Permit #2022050630
Permit Details
Status: COED
| Parcel Id: 07-11-31-7028-00620-0160 |
| CONDITIONED SPACE: 1721 sqft |
| GARAGE: 455 sqft |
| CONDITIONED SPACE: 110 sqft |
| OPENED PORCH (WITH ROOF) : 173 sqft |
| Total Square Footage: 2459 sqft |
| Block: 00620 |
| Subdivision: 2199 - SECTION 28-WYNNFIELD |
| Job Phone: 631-929-5500 |
| Location Address: 40 POST VIEW DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/14/2022 |
| NOC: RECORDED |
| Applicant name: NICHOLAS JOHN ZOUMAS |
| Owner: WICKAPOGUE RE DEVELOPMENT LLC |
|
Address 5460 S QUEBEC STREET 110 ENGLEWOOD, CO 80111 |
| Lot: 0160 |
| Contracted Stated Job Value: ¤160,000.00 |
| Job Description: Single Family residence |
| Type: CN |
Contractor
JNS CONTRACTING FLORIDA, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
Sub Contractors
JAMES MCGOVERN
| Status | Location Address | Phone | Fax |
| ACTIVE |
PO BOX 354295 PALM COAST, FL 32137 |
(386)931-8940 | (386)986-4835 |
NICHOLAS JOHN ZOUMAS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
256 ROUTE 25A WADING RIVER, NY 11792 |
CGC1527793 (Exp: 08/31/2026) | 631-929-5500 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
MICHAEL FRANK MORELLO
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2 HARGROVE GRADE PALM COAST, FL 32164 |
CAC1819466 (Exp: 08/31/2026) | 386-445-5023 | 386-446-4614 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 08/17/2023 | APPROVED | GBERTOLA |
| Note: 8/17/23= At the time of the inspection, all minimum city requirements were met. It is the builder's responsibility to ensure that nothing changes after this Inspection is approved. City add this swales to be re grade.Please, Re grade the swale from 31 to the outfall on 36 Post View Dr, Water can not reach the outfall. 8/10/2023 - PREVIOUS INSPECTION NOTES 08/10/23 RIGHT SIDE SWALE IS HOLDING WATER. NOT FLOWING PROPERLY. PEVIOUS INSPECTION NOTED THIS NEEDED A FULL REGRADE AND SOD RESET. SWALE PLAN DIAGRAM SHOWS FLOW FROM LEFT TO RIGHT. IT IS NOT ON THE RIGHT SIDE. SUURVEY SHOWS FLOW CORRECT BUT THIS IS NOT REFLECTED IN THE FIELD. THIS NEEDS TO BE CORRECTED BEFORE ROW FINAL PASSAGE. PLEASE SEE PHOTOS FOR REFERENCE ___________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9272 08/10/23 PIPE IS CORRECT. CUTS MADE. CULVERT CLEAR BUT FULL DUE TO SWALE NOT FLOWING PROPERLY. SWALE NEEDS TO BE FIXED BEFORE ROW FINAL PASSAGE. _______________________________________________________________________________________________________________________ 5/1/2023 - PREVIOUS INSPECTION NOTES NEED TO HAVE ROAD HOT PATCH DONE BEFORE THIS INSPECTION -------------------------------------------------------------------------------------------- 4/26/2023 - PREVIOUS INSPECTION NOTES 04/26/23 HOT PATCH NOT COMPLETED. | |||
| ROW- PROJECT STATUS | 08/11/2023 | APPROVED | GBERTOLA |
| Note: MEETINGWITH THE BUILDER need to bring the swale up | |||
| BLD - BUILDING FINAL | 08/10/2023 | FINAL APPROVED | KSANDOE |
| ROW - FINAL APRON (AFTER POUR) | 08/10/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 08/10/23 PIPE IS CORRECT. CUTS MADE. CULVERT CLEAR BUT FULL DUE TO SWALE NOT FLOWING PROPERLY. SWALE NEEDS TO BE FIXED BEFORE ROW FINAL PASSAGE. _______________________________________________________________________________________________________________________ 5/1/2023 - PREVIOUS INSPECTION NOTES NEED TO HAVE ROAD HOT PATCH DONE BEFORE THIS INSPECTION -------------------------------------------------------------------------------------------- 4/26/2023 - PREVIOUS INSPECTION NOTES 04/26/23 HOT PATCH NOT COMPLETED. | |||
| ROW - STORMWATER FINAL | 08/10/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 08/10/23 RIGHT SIDE SWALE IS HOLDING WATER. NOT FLOWING PROPERLY. PEVIOUS INSPECTION NOTED THIS NEEDED A FULL REGRADE AND SOD RESET. SWALE PLAN DIAGRAM SHOWS FLOW FROM LEFT TO RIGHT. IT IS NOT ON THE RIGHT SIDE. SUURVEY SHOWS FLOW CORRECT BUT THIS IS NOT REFLECTED IN THE FIELD. THIS NEEDS TO BE CORRECTED BEFORE ROW FINAL PASSAGE. PLEASE SEE PHOTOS FOR REFERENCE ___________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9272 08/10/23 PIPE IS CORRECT. CUTS MADE. CULVERT CLEAR BUT FULL DUE TO SWALE NOT FLOWING PROPERLY. SWALE NEEDS TO BE FIXED BEFORE ROW FINAL PASSAGE. _______________________________________________________________________________________________________________________ 5/1/2023 - PREVIOUS INSPECTION NOTES NEED TO HAVE ROAD HOT PATCH DONE BEFORE THIS INSPECTION -------------------------------------------------------------------------------------------- 4/26/2023 - PREVIOUS INSPECTION NOTES 04/26/23 HOT PATCH NOT COMPLETED. | |||
