I want to search for...

Permit #2022051216

Permit Details

Status: COED

Parcel Id: 23-11-30-6060-00000-00F0
Total Square Footage: 1616 sqft
Block: 00000
Subdivision: 2312 - WHITEVIEW VILLAGE SUBDIVISION
Job Phone: 904-294-2220
Location Address: 32 WAVERLY LN
Type: CPO - COMMERCIAL POOL
Issue Date: 11/04/2022
NOC: RECORDED
Applicant name: JUDSON CLARKSON
Owner: KB HOME JACKSONVILLE, LLC

Address

10475 FORTUNE PKWY, STE 100

JACKSONVILLE, FL 32256

Lot: 00F0
Contracted Stated Job Value: ¤272,990.00
Job Description: SWIMMING POOL - WHITEVIEW
Type: CN

Contractor

POOLS BY JOHN CLARKSON INC
Status Location Address State License Number Phone
ACTIVE

600 ST JOHNS RD N

,

CPC1459376 (Exp: 08/31/2026) 904-294-2220

Sub Contractors

DAVID THOMAS PRUETTE
Status Location Address State License Number Phone
ACTIVE

331-8 PARKRIDGE AVE

ORANGE PARK , FL 32065

EC0002923 (Exp: 08/31/2026) 904-272-7225

Inspection History

Type Request Date Result Inspector
POOL CERTIFICATION/ OPERATING PERMIT - STATE DOH 05/24/2024 FINAL APPROVED BBEMBRY
Note: From: Slone, Renee B <Renee.Slone@flhealth.gov> Sent: Friday, May 24, 2024 1:51 PM To: Bey, John M <John.Bey@flhealth.gov>; Barbie Bembry <BBembry@palmcoastgov.com>; Matrai, Gabor T <Gabor.Matrai@flhealth.gov>; Michael Manley <Michael@pbjc.com>; Blunck, Scott <sblunck@kbhome.com> Cc: scott@bentconstruction.com Subject: RE: Whiteview Amenity Pool - 32 Waverly Lane, Palm Coast Good Afternoon All, I’m sorry I’ve been working on a thing with Tallahassee all day and haven’t gotten to the iop yet. Please go ahead and open the pool for the weekend I will get you the paperwork on Tuesday first thing. You passed all inspections so paperwork is really just a formality. As long as Jon is ok with that. From: Bey, John M <John.Bey@flhealth.gov> Sent: Friday, May 24, 2024 2:00 PM To: Slone, Renee B <Renee.Slone@flhealth.gov>; Barbie Bembry <BBembry@palmcoastgov.com>; Matrai, Gabor T <Gabor.Matrai@flhealth.gov>; Michael Manley <Michael@pbjc.com>; Blunck, Scott <sblunck@kbhome.com> Cc: scott@bentconstruction.com Subject: RE: Whiteview Amenity Pool - 32 Waverly Lane, Palm Coast Yes that is fine. Gabor has provided the Initial Operating Permit Inspection Report which states on the bottom that the Initial Operating Permit Issue Date is 5/22/24, so we are just waiting on a piece of paper at this point. Hope everyone has a great Memorial Day weekend.
BUILDING POOL FINAL 05/21/2024 FINAL APPROVED FWILLIS
Note: 4/25/2024 - PREVIOUS INSPECTION NOTES missing lacth located 54 inches from bottom of gates per note 10 on sheet M1.0
LDSC- LANDSCAPE FINAL 05/21/2024 APPROVED RPICATAGI
BUILDING POOL FINAL 04/25/2024 Disapproved - NO FEE LMILLER
Note: missing lacth located 54 inches from bottom of gates per note 10 on sheet M1.0
FIRE FINAL 04/08/2024 APPROVED RMARTIN
ELECTRIC FINAL 04/05/2024 APPROVED JMUNSON
Note: Inspector Notes from Inspection 3180 1/19/23 NEED SAFETY FENCE UP ASAP, NO MORE INSPECTIONS UNTIL THIS IS DONE, LOOKED AT BONDING THAT WAS UNCOVERED AROUND POOL 12/13/2023 - PREVIOUS INSPECTION NOTES 12/13/23 1. No plans on site FBC 107.3.1 2. Previous notes were not looked at, deck has been finished 3. Conduit has all been backfilled unable to see depth of conduit 11/2/2023 - PREVIOUS INSPECTION NOTES 1. Back left split bolt loose 2. Missed bond wire for light on back side of pool
ELECTRIC 1ST ROUGH 01/19/2024 APPROVED - AS NOTED RMARTIN
Note: 1/19/23 NEED SAFETY FENCE UP ASAP, NO MORE INSPECTIONS UNTIL THIS IS DONE, LOOKED AT BONDING THAT WAS UNCOVERED AROUND POOL 12/13/2023 - PREVIOUS INSPECTION NOTES 12/13/23 1. No plans on site FBC 107.3.1 2. Previous notes were not looked at, deck has been finished 3. Conduit has all been backfilled unable to see depth of conduit 11/2/2023 - PREVIOUS INSPECTION NOTES 1. Back left split bolt loose 2. Missed bond wire for light on back side of pool
ELECTRIC 1ST ROUGH 12/13/2023 Disapproved - NO FEE MKRASKI
Note: 12/13/23 1. No plans on site FBC 107.3.1 2. Previous notes were not looked at, deck has been finished 3. Conduit has all been backfilled unable to see depth of conduit 11/2/2023 - PREVIOUS INSPECTION NOTES 1. Back left split bolt loose 2. Missed bond wire for light on back side of pool
ELECTRIC 1ST ROUGH 11/02/2023 Disapproved - NO FEE MKRASKI
Note: 1. Back left split bolt loose 2. Missed bond wire for light on back side of pool
POOL DECK 02/03/2023 APPROVED LMILLER
Note: Inspector Notes from Inspection 3580 Pool plumbing inspected by Insector JW who was on site with me for the inspection 3 inch gutter plumbing is to be called in for inspection prior to coveringper Inspector JW Pool electric Bond wire inspected by Inspector MK need to see bonding cups and lift chair bonding attached when installed and must be called in for inspection prior to covering per Chief Inspector RM
PLUMBING 2ND ROUGH 12/15/2022 APPROVED MGIBSON
POOL STEEL AND GROUND 12/06/2022 APPROVED - AS NOTED LMILLER
Note: Pool plumbing inspected by Insector JW who was on site with me for the inspection 3 inch gutter plumbing is to be called in for inspection prior to coveringper Inspector JW Pool electric Bond wire inspected by Inspector MK need to see bonding cups and lift chair bonding attached when installed and must be called in for inspection prior to covering per Chief Inspector RM

