Permit #2022041538
Permit Details
Status: COED
| Parcel Id: 48-11-31-1710-00000-0780 |
| GARAGE: 973 sqft |
| CONDITIONED SPACE: 3229 sqft |
| OPENED PORCH (WITH ROOF) : 59 sqft |
| OPENED PORCH (WITH ROOF) : 730 sqft |
| Total Square Footage: 4991 sqft |
| Block: 00000 |
| Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II |
| Job Phone: 386-445-2012 |
| Location Address: 227 WILLOW OAK WAY |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/20/2022 |
| NOC: RECORDED |
| Applicant name: JOHN NICHOLAS CORDASCI |
| Owner: ALVARADO VICTOR M & DARCY L ALVARADO TRUSTEES |
|
Address 633 CORTE LOREN SAN MARCOS, CA 92069 |
| Lot: 0780 |
| Contracted Stated Job Value: ¤656,509.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SKYWAY BUILDERS INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 354786 PALM COAST, FL 32135 |
CBC1263769 (Exp: 08/31/2024) | 386-445-2012 |
Sub Contractors
MARK JOHN LUTCZA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
26 ROYAL LEAF LANE PALM COAST, FL 32164 |
EC13005145 (Exp: 08/31/2026) | 386-586-0770 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
MARK B SOWERS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
609 FOURTH ST BUNNELL, FL 32110 |
35616 (Exp: 08/31/2026) | 386-225-1753 |
RICHARD GARY WILSON JR
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
1504 OLD MOODY BLVD BUNNELL, FL 32110 |
UNIT 6 BUNNELL, FL 32110 |
CAC1817645 (Exp: 08/31/2026) | 386-586-6290 |
Inspection History
| Type | Request Date | Result | Inspector |
| GAS ROUGH | 03/07/2024 | APPROVED | MGIBSON |
| GAS FINAL | 03/07/2024 | APPROVED | MGIBSON |
| BLD - BUILDING FINAL | 03/07/2024 | FINAL APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2490 05-09-2023 1. Guest bath next to the garage has the supply duct that is pinched. Superintendent will address ASAP. 2. Fire foam missed at low voltage panel at top plate and back right bathroom top plate. Superintendent on site and will address ASAP. Inspector Notes from Inspection 2490 05-09-2023 1. Guest bath next to the garage has the supply duct that is pinched. Superintendent will address ASAP. 2. Fire foam missed at low voltage panel at top plate and back right bathroom top plate. Superintendent on site and will address ASAP. | |||
| ROW - STORMWATER FINAL | 03/06/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTION MADE ON THE PAVERS ----------------------------------------------------------------------------- 2/22/24 APPROVING AS NOTED THERE ARE A COUPLE AREAS WHERE PAVERS NEED TO BE RESET/GLUED. WILL BE COMPLETED BEFORE ROW FINAL PASSAGE. __________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 2/22/24 UPON WALKING PROPERTY DETERMINED DRAINAGE WILL WORK AS INDICATED ON SURVEY. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. __________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 12/27/23 READY TO ;LAY PAVERS AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. __________________________________________________________________________________________________________________________ 12/19/2023 - PREVIOUS INSPECTION NOTES READY TO POUR APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| U -UTILITY RESIDENTIAL FINAL | 02/26/2024 | FINAL APPROVED | LFITZGERALD |
| U-CROSS CONNECTION | 02/26/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: reclaim irr-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 02/22/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/22/24 APPROVING AS NOTED THERE ARE A COUPLE AREAS WHERE PAVERS NEED TO BE RESET/GLUED. WILL BE COMPLETED BEFORE ROW FINAL PASSAGE. __________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 2/22/24 UPON WALKING PROPERTY DETERMINED DRAINAGE WILL WORK AS INDICATED ON SURVEY. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. __________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 12/27/23 READY TO ;LAY PAVERS AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. __________________________________________________________________________________________________________________________ 12/19/2023 - PREVIOUS INSPECTION NOTES READY TO POUR APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/22/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/22/24 UPON WALKING PROPERTY DETERMINED DRAINAGE WILL WORK AS INDICATED ON SURVEY. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. __________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 12/27/23 READY TO ;LAY PAVERS AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. __________________________________________________________________________________________________________________________ 12/19/2023 - PREVIOUS INSPECTION NOTES READY TO POUR APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 02/22/2024 | APPROVED | FSLADISH |
