I want to search for...
Permit #2022051096
Permit Details
Status: COED
| Parcel Id: 48-11-31-1710-00000-0370 |
| CONDITIONED SPACE: 3221 sqft |
| OPENED PORCH (WITH ROOF) : 640 sqft |
| OPENED PORCH (WITH ROOF) : 37 sqft |
| GARAGE: 792 sqft |
| Total Square Footage: 4690 sqft |
| Block: 00000 |
| Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II |
| Job Phone: 386-313-6221 |
| Location Address: 22 SCARLET OAK CIR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/10/2022 |
| NOC: RECORDED |
| Applicant name: ANTHONY CRAIG GUCCIONE |
| Owner: FRANER PAUL T & DIANNE R H&W |
|
Address 201 EAST GAY STREET APT 319 WEST CHESTER, PA 19380 |
| Lot: 0370 |
| Contracted Stated Job Value: ¤800,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLD COAST HOME BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 354707 PALM COAST, FL 32137 |
CGC1507791 (Exp: 08/31/2026) | 386-313-6221 |
Sub Contractors
BERT S MCLAUGHLIN
| Status | Location Address | State License Number | Phone |
| ACTIVE |
131 MAGNOLIA AVE DAYTONA BEACH, FL 32114 |
EC13006455 (Exp: 08/31/2026) | 386-265-2687 |
PATRICK FRANCIS MCADAMS
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1201 South Flagler Ave Flagler Beach, FL 32136 |
CFC057805 (Exp: 08/31/2026) | 386-283-9236 | 321-248-0447 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
WILLIAM D ALLEN
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
546 S. SHELL ROAD DEBARY, FL 32713 |
LQ27843 (Exp: 08/13/2024) | 386-668-9592 | (386)668-8577 |
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/06/2024 | FINAL APPROVED | BTAYLOR |
| Note: New inspection due to canceled inspection This house has spray foam isulation | |||
| BLD - BUILDING FINAL | 03/05/2024 | CANCELLED BY APPLICANT | WEB |
| Note: This house has spray foam isulation | |||
| U -UTILITY RESIDENTIAL FINAL | 03/01/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: so sewer clean out and water meter pit were covered over by sod- located by building super-Jeff and work order to city to raise both water/reclaim its/2 existing valves-raised by inspector by obtaining risers from city utility dept. 2/29/2024 - PrEVIOUS INSPECTION NOTES Inspector Notes from Inspection 9035 1)locate sewer clean out,2)locate water meter pit,3) CONTACT CUSTOMER-SERVICE@PALMCOASTGOV.COM-to raise both reclaim/water pits and 4)city utility already placed risers on 2 existing water valves but they both are too low still-either add another riser to each so valves are flush with sod(accessible so sod doesn't grow ovwer)or place 1 each taller riser (and get with me to return short risers)-lmk thanks reclaim-no irrigation 10/30/2023 - PREVIOUS INSPECTION NOTES reclaim meter buried over with soils-expose/ clean out if need and make sure in working order | |||
| ROW - STORMWATER FINAL | 02/29/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/29/24 SOD CORRECTION COMPLETED AS REQUIRED. MEETS COPC MINIMUM STANDARDS AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 2/26/24 Upon walking property, determined that drainage will work as indicated on survey. Area on right side surrounding tree outlined in white paint is low. You will need to raise this area up so that water does not pool and has positive drainage to the curb and gutter system. I am passing this Field survey as noted, as a courtesey, but you will need to make this and any other corrections deemed neccessary on any subsequent inspections prior to Row final passage. | |||
| U -UTILITY RESIDENTIAL FINAL | 02/29/2024 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 1)locate sewer clean out,2)locate water meter pit,3) CONTACT CUSTOMER-SERVICE@PALMCOASTGOV.COM-to raise both reclaim/water pits and 4)city utility already placed risers on 2 existing water valves but they both are too low still-either add another riser to each so valves are flush with sod(accessible so sod doesn't grow ovwer)or place 1 each taller riser (and get with me to return short risers)-lmk thanks reclaim-no irrigation 10/30/2023 - PREVIOUS INSPECTION NOTES reclaim meter buried over with soils-expose/ clean out if need and make sure in working order | |||
| ROW - FINAL APRON (AFTER POUR) | 02/29/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/29/24 PAVERS GLUED. NO CRACKS OR DAMAGE IN DRIVEWAY OR SIDEWALK. MEETS ALL MINIMUM COPC STANDARDS AT THE TIME OF THIS INSPECTION. Inspector Notes from Inspection 9465 2/26/24 Upon walking property, determined that drainage will work as indicated on survey. Area on right side surrounding tree outlined in white paint is low. You will need to raise this area up so that water does not pool and has positive drainage to the curb and gutter system. I am passing this Field survey as noted, as a courtesey, but you will need to make this and any other corrections deemed neccessary on any subsequent inspections prior to Row final passage. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/26/2024 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/26/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/26/24 Upon walking property, determined that drainage will work as indicated on survey. Area on right side surrounding tree outlined in white paint is low. You will need to raise this area up so that water does not pool and has positive drainage to the curb and gutter system. I am passing this Field survey as noted, as a courtesey, but you will need to make this and any other corrections deemed neccessary on any subsequent inspections prior to Row final passage. | |||
