I want to search for...

Permit #2022050657

Permit Details

Status: COED

Parcel Id: 07-11-31-7023-00520-0020
CONDITIONED SPACE: 1721 sqft
GARAGE: 455 sqft
OPENED PORCH (WITH ROOF) : 173 sqft
OPENED PORCH (WITH ROOF) : 110 sqft
Total Square Footage: 2459 sqft
Block: 00520
Subdivision: 0 -
Job Phone: 631-929-5500
Location Address: 3 WHEATFIELD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 11/02/2022
NOC: RECORDED
Applicant name: NICHOLAS JOHN ZOUMAS
Owner: WYMONT FLORIDA V LLC

Address

STE 110

ENGLEWOOD, CO 80111

Address

5460 S QUEBEC ST

ENGLEWOOD, CO 80111

Lot: 0020
Contracted Stated Job Value: ¤160,000.00
Job Description: Single Family Residence
Type: CN

Contractor

JNS CONTRACTING FLORIDA, LLC
Status Location Address State License Number Phone
ACTIVE

256 ROUTE 25A

WADING RIVER, NY 11792

CGC1527793 (Exp: 08/31/2026) 631-929-5500

Sub Contractors

NICHOLAS JOHN ZOUMAS
Status Location Address State License Number Phone
ACTIVE

256 ROUTE 25A

WADING RIVER, NY 11792

CGC1527793 (Exp: 08/31/2026) 631-929-5500
JUAN CARLOS GONZALEZ
Status Location Address State License Number
ACTIVE

1328 COUNTY ROAD 308

CRESCENT CITY, FL 32112

RF11067806 (Exp: 08/31/2027)
JAMES MCGOVERN
Status Location Address Phone Fax
ACTIVE

PO BOX 354295

PALM COAST, FL 32137

(386)931-8940 (386)986-4835
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
MICHAEL FRANK MORELLO
Status Location Address State License Number Phone Fax
ACTIVE

