I want to search for...
Permit #2022050858
Permit Details
Status: COED
| Parcel Id: 07-11-31-7026-00030-0050 |
| CONDITIONED SPACE: 1199 sqft |
| CONDITIONED SPACE: 1199 sqft |
| GARAGE: 380 sqft |
| GARAGE: 380 sqft |
| OPENED PORCH (WITH ROOF) : 199 sqft |
| OPENED PORCH (WITH ROOF) : 199 sqft |
| OPENED PORCH (WITH ROOF) : 42 sqft |
| OPENED PORCH (WITH ROOF) : 42 sqft |
| Total Square Footage: 3640 sqft |
| Block: 00030 |
| Subdivision: 2153 - SECTION 26-PINE GROVE |
| Job Phone: (386)445-9393 |
| Location Address: 9 PINE HILL LN |
| Type: DU - DUPLEX |
| Issue Date: 08/11/2022 |
| NOC: RECORDED |
| Applicant name: ANTONIO JR AMARAL |
| Owner: AMARAL CUSTOM HOMES INC |
|
Address 13 UTILITY DRIVE PALM COAST, FL 32137 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤265,000.00 |
| Job Description: DUPLEX |
Contractor
AMARAL HOMES & POOLS, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
13 Utility Drive PALM COAST, FL 32137 |
CBC058062 (Exp: 08/31/2026) | (386)445-9393 |
Sub Contractors
JEFFREY ADAM MCGREGOR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1312 YORKTOWN STREET DELAND , FL 32724 |
EC13005662 (Exp: 08/31/2026) | 386-736-7475 | 386-785-1503 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ANTONIO AMARAL JR
| Status | Location Address | State License Number |
| ACTIVE |
1370 PALM HARBOR PKWY PALM COAST, FL 32137 |
CCC058004 (Exp: 08/31/2026) |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/20/2024 | FINAL APPROVED | KSANDOE |
| Note: 6/17/2024 - PREVIOUS INSPECTION NOTES Both sides 1. E-cals do not match equipment installed 2. Flood lights on back corners of each unit are not safed off 3. Garage outlets shall be a dedicated circuit NEC 210.11 A side 1. SGD does not lock properly B side 1. ODU liquid tight whip can not be in areas subjuct to damage NEC 350.12 2. Lani outlet not GFCI protected 3. High voltage whip for AHU must be sealed @ ceiling 4. Cat 5 in garage ceiling must be sealed | |||
| BLD - BUILDING FINAL | 06/17/2024 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: Both sides 1. E-cals do not match equipment installed 2. Flood lights on back corners of each unit are not safed off 3. Garage outlets shall be a dedicated circuit NEC 210.11 A side 1. SGD does not lock properly B side 1. ODU liquid tight whip can not be in areas subjuct to damage NEC 350.12 2. Lani outlet not GFCI protected 3. High voltage whip for AHU must be sealed @ ceiling 4. Cat 5 in garage ceiling must be sealed | |||
| U-CROSS CONNECTION | 06/17/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/17/2024 2:07:52 PM *** no irrigatiin-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 06/17/2024 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 06/14/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/14/2024 | APPROVED | PFLANAGAN |
| Note: MEET WITH TONY ABOUT THE ELEVATIONS FOR THE RIGHT OF WAY. PASSING BECAUSE THEY ARE MATCHING THE ADJACENT LOT TO THE LEFT AND THE RIGHT ------------------------------------------------------------------------------------------- 6/6/2024 - PREVIOUS INSPECTION NOTES 1) ALL RIGHT OF WAY / FRONT PROPERTY LINE ELEVATIONS NEED TO BE EQUAL OR GREATER THAN THE EDGE OF PAVEMENT. 2) THE FRONT ROADSIDE SWALE DOESN'T MEET GRADE ON THE RIGHT PROPOERTY LINE THE PROPOSED IS .22 LOWER THAN THE FINAL SUEVEY SHOWS IT. SEE DRAWING 300.C.1 IN TECHNICAL MANUAL FOR GRADING OF SWALE | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/14/2024 | APPROVED | PFLANAGAN |
| Note: See note on Final Survey. | |||
| ROW - FINAL INSPECTION | 06/14/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW- PROJECT STATUS | 06/14/2024 | APPROVED | PFLANAGAN |
| Note: PER GABE AND PARREN THE RIGHT OF WAY ELEVATIONS ARE LOW BUT THIS LOT IS MATCHING ADJACENT LOTS TO THE RIGHT AND THE LEFT. PASSING FINAL SURVEY AND FIELD. --------------------------------------------------------------------------------------------------------- MEETING ON SITE WITH TONY FOR GRADING OF THE LOT FOR THE RIGHT OF WAY LINE ELEVATION LOWER THAN THE EDGE OF PAVEMENT | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/06/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) ALL RIGHT OF WAY / FRONT PROPERTY LINE ELEVATIONS NEED TO BE EQUAL OR GREATER THAN THE EDGE OF PAVEMENT. 2) THE FRONT ROADSIDE SWALE DOESN'T MEET GRADE ON THE RIGHT PROPOERTY LINE THE PROPOSED IS .22 LOWER THAN THE FINAL SUEVEY SHOWS IT. SEE DRAWING 300.C.1 IN TECHNICAL MANUAL FOR GRADING OF SWALE | |||
