Location Address Mailing Address State License Number Phone
INACTIVE

840 DELTONA BLVD

DELTONA, FL 32725

STE F2

DELTONA, FL 32725

CCC1327280 (Exp: 08/31/2026) 386-575-4007

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 01/31/2024 FINAL APPROVED JSTEWART
Note: 1/29/2024 - PREVIOUS INSPECTION NOTES 1/29/2024 - PREVIOUS INSPECTION NOTES 01-29-2024 No hot water.
BLD - BUILDING FINAL 01/29/2024 Disapproved - NO FEE AGAETANO
Note: 01-29-2024 1. Doors locked. Need access for inspection. 2. Job Johnny on site. 3. Temp pole still connected. 4. Sewer line not connected. Inspection stopped.
BLD - BUILDING FINAL 01/29/2024 Disapproved - NO FEE AGAETANO
Note: 1/29/2024 - PREVIOUS INSPECTION NOTES 01-29-2024 No hot water.
U-CROSS CONNECTION 01/16/2024 APPROVED DHANEY
U -UTILITY RESIDENTIAL FINAL 01/16/2024 FINAL APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 12/11/2023 APPROVED EMADISON
ROW - STORMWATER FINAL 12/11/2023 APPROVED EMADISON
ROW - FINAL APRON (AFTER POUR) 12/11/2023 APPROVED EMADISON
FINAL SURVEY (OFFICE USE ONLY) 12/11/2023 APPROVED EMADISON
ROW- PRE-APRON (PRE-POUR) 09/06/2023 APPROVED - AS NOTED EMADISON
Note: ** 09/06/23 READY TO POUR **At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ___________________________________________________________________________________________________________________ 8/24/2023 - PREVIOUS INSPECTION NOTES ** 08/24/23 FORM BOARDS ON BOTH MITERED ENDS NEED TO BE REDONE YOU NEED FORM BPOARDS AT THE OF THE MITERED END 18 INCHES FROM EDGE OF CULVERT PIPE AND AT BOTTOM TAPERS IN TO 9 INCHES FROM EDGE OF CULVERT ** YOUR CURRENT FORMS ARE TO SQUARE ** CULVERT ELEVATION GOOD AT THE TIME OF THIS INSPECTION __________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 08/11/23 CORRECTIONS MADE IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE ROAD SIDE SWALE TO PREVENT ANY TYPE OF NEGATIVE IMPACT ON ADJACENT PROPERTIES OR THE ROADWAY ______________________________________________________________________________________________________________________ 8/9/2023 - PREVIOUS INSPECTION NOTES ** 08/09/23 BUILDER NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE PUT ON JOB SITE ** FOLLOW UP INSPECTION ON 08/11/23 ___________________________________________________________________________________________________________________________ Please check that swale is clear and functioning and proper erosion control is in place-JM
ROW- PRE-APRON (PRE-POUR) 08/24/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 08/24/23 FORM BOARDS ON BOTH MITERED ENDS NEED TO BE REDONE YOU NEED FORM BPOARDS AT THE OF THE MITERED END 18 INCHES FROM EDGE OF CULVERT PIPE AND AT BOTTOM TAPERS IN TO 9 INCHES FROM EDGE OF CULVERT ** YOUR CURRENT FORMS ARE TO SQUARE ** CULVERT ELEVATION GOOD AT THE TIME OF THIS INSPECTION __________________________________________________________________________________________________________________ Inspector Notes from Inspection 9470 ** 08/11/23 CORRECTIONS MADE IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE ROAD SIDE SWALE TO PREVENT ANY TYPE OF NEGATIVE IMPACT ON ADJACENT PROPERTIES OR THE ROADWAY ______________________________________________________________________________________________________________________ 8/9/2023 - PREVIOUS INSPECTION NOTES ** 08/09/23 BUILDER NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE PUT ON JOB SITE ** FOLLOW UP INSPECTION ON 08/11/23 ___________________________________________________________________________________________________________________________ Please check that swale is clear and functioning and proper erosion control is in place-JM
ROW - DRAINAGE 08/11/2023 APPROVED - AS NOTED EMADISON
Note: ** 08/11/23 CORRECTIONS MADE IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE ROAD SIDE SWALE TO PREVENT ANY TYPE OF NEGATIVE IMPACT ON ADJACENT PROPERTIES OR THE ROADWAY ______________________________________________________________________________________________________________________ 8/9/2023 - PREVIOUS INSPECTION NOTES ** 08/09/23 BUILDER NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE PUT ON JOB SITE ** FOLLOW UP INSPECTION ON 08/11/23 ___________________________________________________________________________________________________________________________ Please check that swale is clear and functioning and proper erosion control is in place-JM
ELECTRIC - EARLY POWER 08/11/2023 APPROVED AGAETANO
ROW - DRAINAGE 08/09/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 08/09/23 BUILDER NEEDS TO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE PUT ON JOB SITE ** FOLLOW UP INSPECTION ON 08/11/23 ___________________________________________________________________________________________________________________________ Please check that swale is clear and functioning and proper erosion control is in place-JM
U - SEWER TIE IN 07/13/2023 APPROVED MGIBSON
GRAVITY SEWER TEST 07/13/2023 APPROVED MGIBSON
LATH/BRICK/ WATER BARRIER 05/31/2023 APPROVED AGAETANO