2 HARGROVE GRADE

PALM COAST, FL 32164

CAC1819466 (Exp: 08/31/2026) 386-445-5023 386-446-4614

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/24/2023 FINAL APPROVED MKRASKI
BLD - BUILDING FINAL 03/23/2023 Disapproved - NO FEE MKRASKI
Note: 1. LB coming out of exterior wall for pep tank power needs to be sealed 2. No hot water in home 3. No energy cals on site
U -UTILITY RESIDENTIAL FINAL 03/02/2023 FINAL APPROVED LFITZGERALD
ELECTRIC - EARLY POWER 02/27/2023 APPROVED - AS NOTED MKRASKI
Note: 2/27/23 Emailed FPL @ 1PM 2/24/2023 - PREVIOUS INSPECTION NOTES 2/24/23 1. No address visible from road per FBC 319.1 2/23/2023 - PREVIOUS INSPECTION NOTES 1. No address visible from road per FBC 319.1 2. acorn nut not attached to ground rod 3. Ground wire needs to be buried or protected
ELECTRIC - EARLY POWER 02/24/2023 Disapproved -FEE REQUIRED MKRASKI
Note: 2/24/23 1. No address visible from road per FBC 319.1 2/23/2023 - PREVIOUS INSPECTION NOTES 1. No address visible from road per FBC 319.1 2. acorn nut not attached to ground rod 3. Ground wire needs to be buried or protected
ELECTRIC - EARLY POWER 02/23/2023 Disapproved - NO FEE MKRASKI
Note: 1. No address visible from road per FBC 319.1 2. acorn nut not attached to ground rod 3. Ground wire needs to be buried or protected
ROW - FINAL APRON (AFTER POUR) 02/23/2023 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/23/2023 APPROVED GBERTOLA
ROW FIELD SURVEY /GRADING CERTIFICATION 02/23/2023 APPROVED GBERTOLA
ROW - STORMWATER FINAL 02/23/2023 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW- PRE-APRON (PRE-POUR) 01/25/2023 APPROVED GBERTOLA
Note: 1/25/23=AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/24/2023 - PREVIOUS INSPECTION NOTES ** 01/24/23 CULVERT IS PITCHED IN THE WRONG DIRECT THE FOW OF WATER IS FROM LEFT TO RIGHT.
ROW- PRE-APRON (PRE-POUR) 01/24/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 01/24/23 CULVERT IS PITCHED IN THE WRONG DIRECT THE FOW OF WATER IS FROM LEFT TO RIGHT.
U-CROSS CONNECTION 01/20/2023 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation-no cross connection
U - SEWER TIE IN 01/20/2023 APPROVED MGIBSON
GRAVITY SEWER TEST 01/20/2023 APPROVED MGIBSON
INSULATION 12/29/2022 APPROVED FWILLIS
Note: 12/27/2022 - PREVIOUS INSPECTION NOTES 12/27/22 Drain repaired but slab needs to be sealed, other 2 items have not been repaired 12/22/2022 - PREVIOUS INSPECTION NOTES 1. Hallway going into master missing fire foam above switch 2. Drain for toliet in master needs to be repaired and sealed before inspection can be passed 3. Address in not visible per FBC R319.1
PEP TANK INSTALLATION REQUEST 12/29/2022 APPROVED CSTONE
Note: 12/22/2022 2:50:38 PM- PREVIOUS INSPECTION NOTES exterior-Siding, stucco etc will need to be done first
INSULATION 12/27/2022 Disapproved -FEE REQUIRED MKRASKI
Note: 12/27/22 Drain repaired but slab needs to be sealed, other 2 items have not been repaired 12/22/2022 - PREVIOUS INSPECTION NOTES 1. Hallway going into master missing fire foam above switch 2. Drain for toliet in master needs to be repaired and sealed before inspection can be passed 3. Address in not visible per FBC R319.1
INSULATION 12/22/2022 Disapproved - NO FEE MKRASKI
Note: 1. Hallway going into master missing fire foam above switch 2. Drain for toliet in master needs to be repaired and sealed before inspection can be passed 3. Address in not visible per FBC R319.1
PEP TANK INSTALLATION REQUEST 12/22/2022 Disapproved - NO FEE CSTONE
Note: exterior-Siding, stucco etc will need to be done first
LATH/BRICK/ WATER BARRIER 12/20/2022 APPROVED MKRASKI
ALL ROUGH 12/20/2022 APPROVED MKRASKI
ALL ROUGH 12/19/2022 Disapproved - NO FEE MKRASKI
Note: 1. No 50 lbs of water supply pressure 2. Failed 5' head pressure 3. Spare bath tub not filled with water
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/12/2022 APPROVED FWILLIS
ROOF VALLEY & METAL 12/09/2022 APPROVED MKRASKI
WALL SHEATHING 12/09/2022 APPROVED MKRASKI
TIE BEAM / LINTEL 11/18/2022 APPROVED MKRASKI
ELECTRIC-TUG 11/18/2022 APPROVED - AS NOTED MKRASKI
Note: Emailed FPL 8:40 AM
TIE BEAM / LINTEL 11/17/2022 Disapproved -FEE REQUIRED MKRASKI
