I want to search for...
Permit #2022051216
Permit Details
Status: COED
| Parcel Id: 23-11-30-6060-00000-00F0 |
| Total Square Footage: 1616 sqft |
| Block: 00000 |
| Subdivision: 2312 - WHITEVIEW VILLAGE SUBDIVISION |
| Job Phone: 904-294-2220 |
| Location Address: 32 WAVERLY LN |
| Type: CPO - COMMERCIAL POOL |
| Issue Date: 11/04/2022 |
| NOC: RECORDED |
| Applicant name: JUDSON CLARKSON |
| Owner: KB HOME JACKSONVILLE, LLC |
|
Address 10475 FORTUNE PKWY, STE 100 JACKSONVILLE, FL 32256 |
| Lot: 00F0 |
| Contracted Stated Job Value: ¤272,990.00 |
| Job Description: SWIMMING POOL - WHITEVIEW |
| Type: CN |
Contractor
POOLS BY JOHN CLARKSON INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
600 ST JOHNS RD N , |
CPC1459376 (Exp: 08/31/2026) | 904-294-2220 |
Sub Contractors
DAVID THOMAS PRUETTE
| Status | Location Address | State License Number | Phone |
| ACTIVE |
331-8 PARKRIDGE AVE ORANGE PARK , FL 32065 |
EC0002923 (Exp: 08/31/2026) | 904-272-7225 |
Inspection History
| Type | Request Date | Result | Inspector |
| POOL CERTIFICATION/ OPERATING PERMIT - STATE DOH | 05/24/2024 | FINAL APPROVED | BBEMBRY |
| Note: From: Slone, Renee B <Renee.Slone@flhealth.gov> Sent: Friday, May 24, 2024 1:51 PM To: Bey, John M <John.Bey@flhealth.gov>; Barbie Bembry <BBembry@palmcoastgov.com>; Matrai, Gabor T <Gabor.Matrai@flhealth.gov>; Michael Manley <Michael@pbjc.com>; Blunck, Scott <sblunck@kbhome.com> Cc: scott@bentconstruction.com Subject: RE: Whiteview Amenity Pool - 32 Waverly Lane, Palm Coast Good Afternoon All, I’m sorry I’ve been working on a thing with Tallahassee all day and haven’t gotten to the iop yet. Please go ahead and open the pool for the weekend I will get you the paperwork on Tuesday first thing. You passed all inspections so paperwork is really just a formality. As long as Jon is ok with that. From: Bey, John M <John.Bey@flhealth.gov> Sent: Friday, May 24, 2024 2:00 PM To: Slone, Renee B <Renee.Slone@flhealth.gov>; Barbie Bembry <BBembry@palmcoastgov.com>; Matrai, Gabor T <Gabor.Matrai@flhealth.gov>; Michael Manley <Michael@pbjc.com>; Blunck, Scott <sblunck@kbhome.com> Cc: scott@bentconstruction.com Subject: RE: Whiteview Amenity Pool - 32 Waverly Lane, Palm Coast Yes that is fine. Gabor has provided the Initial Operating Permit Inspection Report which states on the bottom that the Initial Operating Permit Issue Date is 5/22/24, so we are just waiting on a piece of paper at this point. Hope everyone has a great Memorial Day weekend. | |||
| BUILDING POOL FINAL | 05/21/2024 | FINAL APPROVED | FWILLIS |
| Note: 4/25/2024 - PREVIOUS INSPECTION NOTES missing lacth located 54 inches from bottom of gates per note 10 on sheet M1.0 | |||
| LDSC- LANDSCAPE FINAL | 05/21/2024 | APPROVED | RPICATAGI |
| BUILDING POOL FINAL | 04/25/2024 | Disapproved - NO FEE | LMILLER |
| Note: missing lacth located 54 inches from bottom of gates per note 10 on sheet M1.0 | |||
| FIRE FINAL | 04/08/2024 | APPROVED | RMARTIN |
| ELECTRIC FINAL | 04/05/2024 | APPROVED | JMUNSON |
| Note: Inspector Notes from Inspection 3180 1/19/23 NEED SAFETY FENCE UP ASAP, NO MORE INSPECTIONS UNTIL THIS IS DONE, LOOKED AT BONDING THAT WAS UNCOVERED AROUND POOL 12/13/2023 - PREVIOUS INSPECTION NOTES 12/13/23 1. No plans on site FBC 107.3.1 2. Previous notes were not looked at, deck has been finished 3. Conduit has all been backfilled unable to see depth of conduit 11/2/2023 - PREVIOUS INSPECTION NOTES 1. Back left split bolt loose 2. Missed bond wire for light on back side of pool | |||
| ELECTRIC 1ST ROUGH | 01/19/2024 | APPROVED - AS NOTED | RMARTIN |
| Note: 1/19/23 NEED SAFETY FENCE UP ASAP, NO MORE INSPECTIONS UNTIL THIS IS DONE, LOOKED AT BONDING THAT WAS UNCOVERED AROUND POOL 12/13/2023 - PREVIOUS INSPECTION NOTES 12/13/23 1. No plans on site FBC 107.3.1 2. Previous notes were not looked at, deck has been finished 3. Conduit has all been backfilled unable to see depth of conduit 11/2/2023 - PREVIOUS INSPECTION NOTES 1. Back left split bolt loose 2. Missed bond wire for light on back side of pool | |||
