I want to search for...
Permit #2022051225
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7022-00010-0050 |
| Block: 00010 |
| Subdivision: 2217 - SECTION 22-WYNNFIELD |
| Job Phone: 386-597-9271 |
| Location Address: 15 WEIDNER PL |
| Type: DR - DRIVEWAY |
| Issue Date: 07/18/2022 |
| NOC: Unknown |
| Applicant name: GARY W MCCAIN |
| Owner: MCCAIN GARY & BETH H&W |
|
Address 15 WEIDNER PLACE PALM COAST, FL 32164 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤2,450.00 |
| Job Description: CIRCULAR DRIVEWAY |
| Type: CN |
Contractor
MCCAIN CONSTRUCTION LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
15 WEIDNER PLACE PALM COAST, FL 32164 |
CBC1261573 (Exp: 08/31/2026) | 386-447-0035 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 09/07/2023 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL INSPECTION | 09/06/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. THE BUILDER IS RESPONSIBLE FOR ENSURING THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - FINAL APRON (AFTER POUR) | 03/23/2023 | APPROVED | GBERTOLA |
| ROW- PRE-APRON (PRE-POUR) | 02/21/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 02/02/2023 | 02/02/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/02/2023 | 02/07/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| UD1 | CANCEL | 02/02/2023 | 02/02/2023 |
| UTL | COMPLETE | 02/02/2023 | 02/09/2023 |
| Note: Released By: LARRY FITZGERALD - - LFITZGERALD@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/20/2022 | 05/24/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 05/20/2022 | 05/25/2022 |
| Note: Released By: LARRY FITZGERALD - - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/20/2022 | 05/20/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| EXTENSION | ¤40.00 | 09/06/2023 |
| SW ENG INSPECTION 40 | ¤40.00 | 07/18/2022 |
| SW ENG PRE APRON | ¤30.00 | 07/18/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/18/2022 |
| SITE PLAN 15 | ¤15.00 | 07/18/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/18/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤355.00 |