Review History

Department Status Date In Date Out
BLD COMPLETE 10/18/2022 10/19/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
DSD COMPLETE 09/06/2022 09/06/2022
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM
DSD HOLD 06/28/2022 06/29/2022
Note: Held By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM Repeat Comments Provide a separate fence permit along with fence details such as height, color and fence type.
PLLA COMPLETE 06/28/2022 06/29/2022
Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM Landscape is part of the bathroom permit.
BLD HOLD 06/28/2022 07/08/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. OK 2. OK 3. Fence and gates are to comply with FBC 454.1.3.9. Engineer’s response letter noted they were not responsible for fence and gate. This is a life safety issue and the proposed permit cannot be approved without the required barrier. Provide a copy of the hard scape for approval. 4. Addition notes are noted as added to sheet CV1.0. No notes where added.
ELEC COMPLETE 06/28/2022 06/29/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 06/28/2022 06/29/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
PLLA HOLD 05/26/2022 05/26/2022
Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM Provide a landscape plan.
BLD HOLD 05/20/2022 06/06/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. All Structural Sheets are to be either digitally signed and sealed or wet sealed by the Engineer of record. FBC [A]107 2. Two means of entry are shown for the proposed pool. Both are steps with handrails meeting the Code requirements. Provide if a ramp or chair will be provided for access to the pool. 242.2 Florida Accessibility Code and 454.1.2.5 FBC. 3. Fence and gates are to comply with FBC 454.1.3.9.
DSD HOLD 05/20/2022 05/26/2022
Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM Provide dimensions for all structures. Provide a separate fence permit along with fence details such as height, color and fence type.
ELEC COMPLETE 05/20/2022 05/23/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 05/20/2022 05/23/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
EXTENSION ¤40.00 05/20/2024
EXTENSION ¤40.00 05/20/2024
INSPECTION COMMERCIAL ¤1,911.00 11/04/2022
PLAN REVIEW - COMMERCIAL ¤313.95 11/04/2022
SURCHARGE FS 533.721 ¤12.10 11/04/2022
SURCHARGE - FS 468.631 ¤18.15 11/04/2022
SITE PLAN 30 ¤30.00 11/04/2022
ADJUSTMENT 50% (¤1,149.98) 11/04/2022
ADMINISTRATIVE - COMMERCIAL ¤75.00 11/04/2022
Fees Total Due: ¤0.00 Total Paid: ¤1,290.22