| ELECTRIC 1ST ROUGH | 12/13/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 12/13/23 1. No plans on site FBC 107.3.1 2. Previous notes were not looked at, deck has been finished 3. Conduit has all been backfilled unable to see depth of conduit 11/2/2023 - PREVIOUS INSPECTION NOTES 1. Back left split bolt loose 2. Missed bond wire for light on back side of pool | |||
| ELECTRIC 1ST ROUGH | 11/02/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Back left split bolt loose 2. Missed bond wire for light on back side of pool | |||
| POOL DECK | 02/03/2023 | APPROVED | LMILLER |
| Note: Inspector Notes from Inspection 3580 Pool plumbing inspected by Insector JW who was on site with me for the inspection 3 inch gutter plumbing is to be called in for inspection prior to coveringper Inspector JW Pool electric Bond wire inspected by Inspector MK need to see bonding cups and lift chair bonding attached when installed and must be called in for inspection prior to covering per Chief Inspector RM | |||
| PLUMBING 2ND ROUGH | 12/15/2022 | APPROVED | MGIBSON |
| POOL STEEL AND GROUND | 12/06/2022 | APPROVED - AS NOTED | LMILLER |
| Note: Pool plumbing inspected by Insector JW who was on site with me for the inspection 3 inch gutter plumbing is to be called in for inspection prior to coveringper Inspector JW Pool electric Bond wire inspected by Inspector MK need to see bonding cups and lift chair bonding attached when installed and must be called in for inspection prior to covering per Chief Inspector RM |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 10/18/2022 | 10/19/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| DSD | COMPLETE | 09/06/2022 | 09/06/2022 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM | |||
| DSD | HOLD | 06/28/2022 | 06/29/2022 |
| Note: Held By: JACQUELINE GONZALEZ - (386)986-3751 - JGONZALEZ@PALMCOASTGOV.COM Repeat Comments Provide a separate fence permit along with fence details such as height, color and fence type. | |||
| PLLA | COMPLETE | 06/28/2022 | 06/29/2022 |
| Note: Released By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM Landscape is part of the bathroom permit. | |||
| BLD | HOLD | 06/28/2022 | 07/08/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. OK 2. OK 3. Fence and gates are to comply with FBC 454.1.3.9. Engineer’s response letter noted they were not responsible for fence and gate. This is a life safety issue and the proposed permit cannot be approved without the required barrier. Provide a copy of the hard scape for approval. 4. Addition notes are noted as added to sheet CV1.0. No notes where added. | |||
| ELEC | COMPLETE | 06/28/2022 | 06/29/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/28/2022 | 06/29/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLLA | HOLD | 05/26/2022 | 05/26/2022 |
| Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM Provide a landscape plan. | |||
| BLD | HOLD | 05/20/2022 | 06/06/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. All Structural Sheets are to be either digitally signed and sealed or wet sealed by the Engineer of record. FBC [A]107 2. Two means of entry are shown for the proposed pool. Both are steps with handrails meeting the Code requirements. Provide if a ramp or chair will be provided for access to the pool. 242.2 Florida Accessibility Code and 454.1.2.5 FBC. 3. Fence and gates are to comply with FBC 454.1.3.9. | |||
| DSD | HOLD | 05/20/2022 | 05/26/2022 |
| Note: Held By: DAMARIS RAMIREZ - (386)986-3750 - DRAMIREZ@PALMCOASTGOV.COM Provide dimensions for all structures. Provide a separate fence permit along with fence details such as height, color and fence type. | |||
| ELEC | COMPLETE | 05/20/2022 | 05/23/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/20/2022 | 05/23/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EXTENSION | ¤40.00 | 05/20/2024 |
| EXTENSION | ¤40.00 | 05/20/2024 |
| INSPECTION COMMERCIAL | ¤1,911.00 | 11/04/2022 |
| PLAN REVIEW - COMMERCIAL | ¤313.95 | 11/04/2022 |
| SURCHARGE FS 533.721 | ¤12.10 | 11/04/2022 |
| SURCHARGE - FS 468.631 | ¤18.15 | 11/04/2022 |
| SITE PLAN 30 | ¤30.00 | 11/04/2022 |
| ADJUSTMENT 50% | (¤1,149.98) | 11/04/2022 |
| ADMINISTRATIVE - COMMERCIAL | ¤75.00 | 11/04/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤1,290.22 |