I want to search for...

Permit #2022051496

Permit Details

Status: COED

Parcel Id: 07-11-31-7058-00430-0130
CONDITIONED SPACE: 1517 sqft
GARAGE: 394 sqft
Total Square Footage: 1911 sqft
Block: 00430
Subdivision: 2215 - SECTION 58-SEMINOLE PARK
Job Phone: 407-432-2344
Location Address: 16 SEDERHOLM PATH
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/01/2022
NOC: RECORDED
Applicant name: WADE GILMER JURNEY JR
Owner: NATIONAL HOME CORPORATION

Address

4850 TAMIAMI TRAIL N

NAPLES, FL 34103

Lot: 0130
Contracted Stated Job Value: ¤209,353.00
Job Description: Single Family Residence
Type: CN

Contractor

NATIONAL HOME CORPORATION
Status Location Address Mailing Address State License Number Phone
INACTIVE

1080 HOLCOMB BRIDGE ROAD

,

BLDG 100 - 330

ROSWELL , GA 30076

CBC1257700 (Exp: 08/31/2026) 471-817-1259

Sub Contractors

DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JASON PATRICK RIBOCK
Status Location Address State License Number Phone
INACTIVE

620 E PINE ST

, 0

ES12001313 (Exp: 08/31/2026) 407-625-0257
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
RANDALL SCOTT ROSENFELD
Status Location Address State License Number Phone
ACTIVE

