I want to search for...

Permit #2022051670

Permit Details

Status: COED

Parcel Id: 42-10-30-3210-00000-1470
CONDITIONED SPACE: 2315 sqft
GARAGE: 459 sqft
OPENED PORCH (WITH ROOF) : 32 sqft
OPENED PORCH (WITH ROOF) : 295 sqft
Total Square Footage: 3101 sqft
Block: 00000
Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH
Job Phone: 386-313-6221
Location Address: 313 HIBISCUS WAY
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/10/2022
NOC: RECORDED
Applicant name: ANTHONY CRAIG GUCCIONE
Owner: TRASKOS JAMES J JR & KATHLEEN H&W

Address

113 CANAL ST

WESTERLY, RI 02891

Lot: 1470
Contracted Stated Job Value: ¤400,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

GOLD COAST HOME BUILDERS INC
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 354707

PALM COAST, FL 32137

CGC1507791 (Exp: 08/31/2026) 386-313-6221

Sub Contractors

PATRICK FRANCIS MCADAMS
Status Location Address State License Number Phone Fax
ACTIVE

1201 South Flagler Ave

Flagler Beach, FL 32136

CFC057805 (Exp: 08/31/2026) 386-283-9236 321-248-0447
BERT S MCLAUGHLIN
Status Location Address State License Number Phone
ACTIVE

131 MAGNOLIA AVE

DAYTONA BEACH, FL 32114

EC13006455 (Exp: 08/31/2026) 386-265-2687
THOMAS A REGULA
Status Location Address State License Number Phone Fax
INACTIVE

11320 PHILLIPS PKWY DRIVE E

JACKSONVILLE, FL 32256

CMC1250075 (Exp: 08/31/2026) 904-278-0339 904-278-0366
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
WILLIAM D ALLEN
Status Location Address State License Number Phone Fax
INACTIVE

546 S. SHELL ROAD

DEBARY, FL 32713

LQ27843 (Exp: 08/13/2024) 386-668-9592 (386)668-8577
PEDRO DANIEL CHINCHILLA
Status Location Address State License Number Phone
ACTIVE

