I want to search for...
Permit #2022041543
Permit Details
Status: COED
| Parcel Id: 07-11-31-7026-00730-0240 |
| CONDITIONED SPACE: 1900 sqft |
| GARAGE: 471 sqft |
| OPENED PORCH (WITH ROOF) : 24 sqft |
| OPENED PORCH (WITH ROOF) : 144 sqft |
| Total Square Footage: 2539 sqft |
| Block: 00730 |
| Subdivision: 2153 - SECTION 26-PINE GROVE |
| Job Phone: 912-258-2201 |
| Location Address: 3 PITTWICK LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/14/2022 |
| NOC: RECORDED |
| Applicant name: JAMES FUCETOLA III |
| Owner: PALM COAST COMMUNITIES LLC |
|
Address PO BOX 22547 ST SIMONS ISLAND, GA 31522 |
| Lot: 0240 |
| Contracted Stated Job Value: ¤170,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PALM COAST COMMUNITIES LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 22547 PALM COAST, FL 32164 |
CBC1262878 (Exp: 08/31/2026) | 321-501-4617 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/08/2023 | FINAL APPROVED | BTAYLOR |
| U -UTILITY RESIDENTIAL FINAL | 06/08/2023 | FINAL APPROVED | LFITZGERALD |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/07/2023 | APPROVED | FSLADISH |
| Note: CORRECTIONS MADE. LOOKED GOOD AT THE TIME OF INSPECTION. ________________________________________________________________________________________________________________________ 6/6/2023 - PREVIOUS INSPECTION NOTES 6/5/2023 - PREVIOUS INSPECTION NOTES 06/05/23 WALKED PROPERTY, NEED TO SEED AND STRAW REAR PROPERTY LINE TO PREVENT EROSION. WILL NEED TO REMOVE DIRT FROM RIGHT SIDE SWALE AT ADJOINING PROPERTY LINE. | |||
| ROW - STORMWATER FINAL | 06/07/2023 | FINAL APPROVED | FSLADISH |
| Note: 06/07/23 AT THE TIME OF INSPECTION EVERYTHING LOOKED GOOD. | |||
| ROW - FINAL APRON (AFTER POUR) | 06/07/2023 | APPROVED | FSLADISH |
| Note: 06/07/23 PIPE ELEVATION IS GOOD. CUTS MADE. CULVERTS CLEAR. LOOKED GOOD AT TIME OF INSPECTION. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/06/2023 | CANCELLED BY APPLICANT | FSLADISH |
| Note: 6/5/2023 - PREVIOUS INSPECTION NOTES 06/05/23 WALKED PROPERTY, NEED TO SEED AND STRAW REAR PROPERTY LINE TO PREVENT EROSION. WILL NEED TO REMOVE DIRT FROM RIGHT SIDE SWALE AT ADJOINING PROPERTY LINE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/05/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 06/05/23 WALKED PROPERTY, NEED TO SEED AND STRAW REAR PROPERTY LINE TO PREVENT EROSION. WILL NEED TO REMOVE DIRT FROM RIGHT SIDE SWALE AT ADJOINING PROPERTY LINE. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 06/05/2023 | APPROVED | FSLADISH |
| U-CROSS CONNECTION | 05/24/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irrigation with DBL CHECK-no cross connection | |||
| ELECTRIC - EARLY POWER | 05/19/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 1148. Release Power | |||
| ROW- PRE-APRON (PRE-POUR) | 05/04/2023 | APPROVED | FSLADISH |
| Note: 05/04/23 READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| U - SEWER TIE IN | 04/27/2023 | APPROVED | KSANDOE |
| PEP TANK INSTALLATION REQUEST | 04/06/2023 | APPROVED | TSCHWEERS |
| INSULATION | 03/28/2023 | APPROVED | KSANDOE |
| LATH/BRICK/ WATER BARRIER | 03/17/2023 | APPROVED | KSANDOE |
| ALL ROUGH | 03/13/2023 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 2460 1. Truss HJO3 right side rear porch missing hold down anchor. 2. Install truss plates or a moisture barrier at the truss landing on the CMU walls at the front entry. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/06/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 1. Truss HJO3 right side rear porch missing hold down anchor. 2. Install truss plates or a moisture barrier at the truss landing on the CMU walls at the front entry. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/03/2023 | Disapproved - NO FEE | KSANDOE |
| Note: 3/3/23 Need building plans on site for inspection 02/10/2023- Bumped roof sheathing/ approved during wall sheating inspection | |||
| ROOF VALLEY & METAL | 02/21/2023 | APPROVED | KSANDOE |
| ROOF SHEATHING | 02/14/2023 | APPROVED | KSANDOE |
| WALL SHEATHING | 02/10/2023 | APPROVED | TSTAUFFACHER |
| FOUND SURVEY APPROVED (OFFICE) | 02/09/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 01/26/2023 | APPROVED | KSANDOE |
| MONOLITHIC SLAB | 01/19/2023 | APPROVED | KSANDOE |
| Note: 1/17/2023 - PREVIOUS INSPECTION NOTES Missing compaction report Additional compaction needed along leeft side near bathroom | |||
| MONOLITHIC SLAB | 01/17/2023 | Disapproved - NO FEE | KSANDOE |
| Note: Missing compaction report Additional compaction needed along leeft side near bathroom | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/12/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 01/12/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 11/28/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 03/22/2023 | 03/22/2023 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Need updated NOC. This NOC is expired. | |||
| BLD | COMPLETE | 02/14/2023 | 02/15/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/07/2023 | 02/09/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/07/2023 | 02/07/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/10/2022 | 05/10/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/10/2022 | 05/10/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/10/2022 | 05/10/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/10/2022 | 05/16/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 04/29/2022 | 06/27/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 04/28/2022 | 05/04/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. [A] 107.3.4.1 Deferred Submittals - Deferral of any submittal items shall have the prior approval of the building official. The registered design professional in responsible charge shall list the deferred submittals on the construction documents for review by the building official. | |||
| CUSVC | COMPLETE | 04/28/2022 | 05/03/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 04/28/2022 | 04/29/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/28/2022 | 04/29/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 04/28/2022 | 05/02/2022 |
| Note: Released By: TONI CHURCHILL - - | |||
| MECH | COMPLETE | 04/28/2022 | 04/29/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/28/2022 | 05/05/2022 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. (I) Remember when you start doing the re grade for property line | |||
| ZON | HOLD | 04/28/2022 | 05/04/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Rear setback must be from furthest rear patio to property line Front entry on site plan doesn't match plans and landscape plan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 06/09/2023 |
| CONNECTION FEES | ¤1,077.88 | 11/14/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 11/14/2022 |
| IMPACT FEE FIRE | ¤388.65 | 11/14/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 11/14/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 11/14/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 11/14/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/14/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 11/14/2022 |
| SURCHARGE FS 533.721 | ¤2.86 | 11/14/2022 |
| SURCHARGE - FS 468.631 | ¤4.28 | 11/14/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/14/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/14/2022 |
| SW ENG PRE APRON | ¤30.00 | 11/14/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/14/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/14/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 11/14/2022 |
| SEWER CREDIT | (¤1,147.00) | 11/14/2022 |
| SEWER INSPECTION | ¤25.00 | 11/14/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 11/14/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 11/14/2022 |
| SITE PLAN 30 | ¤30.00 | 11/14/2022 |
| WATER- TURN ON | ¤25.00 | 11/14/2022 |
| ADJUSTMENT 50% | (¤433.31) | 11/14/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/14/2022 |
| INSPECTION - RESIDENTIAL | ¤651.75 | 11/14/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤184.86 | 11/14/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,524.63 |