234 N WHITNEY ST

PALM COAST, FL 32084

CAC1816641 (Exp: 08/31/2026) 904-599-0082

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/13/2023 FINAL APPROVED JSTEWART
Note: 2/9/2023 - PREVIOUS INSPECTION NOTES 2-9-23 1. No hot water. 2. Energy cals don't match outside unit.
BLD - BUILDING FINAL 02/09/2023 Disapproved - NO FEE BTAYLOR
Note: 2-9-23 1. No hot water. 2. Energy cals don't match outside unit.
ROW - STORMWATER FINAL 02/09/2023 FINAL APPROVED EMADISON
Note: ** 02/09/23 EVERYTHING LOOKS GOOD AT THE TIME OF INSPECTION __________________________________________________________________________________________________________________________ New inspection due to canceled inspection ** SEE NOTES IN FIELD SURVEY FOR CORRECTIONS NEEDED
U -UTILITY RESIDENTIAL FINAL 02/07/2023 FINAL APPROVED JHARDING
ROW - STORMWATER FINAL 02/07/2023 CANCELLED BY APPLICANT WEB
Note: ** SEE NOTES IN FIELD SURVEY FOR CORRECTIONS NEEDED
ROW FIELD SURVEY /GRADING CERTIFICATION 02/06/2023 APPROVED EMADISON
Note: ** HOT PATCH ROAD REPAIR NEEDED ** LEFT SIDE ALONG VACANT **SEED** AND **STRAW** NEEDED ON ALL BARE EARTH ** LEFT SIDE ROW IN FRONT OF VACANT SOD NEEDED ON BARE EARTH WHERE PORTA-JOHN SAT
ROW - FINAL APRON (AFTER POUR) 02/06/2023 FINAL APPROVED EMADISON
FINAL SURVEY (OFFICE USE ONLY) 02/06/2023 APPROVED EMADISON
ELECTRIC - EARLY POWER 01/19/2023 APPROVED JMUNSON
ROW- PRE-APRON (PRE-POUR) 12/21/2022 APPROVED GBERTOLA
Note: 12/21/22=AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL __________________________________________________________________________________________________________________________ 12/15/2022 - PREVIOUS INSPECTION NOTES 1) THE CULVERT NEEDS TO BE 8' OFF THE EDGE OF PAVEMENT 2) NEED TO SOIL COMPACTED MORE NEED TO HAVE A MINIMUM OF 95% COMPACTION IN THE POURING AREA ----------------------------------------------------------------------------------- 12/14/2022 - PREVIOUS INSPECTION NOTES 12/14/22=Not ready for inspection. Not formed
ROW- PRE-APRON (PRE-POUR) 12/15/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) THE CULVERT NEEDS TO BE 8' OFF THE EDGE OF PAVEMENT 2) NEED TO SOIL COMPACTED MORE NEED TO HAVE A MINIMUM OF 95% COMPACTION IN THE POURING AREA ----------------------------------------------------------------------------------- 12/14/2022 - PREVIOUS INSPECTION NOTES 12/14/22=Not ready for inspection. Not formed
ROW- PRE-APRON (PRE-POUR) 12/14/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 12/14/22=Not ready for inspection. Not formed
U - SEWER TIE IN 12/05/2022 APPROVED MGIBSON
U-CROSS CONNECTION 12/05/2022 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
INSULATION 11/28/2022 APPROVED BTAYLOR
LATH/BRICK/ WATER BARRIER 11/28/2022 APPROVED BTAYLOR
ALL ROUGH 11/21/2022 APPROVED BTAYLOR
ELECTRIC-TUG 10/27/2022 APPROVED BTAYLOR
Note: 10/25/2022 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 10/12/2022 - PREVIOUS INSPECTION NOTES 10/2/2022 11:44:15 AM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd have been cancelled. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. 9/22/2022 - PREVIOUS INSPECTION NOTES 9-22-22 1. Not ready 10/12/22 1.Schedule 80 conduit must be installed. NEC 2017 300.5 (D) (4) 2. Ground wire must be protected. NEC 2017 250.64 10/25/22 1.Schedule 80 conduit must be installed. NEC 2017 300.5 (D) (4) 2. Ground wire must be protected. NEC 2017 250.64
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/27/2022 APPROVED BTAYLOR
Note: 10/25/2022 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 10/12/2022 - PREVIOUS INSPECTION NOTES 10/2/2022 11:45:29 AM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd have been cancelled. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. 10-12-22 1. Engineering for gable not complete. Circled 10-25-22 . Engineering for gable not complete. Circled
ELECTRIC-TUG 10/25/2022 Disapproved -FEE REQUIRED JMUNSON
Note: New inspection due to canceled inspection 10/12/2022 - PREVIOUS INSPECTION NOTES 10/2/2022 11:44:15 AM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd have been cancelled. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. 9/22/2022 - PREVIOUS INSPECTION NOTES 9-22-22 1. Not ready 10/12/22 1.Schedule 80 conduit must be installed. NEC 2017 300.5 (D) (4) 2. Ground wire must be protected. NEC 2017 250.64 10/25/22 1.Schedule 80 conduit must be installed. NEC 2017 300.5 (D) (4) 2. Ground wire must be protected. NEC 2017 250.64
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/25/2022 Disapproved -FEE REQUIRED BTAYLOR
Note: New inspection due to canceled inspection 10/12/2022 - PREVIOUS INSPECTION NOTES 10/2/2022 11:45:29 AM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd have been cancelled. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. 10-12-22 1. Engineering for gable not complete. Circled 10-25-22 . Engineering for gable not complete. Circled
ELECTRIC-TUG 10/21/2022 CANCELLED BY APPLICANT WEB