| ROW- PRE-APRON (PRE-POUR) | 12/27/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 12/27/23 READY TO ;LAY PAVERS AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. __________________________________________________________________________________________________________________________ 12/19/2023 - PREVIOUS INSPECTION NOTES READY TO POUR APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PAVER RESTRAINTS | 12/19/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/19/2023 | PARTIALLY APPROVED | PFLANAGAN |
| Note: READY TO POUR APRON AND PAVER RESTRAINTS ONLY. BEFORE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF THE INSPECTION. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC - EARLY POWER | 08/23/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 8-23-23 1. Emailed FPL at 10:50. | |||
| GRAVITY SEWER TEST | 07/26/2023 | APPROVED | TSTAUFFACHER |
| U - SEWER TIE IN | 07/26/2023 | APPROVED | TSTAUFFACHER |
| ELECTRIC-TUG | 06/29/2023 | APPROVED | RMARTIN |
| LATH/BRICK/ WATER BARRIER | 05/09/2023 | APPROVED | AGAETANO |
| INSULATION | 05/09/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 05-09-2023 1. Guest bath next to the garage has the supply duct that is pinched. Superintendent will address ASAP. 2. Fire foam missed at low voltage panel at top plate and back right bathroom top plate. Superintendent on site and will address ASAP. | |||
| ALL ROUGH | 03/28/2023 | APPROVED | TSTAUFFACHER |
| GAS ROUGH | 03/28/2023 | APPROVED | TSTAUFFACHER |
| WALL SHEATHING | 12/09/2022 | APPROVED | DCUSHING |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/09/2022 | APPROVED | DCUSHING |
| ROOF VALLEY & METAL | 12/09/2022 | APPROVED | DCUSHING |
| FOUND SURVEY APPROVED (OFFICE) | 09/16/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 09/14/2022 | APPROVED | LMILLER |
| MONOLITHIC SLAB | 08/08/2022 | APPROVED | DCUSHING |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/04/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 06/15/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 02/20/2024 | 02/22/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/20/2024 | 02/22/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/15/2022 | 09/16/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/15/2022 | 09/15/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/09/2022 | 05/09/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/06/2022 | 05/06/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 05/06/2022 | 05/06/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM No comments | |||
| BLD | HOLD | 05/06/2022 | 05/06/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/06/2022 | 05/06/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/06/2022 | 05/13/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 05/03/2022 | 05/04/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM According to the Site Plan/Survey submitted on 4/26/22 the structure does not fall within SFHA. However, the Site Plan/Survey do not note all flood zones in the notes/description. Please revise. | |||
| BLD | HOLD | 04/28/2022 | 05/04/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Provide a completed City of palm Coast Roofing Worksheet. 2. Provide Product Approval for proposed Sola Tube. Per F.S. 471.025 and F.A.C. 61 G15-23.005. | |||
| CUSVC | COMPLETE | 04/28/2022 | 05/03/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 04/28/2022 | 05/01/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/28/2022 | 04/29/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 04/28/2022 | 05/02/2022 |
| Note: Released By: TONI CHURCHILL - - | |||
| MECH | COMPLETE | 04/28/2022 | 04/29/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/28/2022 | 05/05/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 04/28/2022 | 05/03/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Survey notes do not have all flood zones listed Driveway width must be a minimum of 16ft |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 03/08/2024 |
| CONNECTION FEES | ¤25.00 | 05/20/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 05/20/2022 |
| IMPACT FEE FIRE | ¤388.65 | 05/20/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 05/20/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/20/2022 |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | 05/20/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 05/20/2022 |
| SURCHARGE FS 533.721 | ¤39.31 | 05/20/2022 |
| SURCHARGE - FS 468.631 | ¤58.97 | 05/20/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/20/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/20/2022 |
| SW ENG PRE APRON | ¤30.00 | 05/20/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/20/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/20/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤96.72) | 05/20/2022 |
| SEWER INSPECTION | ¤25.00 | 05/20/2022 |
| WORK WITHOUT PERMIT | ¤1,965.03 | 05/20/2022 |
| SITE PLAN 30 | ¤30.00 | 05/20/2022 |
| WATER-METER | ¤467.09 | 05/20/2022 |
| WATER-METER | ¤388.04 | 05/20/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/20/2022 |
| INSPECTION - RESIDENTIAL | ¤1,806.75 | 05/20/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤512.46 | 05/20/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,245.90 |