I want to search for...
Permit #2022051496
Permit Details
Status: COED
| Parcel Id: 07-11-31-7058-00430-0130 |
| CONDITIONED SPACE: 1517 sqft |
| GARAGE: 394 sqft |
| Total Square Footage: 1911 sqft |
| Block: 00430 |
| Subdivision: 2215 - SECTION 58-SEMINOLE PARK |
| Job Phone: 407-432-2344 |
| Location Address: 16 SEDERHOLM PATH |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/01/2022 |
| NOC: RECORDED |
| Applicant name: WADE GILMER JURNEY JR |
| Owner: NATIONAL HOME CORPORATION |
|
Address 4850 TAMIAMI TRAIL N NAPLES, FL 34103 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤209,353.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
NATIONAL HOME CORPORATION
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1080 HOLCOMB BRIDGE ROAD , |
BLDG 100 - 330 ROSWELL , GA 30076 |
CBC1257700 (Exp: 08/31/2026) | 471-817-1259 |
Sub Contractors
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JASON PATRICK RIBOCK
| Status | Location Address | State License Number | Phone |
| INACTIVE |
620 E PINE ST , 0 |
ES12001313 (Exp: 08/31/2026) | 407-625-0257 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
RANDALL SCOTT ROSENFELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
234 N WHITNEY ST PALM COAST, FL 32084 |
CAC1816641 (Exp: 08/31/2026) | 904-599-0082 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/13/2023 | FINAL APPROVED | JSTEWART |
| Note: 2/9/2023 - PREVIOUS INSPECTION NOTES 2-9-23 1. No hot water. 2. Energy cals don't match outside unit. | |||
| BLD - BUILDING FINAL | 02/09/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 2-9-23 1. No hot water. 2. Energy cals don't match outside unit. | |||
| ROW - STORMWATER FINAL | 02/09/2023 | FINAL APPROVED | EMADISON |
| Note: ** 02/09/23 EVERYTHING LOOKS GOOD AT THE TIME OF INSPECTION __________________________________________________________________________________________________________________________ New inspection due to canceled inspection ** SEE NOTES IN FIELD SURVEY FOR CORRECTIONS NEEDED | |||
| U -UTILITY RESIDENTIAL FINAL | 02/07/2023 | FINAL APPROVED | JHARDING |
| ROW - STORMWATER FINAL | 02/07/2023 | CANCELLED BY APPLICANT | WEB |
| Note: ** SEE NOTES IN FIELD SURVEY FOR CORRECTIONS NEEDED | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/06/2023 | APPROVED | EMADISON |
| Note: ** HOT PATCH ROAD REPAIR NEEDED ** LEFT SIDE ALONG VACANT **SEED** AND **STRAW** NEEDED ON ALL BARE EARTH ** LEFT SIDE ROW IN FRONT OF VACANT SOD NEEDED ON BARE EARTH WHERE PORTA-JOHN SAT | |||
| ROW - FINAL APRON (AFTER POUR) | 02/06/2023 | FINAL APPROVED | EMADISON |
| FINAL SURVEY (OFFICE USE ONLY) | 02/06/2023 | APPROVED | EMADISON |
| ELECTRIC - EARLY POWER | 01/19/2023 | APPROVED | JMUNSON |
| ROW- PRE-APRON (PRE-POUR) | 12/21/2022 | APPROVED | GBERTOLA |
| Note: 12/21/22=AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL __________________________________________________________________________________________________________________________ 12/15/2022 - PREVIOUS INSPECTION NOTES 1) THE CULVERT NEEDS TO BE 8' OFF THE EDGE OF PAVEMENT 2) NEED TO SOIL COMPACTED MORE NEED TO HAVE A MINIMUM OF 95% COMPACTION IN THE POURING AREA ----------------------------------------------------------------------------------- 12/14/2022 - PREVIOUS INSPECTION NOTES 12/14/22=Not ready for inspection. Not formed | |||
| ROW- PRE-APRON (PRE-POUR) | 12/15/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) THE CULVERT NEEDS TO BE 8' OFF THE EDGE OF PAVEMENT 2) NEED TO SOIL COMPACTED MORE NEED TO HAVE A MINIMUM OF 95% COMPACTION IN THE POURING AREA ----------------------------------------------------------------------------------- 12/14/2022 - PREVIOUS INSPECTION NOTES 12/14/22=Not ready for inspection. Not formed | |||
| ROW- PRE-APRON (PRE-POUR) | 12/14/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 12/14/22=Not ready for inspection. Not formed | |||
| U - SEWER TIE IN | 12/05/2022 | APPROVED | MGIBSON |
| U-CROSS CONNECTION | 12/05/2022 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| INSULATION | 11/28/2022 | APPROVED | BTAYLOR |
| LATH/BRICK/ WATER BARRIER | 11/28/2022 | APPROVED | BTAYLOR |
| ALL ROUGH | 11/21/2022 | APPROVED | BTAYLOR |
| ELECTRIC-TUG | 10/27/2022 | APPROVED | BTAYLOR |
