I want to search for...

Permit #2022050621

Permit Details

Status: COED

Parcel Id: 07-11-31-7017-00010-0910
CONDITIONED SPACE: 1721 sqft
GARAGE: 455 sqft
OPENED PORCH (WITH ROOF) : 173 sqft
OPENED PORCH (WITH ROOF) : 110 sqft
Total Square Footage: 2459 sqft
Block: 00010
Subdivision: 2129 - SECTION 17-BELLE TERRE
Job Phone: 631-929-5500
Location Address: 211 BOULDER ROCK DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 12/27/2022
NOC: RECORDED
Applicant name: NICHOLAS JOHN ZOUMAS
Owner: WICKAPOGUE RE DEVELOPMENT LLC

Address

STE 110

GREENWOOD VILLAGE, CO 80111

Address

5460 S QUEBEC ST

GREENWOOD VILLAGE, CO 80111

Lot: 0910
Contracted Stated Job Value: ¤160,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

JNS CONTRACTING FLORIDA, LLC
Status Location Address State License Number Phone
ACTIVE

256 ROUTE 25A

WADING RIVER, NY 11792

CGC1527793 (Exp: 08/31/2026) 631-929-5500

Sub Contractors

NICHOLAS JOHN ZOUMAS
Status Location Address State License Number Phone
ACTIVE

256 ROUTE 25A

WADING RIVER, NY 11792

CGC1527793 (Exp: 08/31/2026) 631-929-5500
JAMES MCGOVERN
Status Location Address Phone Fax
ACTIVE

