I want to search for...
Permit #2022051481
Permit Details
Status: COED
| Parcel Id: 07-11-31-7027-00440-0070 |
| CONDITIONED SPACE: 2000 sqft |
| GARAGE: 476 sqft |
| OPENED PORCH (WITH ROOF) : 197 sqft |
| OPENED PORCH (WITH ROOF) : 144 sqft |
| Total Square Footage: 2817 sqft |
| Block: 00440 |
| Subdivision: 2128 - SECTION 27-WYNNFIELD |
| Job Phone: 912-258-2201 |
| Location Address: 77 WOODBURY DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/28/2022 |
| NOC: RECORDED |
| Applicant name: JAMES FUCETOLA III |
| Owner: PALM COAST COMMUNITIES LLC |
|
Address PO BOX 22547 ST SIMONS ISLAND, FL 31522 |
| Lot: 0070 |
| Contracted Stated Job Value: ¤215,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PALM COAST COMMUNITIES LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 22547 PALM COAST, FL 32164 |
CBC1262878 (Exp: 08/31/2026) | 321-501-4617 |
Sub Contractors
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/21/2023 | FINAL APPROVED | MKRASKI |
| U -UTILITY RESIDENTIAL FINAL | 03/21/2023 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/16/2023 | APPROVED | GBERTOLA |
| Note: 3/16/23=CORRECTION WERE MADE AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/13/2023 - PREVIOUS INSPECTION NOTES 03/13/23= IN THE BACK YARD YOU ARE MOVING THE WATER TO THE BACK . YOU NEED TO MOVE THE WATER TO THE FRONT The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/16/2023 | APPROVED | GBERTOLA |
| Note: CORRECTION WERE MADE AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD 3/9/2023 - PREVIOUS INSPECTION NOTES final survey need to be aproved first | |||
| ROW - STORMWATER FINAL | 03/16/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - FINAL APRON (AFTER POUR) | 03/16/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| U - SEWER TIE IN | 03/15/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/13/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: 03/13/23= IN THE BACK YARD YOU ARE MOVING THE WATER TO THE BACK . YOU NEED TO MOVE THE WATER TO THE FRONT. LOOK AT THE NUMBERS IN THE FINAL SURVEY. YOU DIDN'T BUILD THIS ACCORDING TO THE SITE PLAN The subject lots drainage must not negatively impact any adjacent property. (B) B.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/09/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: final survey need to be aproved first | |||
| U-CROSS CONNECTION | 03/08/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irrigation with RPZ installed-no cross connection. ALSO-SEWER CLEAN OUT RISER PIPE FULL OF WATER-MAKE SURE SEWER LINE IS CLEAR AND FUNCTIONAL BY FINAL | |||
| ELECTRIC - EARLY POWER | 02/23/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 0851. Release Power | |||
| ROW- PRE-APRON (PRE-POUR) | 02/17/2023 | APPROVED | PFLANAGAN |
| Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING THE CONCRETE FOR DRIVEWAY | |||
| LATH/BRICK/ WATER BARRIER | 01/25/2023 | APPROVED | KSANDOE |
| INSULATION | 01/23/2023 | APPROVED | MKRASKI |
| ALL ROUGH | 01/17/2023 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/21/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: 12/21/22 Adress number not visible per FBC R319.1 Correct before next inspection 12/16/2022 - PREVIOUS INSPECTION NOTES 12/16/22 1. Truss repair for T30 not repaired per plan missing 2x4 on web 11/14/2022 - PREVIOUS INSPECTION NOTES 11/4/2022 - PREVIOUS INSPECTION NOTES 1. Truss layout with truss engineering does not match home (reversed) 2. Missing straps over garage door Check all truss strapping 3. No interior load bearing wall detail on site 4. Hand framed rafters on back lani are not strapped to CMU 11/14/22 1. Truss T30 is damaged and needs engineered repairs submitted to city 2. Truss's T21, T27, HJ01, HJ05 missing straps 3. Multiple shinners on back lani near truss T26 All marked on truss layout Stopped inspection | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/16/2022 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 12/16/22 1. Truss repair for T30 not repaired per plan missing 2x4 on web 11/14/2022 - PREVIOUS INSPECTION NOTES 11/4/2022 - PREVIOUS INSPECTION NOTES 1. Truss layout with truss engineering does not match home (reversed) 2. Missing straps over garage door Check all truss strapping 3. No interior load bearing wall detail on site 4. Hand framed rafters on back lani are not strapped to CMU 11/14/22 1. Truss T30 is damaged and needs engineered repairs submitted to city 2. Truss's T21, T27, HJ01, HJ05 missing straps 3. Multiple shinners on back lani near truss T26 All marked on truss layout Stopped inspection | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/14/2022 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 11/4/2022 - PREVIOUS INSPECTION NOTES 1. Truss layout with truss engineering does not match home (reversed) 2. Missing straps over garage door Check all truss strapping 3. No interior load bearing wall detail on site 4. Hand framed rafters on back lani are not strapped to CMU 11/14/22 1. Truss T30 is damaged and needs engineered repairs submitted to city 2. Truss's T21, T27, HJ01, HJ05 missing straps 3. Multiple shinners on back lani near truss T26 All marked on truss layout Still need to check truss engineering Stopped inspection | |||