| GAS ROUGH | 12/11/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: GAS LINE NEEDS TO MOVED OUT OF POOL EQUIPMENT PAD WILL CHECK AT GAS FINAL | |||
| U-CROSS CONNECTION | 11/01/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: reclaim-no irrigation 10/30/2023 - PREVIOUS INSPECTION NOTES reclaim meter buried over with soils-expose/ clean out if need and make sure in working order | |||
| U-CROSS CONNECTION | 10/30/2023 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: reclaim meter buried over with soils-expose/ clean out if need and make sure in working order | |||
| ELECTRIC - EARLY POWER | 05/23/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 5/22/2023 - PREVIOUS INSPECTION NOTES 5-22-23 1. House locked up. 5-23-23 1. Emailed FPL at 10:09. | |||
| ELECTRIC - EARLY POWER | 05/22/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 5-22-23 1. House locked up. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/15/2023 | APPROVED | PFLANAGAN |
| Note: READY FOR PAVERS. --------------------------------------------------------------------------- 3/9/2023 - PREVIOUS INSPECTION NOTES ** 03/09/23 READY TO POUR ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR HAS BEEN APPROVED __________________________________________________________________________________________________________________________ 3/8/2023 - PREVIOUS INSPECTION NOTES ** 03/08/23 ** 03/08/23 NOT READY FOR INSPECTION ___________________________________________________________________________________________________________________________ 3/7/2023 - PREVIOUS INSPECTION NOTES ** 03/07/23 DRIVEWAY NOT READY FOR PRE-POUR INSPECTION ** SEE ATTACHED PHOTOS | |||
| ROW- PRE-APRON (PRE-POUR) | 04/27/2023 | CANCELLED BY APPLICANT | WEB |
| Note: New inspection due to canceled inspection 3/9/2023 - PREVIOUS INSPECTION NOTES ** 03/09/23 READY TO POUR ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR HAS BEEN APPROVED __________________________________________________________________________________________________________________________ 3/8/2023 - PREVIOUS INSPECTION NOTES ** 03/08/23 ** 03/08/23 NOT READY FOR INSPECTION ___________________________________________________________________________________________________________________________ 3/7/2023 - PREVIOUS INSPECTION NOTES ** 03/07/23 DRIVEWAY NOT READY FOR PRE-POUR INSPECTION ** SEE ATTACHED PHOTOS | |||
| ROW- PRE-APRON (PRE-POUR) | 04/26/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 3/9/2023 - PREVIOUS INSPECTION NOTES ** 03/09/23 READY TO POUR ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR HAS BEEN APPROVED __________________________________________________________________________________________________________________________ 3/8/2023 - PREVIOUS INSPECTION NOTES ** 03/08/23 ** 03/08/23 NOT READY FOR INSPECTION ___________________________________________________________________________________________________________________________ 3/7/2023 - PREVIOUS INSPECTION NOTES ** 03/07/23 DRIVEWAY NOT READY FOR PRE-POUR INSPECTION ** SEE ATTACHED PHOTOS | |||
| ROW- PRE-APRON (PRE-POUR) | 03/09/2023 | PARTIALLY APPROVED | EMADISON |
| Note: ** 03/09/23 READY TO POUR ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR HAS BEEN APPROVED __________________________________________________________________________________________________________________________ 3/8/2023 - PREVIOUS INSPECTION NOTES ** 03/08/23 ** 03/08/23 NOT READY FOR INSPECTION ___________________________________________________________________________________________________________________________ 3/7/2023 - PREVIOUS INSPECTION NOTES ** 03/07/23 DRIVEWAY NOT READY FOR PRE-POUR INSPECTION ** SEE ATTACHED PHOTOS | |||
| ROW- PAVER RESTRAINTS | 03/09/2023 | APPROVED | EMADISON |
| Note: )3/09/23 READY TO POUR ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL _______________________________________________________________________________________________________________________ 3/8/2023 - PREVIOUS INSPECTION NOTES ** 03/08/23 NOT READY FOR INSPECTION _______________________________________________________________________________________________________________________ 3/7/2023 - PREVIOUS INSPECTION NOTES ** 03/07/23 PAVER RESTRAINTS HAVE NOT BEEN DUG | |||
| ROW- PAVER RESTRAINTS | 03/08/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 03/08/23 NOT READY FOR INSPECTION _______________________________________________________________________________________________________________________ 3/7/2023 - PREVIOUS INSPECTION NOTES ** 03/07/23 PAVER RESTRAINTS HAVE NOT BEEN DUG | |||