| ELECTRIC - EARLY POWER | 04/12/2024 | APPROVED | AGAETANO |
| Note: 4/4/2024 - PREVIOUS INSPECTION NOTES 4/4/24: Need portable toilet on site throughout project. No working facilities within units. TOILET FACILITIES FOR WORKERS 311.1 General. Toilet facilities shall be provided for construction workers and such facilities shall be maintained in a sanitary condition. Construction worker toilet facilities of the nonsewer type shall conform to ANSI Z4.3. | |||
| ELECTRIC - EARLY POWER | 04/04/2024 | Disapproved - NO FEE | RSIMS |
| Note: 4/4/24: Need portable toilet on site throughout project. No working facilities within units. TOILET FACILITIES FOR WORKERS 311.1 General. Toilet facilities shall be provided for construction workers and such facilities shall be maintained in a sanitary condition. Construction worker toilet facilities of the nonsewer type shall conform to ANSI Z4.3. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/27/2024 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| GRAVITY SEWER TEST | 01/17/2024 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 01/17/2024 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 12/29/2023 | APPROVED | TCHURCHILL |
| Note: 11/29/2023 10:17:41 AM- PREVIOUS INSPECTION NOTES Exterior is not ready | |||
| LATH/BRICK/ WATER BARRIER | 12/01/2023 | APPROVED | KSANDOE |
| PEP TANK INSTALLATION REQUEST | 11/28/2023 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: Exterior is not ready | |||
| INSULATION | 11/21/2023 | APPROVED | KSANDOE |
| ALL ROUGH | 11/13/2023 | APPROVED | RSIMS |
| Note: 11/8/2023 - PREVIOUS INSPECTION NOTES 11/2/2023 - PREVIOUS INSPECTION NOTES Prints laying on ground next to job box SER wires still in contact with roof sheathing Exhaust ducts have not been sealed at roof sheathing 10/10/2023 - PREVIOUS INSPECTION NOTES No prints onsite. 1. Electrical riser shown on page 4 of the details does not match what is installed. Please submit a revision to the building department showing as built. Check wire size at the weather head. This was checked on the computer submitted drawing. PLEASE have the full set of approved prints onsite for all inspections. 2. Please have a the HVAC duct layout approved drawing onsite for reinspectoin. 3. The service feeders need to be pulled down off the roof deck and supported to avoid possible future nail punctures. 4. Seal the dryer exhaust ducts where the penetrated the roof decking. Inspection stopped. | |||
| ALL ROUGH | 11/08/2023 | CANCELLED BY APPLICANT | KSANDOE |
| Note: 11/2/2023 - PREVIOUS INSPECTION NOTES Prints laying on ground next to job box SER wires still in contact with roof sheathing Exhaust ducts have not been sealed at roof sheathing 10/10/2023 - PREVIOUS INSPECTION NOTES No prints onsite. 1. Electrical riser shown on page 4 of the details does not match what is installed. Please submit a revision to the building department showing as built. Check wire size at the weather head. This was checked on the computer submitted drawing. PLEASE have the full set of approved prints onsite for all inspections. 2. Please have a the HVAC duct layout approved drawing onsite for reinspectoin. 3. The service feeders need to be pulled down off the roof deck and supported to avoid possible future nail punctures. 4. Seal the dryer exhaust ducts where the penetrated the roof decking. Inspection stopped. | |||
| ALL ROUGH | 11/02/2023 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Prints laying on ground next to job box SER wires still in contact with roof sheathing Exhaust ducts have not been sealed at roof sheathing 10/10/2023 - PREVIOUS INSPECTION NOTES No prints onsite. 1. Electrical riser shown on page 4 of the details does not match what is installed. Please submit a revision to the building department showing as built. Check wire size at the weather head. This was checked on the computer submitted drawing. PLEASE have the full set of approved prints onsite for all inspections. 2. Please have a the HVAC duct layout approved drawing onsite for reinspectoin. 3. The service feeders need to be pulled down off the roof deck and supported to avoid possible future nail punctures. 4. Seal the dryer exhaust ducts where the penetrated the roof decking. Inspection stopped. | |||
| ALL ROUGH | 10/10/2023 | Disapproved - NO FEE | JWALKER |