| Note: 10/25/2022 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 10/12/2022 - PREVIOUS INSPECTION NOTES 10/2/2022 11:44:15 AM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd have been cancelled. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. 9/22/2022 - PREVIOUS INSPECTION NOTES 9-22-22 1. Not ready 10/12/22 1.Schedule 80 conduit must be installed. NEC 2017 300.5 (D) (4) 2. Ground wire must be protected. NEC 2017 250.64 10/25/22 1.Schedule 80 conduit must be installed. NEC 2017 300.5 (D) (4) 2. Ground wire must be protected. NEC 2017 250.64 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/27/2022 | APPROVED | BTAYLOR |
| Note: 10/25/2022 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 10/12/2022 - PREVIOUS INSPECTION NOTES 10/2/2022 11:45:29 AM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd have been cancelled. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. 10-12-22 1. Engineering for gable not complete. Circled 10-25-22 . Engineering for gable not complete. Circled | |||
| ELECTRIC-TUG | 10/25/2022 | Disapproved -FEE REQUIRED | JMUNSON |
| Note: New inspection due to canceled inspection 10/12/2022 - PREVIOUS INSPECTION NOTES 10/2/2022 11:44:15 AM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd have been cancelled. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. 9/22/2022 - PREVIOUS INSPECTION NOTES 9-22-22 1. Not ready 10/12/22 1.Schedule 80 conduit must be installed. NEC 2017 300.5 (D) (4) 2. Ground wire must be protected. NEC 2017 250.64 10/25/22 1.Schedule 80 conduit must be installed. NEC 2017 300.5 (D) (4) 2. Ground wire must be protected. NEC 2017 250.64 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/25/2022 | Disapproved -FEE REQUIRED | BTAYLOR |
| Note: New inspection due to canceled inspection 10/12/2022 - PREVIOUS INSPECTION NOTES 10/2/2022 11:45:29 AM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd have been cancelled. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. 10-12-22 1. Engineering for gable not complete. Circled 10-25-22 . Engineering for gable not complete. Circled | |||
| ELECTRIC-TUG | 10/21/2022 | CANCELLED BY APPLICANT | WEB |
| Note: 10/12/2022 - PREVIOUS INSPECTION NOTES 10/2/2022 11:44:15 AM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd have been cancelled. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. 9/22/2022 - PREVIOUS INSPECTION NOTES 9-22-22 1. Not ready 10/12/22 1.Schedule 80 conduit must be installed. NEC 2017 300.5 (D) (4) 2. Ground wire must be protected. NEC 2017 250.64 | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/20/2022 | CANCELLED BY APPLICANT | WEB |
| Note: 10/12/2022 - PREVIOUS INSPECTION NOTES 10/2/2022 11:45:29 AM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd have been cancelled. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. 10-12-22 1. Engineering for gable not complete. Circled | |||
| ROOF VALLEY & METAL | 10/20/2022 | APPROVED | BTAYLOR |
| Note: 10/2/2022 11:46:17 AM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd have been cancelled. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/12/2022 | Disapproved - NO FEE | BTAYLOR |
| Note: 10/2/2022 11:45:29 AM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd have been cancelled. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. 10-12-22 1. Engineering for gable not complete. Circled | |||
| ELECTRIC-TUG | 10/12/2022 | Disapproved -FEE REQUIRED | JMUNSON |
| Note: 10/2/2022 11:44:15 AM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd have been cancelled. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. 9/22/2022 - PREVIOUS INSPECTION NOTES 9-22-22 1. Not ready 10/12/22 1.Schedule 80 conduit must be installed. NEC 2017 300.5 (D) (4) 2. Ground wire must be protected. NEC 2017 250.64 | |||
| WALL SHEATHING | 10/12/2022 | APPROVED | BTAYLOR |
| Note: 10/2/2022 11:44:50 AM- PREVIOUS INSPECTION NOTES Inspections requested for October 3rd have been cancelled.. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/03/2022 | CANCELLED BY APPLICANT | BBEMBRY |
| Note: Inspections requested for October 3rd have been cancelled. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. | |||
| WALL SHEATHING | 10/03/2022 | CANCELLED BY APPLICANT | BBEMBRY |
| Note: Inspections requested for October 3rd have been cancelled.. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. | |||