Note: Inspector Notes from Inspection 2490 Inspector Notes from Inspection 2420 5/3/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2467 03-08-2023 Job site is a mess. Please clean site prior to next inspection. 05-03-2023 1. All grounds need to be connected. All grounds need to be connected – NEC 110.14A 2. Shield plate not installed properly at garage #6 conductor. 3. Garage #6 conductor not fastened properly. 4. Garage truss at garage entry strap not fastened properly. 5. Duct in front right bedroom is compacted. Air flow may be restricted. Please address. 05-12-2023 1. All grounds need to be connected. NEC 110.14A. Check all. 2. UFER ground not visible. Check at next inspection. 05-24-2023 Entry outlet grounds not connected. NEC 110.14A
INSULATION 05/24/2023 APPROVED - AS NOTED AGAETANO
Note: Inspector Notes from Inspection 2420 5/3/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2467 03-08-2023 Job site is a mess. Please clean site prior to next inspection. 05-03-2023 1. All grounds need to be connected. All grounds need to be connected – NEC 110.14A 2. Shield plate not installed properly at garage #6 conductor. 3. Garage #6 conductor not fastened properly. 4. Garage truss at garage entry strap not fastened properly. 5. Duct in front right bedroom is compacted. Air flow may be restricted. Please address. 05-12-2023 1. All grounds need to be connected. NEC 110.14A. Check all. 2. UFER ground not visible. Check at next inspection. 05-24-2023 Entry outlet grounds not connected. NEC 110.14A
ALL ROUGH 05/12/2023 APPROVED - AS NOTED AGAETANO
Note: 5/3/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2467 03-08-2023 Job site is a mess. Please clean site prior to next inspection. 05-03-2023 1. All grounds need to be connected. All grounds need to be connected – NEC 110.14A 2. Shield plate not installed properly at garage #6 conductor. 3. Garage #6 conductor not fastened properly. 4. Garage truss at garage entry strap not fastened properly. 5. Duct in front right bedroom is compacted. Air flow may be restricted. Please address. 05-12-2023 1. All grounds need to be connected. NEC 110.14A. Check all. 2. UFER ground not visible. Check at next inspection.
ALL ROUGH 05/03/2023 Disapproved - NO FEE AGAETANO
Note: Inspector Notes from Inspection 2467 03-08-2023 Job site is a mess. Please clean site prior to next inspection. 05-03-2023 1. All grounds need to be connected. All grounds need to be connected – NEC 110.14A 2. Shield plate not installed properly at garage #6 conductor. 3. Garage #6 conductor not fastened properly. 4. Garage truss at garage entry strap not fastened properly. 5. Duct in front right bedroom is compacted. Air flow may be restricted. Please address.
ROOF VALLEY & METAL 03/08/2023 APPROVED - AS NOTED AGAETANO
Note: 03-08-2023 Job site is a mess. Please clean site prior to next inspection.
WATER METER INSTALLATION REQUEST 03/03/2023 APPROVED TSCHWEERS
WALL SHEATHING 01/31/2023 APPROVED AGAETANO
Note: Inspector Notes from Inspection 2340 10/26/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2250 9/15/2022 - PREVIOUS INSPECTION NOTES 09-15-2022 UFER ground not visible. NEC 250.53 09-16-2022 Entry on right side soil has collapsed into the footing. UFER installed. 10-26-2022 Missing rod at entry. Contractor will have that cell open for next inspection. 10-31-2022 Entry rod needs epoxy.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/31/2023 APPROVED - AS NOTED AGAETANO
Note: Inspector Notes from Inspection 2340 10/26/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2250 01-31-2023 1. Sheet 7 Typical Frame to ICF at non load walls not fastened as per plans. Check all non bearing walls to exterior wall connections. 2. Please have trash removed prior to next inspection. 9/15/2022 - PREVIOUS INSPECTION NOTES 09-15-2022 UFER ground not visible. NEC 250.53 09-16-2022 Entry on right side soil has collapsed into the footing. UFER installed. 10-26-2022 Missing rod at entry. Contractor will have that cell open for next inspection. 10-31-2022 Entry rod needs epoxy.
FOUND SURVEY APPROVED (OFFICE) 01/25/2023 APPROVED TBAKER
TIE BEAM / LINTEL 10/31/2022 APPROVED - AS NOTED AGAETANO
Note: 10/26/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2250 9/15/2022 - PREVIOUS INSPECTION NOTES 09-15-2022 UFER ground not visible. NEC 250.53 09-16-2022 Entry on right side soil has collapsed into the footing. UFER installed. 10-26-2022 Missing rod at entry. Contractor will have that cell open for next inspection. 10-31-2022 Entry rod needs epoxy.
TIE BEAM / LINTEL 10/26/2022 PARTIALLY APPROVED AGAETANO
Note: Inspector Notes from Inspection 2250 9/15/2022 - PREVIOUS INSPECTION NOTES 09-15-2022 UFER ground not visible. NEC 250.53 09-16-2022 Entry on right side soil has collapsed into the footing. UFER installed. 10-26-2022 Missing rod at entry. Contractor will have that cell open for next inspection.
MONOLITHIC SLAB 09/16/2022 APPROVED - AS NOTED AGAETANO
Note: 9/15/2022 - PREVIOUS INSPECTION NOTES 09-15-2022 UFER ground not visible. NEC 250.53 09-16-2022 Entry on right side soil has collapsed into the footing. UFER installed.
MONOLITHIC SLAB 09/15/2022 Disapproved - NO FEE AGAETANO
Note: 09-15-2022 UFER ground not visible. NEC 250.53
PLUMBING 1ST ROUGH UNDERGROUND 09/08/2022 APPROVED MGIBSON

