I want to search for...
Permit #2022050693
Permit Details
Status: COED
| Parcel Id: 07-11-31-7009-00160-0140 |
| CONDITIONED SPACE: 2031 sqft |
| GARAGE: 748 sqft |
| ENCLOSE EXISTING PORCH TO LIVING : 140 sqft |
| SCREEN PORCH (SOLID ROOF) : 268 sqft |
| Total Square Footage: 3187 sqft |
| Block: 00160 |
| Subdivision: 2208 - SECTION 9-FLORIDA PARK |
| Job Phone: 386-283-7499 |
| Location Address: 40 FAIRBANK LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 05/26/2022 |
| NOC: RECORDED |
| Applicant name: WILLIAM ROBERT BARRICK |
| Owner: JM PROPERTIES X LLC |
|
Address PO BOX 9 CISSNA PARK, IL 60924 |
| Lot: 0140 |
| Contracted Stated Job Value: ¤273,066.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
RBI ENTERPRISES INC
| Status | Location Address | State License Number | Phone |
| CANCEL |
10 WHITTINGTON DR PALM COAST, FL 32164 |
RB29003845 (Exp: 08/31/2025) | 386-585-4097 |
Sub Contractors
WILLIAM ROBERT BARRICK
| Status | Location Address | State License Number | Phone |
| CANCEL |
21 CEDARWOOD CT PALM COAST, FL 32137 |
RC29027799 (Exp: 08/31/2023) | 229-375-9123 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
DAVID SCOTT MORRIS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
63 LEIDEL DR PALM COAST, FL 32137 |
ER13015750 (Exp: 08/31/2026) | 386-569-7262 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/03/2023 | FINAL APPROVED | AGAETANO |
| Note: 2/2/2023 - PREVIOUS INSPECTION NOTES 02-02-2023 1. Master bath GFCI will not reset. 2. Kitchen outlet to the right of stove is loose. 3. Meter main cover panel does not close properly. | |||
| BLD - BUILDING FINAL | 02/02/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 02-02-2023 1. Master bath GFCI will not reset. 2. Kitchen outlet to the right of stove is loose. 3. Meter main cover panel does not close properly. | |||
| U -UTILITY RESIDENTIAL FINAL | 02/02/2023 | FINAL APPROVED | DHANEY |
| Note: 2/1/2023 - PREVIOUS INSPECTION NOTES Could not find Sewer clean outs . | |||
| U-CROSS CONNECTION | 02/01/2023 | APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 02/01/2023 | FINAL APPROVED | PFLANAGAN |
| Note: ** 01/24/23 SEE FIELD SURVEY FOR NOTES | |||
| U -UTILITY RESIDENTIAL FINAL | 02/01/2023 | Disapproved - NO FEE | DHANEY |
| Note: Could not find Sewer clean outs . | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/24/2023 | APPROVED | EMADISON |
| Note: ** 01/24/23 BARE AREAS OF EARTH ACROSS REAR PROPERTY LINE THAT ARE ON THE CITY EASEMENT NEED TO BE SODDED ** HOT PATCH ** NOTE SWALE ON RIGHT SIDE HAS BEEN REPAIRED AND SODDED RUTS IN ARE FROM VEHICLES FROM ANOTHER PROPERTY ............. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/24/2023 | APPROVED | EMADISON |
| Note: ** 01/24/23 BARE AREAS OF EARTH ACROSS REAR PROPERTY LINE THAT ARE ON THE CITY EASEMENT NEED TO BE SODDED ** HOT PATCH ** NOTE SWALE ON RIGHT SIDE HAS BEEN REPAIRED AND SODDED RUTS IN ARE FROM VEHICLES FROM ANOTHER PROPERTY ............. | |||
| ROW - FINAL APRON (AFTER POUR) | 01/24/2023 | FINAL APPROVED | EMADISON |
| ROW- PRE-APRON (PRE-POUR) | 01/03/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| U - SEWER TIE IN | 12/15/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 12/15/2022 | APPROVED | MGIBSON |
| ELECTRIC - EARLY POWER | 12/15/2022 | APPROVED | AGAETANO |
| Note: FPL notified at 10:20 am | |||
| LATH/BRICK/ WATER BARRIER | 10/19/2022 | APPROVED | AGAETANO |
| INSULATION | 10/18/2022 | APPROVED | AGAETANO |
| ALL ROUGH | 10/07/2022 | APPROVED | AGAETANO |
| ROOF VALLEY & METAL | 09/20/2022 | APPROVED | AGAETANO |
| WALL SHEATHING | 09/15/2022 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/15/2022 | APPROVED | AGAETANO |
| FOUND SURVEY APPROVED (OFFICE) | 09/14/2022 | APPROVED | TDOAK |
| TIE BEAM / LINTEL | 08/10/2022 | APPROVED | DCUSHING |
| MONOLITHIC SLAB | 08/02/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Areas indicated on drawings need to be tamped. | |||
| MONOLITHIC SLAB | 08/02/2022 | APPROVED | AGAETANO |
| Note: THIS IS A REINSPECTION Areas indicated on drawings need to be tamped. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/28/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 06/30/2022 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 6/24/2022 10:16:52 AM still clearing | |||
| WATER METER INSTALLATION REQUEST | 06/23/2022 | Disapproved - NO FEE | CSTONE |
| Note: still clearing |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 01/25/2023 | 01/25/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/14/2022 | 09/14/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/14/2022 | 09/14/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/14/2022 | 09/14/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/19/2022 | 05/19/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/19/2022 | 05/19/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/19/2022 | 05/25/2022 |
| Note: Released By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/11/2022 | 05/16/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 05/11/2022 | 05/12/2022 |
| Note: Released By: ALYSSA ROSCOE - - | |||
| ELEC | COMPLETE | 05/11/2022 | 05/12/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/11/2022 | 05/11/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/11/2022 | 05/13/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/11/2022 | 05/11/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/11/2022 | 05/18/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/11/2022 | 05/17/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site Plan : Please provide set back for the rear of home. | |||
| SWALE | COMPLETE | 05/11/2022 | 07/28/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER-METER | ¤467.09 | 05/26/2022 |
| WATER- TURN ON | ¤25.00 | 05/26/2022 |
| WATER- TURN ON | ¤25.00 | 05/26/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 05/26/2022 |
| INSPECTION - RESIDENTIAL | ¤761.75 | 05/26/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤216.06 | 05/26/2022 |
| CONNECTION FEES | ¤1,077.88 | 05/26/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 05/26/2022 |
| IMPACT FEE FIRE | ¤388.65 | 05/26/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 05/26/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 05/26/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 05/26/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/26/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 05/26/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 05/26/2022 |
| SURCHARGE FS 533.721 | ¤8.43 | 05/26/2022 |
| SURCHARGE - FS 468.631 | ¤12.64 | 05/26/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 05/26/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 05/26/2022 |
| SW ENG PRE APRON | ¤30.00 | 05/26/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 05/26/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 05/26/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 05/26/2022 |
| SEWER CREDIT | (¤1,342.00) | 05/26/2022 |
| SEWER INSPECTION | ¤25.00 | 05/26/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 05/26/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 05/26/2022 |
| SITE PLAN 30 | ¤30.00 | 05/26/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,402.66 |