| ELECTRIC-TUG | 10/03/2022 | CANCELLED BY APPLICANT | BBEMBRY |
| Note: Inspections requested for October 3rd have been cancelled. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. 9/22/2022 - PREVIOUS INSPECTION NOTES 9-22-22 1. Not ready | |||
| ROOF VALLEY & METAL | 10/03/2022 | CANCELLED BY APPLICANT | BBEMBRY |
| Note: Inspections requested for October 3rd have been cancelled. The Building Inspectors are working with the Utility Department pumping PEP tanks from homes that are currently without power. | |||
| FOUND SURVEY APPROVED (OFFICE) | 09/27/2022 | APPROVED | TBAKER |
| ELECTRIC-TUG | 09/22/2022 | Disapproved - NO FEE | BTAYLOR |
| Note: 9-22-22 1. Not ready | |||
| TIE BEAM / LINTEL | 09/13/2022 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 08/29/2022 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/25/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 08/25/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 08/01/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | HOLD | 02/10/2023 | 02/10/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide entire energy calc with heatload and duct layout 2. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition 3. Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition | |||
| MECH | COMPLETE | 02/10/2023 | 02/10/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/27/2022 | 09/27/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 09/27/2022 | 09/27/2022 |
| Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM foundation survey uploaded does not show entire information needed | |||
| BADMIN | INFORMATION | 09/27/2022 | 09/27/2022 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO FOUNDATION SURVEY.PDF | |||
| ENGIN1 | COMPLETE | 09/27/2022 | 09/27/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/09/2022 | 08/10/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/24/2022 | 06/24/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/17/2022 | 06/21/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM repeat comment: Please add to shrubs after side walk foundations plantings are to go along the foundation of the home. Plantings and shrubbery: Residential homes shall provide a foundation plantings consisting of 16 shrubs on interior lots. Eight shrubs shall be planted in front of home and four shrubs planted on each side of the home. The corners of the home shall be wrapped with shrubbery or have an understory tree planted there. *All of these required shrubs shall be planted between two and one half and eight feet of the homes foundation.* Eight Shrubs in the front *Six Shrubs shall be planted on the side of the home facing the street | |||
| BLD | COMPLETE | 06/17/2022 | 06/22/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/14/2022 | 06/14/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM repeat comment Landscape plan missing Please include: Trees: One tree for every 2500 square ft. All calculations are rounded to the nearest whole number. This property requires 4 trees please draw them in and label Plantings and shrubbery: Residential homes shall provide a foundation plantings consisting of 16 shrubs on interior lots. Eight shrubs shall be planted in front of home and four shrubs planted on each side of the home. The corners of the home shall be wrapped with shrubbery or have an understory tree planted there. *All of these required shrubs shall be planted between two and one half and eight feet of the homes foundation.* Eight Shrubs in the front *Six Shrubs shall be planted on the side of the home facing the street | |||
| BLD | COMPLETE | 06/14/2022 | 06/17/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/13/2022 | 06/14/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/10/2022 | 06/13/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/10/2022 | 06/10/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/10/2022 | 06/10/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM repeat comment Landscape plan missing Please include: Trees: One tree for every 2500 square ft. All calculations are rounded to the nearest whole number. This property requires 4 trees please draw them in and label Plantings and shrubbery: Residential homes shall provide a foundation plantings consisting of 16 shrubs on interior lots. Eight shrubs shall be planted in front of home and four shrubs planted on each side of the home. The corners of the home shall be wrapped with shrubbery or have an understory tree planted there. *All of these required shrubs shall be planted between two and one half and eight feet of the homes foundation.* Eight Shrubs in the front *Six Shrubs shall be planted on the side of the home facing the street | |||