| Note: No prints onsite. 1. Electrical riser shown on page 4 of the details does not match what is installed. Please submit a revision to the building department showing as built. Check wire size at the weather head. This was checked on the computer submitted drawing. PLEASE have the full set of approved prints onsite for all inspections. 2. Please have a the HVAC duct layout approved drawing onsite for reinspectoin. 3. The service feeders need to be pulled down off the roof deck and supported to avoid possible future nail punctures. 4. Seal the dryer exhaust ducts where the penetrated the roof decking. Inspection stopped. | |||
| ROOF VALLEY & METAL | 10/09/2023 | APPROVED | KSANDOE |
| Note: 10/6/2023 - PREVIOUS INSPECTION NOTES 10-6-23 we will need to meet someone on site to open up some areas for inspection to resolve the notes below 10/5/2023 - PREVIOUS INSPECTION NOTES 10/4/23: Cancelled by Applicant via phone call at @ 08:37. 9/22/2023 - PREVIOUS INSPECTION NOTES 9/22/23: Entire roof is covered with Barrel Tile roofing. Cannot see Roof Valley Metal. Also, there are no plans in permit box leaning against wall or on-site. 107.3.1 | |||
| ROOF VALLEY & METAL | 10/06/2023 | Disapproved - NO FEE | LMILLER |
| Note: 10-6-23 we will need to meet someone on site to open up some areas for inspection to resolve the notes below 10/5/2023 - PREVIOUS INSPECTION NOTES 10/4/23: Cancelled by Applicant via phone call at @ 08:37. 9/22/2023 - PREVIOUS INSPECTION NOTES 9/22/23: Entire roof is covered with Barrel Tile roofing. Cannot see Roof Valley Metal. Also, there are no plans in permit box leaning against wall or on-site. 107.3.1 | |||
| ROOF VALLEY & METAL | 10/05/2023 | CANCELLED BY APPLICANT | RSIMS |
| Note: 10/4/23: Cancelled by Applicant via phone call at @ 08:37. 9/22/2023 - PREVIOUS INSPECTION NOTES 9/22/23: Entire roof is covered with Barrel Tile roofing. Cannot see Roof Valley Metal. Also, there are no plans in permit box leaning against wall or on-site. 107.3.1 | |||
| ROOF VALLEY & METAL | 09/22/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 9/22/23: Entire roof is covered with Barrel Tile roofing. Cannot see Roof Valley Metal. Also, there are no plans in permit box leaning against wall or on-site. 107.3.1 | |||
| FIREWALL FINAL | 09/18/2023 | APPROVED | KSANDOE |
| FIREWALL DRYWALL NAILING | 09/08/2023 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/18/2023 | APPROVED | KSANDOE |
| Note: 8/2/2023 - PREVIOUS INSPECTION NOTES T05 missing strapping T09 bracing needs attention Bracing on gable truss installed will prevent proper firewall drywall application. Please provide detail | |||
| WALL SHEATHING | 08/02/2023 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/02/2023 | Disapproved - NO FEE | KSANDOE |
| Note: T05 missing strapping T09 bracing needs attention Bracing on gable truss installed will prevent proper firewall drywall application. Please provide detail | |||
| TIE BEAM / LINTEL | 07/06/2023 | APPROVED | KSANDOE |
| FOUND SURVEY APPROVED (OFFICE) | 06/07/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 02/15/2023 | APPROVED | KSANDOE |
| Note: 2/13/2023 - PREVIOUS INSPECTION NOTES Need building plans, compaction report, and permits on site for inspection | |||
| MONOLITHIC SLAB | 02/13/2023 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Need building plans, compaction report, and permits on site for inspection | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 02/09/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 01/09/2023 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 9/12/2022 8:51:49 AM TREE IN THE WAY | |||
| ROW- PROJECT STATUS | 10/10/2022 | APPROVED | GBERTOLA |
| Note: wrong permit number | |||
| WATER METER INSTALLATION REQUEST | 09/09/2022 | Disapproved - NO FEE | CSTONE |
| Note: TREE IN THE WAY |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 06/18/2024 | 06/18/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 06/05/2024 | 06/05/2024 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM RENAME TO FINAL SURVEY.PDF | |||
| BADMIN | INFORMATION | 03/22/2024 | 03/22/2024 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM RENAME TO ENERGY CALCS.PDF | |||
| ELEC | COMPLETE | 10/26/2023 | 10/31/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 10/23/2023 | 10/23/2023 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM SELECT ELECTRICAL PLANS, NOT ENERGY CALCS | |||
| BLD | COMPLETE | 10/17/2023 | 10/17/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 10/17/2023 | 10/17/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need to show wire size going up the riser and out the weater head. | |||