| ROW - STORMWATER FINAL | 05/01/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) STILL NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM SITE 2) NEED TO REMOVE PORTER JOHN ACROSSED STREET AND FIX BARE AREAIN THE SWALE WITH SOD ACROSSED THE STREET --------------------------------------------------------------------------------------------------- 4/26/2023 - PREVIOUS INSPECTION NOTES 04/26/23 NEED TO CLEAN UP ALL TRASH AND DEBRIS ON PROPERTY. NEED TO CLAEN OUT CULVERT ENDS. DRIVEWAY APRON HOT PATCH STRIP NOT COMPLETED. _________________________________________________________________________________________________________________ 04/17/23 WILL NEED TO REPAIR SWALE AS INDICATED IN PREVIOUS NOTES. DO NOT PASS FINAL UNTIL CORRECTIONS ARE MADE. | |||
| ROW - FINAL APRON (AFTER POUR) | 05/01/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO HAVE ROAD HOT PATCH DONE BEFORE THIS INSPECTION -------------------------------------------------------------------------------------------- 4/26/2023 - PREVIOUS INSPECTION NOTES 04/26/23 HOT PATCH NOT COMPLETED. | |||
| ROW - STORMWATER FINAL | 04/26/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 04/26/23 NEED TO CLEAN UP ALL TRASH AND DEBRIS ON PROPERTY. NEED TO CLAEN OUT CULVERT ENDS. DRIVEWAY APRON HOT PATCH STRIP NOT COMPLETED. _________________________________________________________________________________________________________________ 04/17/23 WILL NEED TO REPAIR SWALE AS INDICATED IN PREVIOUS NOTES. DO NOT PASS FINAL UNTIL CORRECTIONS ARE MADE. | |||
| ROW - FINAL APRON (AFTER POUR) | 04/26/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 04/26/23 HOT PATCH NOT COMPLETED. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/26/2023 | FINAL APPROVED | LFITZGERALD |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/17/2023 | APPROVED | FSLADISH |
| Note: 04/17/23 WILL NEED TO REPAIR SWALE AS INDICATED IN PREVIOUS NOTES. DO NOT PASS FINAL UNTIL CORRECTIONS ARE MADE. 4/11/2023 - PREVIOUS INSPECTION NOTES 04/11/23 NEED TO REPAIR WHOLE RIGHT SIDE SWALE AREA DUE TO IT BEING TOTALLY WASHED OUT. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/11/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 04/11/23 NEED TO REPAIR WHOLE RIGHT SIDE SWALE AREA DUE TO IT BEING TOTALLY WASHED OUT. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 04/11/2023 | APPROVED | FSLADISH |
| ELECTRIC - EARLY POWER | 04/06/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 1446. Release Power Inspector Notes from Inspection 2200 Emailed FPL @ 1200. Release Power | |||
| ROW- PRE-APRON (PRE-POUR) | 03/27/2023 | APPROVED | EMADISON |
| Note: ** 03/27/23 READY TO POUR IN THE EVENT OF RAIN RECHECK CULVERT ELEVATION AND COMPACTION ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL _______________________________________________________________________________________________________________________ 3/24/2023 - PREVIOUS INSPECTION NOTES Not ready for inspection. Not formed | |||
| ROW- PRE-APRON (PRE-POUR) | 03/24/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: Not ready for inspection. Not formed | |||
| U-CROSS CONNECTION | 03/17/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| U - SEWER TIE IN | 03/17/2023 | APPROVED | KSANDOE |
| GRAVITY SEWER TEST | 03/17/2023 | APPROVED | RSIMS |
| INSULATION | 02/06/2023 | Disapproved - NO FEE | KSANDOE |
| Note: 2-6-23 1. please firestop double wall at shower 2. please firestop gap at truss and range vent. | |||
| INSULATION | 02/06/2023 | APPROVED | KSANDOE |
| Note: 2/6/2023 - PREVIOUS INSPECTION NOTES 2-6-23 1. please firestop double wall at shower 2. please firestop gap at truss and range vent. | |||
| PEP TANK INSTALLATION REQUEST | 02/01/2023 | APPROVED | TSCHWEERS |
| LATH/BRICK/ WATER BARRIER | 01/31/2023 | APPROVED | TSTAUFFACHER |
| ALL ROUGH | 01/31/2023 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/20/2023 | APPROVED | KSANDOE |
| Note: 1/19/2023 - PREVIOUS INSPECTION NOTES Must have full approved set of building plans on site for inspector use New inspection due to canceled inspection 1/18/23: Roof Valley Metal Inspection called in too early. Must pass roof sheathing before roof valley metal. **** Started to bump check roof sheathing (while there) - Found 3 loose areas in garage - INSPECTION STOPPED! | |||
| ROOF VALLEY & METAL | 01/20/2023 | APPROVED | KSANDOE |
| Note: 1/19/2023 - PREVIOUS INSPECTION NOTES Must pass roof sheathing before roof valley metal. 1/18/2023 - PREVIOUS INSPECTION NOTES 1/18/23: Inspection called in too early. Must pass roof sheathing before roof valley metal. **** Started to bump check roof sheathing - Found 3 loose areas in garage - INSPECTION STOPPED! | |||
| ROOF VALLEY & METAL | 01/19/2023 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Must pass roof sheathing before roof valley metal. 1/18/2023 - PREVIOUS INSPECTION NOTES 1/18/23: Inspection called in too early. Must pass roof sheathing before roof valley metal. **** Started to bump check roof sheathing - Found 3 loose areas in garage - INSPECTION STOPPED! | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/19/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 1/18/23: Roof Valley Metal Inspection called in too early. Must pass roof sheathing before roof valley metal. **** Started to bump check roof sheathing (while there) - Found 3 loose areas in garage - INSPECTION STOPPED! | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/19/2023 | Disapproved - NO FEE | KSANDOE |