Note: 10/12/2022 - PREVIOUS INSPECTION NOTES 10/2/2022 11:44:15 AM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd have been cancelled. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. 9/22/2022 - PREVIOUS INSPECTION NOTES 9-22-22 1. Not ready 10/12/22 1.Schedule 80 conduit must be installed. NEC 2017 300.5 (D) (4) 2. Ground wire must be protected. NEC 2017 250.64
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/20/2022 CANCELLED BY APPLICANT WEB
Note: 10/12/2022 - PREVIOUS INSPECTION NOTES 10/2/2022 11:45:29 AM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd have been cancelled. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. 10-12-22 1. Engineering for gable not complete. Circled
ROOF VALLEY & METAL 10/20/2022 APPROVED BTAYLOR
Note: 10/2/2022 11:46:17 AM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd have been cancelled. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/12/2022 Disapproved - NO FEE BTAYLOR
Note: 10/2/2022 11:45:29 AM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd have been cancelled. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. 10-12-22 1. Engineering for gable not complete. Circled
ELECTRIC-TUG 10/12/2022 Disapproved -FEE REQUIRED JMUNSON
Note: 10/2/2022 11:44:15 AM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd have been cancelled. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. 9/22/2022 - PREVIOUS INSPECTION NOTES 9-22-22 1. Not ready 10/12/22 1.Schedule 80 conduit must be installed. NEC 2017 300.5 (D) (4) 2. Ground wire must be protected. NEC 2017 250.64
WALL SHEATHING 10/12/2022 APPROVED BTAYLOR
Note: 10/2/2022 11:44:50 AM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd have been cancelled.. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/03/2022 CANCELLED BY APPLICANT BBEMBRY
Note: Inspections requested for October 3rd have been cancelled. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power.
WALL SHEATHING 10/03/2022 CANCELLED BY APPLICANT BBEMBRY
Note: Inspections requested for October 3rd have been cancelled.. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power.
ELECTRIC-TUG 10/03/2022 CANCELLED BY APPLICANT BBEMBRY
Note: Inspections requested for October 3rd have been cancelled. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. 9/22/2022 - PREVIOUS INSPECTION NOTES 9-22-22 1. Not ready
ROOF VALLEY & METAL 10/03/2022 CANCELLED BY APPLICANT BBEMBRY
Note: Inspections requested for October 3rd have been cancelled. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power.
FOUND SURVEY APPROVED (OFFICE) 09/27/2022 APPROVED TBAKER
ELECTRIC-TUG 09/22/2022 Disapproved - NO FEE BTAYLOR
Note: 9-22-22 1. Not ready
TIE BEAM / LINTEL 09/13/2022 APPROVED BTAYLOR
MONOLITHIC SLAB 08/29/2022 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 08/25/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 08/25/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 08/01/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH HOLD 02/10/2023 02/10/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide entire energy calc with heatload and duct layout 2. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition 3. Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition
MECH COMPLETE 02/10/2023 02/10/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 09/27/2022 09/27/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BADMIN INFORMATION 09/27/2022 09/27/2022
Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM foundation survey uploaded does not show entire information needed
BADMIN INFORMATION 09/27/2022 09/27/2022
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO FOUNDATION SURVEY.PDF
ENGIN1 COMPLETE 09/27/2022 09/27/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 08/09/2022 08/10/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON COMPLETE 06/24/2022 06/24/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON HOLD 06/17/2022 06/21/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM repeat comment: Please add to shrubs after side walk foundations plantings are to go along the foundation of the home. Plantings and shrubbery: Residential homes shall provide a foundation plantings consisting of 16 shrubs on interior lots. Eight shrubs shall be planted in front of home and four shrubs planted on each side of the home. The corners of the home shall be wrapped with shrubbery or have an understory tree planted there. *All of these required shrubs shall be planted between two and one half and eight feet of the homes foundation.* Eight Shrubs in the front *Six Shrubs shall be planted on the side of the home facing the street
BLD COMPLETE 06/17/2022 06/22/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON HOLD 06/14/2022 06/14/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM repeat comment Landscape plan missing Please include: Trees: One tree for every 2500 square ft. All calculations are rounded to the nearest whole number. This property requires 4 trees please draw them in and label Plantings and shrubbery: Residential homes shall provide a foundation plantings consisting of 16 shrubs on interior lots. Eight shrubs shall be planted in front of home and four shrubs planted on each side of the home. The corners of the home shall be wrapped with shrubbery or have an understory tree planted there. *All of these required shrubs shall be planted between two and one half and eight feet of the homes foundation.* Eight Shrubs in the front *Six Shrubs shall be planted on the side of the home facing the street