324 COVENT GARDENS PL

DELTONA, FL 32725

CCC1333997 (Exp: 08/31/2026) 386-679-6228

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 09/15/2023 FINAL APPROVED AGAETANO
Note: 9/13/2023 - PREVIOUS INSPECTION NOTES 09-13-2023 1. AC energy calcs do not match. 2. Lanai weather proof box and WR outlet needed at fireplace. 3. Please seal AHU at stand.
ROW - STORMWATER FINAL 09/14/2023 FINAL APPROVED EMADISON
U -UTILITY RESIDENTIAL FINAL 09/13/2023 FINAL APPROVED DHANEY
U-CROSS CONNECTION 09/13/2023 APPROVED DHANEY
BLD - BUILDING FINAL 09/13/2023 Disapproved - NO FEE AGAETANO
Note: 09-13-2023 1. AC energy calcs do not match. 2. Lanai weather proof box and WR outlet needed at fireplace. 3. Please seal AHU at stand. 4. Please install safety barrier around pool that is under construction.
ROW - FINAL APRON (AFTER POUR) 09/13/2023 FINAL APPROVED EMADISON
ROW - STORMWATER FINAL 09/13/2023 Disapproved - NO FEE EMADISON
Note: ** 09/13 23 NEED TO REPAIR BACK SLOPE WHERE WASH OUTS OCCURED DUE TO HEAVY RAINS AREAS AROUND THE POP-UP DRAINS AND ACROSS SLOPE
GAS FINAL 09/13/2023 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2225 CHECKED GRADE WITH C/M WITH TANK IT IS AT GRADE WITH 2'' FOR SOD PLACEMENT
FINAL SURVEY (OFFICE USE ONLY) 09/12/2023 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 09/12/2023 APPROVED - AS NOTED EMADISON
Note: ** 09/12/23 RIGHT REAR CORNER NO SOD SILT FECE FROM ADJACENT PROPERTY SEEMS TO BE ONTO YOUR SITE.
GAS ROUGH 08/18/2023 APPROVED - AS NOTED MGIBSON
Note: CHECKED GRADE WITH C/M WITH TANK IT IS AT GRADE WITH 2'' FOR SOD PLACEMENT
ELECTRIC - EARLY POWER 05/11/2023 APPROVED AGAETANO
Note: FPL notified at 8:23 am
WINDOW NAILING 04/10/2023 APPROVED AGAETANO
Note: 01-19-2023 Transom over entry, three windows over garage windows and two small windows over left front bedroom need to be installed. Window nailing added. 04-10-2023 Entry circle top window installed.
ROW- PRE-APRON (PRE-POUR) 03/31/2023 APPROVED PFLANAGAN
Note: READY FOR PAVERS 2/21/2023 - PREVIOUS INSPECTION NOTES READY TO POUR APRON, AND PAVER RESTAINTS ONLY BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS AT THE TIME OF THE INSPECTION
ROW- PRE-APRON (PRE-POUR) 02/21/2023 PARTIALLY APPROVED PFLANAGAN
Note: READY TO POUR APRON, AND PAVER RESTAINTS ONLY BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS AT THE TIME OF THE INSPECTION
LATH/BRICK/ WATER BARRIER 01/31/2023 APPROVED AGAETANO
GAS ROUGH 01/19/2023 APPROVED MGIBSON
INSULATION 01/19/2023 APPROVED AGAETANO
Note: 01-19-2023 Transom over entry, three swindows over garage windows and two small windows over left front bedroom need to be installed. Window nailing added.
ALL ROUGH 01/12/2023 APPROVED AGAETANO
Note: 1/11/2023 - PREVIOUS INSPECTION NOTES 01-11-2023 1. Mechanical drawings not on site. 3. NEED APPROVED DOCUMENTS ON SITE FOR INSPECTION SITE 107.3,1 2. Head test not on site. 5' head pressure test failed P2503.5.1
ALL ROUGH 01/11/2023 Disapproved - NO FEE AGAETANO
Note: 01-11-2023 1. Mechanical drawings not on site. 3. NEED APPROVED DOCUMENTS ON SITE FOR INSPECTION SITE 107.3,1 2. Head test not on site. 5' head pressure test failed P2503.5.1 3. Window over entry not installed. Please add window nailing.
ELECTRIC UNDERGROUND 11/29/2022 CANCELLED BY INSPECTOR AGAETANO
Note: Contractor on site and make a mistake calling in this inspection.
ELECTRIC-TUG 11/29/2022 APPROVED AGAETANO
GRAVITY SEWER TEST 09/13/2022 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2060 Silt fence not installed. Check at next inspection.
ROOF VALLEY & METAL 09/13/2022 APPROVED AGAETANO
U - SEWER TIE IN 09/13/2022 APPROVED MGIBSON
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/02/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION 09-01-2022 Engineering packet not on site.
WALL SHEATHING 09/01/2022 APPROVED AGAETANO
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/01/2022 Disapproved - NO FEE AGAETANO
Note: 09-01-2022 Engineering packet not on site.
TIE BEAM / LINTEL 08/10/2022 APPROVED DCUSHING
Note: THIS IS A REINSPECTION ned to remove screen from blocks in area of wall section to be poured solid per plans for ledger bord attachment so that Crete will pass down to levels below (required by Plans) SCREENS REMOVED, CELLS OPEN
TIE BEAM / LINTEL 08/09/2022 Disapproved -FEE REQUIRED LMILLER
Note: ned to remove screen from blocks in area of wall section to be poured solid per plans for ledger bord attachment so that Crete will pass down to levels below (required by Plans)
TIE BEAM / LINTEL 08/05/2022 CANCELLED BY APPLICANT WEB
FOUND SURVEY APPROVED (OFFICE) 07/21/2022 APPROVED TBAKER
MONOLITHIC SLAB 07/13/2022 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 07/12/2022 APPROVED - AS NOTED AGAETANO
Note: Silt fence not installed. Check at next inspection.
WATER METER INSTALLATION REQUEST 06/28/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 09/13/2023 09/14/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
GAS COMPLETE 08/31/2023 09/05/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 12/19/2022 12/19/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/21/2022 07/21/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 07/21/2022 07/21/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ELEC COMPLETE 06/08/2022 06/08/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 06/07/2022 06/07/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ELEC HOLD 06/07/2022 06/07/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Show spa location on electric plans 2nd REQUEST
URB COMPLETE 06/01/2022 06/06/2022
Note: Released By: JOHN BEAUDET - (386)986-2456 -
ELEC HOLD 05/31/2022 05/31/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Electric load calcs do not match the square footage of the home 2. Electric load calcs need to show spa also and location on electric plan 3. Need outlet on the front of the house. NEC 2017 210.52 (E) (1)
BLD COMPLETE 05/31/2022 06/02/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 05/31/2022 06/01/2022
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC HOLD 05/31/2022 05/31/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Electric load calcs do not match the square footage of the home 2. Need outlet on the front of the house. NEC 2017 210.52 (E) (1)
ENGIN1 COMPLETE 05/31/2022 05/31/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 05/31/2022 06/07/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 05/31/2022 05/31/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Square footage on Energy Calcs does not match the house plans
SW1 COMPLETE 05/31/2022 06/07/2022
Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM
ZON COMPLETE 05/31/2022 06/01/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 09/14/2023
PLAN REVIEW - REVISION ¤32.50 09/14/2023
PLAN REVIEW - REVISION ¤32.50 09/14/2023
REINSPECTION RESIDENTIAL ¤40.00 09/14/2023
CONNECTION FEES ¤25.00 06/10/2022
WATER-METER ¤467.09 06/10/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/10/2022
INSPECTION - RESIDENTIAL ¤1,100.00 06/10/2022
PLAN REVIEW - RESIDENTIAL ¤312.00 06/10/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 06/10/2022
IMPACT FEE FIRE ¤388.65 06/10/2022
IMPACT FEE PARKS ¤1,455.13 06/10/2022
IMPACT FEE SCHOOL ¤3,600.00 06/10/2022
IMPACT FEE TRANSPORTATION ¤3,224.00 06/10/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 06/10/2022
SURCHARGE FS 533.721 ¤11.90 06/10/2022
SURCHARGE - FS 468.631 ¤17.85 06/10/2022
SW ENG - FOUNDATION SURVEY ¤20.00 06/10/2022
SW ENG INSPECTION 80 ¤80.00 06/10/2022
SW ENG PRE APRON ¤30.00 06/10/2022
SW ENG - REVIEW 20 ¤20.00 06/10/2022
SW ENG RES REVIEW 200 ¤200.00 06/10/2022
3% TRANS IMPACT FEE CREDIT (¤96.72) 06/10/2022
SEWER INSPECTION ¤25.00 06/10/2022
SITE PLAN 30 ¤30.00 06/10/2022
Fees Total Due: ¤0.00 Total Paid: ¤11,009.59