| ROW- PRE-APRON (PRE-POUR) | 03/08/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 03/08/23 ** 03/08/23 NOT READY FOR INSPECTION ___________________________________________________________________________________________________________________________ 3/7/2023 - PREVIOUS INSPECTION NOTES ** 03/07/23 DRIVEWAY NOT READY FOR PRE-POUR INSPECTION ** SEE ATTACHED PHOTOS | |||
| ROW- PRE-APRON (PRE-POUR) | 03/07/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 03/07/23 DRIVEWAY NOT READY FOR PRE-POUR INSPECTION ** SEE ATTACHED PHOTOS | |||
| ROW- PAVER RESTRAINTS | 03/07/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 03/07/23 PAVER RESTRAINTS HAVE NOT BEEN DUG | |||
| INSULATION | 01/20/2023 | APPROVED | TSTAUFFACHER |
| LATH/BRICK/ WATER BARRIER | 01/20/2023 | APPROVED | TSTAUFFACHER |
| GAS ROUGH | 01/04/2023 | APPROVED | MGIBSON |
| ALL ROUGH | 01/04/2023 | APPROVED | RMARTIN |
| WALL SHEATHING | 12/20/2022 | CANCELLED BY APPLICANT | WEB |
| Note: New inspection due to canceled inspection 11/18/2022 - PREVIOUS INSPECTION NOTES 11-18-2022 Front entry not exposed for thru rod inspection. Please request a front entry wall sheathing. | |||
| WALL SHEATHING | 12/19/2022 | APPROVED | BTAYLOR |
| Note: New inspection due to canceled inspection New inspection due to canceled inspection 11/18/2022 - PREVIOUS INSPECTION NOTES 11-18-2022 Front entry not exposed for thru rod inspection. Please request a front entry wall sheathing. | |||
| WALL SHEATHING | 12/16/2022 | CANCELLED BY APPLICANT | WEB |
| Note: 11/18/2022 - PREVIOUS INSPECTION NOTES 11-18-2022 Front entry not exposed for thru rod inspection. Please request a front entry wall sheathing. | |||
| GRAVITY SEWER TEST | 12/13/2022 | APPROVED | MGIBSON |
| ELECTRIC-TUG | 12/13/2022 | APPROVED | LMILLER |
| U - SEWER TIE IN | 12/13/2022 | APPROVED | MGIBSON |
| ROOF VALLEY & METAL | 12/08/2022 | APPROVED | AGAETANO |
| Note: 11/30/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 11-18-2022 Sheet 3 indicates thru rods at second floor right side bedroom. S-2 Note CTO5 used (MSTA 12 straps). There is no CMU below that second floor wall. 11-30-22 1. notes above were not resolved (a revision is needed to resolve the issues listed above 2. FASTENERS FOR UNDERLAYMENT AS REQUIRED, R905.1.1.1 Need fasteners at 6inch max OC spacing on overlaps (seams) 3. Missing double coverage in several areas (check all) | |||
| ROOF VALLEY & METAL | 11/30/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: Inspector Notes from Inspection 2460 11-18-2022 Sheet 3 indicates thru rods at second floor right side bedroom. S-2 Note CTO5 used (MSTA 12 straps). There is no CMU below that second floor wall. 11-30-22 1. notes above were not resolved (a revision is needed to resolve the issues listed above 2. FASTENERS FOR UNDERLAYMENT AS REQUIRED, R905.1.1.1 Need fasteners at 6inch max OC spacing on overlaps (seams) 3. Missing double coverage in several areas (check all) | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/18/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: 11-18-2022 Sheet 3 indicates thru rods at second floor right side bedroom. S-2 Note CTO5 used (MSTA 12 straps). There is no CMU below that second floor wall. | |||
| WALL SHEATHING | 11/18/2022 | PARTIALLY APPROVED | AGAETANO |
| Note: 11-18-2022 Front entry not exposed for thru rod inspection. Please request a front entry wall sheathing. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/28/2022 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING | 10/28/2022 | APPROVED | BTAYLOR |
| TIE BEAM / LINTEL | 09/07/2022 | APPROVED | RMARTIN |
| Note: THIS IS A REINSPECTION 1. Clearance from masonry FBC, R606.3.4 minimum wall reinforcing steel coverage not met (.75 inch) 2. FBC, R606.3.5.3 (3) CELLS CONTAINING REINFORCEMENT SHALL BE FILLED SOLIDLY WITH GROUT. (soil in cells) see orange paint | |||
| TIE BEAM / LINTEL | 09/06/2022 | Disapproved -FEE REQUIRED | LMILLER |
| Note: 1. Clearance from masonry FBC, R606.3.4 minimum wall reinforcing steel coverage not met (.75 inch) 2. FBC, R606.3.5.3 (3) CELLS CONTAINING REINFORCEMENT SHALL BE FILLED SOLIDLY WITH GROUT. (soil in cells) see orange paint | |||
| FOUND SURVEY APPROVED (OFFICE) | 08/30/2022 | APPROVED | TDOAK |
| MONOLITHIC SLAB | 08/17/2022 | APPROVED | DCUSHING |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/11/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 06/24/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/20/2024 | 02/22/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| GAS | COMPLETE | 01/09/2024 | 01/09/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| GAS | HOLD | 12/14/2023 | 12/14/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide new site plan showing distance from tank to house and tank to property line | |||
