I want to search for...
Permit #2022050629
Permit Details
Status: COED
| Parcel Id: 07-11-31-7058-00280-0120 |
| CONDITIONED SPACE: 1721 sqft |
| GARAGE: 455 sqft |
| OPENED PORCH (WITH ROOF) : 173 sqft |
| OPENED PORCH (WITH ROOF) : 110 sqft |
| Total Square Footage: 2459 sqft |
| Block: 00280 |
| Subdivision: 2215 - SECTION 58-SEMINOLE PARK |
| Job Phone: 631-929-5500 |
| Location Address: 5 SERENADE PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/23/2022 |
| NOC: RECORDED |
| Applicant name: NICHOLAS JOHN ZOUMAS |
| Owner: WICKAPOGUE RE DEVELOPMENT LLC |
|
Address SUITE 300 ORLANDO, FL 32819 |
|
Address 7450 DR PHILLIPS BLVD ORLANDO, FL 32819 |
| Lot: 0120 |
| Contracted Stated Job Value: ¤160,000.00 |
| Job Description: Single Family Home |
| Type: CN |
Contractor
JNS CONTRACTING FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
Sub Contractors
NICHOLAS JOHN ZOUMAS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
JAMES MCGOVERN
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 354295 PALM COAST, FL 32137 |
(386)931-8940 | (386)986-4835 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/02/2023 | FINAL APPROVED | BTAYLOR |
| Note: 7/28/2023 - PREVIOUS INSPECTION NOTES 7/28/23: Cancelled by Applicant via text at @ 07:16. Stated that vendor needed to button up some items. | |||
| BLD - BUILDING FINAL | 07/28/2023 | CANCELLED BY APPLICANT | RSIMS |
| Note: 7/28/23: Cancelled by Applicant via text at @ 07:16. Stated that vendor needed to button up some items. | |||
| U -UTILITY RESIDENTIAL FINAL | 07/28/2023 | FINAL APPROVED | JHARDING |
| ROW - FINAL APRON (AFTER POUR) | 07/25/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/25/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/25/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 07/25/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC - EARLY POWER | 05/02/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 1 :30 PM | |||
| ROW- PRE-APRON (PRE-POUR) | 04/26/2023 | APPROVED | PFLANAGAN |
| Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING THE CONCRETE FOR DRIVEWAY. | |||
| U - SEWER TIE IN | 04/06/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 04/06/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U-CROSS CONNECTION | 04/06/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| LATH/BRICK/ WATER BARRIER | 03/29/2023 | APPROVED | BTAYLOR |
| INSULATION | 03/22/2023 | APPROVED | BTAYLOR |
| ALL ROUGH | 03/20/2023 | APPROVED | BTAYLOR |
| ELECTRIC-TUG | 03/08/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 3-8-23 1. Emailed FPL at 2:00. | |||
| ROOF VALLEY & METAL | 02/27/2023 | APPROVED | BTAYLOR |
| WALL SHEATHING | 02/23/2023 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/23/2023 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 02/16/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 02/08/2023 | APPROVED | BTAYLOR |
| Note: 2/7/2023 - PREVIOUS INSPECTION NOTES 2-7-23 1. Missing rebar dowel at front left of house. Circled on plan | |||
| TIE BEAM / LINTEL | 02/07/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 2-7-23 1. Missing rebar dowel at front left of house. Circled on plan | |||
| MONOLITHIC SLAB | 01/31/2023 | APPROVED | JWALKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 01/27/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 12/07/2022 | APPROVED | TCHURCHILL |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 04/05/2023 | 04/05/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/16/2023 | 02/16/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/16/2023 | 02/16/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/17/2022 | 05/17/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/17/2022 | 05/17/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/17/2022 | 05/23/2022 |
| Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/17/2022 | 05/17/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 05/11/2022 | 07/26/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/10/2022 | 05/11/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 05/10/2022 | 05/12/2022 |
| Note: Released By: ALYSSA ROSCOE - - | |||
| ELEC | COMPLETE | 05/10/2022 | 05/11/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/10/2022 | 05/11/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/10/2022 | 05/13/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/10/2022 | 05/11/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy Calcs does not match the site plan. revise to match | |||
| SW1 | COMPLETE | 05/10/2022 | 05/16/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/10/2022 | 05/13/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 08/02/2023 |
| CONNECTION FEES | ¤1,077.88 | 11/23/2022 |
| CONTRACTOR CHANGE | ¤20.00 | 11/23/2022 |
| CONTRACTOR CHANGE | ¤20.00 | 11/23/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 11/23/2022 |
| IMPACT FEE FIRE | ¤388.65 | 11/23/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 11/23/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 11/23/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 11/23/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/23/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 11/23/2022 |
| SURCHARGE FS 533.721 | ¤2.69 | 11/23/2022 |
| SURCHARGE - FS 468.631 | ¤4.04 | 11/23/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/23/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/23/2022 |
| SW ENG PRE APRON | ¤30.00 | 11/23/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/23/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/23/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 11/23/2022 |
| SEWER CREDIT | (¤1,700.00) | 11/23/2022 |
| SEWER INSPECTION | ¤25.00 | 11/23/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 11/23/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 11/23/2022 |
| SITE PLAN 30 | ¤30.00 | 11/23/2022 |
| WATER- TURN ON | ¤25.00 | 11/23/2022 |
| ADJUSTMENT 50% | (¤405.07) | 11/23/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/23/2022 |
| INSPECTION - RESIDENTIAL | ¤607.75 | 11/23/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤172.38 | 11/23/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,982.98 |