| BLD | COMPLETE | 07/28/2023 | 08/03/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 07/05/2023 | 07/07/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Letter needs to be signed and sealed by Engineer | |||
| BLD | COMPLETE | 06/08/2023 | 06/12/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/07/2023 | 06/07/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/07/2023 | 06/07/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/01/2022 | 12/01/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 12/01/2022 | 12/07/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/01/2022 | 12/01/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/25/2022 | 05/25/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/25/2022 | 05/25/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/25/2022 | 05/31/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/25/2022 | 05/26/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/25/2022 | 05/26/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/25/2022 | 05/26/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/25/2022 | 05/26/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/16/2022 | 05/19/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 05/16/2022 | 05/18/2022 |
| Note: Released By: ALYSSA ROSCOE - - | |||
| ELEC | HOLD | 05/16/2022 | 05/17/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need correct outlet spacing in master bedrooms. NEC 2017 210.52 | |||
| ENGIN1 | COMPLETE | 05/16/2022 | 05/16/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/16/2022 | 05/19/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/16/2022 | 05/16/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/16/2022 | 05/23/2022 |
| Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/16/2022 | 05/17/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Driveways: For the 20 feet of the driveway that is closest to the garage, driveways for one and two-car garages shall have a minimum width of 16 feet,please make changes . Duplexes with less than 1,300 square feet in living area per unit shall have at least a one-car attached garage and a permanent surface for two exterior parking spaces per dwelling unit. Duplexes with 1,300 or greater square feet in living area per unit shall have at least a two-car attached garage per dwelling unit unless an exception is specifically permitted by another provision of this Code. | |||
| SWALE | COMPLETE | 05/16/2022 | 07/29/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/20/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/20/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/20/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/20/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 06/20/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/20/2024 |
| UTILITY PEP REINSPECTION | ¤40.00 | 06/20/2024 |
| SEWER CREDIT | (¤1,146.92) | 08/11/2022 |
| SEWER INSPECTION | ¤25.00 | 08/11/2022 |
| SEWER CAPITAL FACILITY | ¤9,879.52 | 08/11/2022 |
| WATER CAPITAL FACILITY FEE | ¤7,253.00 | 08/11/2022 |
| SITE PLAN 30 | ¤30.00 | 08/11/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/11/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/11/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤82.14) | 08/11/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤23.32) | 08/11/2022 |
| IMPACT FEE FIRE | ¤777.30 | 08/11/2022 |
| IMPACT FEE PARKS | ¤2,910.26 | 08/11/2022 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 08/11/2022 |
| IMPACT FEE TRANSPORTATION | ¤2,738.00 | 08/11/2022 |
| IMPACT FEE TRANSPORTATION | ¤2,738.00 | 08/11/2022 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 08/11/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤87.31) | 08/11/2022 |
| SURCHARGE FS 533.721 | ¤3.66 | 08/11/2022 |
| SURCHARGE - FS 468.631 | ¤5.50 | 08/11/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/11/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/11/2022 |
| SW ENG PRE APRON | ¤30.00 | 08/11/2022 |
| CONNECTION FEES | ¤2,155.76 | 08/11/2022 |
| WATER- TURN ON | ¤50.00 | 08/11/2022 |
| ADJUSTMENT 50% | (¤574.51) | 08/11/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/11/2022 |
| INSPECTION - RESIDENTIAL | ¤871.75 | 08/11/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤247.26 | 08/11/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤35,640.81 |