| Note: Must have full approved set of building plans on site for inspector use New inspection due to canceled inspection 1/18/23: Roof Valley Metal Inspection called in too early. Must pass roof sheathing before roof valley metal. **** Started to bump check roof sheathing (while there) - Found 3 loose areas in garage - INSPECTION STOPPED! | |||
| WALL SHEATHING | 01/18/2023 | APPROVED | RSIMS |
| ROOF VALLEY & METAL | 01/18/2023 | Disapproved - NO FEE | RSIMS |
| Note: 1/18/23: Inspection called in too early. Must pass roof sheathing before roof valley metal. **** Started to bump check roof sheathing - Found 3 loose areas in garage - INSPECTION STOPPED! | |||
| ELECTRIC-TUG | 01/13/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 1200. Release Power | |||
| FOUND SURVEY APPROVED (OFFICE) | 01/12/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 01/05/2023 | APPROVED | KSANDOE |
| Note: Inspector Notes from Inspection 2250 At the time of inspection, Minimum requirements for monolithic slab have been met | |||
| MONOLITHIC SLAB | 12/27/2022 | APPROVED - AS NOTED | KSANDOE |
| Note: At the time of inspection, Minimum requirements for monolithic slab have been met | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/20/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 12/13/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 04/17/2023 | 04/17/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/17/2023 | 01/18/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 01/12/2023 | 01/12/2023 |
| Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM PER CONTRACTOR REQUEST ALREADY HAD SUBMITTED A ENERGY CALCUS THIS ONE WAS AN ERROR | |||
| ENGIN1 | COMPLETE | 01/12/2023 | 01/12/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/12/2023 | 01/12/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/09/2023 | 01/09/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 05/11/2022 | 07/26/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/10/2022 | 05/11/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 05/10/2022 | 05/12/2022 |
| Note: Released By: ALYSSA ROSCOE - - | |||
| ELEC | COMPLETE | 05/10/2022 | 05/11/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/10/2022 | 05/11/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/10/2022 | 05/13/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/10/2022 | 05/11/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/10/2022 | 05/16/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/10/2022 | 05/16/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 08/17/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 08/17/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 08/17/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/17/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 08/17/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 08/17/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 08/17/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 08/17/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 08/17/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 08/17/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/14/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/14/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 11/14/2022 |
| SEWER CREDIT | (¤650.00) | 11/14/2022 |
| SEWER INSPECTION | ¤25.00 | 11/14/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 11/14/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 11/14/2022 |
| SITE PLAN 30 | ¤30.00 | 11/14/2022 |
| WATER- TURN ON | ¤25.00 | 11/14/2022 |
| ADJUSTMENT 50% | (¤419.19) | 11/14/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/14/2022 |
| INSPECTION - RESIDENTIAL | ¤629.75 | 11/14/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤178.62 | 11/14/2022 |
| CONNECTION FEES | ¤1,077.88 | 11/14/2022 |
| CONTRACTOR CHANGE | ¤20.00 | 11/14/2022 |
| CONTRACTOR CHANGE | ¤20.00 | 11/14/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 11/14/2022 |
| IMPACT FEE FIRE | ¤388.65 | 11/14/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 11/14/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 11/14/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 11/14/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/14/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 11/14/2022 |
| SURCHARGE FS 533.721 | ¤2.78 | 11/14/2022 |
| SURCHARGE - FS 468.631 | ¤4.16 | 11/14/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/14/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/14/2022 |
| SW ENG PRE APRON | ¤30.00 | 11/14/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,282.31 |