BLD COMPLETE 06/14/2022 06/17/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD COMPLETE 06/13/2022 06/14/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ELEC COMPLETE 06/10/2022 06/13/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 06/10/2022 06/10/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ZON HOLD 06/10/2022 06/10/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM repeat comment Landscape plan missing Please include: Trees: One tree for every 2500 square ft. All calculations are rounded to the nearest whole number. This property requires 4 trees please draw them in and label Plantings and shrubbery: Residential homes shall provide a foundation plantings consisting of 16 shrubs on interior lots. Eight shrubs shall be planted in front of home and four shrubs planted on each side of the home. The corners of the home shall be wrapped with shrubbery or have an understory tree planted there. *All of these required shrubs shall be planted between two and one half and eight feet of the homes foundation.* Eight Shrubs in the front *Six Shrubs shall be planted on the side of the home facing the street
BLD COMPLETE 06/10/2022 06/10/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BADMIN INFORMATION 06/09/2022 06/09/2022
Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Product Approval Sheet missing address.
SWALE COMPLETE 05/26/2022 08/11/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 05/25/2022 05/31/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code – Residential REVIEW COMMENTS: 1. Provide Product Approval for wood anchors and ties. Per F.S. 471.025 and F.A.C. 61 G15-23.005.
CUSVC COMPLETE 05/25/2022 05/31/2022
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC HOLD 05/25/2022 05/26/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit electric load calcs
ENGIN1 COMPLETE 05/25/2022 05/26/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 05/25/2022 05/27/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 05/25/2022 05/26/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs and EPL card need to be signed by the builder
SW1 COMPLETE 05/25/2022 05/26/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON HOLD 05/25/2022 05/27/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Landscape plan missing Please include: Trees: One tree for every 2500 square ft. All calculations are rounded to the nearest whole number. This property requires Plantings and shrubbery: Residential homes shall provide a foundation plantings consisting of 16 shrubs on interior lots. Eight shrubs shall be planted in front of home and four shrubs planted on each side of the home. The corners of the home shall be wrapped with shrubbery or have an understory tree planted there. *All of these required shrubs shall be planted between two and one half and eight feet of the homes foundation.* *Six Shrubs shall be planted on each side of the home facing the street Please provide the proposed sod being laid down. Also if Irrigation will be needed Please include proposed shrubs that will provide coverage for the mechanical equipment.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 02/13/2023
PLAN REVIEW - REVISION ¤32.50 02/13/2023
REINSPECTION RESIDENTIAL ¤40.00 02/13/2023
REINSPECTION RESIDENTIAL ¤40.00 02/13/2023
REINSPECTION RESIDENTIAL ¤40.00 02/13/2023
CONTRACTOR CHANGE ¤20.00 02/13/2023
CONTRACTOR CHANGE ¤40.00 02/13/2023
SW ENG REINSPECTION 30 ¤30.00 02/13/2023
SW ENG REINSPECTION 30 ¤30.00 02/13/2023
SW ENG - REVIEW 20 ¤20.00 07/01/2022
SW ENG RES REVIEW 200 ¤200.00 07/01/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 07/01/2022
SEWER CREDIT (¤1,147.00) 07/01/2022
SEWER INSPECTION ¤25.00 07/01/2022
SEWER CAPITAL FACILITY ¤4,939.76 07/01/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 07/01/2022
SITE PLAN 30 ¤30.00 07/01/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 07/01/2022
IMPACT FEE FIRE ¤388.65 07/01/2022
IMPACT FEE PARKS ¤1,455.13 07/01/2022
IMPACT FEE SCHOOL ¤3,600.00 07/01/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 07/01/2022
WATER -IRRIGATION INSPECTION ¤25.00 07/01/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 07/01/2022
SURCHARGE FS 533.721 ¤6.54 07/01/2022
SURCHARGE - FS 468.631 ¤9.81 07/01/2022
SW ENG - FOUNDATION SURVEY ¤20.00 07/01/2022
SW ENG INSPECTION 80 ¤80.00 07/01/2022
SW ENG PRE APRON ¤30.00 07/01/2022
CONNECTION FEES ¤1,077.88 07/01/2022
WATER- TURN ON ¤25.00 07/01/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/01/2022
INSPECTION - RESIDENTIAL ¤577.50 07/01/2022
PLAN REVIEW - RESIDENTIAL ¤163.80 07/01/2022
Fees Total Due: ¤0.00 Total Paid: ¤17,144.34