Note: 1. Clean out missing in front cloumb marked on print 2. Dowel not tied to down rod marked on print
TIE BEAM / LINTEL 11/16/2022 Disapproved -FEE REQUIRED MKRASKI
Note: Not ready for inspection, block masons still working
FOUND SURVEY APPROVED (OFFICE) 11/15/2022 APPROVED TBAKER
ROW - DRAINAGE 11/15/2022 Disapproved -FEE REQUIRED RGROSS
Note: 11/15/22 - Large pile of sand in the middle of the swale at the time of the inspeciton 11/14/2022 - PREVIOUS INSPECTION NOTES ** 11/14/22 NO CORRECTIONS WERER MADE ** NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE AND ALL THE WAY DOWN TO THE SWALE ON THE DOWNSTREAM Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots When necessary, an Erosion Control Inspection (119) NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** NEED TO REMOVE SAND DUMPED IN SWALE / CEMENT MIXER / BOARDS IN SWALE ** FOLLOW UP INSPECTION ON 11/15/22 11/9/2022 - PREVIOUS INSPECTION NOTES ** 11/09/22 NO CORRECTIONS WERER MADE ** NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE AND ALL THE WAY DOWN TO THE SWALE ON THE DOWNSTREAM Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots When necessary, an Erosion Control Inspection (119) NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS INSPECTOR WILL RETURN 11/14/22 DUE TO TROPICAL/HURRICAN NICHOLE 11/4/2022 - PREVIOUS INSPECTION NOTES NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE AND ALL THE WAY DOWN TO THE SWALE ON THE DOWNSTREAM Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots When necessary, an Erosion Control Inspection (119) NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW INSPECTOR WILL RETURN 11/9/22
ROW - DRAINAGE 11/14/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 11/14/22 NO CORRECTIONS WERER MADE ** NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE AND ALL THE WAY DOWN TO THE SWALE ON THE DOWNSTREAM Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots When necessary, an Erosion Control Inspection (119) NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS ** NEED TO REMOVE SAND DUMPED IN SWALE / CEMENT MIXER / BOARDS IN SWALE ** FOLLOW UP INSPECTION ON 11/15/22 11/9/2022 - PREVIOUS INSPECTION NOTES ** 11/09/22 NO CORRECTIONS WERER MADE ** NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE AND ALL THE WAY DOWN TO THE SWALE ON THE DOWNSTREAM Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots When necessary, an Erosion Control Inspection (119) NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS INSPECTOR WILL RETURN 11/14/22 DUE TO TROPICAL/HURRICAN NICHOLE 11/4/2022 - PREVIOUS INSPECTION NOTES NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE AND ALL THE WAY DOWN TO THE SWALE ON THE DOWNSTREAM Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots When necessary, an Erosion Control Inspection (119) NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW INSPECTOR WILL RETURN 11/9/22
ROW - DRAINAGE 11/09/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 11/09/22 NO CORRECTIONS WERER MADE ** NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE AND ALL THE WAY DOWN TO THE SWALE ON THE DOWNSTREAM Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots When necessary, an Erosion Control Inspection (119) NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW ** IT IS THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS INSPECTOR WILL RETURN 11/14/22 DUE TO TROPICAL/HURRICAN NICHOLE 11/4/2022 - PREVIOUS INSPECTION NOTES NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE AND ALL THE WAY DOWN TO THE SWALE ON THE DOWNSTREAM Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots When necessary, an Erosion Control Inspection (119) NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW INSPECTOR WILL RETURN 11/9/22
MONOLITHIC SLAB 11/07/2022 APPROVED FWILLIS
ROW - DRAINAGE 11/04/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE AND ALL THE WAY DOWN TO THE SWALE ON THE DOWNSTREAM Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots When necessary, an Erosion Control Inspection (119) NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW INSPECTOR WILL RETURN 11/9/22
WATER METER INSTALLATION REQUEST 11/03/2022 APPROVED CSTONE
PLUMBING 1ST ROUGH UNDERGROUND 11/03/2022 APPROVED MKRASKI