| ROOF VALLEY & METAL | 11/08/2022 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/04/2022 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. Truss layout with truss engineering does not match home (reversed) 2. Missing straps over garage door Check all truss strapping 3. No interior load bearing wall detail on site 4. Hand framed rafters on back lani are not strapped to CMU Stopped inspection | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/03/2022 | Disapproved - NO FEE | MKRASKI |
| Note: Not ready workers still working | |||
| ROOF SHEATHING | 11/03/2022 | APPROVED | MKRASKI |
| WALL SHEATHING | 10/27/2022 | CANCELLED BY INSPECTOR | DCUSHING |
| Note: N/A - no wall sheathing | |||
| ROOF SHEATHING | 10/27/2022 | Disapproved - NO FEE | RSIMS |
| Note: 10/27/2022: INSPECTION STOPPED 1). right side of garage has loose plywood. (marked on wall with an arrow below area) 2). Back left & center areas the gap between the sheets of plywood is excessive making the clips ineffective. (Plywood sinks in when walked on.) 3). Right front area - clips are not flush with plywood. | |||
| FOUND SURVEY APPROVED (OFFICE) | 10/18/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 10/10/2022 | APPROVED | MKRASKI |
| MONOLITHIC SLAB | 09/15/2022 | APPROVED | MKRASKI |
| MONOLITHIC SLAB | 09/14/2022 | CANCELLED BY APPLICANT | MKRASKI |
| Note: THIS IS A REINSPECTION 1. No compaction report in Doc-box FBC 404.1 Stopped inspection | |||
| MONOLITHIC SLAB | 09/13/2022 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. No compaction report in Doc-box FBC 404.1 Stopped inspection | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 09/12/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: THE P-TRAP FOR HANSEN BOX'' W/M'' IS UNDER THE SLAB!!! | |||
| GRAVITY SEWER TEST | 09/12/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 08/05/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 12/02/2022 | 12/05/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/18/2022 | 11/18/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/18/2022 | 10/18/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/18/2022 | 10/18/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/09/2022 | 06/09/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/25/2022 | 05/31/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 05/25/2022 | 05/31/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 05/25/2022 | 05/26/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/25/2022 | 05/25/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/25/2022 | 05/27/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/25/2022 | 05/26/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/25/2022 | 05/26/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/25/2022 | 05/26/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM AC must be screened with 7 gallon shrubs | |||
| SWALE | COMPLETE | 05/25/2022 | 08/11/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 03/21/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 03/21/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/21/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/21/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/21/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/21/2023 |
| CONNECTION FEES | ¤1,077.88 | 07/28/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 07/28/2022 |
| IMPACT FEE FIRE | ¤388.65 | 07/28/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 07/28/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/28/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 07/28/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/28/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 07/28/2022 |
| SURCHARGE FS 533.721 | ¤7.81 | 07/28/2022 |
| SURCHARGE - FS 468.631 | ¤11.71 | 07/28/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/28/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/28/2022 |
| SW ENG PRE APRON | ¤30.00 | 07/28/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/28/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/28/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 07/28/2022 |
| SEWER CREDIT | (¤1,147.00) | 07/28/2022 |
| SEWER INSPECTION | ¤25.00 | 07/28/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 07/28/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 07/28/2022 |
| SITE PLAN 30 | ¤30.00 | 07/28/2022 |
| WATER- TURN ON | ¤25.00 | 07/28/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/28/2022 |
| INSPECTION - RESIDENTIAL | ¤701.25 | 07/28/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤198.90 | 07/28/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,226.36 |