I want to search for...
Permit #2022050573
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-01430-0010 |
| CONDITIONED SPACE: 2526 sqft |
| GARAGE: 711 sqft |
| PATIO/DECK (NO ROOF) : 45 sqft |
| OPENED PORCH (WITH ROOF) : 323 sqft |
| Total Square Footage: 3605 sqft |
| Block: 01430 |
| Subdivision: 2176 - SECTION 37-LAKEVIEW |
| Job Phone: 386-283-7499 |
| Location Address: 66 LEE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/23/2022 |
| NOC: RECORDED |
| Applicant name: WILLIAM ROBERT BARRICK |
| Owner: INTRACOASTAL PROPERTIES V LLC |
|
Address PO BOX 9 CISSNA PARK, IL 60924 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤298,495.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
RBI ENTERPRISES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
10 WHITTINGTON DR PALM COAST, FL 32164 |
RB29003845 (Exp: 08/31/2025) | 386-585-4097 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
DAVID SCOTT MORRIS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
63 LEIDEL DR PALM COAST, FL 32137 |
ER13015750 (Exp: 08/31/2026) | 386-569-7262 |
WILLIAM ROBERT BARRICK
| Status | Location Address | State License Number | Phone |
| CANCEL |
21 CEDARWOOD CT PALM COAST, FL 32137 |
RC29027799 (Exp: 08/31/2023) | 229-375-9123 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/06/2023 | FINAL APPROVED | TSTAUFFACHER |
| Note: 3/3/2023 - PREVIOUS INSPECTION NOTES 3/3/2023---Energy calcs dont match, Please send in revision. Ufer ground broke (electrician onsite for repair). | |||
| BLD - BUILDING FINAL | 03/03/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 3/3/2023---Energy calcs dont match, Please send in revision. Ufer ground broke (electrician onsite for repair). | |||
| U-CROSS CONNECTION | 02/14/2023 | APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 02/14/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - STORMWATER FINAL | 02/14/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| U -UTILITY RESIDENTIAL FINAL | 02/14/2023 | FINAL APPROVED | DHANEY |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/07/2023 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/07/2023 | APPROVED | PFLANAGAN |
| ROW- PRE-APRON (PRE-POUR) | 01/17/2023 | APPROVED | EMADISON |
| Note: ** 01/17/23 READY TO POUR RECHECK ELEVATIONS AND COMPACTION IN THE EVENT OF RAIN ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ELECTRIC - EARLY POWER | 12/27/2022 | APPROVED - AS NOTED | JMUNSON |
| Note: Ground wire needs to be protected by next inspection. NEC 2017 250.64 | |||
| GRAVITY SEWER TEST | 12/13/2022 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 12/13/2022 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 11/18/2022 | APPROVED | CSTONE |
| Note: 11/8/2022 2:11:11 PM- PREVIOUS INSPECTION NOTES dumpster will need to move | |||
| PEP TANK INSTALLATION REQUEST | 11/08/2022 | Disapproved - NO FEE | CSTONE |
| Note: dumpster will need to move | |||
| INSULATION | 10/28/2022 | APPROVED | FWILLIS |
| LATH/BRICK/ WATER BARRIER | 10/26/2022 | APPROVED | FWILLIS |
| ALL ROUGH | 10/14/2022 | APPROVED | MKRASKI |
| ROOF VALLEY & METAL | 08/30/2022 | APPROVED | AGAETANO |
| WALL SHEATHING | 08/23/2022 | APPROVED | RMARTIN |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/23/2022 | APPROVED | RMARTIN |
| FOUND SURVEY APPROVED (OFFICE) | 08/22/2022 | APPROVED | TDOAK |
| TIE BEAM / LINTEL | 07/26/2022 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 07/12/2022 | APPROVED | RMARTIN |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/06/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 06/08/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 03/03/2023 | 03/03/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/22/2022 | 08/22/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/22/2022 | 08/22/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/19/2022 | 05/19/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/10/2022 | 05/12/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 05/10/2022 | 05/12/2022 |
| Note: Released By: ALYSSA ROSCOE - - | |||
| ELEC | COMPLETE | 05/10/2022 | 05/10/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/10/2022 | 05/10/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/10/2022 | 05/13/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/10/2022 | 05/10/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Is AHU Hanging in Garage? If hanging provide support details on plans. | |||
| SW1 | COMPLETE | 05/10/2022 | 05/16/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/10/2022 | 05/12/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 05/10/2022 | 07/22/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 03/08/2023 |
| CONNECTION FEES | ¤1,077.88 | 05/23/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 05/23/2022 |
| IMPACT FEE FIRE | ¤388.65 | 05/23/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 05/23/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/23/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 05/23/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/23/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/23/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 05/23/2022 |
| SURCHARGE FS 533.721 | ¤9.75 | 05/23/2022 |
| SURCHARGE - FS 468.631 | ¤14.63 | 05/23/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/23/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/23/2022 |
| SW ENG PRE APRON | ¤30.00 | 05/23/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/23/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/23/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 05/23/2022 |
| SEWER INSPECTION | ¤25.00 | 05/23/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 05/23/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 05/23/2022 |
| SITE PLAN 30 | ¤30.00 | 05/23/2022 |
| WATER-METER | ¤467.09 | 05/23/2022 |
| WATER- TURN ON | ¤25.00 | 05/23/2022 |
| WATER- TURN ON | ¤25.00 | 05/23/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/23/2022 |
| INSPECTION - RESIDENTIAL | ¤891.00 | 05/23/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤252.72 | 05/23/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,946.38 |