PO BOX 354295

PALM COAST, FL 32137

(386)931-8940 (386)986-4835
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/27/2023 FINAL APPROVED JSTEWART
U -UTILITY RESIDENTIAL FINAL 07/24/2023 FINAL APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 07/20/2023 APPROVED GBERTOLA
Note: 7/20/23= CORRECTION WERE MADE At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 4/26/2023 - PREVIOUS INSPECTION NOTES ** 04/26/23 RIGHT SIDE NEAR A/C UNIT BUILDER CREATED A HIGH SPOT WHICH WILL NOT ALLOW THE STORM WATER TO FLOW TO FRONT NOTE PINK PAINT ** RIGHT SIDE BUILDER NEEDS TO REMOVE BARK MULCH FROM THE DRAINAGE CONVEYANCE AND REPLACE SOD AREA TO BE REPAIRED HIGH LIGHTED WITH PINK PAINT. _______________________________________________________________________________________________________________________ 4/11/2023 - PREVIOUS INSPECTION NOTES THERE IS ALOT SOD MISSING ON THE RIGHT SIDE OF HOME NEED TO BE FIXED BEFORE PASSING
ROW - STORMWATER FINAL 07/20/2023 APPROVED GBERTOLA
Note: CORRECTION WERE MADE At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved.
ROW - FINAL APRON (AFTER POUR) 07/20/2023 APPROVED GBERTOLA
Note: CORRECTION WERE MADE At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved.
ROW- PROJECT STATUS 05/30/2023 APPROVED FSLADISH
ROW FIELD SURVEY /GRADING CERTIFICATION 04/26/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 04/26/23 RIGHT SIDE NEAR A/C UNIT BUILDER CREATED A HIGH SPOT WHICH WILL NOT ALLOW THE STORM WATER TO FLOW TO FRONT NOTE PINK PAINT ** RIGHT SIDE BUILDER NEEDS TO REMOVE BARK MULCH FROM THE DRAINAGE CONVEYANCE AND REPLACE SOD AREA TO BE REPAIRED HIGH LIGHTED WITH PINK PAINT. _______________________________________________________________________________________________________________________ 4/11/2023 - PREVIOUS INSPECTION NOTES THERE IS ALOT SOD MISSING ON THE RIGHT SIDE OF HOME NEED TO BE FIXED BEFORE PASSING
ROW FIELD SURVEY /GRADING CERTIFICATION 04/11/2023 Disapproved - NO FEE PFLANAGAN
Note: THERE IS ALOT SOD MISSING ON THE RIGHT SIDE OF HOME NEED TO BE FIXED BEFORE PASSING
FINAL SURVEY (OFFICE USE ONLY) 04/11/2023 APPROVED PFLANAGAN
ELECTRIC - EARLY POWER 03/24/2023 APPROVED JSTEWART
ROW- PRE-APRON (PRE-POUR) 03/07/2023 APPROVED PFLANAGAN
Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING DRIVEWAY --------------------------------------------------------------------------------- 3/6/2023 - PREVIOUS INSPECTION NOTES 03/6/23= NEED TO RESET THE FORM BOARD BY THE EDGE OF THE ROAD IS DOWN ON THE LEFT SIDE AND THE FORM BOARD BY THE WING ON THE LEFT SIDE APRON . CULVERT PIPE IS GOOD
ROW- PRE-APRON (PRE-POUR) 03/06/2023 Disapproved - NO FEE GBERTOLA
Note: 03/6/23= NEED TO RESET THE FORM BOARD BY THE EDGE OF THE ROAD IS DOWN ON THE LEFT SIDE AND THE FORM BOARD BY THE WING ON THE LEFT SIDE APRON . CULVERT PIPE IS GOOD
U-CROSS CONNECTION 02/24/2023 APPROVED - AS NOTED DHANEY
Note: Yard not installed yet - no cross cn. .
U - SEWER TIE IN 02/24/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 02/24/2023 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 NEED TO PROVIDE PORTABLE RESTROOM BEFORE SLAB INSPECTION THIS WAS A VIRTUAL INSPECTION
PEP TANK INSTALLATION REQUEST 02/10/2023 APPROVED - AS NOTED TSCHWEERS
Note: Gravity Sewer no need for pep tank.
INSULATION 02/06/2023 APPROVED FWILLIS
ALL ROUGH 02/02/2023 APPROVED KSANDOE
Note: 1/31/2023 - PREVIOUS INSPECTION NOTES Not ready for inspection 1. need all approved documents on site for inspection 107.3 2. 5ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 (1) 3. Missing Duct layout (could not inspect Ductwork) 4. Missing Ffireblocking at range wall FIREBLOCKING REQUIRED R302.11 (1-6) 5. wrong nail plates used on range vents NAIL PLATES FBC… R, M1308.2 PROTECTION FROM PHYSICAL DAMAGE… IF PIPE IS LESS THAN 1.5” FROM EDGE IT MUST BE PROTECTED WITH A MINIMUM OF 16 GAGE STEEL PLATE AND PLATE MUST EXTEND A MINIMUM OF 2” ABOVE THE SOLE PLATES AND BELOW THE TOP PLATES inspection stopped
LATH/BRICK/ WATER BARRIER 02/01/2023 APPROVED FWILLIS
ALL ROUGH 01/31/2023 Disapproved -FEE REQUIRED LMILLER
Note: Not ready for inspection 1. need all approved documents on site for inspection 107.3 2. 5ft HEAD OF WATER, FBC CHAPTER 25 SECTION P2503.5.1 (1) 3. Missing Duct layout (could not inspect Ductwork) 4. Missing Ffireblocking at range wall FIREBLOCKING REQUIRED R302.11 (1-6) 5. wrong nail plates used on range vents NAIL PLATES FBC… R, M1308.2 PROTECTION FROM PHYSICAL DAMAGE… IF PIPE IS LESS THAN 1.5” FROM EDGE IT MUST BE PROTECTED WITH A MINIMUM OF 16 GAGE STEEL PLATE AND PLATE MUST EXTEND A MINIMUM OF 2” ABOVE THE SOLE PLATES AND BELOW THE TOP PLATES inspection stopped
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/19/2023 APPROVED FWILLIS
ROOF VALLEY & METAL 01/18/2023 APPROVED FWILLIS
WALL SHEATHING 01/18/2023 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 01/17/2023 APPROVED AMOBLEY
TIE BEAM / LINTEL 01/10/2023 APPROVED KSANDOE
Note: Inspector Notes from Inspection 2250 Minor cave-in in garage on left side. Clear before pour
MONOLITHIC SLAB 01/04/2023 APPROVED - AS NOTED KSANDOE
Note: Minor cave-in in garage on left side. Clear before pour
PLUMBING 1ST ROUGH UNDERGROUND 12/29/2022 APPROVED - AS NOTED MGIBSON
Note: NEED TO PROVIDE PORTABLE RESTROOM BEFORE SLAB INSPECTION
WATER METER INSTALLATION REQUEST 12/29/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 03/28/2023 03/29/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 01/17/2023 01/17/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/16/2023 01/17/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/16/2023 01/17/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
MECH COMPLETE 01/10/2023 01/10/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 06/21/2022 06/21/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SWALE COMPLETE 05/11/2022 07/25/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 05/10/2022 05/11/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 05/10/2022 05/12/2022
Note: Released By: ALYSSA ROSCOE - -
ELEC COMPLETE 05/10/2022 05/11/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/10/2022 05/11/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 05/10/2022 05/19/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 05/10/2022 05/11/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy calcs does not match the site plan. Revise to match
SW1 COMPLETE 05/10/2022 05/16/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 05/10/2022 05/13/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 07/27/2023
PLAN REVIEW - REVISION ¤32.50 07/27/2023
PLAN REVIEW - REVISION ¤32.50 07/27/2023
REINSPECTION RESIDENTIAL ¤40.00 07/27/2023
SW ENG REINSPECTION 20 ¤20.00 07/27/2023
SW ENG REINSPECTION 20 ¤20.00 07/27/2023
SEWER CAPITAL FACILITY ¤405.06 12/29/2022
WATER CAPITAL FACILITY FEE ¤297.38 12/29/2022
CONNECTION FEES ¤88.38 12/29/2022
CONNECTION FEES ¤1,077.88 12/27/2022
CONTRACTOR CHANGE ¤20.00 12/27/2022
CONTRACTOR CHANGE ¤20.00 12/27/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 12/27/2022
IMPACT FEE FIRE ¤388.65 12/27/2022
IMPACT FEE PARKS ¤1,455.13 12/27/2022
IMPACT FEE SCHOOL ¤3,600.00 12/27/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 12/27/2022
WATER -IRRIGATION INSPECTION ¤25.00 12/27/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 12/27/2022
SURCHARGE FS 533.721 ¤2.69 12/27/2022
SURCHARGE - FS 468.631 ¤4.04 12/27/2022
SW ENG - FOUNDATION SURVEY ¤20.00 12/27/2022
SW ENG INSPECTION 80 ¤80.00 12/27/2022
SW ENG PRE APRON ¤30.00 12/27/2022
SITE PLAN 30 ¤30.00 12/27/2022
SEWER CAPITAL FACILITY ¤4,939.76 12/27/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 12/27/2022
SW ENG - REVIEW 20 ¤20.00 12/27/2022
SW ENG RES REVIEW 200 ¤200.00 12/27/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 12/27/2022
SEWER CREDIT (¤1,147.00) 12/27/2022
SEWER INSPECTION ¤25.00 12/27/2022
WATER- TURN ON ¤25.00 12/27/2022
ADJUSTMENT 50% (¤405.07) 12/27/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 12/27/2022
INSPECTION - RESIDENTIAL ¤607.75 12/27/2022
PLAN REVIEW - RESIDENTIAL ¤172.38 12/27/2022
Fees Total Due: ¤0.00 Total Paid: ¤17,471.80