Review History

Department Status Date In Date Out
MECH COMPLETE 02/14/2023 02/14/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 12/08/2022 12/08/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
MECH COMPLETE 11/21/2022 11/22/2022
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/15/2022 11/15/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 11/15/2022 11/15/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/28/2022 10/28/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 10/28/2022 11/01/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON COMPLETE 10/28/2022 10/28/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 HOLD 10/21/2022 10/21/2022
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Site benchmark is indicated in the wrong place on the latest survey. COPC survey crew found benchmark between lots 3 and 4. Please revise and resubmit.
ENGIN1 COMPLETE 10/19/2022 10/19/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 10/19/2022 10/26/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON COMPLETE 10/19/2022 10/19/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 HOLD 07/20/2022 07/20/2022
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM 0COPC survey crew was unable to find the site benchmark indicated on the survey. They were able to locate a benchmark between lots 3 & 4 from a previous job with an elevation of 29.19. This benchmark will work if the survey is revised to show it.
ENGIN1 COMPLETE 07/18/2022 07/18/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/18/2022 07/18/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 07/18/2022 07/22/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
SWALE COMPLETE 07/18/2022 11/17/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 HOLD 07/01/2022 07/01/2022
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Utility pole with benchmark has been replaced - need a new benchmark.
SW1 COMPLETE 06/17/2022 06/27/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/17/2022 06/17/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 06/17/2022 06/17/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 HOLD 05/23/2022 05/26/2022
Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM See unchecked box on SW1 Checklist dated 5/26/22. Drainage must flow from rear to front.
MECH COMPLETE 05/23/2022 05/23/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 05/23/2022 05/23/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 05/23/2022 05/23/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SW1 COMPLETE 05/19/2022 05/19/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
BLD COMPLETE 05/11/2022 05/11/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 05/11/2022 05/12/2022
Note: Released By: ALYSSA ROSCOE - -
ELEC COMPLETE 05/11/2022 05/11/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 HOLD 05/11/2022 05/11/2022
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM No benchmark on survey
LOCATE COMPLETE 05/11/2022 05/13/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 05/11/2022 05/11/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy calcs does not match the site plan. Revise to match
SW1 HOLD 05/11/2022 05/18/2022
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM THE DRAINAGE NEED TO GO FROM BACK TO THE FRONT DO TO THE ADJACENT LOTS ARE NOT DRAINING TO THE BACK
ZON HOLD 05/11/2022 05/16/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM This house backs to a street, must have banding on windows and doors facing the street.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 03/24/2023
PLAN REVIEW - REVISION ¤32.50 03/24/2023
PLAN REVIEW - REVISION ¤32.50 03/24/2023
REINSPECTION RESIDENTIAL ¤40.00 03/24/2023
REINSPECTION RESIDENTIAL ¤40.00 03/24/2023
REINSPECTION RESIDENTIAL ¤40.00 03/24/2023
REINSPECTION RESIDENTIAL ¤40.00 03/24/2023
CONTRACTOR CHANGE ¤20.00 03/24/2023
SW ENG - INSPECTION 20 ¤20.00 03/24/2023
SW ENG - INSPECTION 20 ¤20.00 03/24/2023
SW ENG - INSPECTION 20 ¤20.00 03/24/2023
SW ENG - INSPECTION 20 ¤20.00 03/24/2023
SW ENG - INSPECTION 20 ¤20.00 03/24/2023
SW ENG REINSPECTION 30 ¤30.00 03/24/2023
SW ENG - REVIEW 20 ¤20.00 11/02/2022
SW ENG RES REVIEW 200 ¤200.00 11/02/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 11/02/2022
SEWER CREDIT (¤1,342.00) 11/02/2022
SEWER INSPECTION ¤25.00 11/02/2022
SEWER CAPITAL FACILITY ¤4,939.76 11/02/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 11/02/2022
SITE PLAN 30 ¤30.00 11/02/2022
SW ENG INSPECTION 80 ¤80.00 11/02/2022
SW ENG PRE APRON ¤30.00 11/02/2022
WATER- TURN ON ¤25.00 11/02/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/02/2022
INSPECTION - RESIDENTIAL ¤607.75 11/02/2022
PLAN REVIEW - RESIDENTIAL ¤172.38 11/02/2022
CONTRACTOR CHANGE ¤20.00 11/02/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 11/02/2022
IMPACT FEE FIRE ¤388.65 11/02/2022
IMPACT FEE PARKS ¤1,455.13 11/02/2022
IMPACT FEE SCHOOL ¤3,600.00 11/02/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 11/02/2022
WATER -IRRIGATION INSPECTION ¤25.00 11/02/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 11/02/2022
SURCHARGE FS 533.721 ¤6.85 11/02/2022
SURCHARGE - FS 468.631 ¤10.27 11/02/2022
SW ENG - FOUNDATION SURVEY ¤20.00 11/02/2022
CONNECTION FEES ¤1,077.88 11/02/2022
Fees Total Due: ¤0.00 Total Paid: ¤17,111.44