Review History

Department Status Date In Date Out
MECH COMPLETE 01/10/2024 01/12/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/25/2023 01/25/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/25/2023 01/25/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
MECH COMPLETE 06/09/2022 06/09/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 06/06/2022 06/07/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy calcs need to be signed by the builder
SW1 COMPLETE 06/06/2022 06/09/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/06/2022 06/06/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 06/06/2022 06/07/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SWALE COMPLETE 04/22/2022 07/14/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 04/21/2022 04/22/2022
Note: Released By: FRED REODICA - (386)986-4734 - FREODICA@PALMCOASTGOV.COM
CUSVC COMPLETE 04/21/2022 04/26/2022
Note: Released By: ALYSSA ROSCOE - -
ELEC COMPLETE 04/21/2022 04/22/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/21/2022 04/22/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 04/21/2022 04/26/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 04/21/2022 04/22/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Need balanced return air in master suite on duct layout per M1602.3 exception 3 FBC Residential 2020 7Th edition
SW1 HOLD 04/21/2022 04/28/2022
Note: Held By: PARREN FLANAGAN - - PFLANAGAN@PALMCOASTGOV.COM Proposed elevations are to be clearly noted and discernible from the existing survey data. (A) The proposed elevations shall be shown at all locations of existing elevations per the topographic survey. (A)
ZON COMPLETE 04/21/2022 04/25/2022
Note: Released By: CINDY CHIRI-GONCALVES - - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 01/31/2024
SW ENG - INSPECTION 20 ¤20.00 01/11/2024
SW ENG - INSPECTION 20 ¤20.00 01/11/2024
SW ENG REINSPECTION 30 ¤30.00 01/11/2024
SW ENG - REVIEW 20 ¤20.00 06/24/2022
SW ENG RES REVIEW 200 ¤200.00 06/24/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 06/24/2022
SEWER CREDIT (¤2,465.75) 06/24/2022
SEWER INSPECTION ¤25.00 06/24/2022
SEWER CAPITAL FACILITY ¤4,939.76 06/24/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 06/24/2022
SITE PLAN 30 ¤30.00 06/24/2022
SW ENG INSPECTION 80 ¤80.00 06/24/2022
SW ENG PRE APRON ¤30.00 06/24/2022
WATER- TURN ON ¤25.00 06/24/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/24/2022
INSPECTION - RESIDENTIAL ¤962.50 06/24/2022
PLAN REVIEW - RESIDENTIAL ¤273.00 06/24/2022
CONNECTION FEES ¤1,077.88 06/24/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 06/24/2022
IMPACT FEE FIRE ¤388.65 06/24/2022
IMPACT FEE PARKS ¤1,455.13 06/24/2022
IMPACT FEE SCHOOL ¤3,600.00 06/24/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 06/24/2022
WATER -IRRIGATION INSPECTION ¤25.00 06/24/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 06/24/2022
SURCHARGE FS 533.721 ¤10.49 06/24/2022
SURCHARGE - FS 468.631 ¤15.73 06/24/2022
SW ENG - FOUNDATION SURVEY ¤20.00 06/24/2022
Fees Total Due: ¤0.00 Total Paid: ¤16,127.16