| BLD | COMPLETE | 06/10/2022 | 06/10/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 06/09/2022 | 06/09/2022 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Product Approval Sheet missing address. | |||
| SWALE | COMPLETE | 05/26/2022 | 08/11/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/25/2022 | 05/31/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code – Residential REVIEW COMMENTS: 1. Provide Product Approval for wood anchors and ties. Per F.S. 471.025 and F.A.C. 61 G15-23.005. | |||
| CUSVC | COMPLETE | 05/25/2022 | 05/31/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | HOLD | 05/25/2022 | 05/26/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit electric load calcs | |||
| ENGIN1 | COMPLETE | 05/25/2022 | 05/26/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 05/25/2022 | 05/27/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/25/2022 | 05/26/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs and EPL card need to be signed by the builder | |||
| SW1 | COMPLETE | 05/25/2022 | 05/26/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/25/2022 | 05/27/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Landscape plan missing Please include: Trees: One tree for every 2500 square ft. All calculations are rounded to the nearest whole number. This property requires Plantings and shrubbery: Residential homes shall provide a foundation plantings consisting of 16 shrubs on interior lots. Eight shrubs shall be planted in front of home and four shrubs planted on each side of the home. The corners of the home shall be wrapped with shrubbery or have an understory tree planted there. *All of these required shrubs shall be planted between two and one half and eight feet of the homes foundation.* *Six Shrubs shall be planted on each side of the home facing the street Please provide the proposed sod being laid down. Also if Irrigation will be needed Please include proposed shrubs that will provide coverage for the mechanical equipment. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 02/13/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 02/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/13/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 02/13/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 02/13/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 02/13/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 02/13/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/01/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/01/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 07/01/2022 |
| SEWER CREDIT | (¤1,147.00) | 07/01/2022 |
| SEWER INSPECTION | ¤25.00 | 07/01/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 07/01/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 07/01/2022 |
| SITE PLAN 30 | ¤30.00 | 07/01/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 07/01/2022 |
| IMPACT FEE FIRE | ¤388.65 | 07/01/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 07/01/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/01/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 07/01/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/01/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 07/01/2022 |
| SURCHARGE FS 533.721 | ¤6.54 | 07/01/2022 |
| SURCHARGE - FS 468.631 | ¤9.81 | 07/01/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/01/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/01/2022 |
| SW ENG PRE APRON | ¤30.00 | 07/01/2022 |
| CONNECTION FEES | ¤1,077.88 | 07/01/2022 |
| WATER- TURN ON | ¤25.00 | 07/01/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/01/2022 |
| INSPECTION - RESIDENTIAL | ¤577.50 | 07/01/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤163.80 | 07/01/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,144.34 |