| MECH | COMPLETE | 11/19/2023 | 11/20/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/08/2023 | 05/08/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide project summary page showing equipment model numbers and AHRI reference numbers that comply with R403.7.1.2.1 FBC Energy Conservation 2020 7TH Edition | |||
| MECH | HOLD | 04/06/2023 | 04/06/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Still missing heatload and manual D from packet | |||
| BADMIN | INFORMATION | 04/06/2023 | 04/06/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM The subcontractor is to be changed throught the online portal. click on subcontractors, you can inactivate the one you are changing and add the new one. Page 60 of the How to use the online portal will take you step by step. | |||
| MECH | HOLD | 03/30/2023 | 03/30/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide entire energy calc and heatload with Duct layout and Manual D report | |||
| MECH | HOLD | 03/14/2023 | 03/15/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide entire energy calc and heatload with duct layout | |||
| BLD | COMPLETE | 03/14/2023 | 03/15/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 12/19/2022 | 12/19/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide entire energy calc and heatload with duct layout | |||
| BLD | COMPLETE | 12/19/2022 | 12/20/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/29/2022 | 12/02/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/30/2022 | 08/30/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/30/2022 | 08/30/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/01/2022 | 06/01/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/27/2022 | 06/02/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/27/2022 | 05/31/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Plans show second floor walls to be frame. Energy Calcs say Block. Revise to match. 2. Remove vented from soffit detail on plans. Attic is nonvented with spray foam (Second Request) | |||
| URB | COMPLETE | 05/19/2022 | 05/20/2022 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - | |||
| BLD | COMPLETE | 05/18/2022 | 05/19/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 05/18/2022 | 05/19/2022 |
| Note: Released By: ALYSSA ROSCOE - - | |||
| ELEC | COMPLETE | 05/18/2022 | 05/19/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/18/2022 | 05/18/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/18/2022 | 05/24/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/18/2022 | 05/19/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Plans show second floor walls to be frame. Energy Calcs say Block. Revise to match. 2. Remove vented from soffit detail on plans. Attic is nonvented with spray foam | |||
| SW1 | COMPLETE | 05/18/2022 | 05/25/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/18/2022 | 05/19/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM . Site plan: Please provide setback from front property line to bottom arc of circular driveway to demonstrate it meets 5' minimum required setback. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 03/06/2024 |
| REINSPECTION FEE | ¤40.00 | 03/06/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 02/20/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/20/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/20/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 02/20/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 02/20/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 02/20/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 02/20/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 02/20/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 02/20/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 02/20/2024 |
| REINSPECTION FEE | ¤40.00 | 02/20/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/10/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/10/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤96.72) | 06/10/2022 |
| SEWER INSPECTION | ¤25.00 | 06/10/2022 |
| SITE PLAN 30 | ¤30.00 | 06/10/2022 |
| CONNECTION FEES | ¤25.00 | 06/10/2022 |
| WATER-METER | ¤467.09 | 06/10/2022 |
| WATER-METER | ¤388.04 | 06/10/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/10/2022 |
| INSPECTION - RESIDENTIAL | ¤2,200.00 | 06/10/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤624.00 | 06/10/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 06/10/2022 |
| IMPACT FEE FIRE | ¤388.65 | 06/10/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 06/10/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/10/2022 |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | 06/10/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 06/10/2022 |
| SURCHARGE FS 533.721 | ¤23.18 | 06/10/2022 |
| SURCHARGE - FS 468.631 | ¤34.77 | 06/10/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/10/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/10/2022 |
| SW ENG PRE APRON | ¤30.00 | 06/10/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,122.83 |