I want to search for...

Permit #2022051752

Permit Details

Status: FINAL

Parcel Id: 07-11-31-7004-00150-0100
Block: 00150
Subdivision: 2203 - SECTION 4-COUNTRY CLUB COVE
Job Phone: 386-931-6577
Location Address: 23 CRESCENT CT N
Type: BIA - BUILDING INTERIOR EXTERIOR ALTERATION
Issue Date: 06/23/2022
NOC: RECORDED
Applicant name: LUIS JORGE MEDEIROS
Owner: ULRICH PATRICIA J TRUSTEE

Address

23 CRESCENT COURT N

PALM COAST, FL 32137

Lot: 0100
Contracted Stated Job Value: ¤20,000.00
Job Description: ROOF & FRONT ENTRY BUILT
Type: CN

Contractor

A PLUS HOME IMPROVEMENTS LLC
Status Location Address State License Number Phone
ACTIVE

306 S RAILROAD ST

BUNNELL, FL 32110

CRC1327024 (Exp: 08/31/2026) 386-263-2167

Sub Contractors

JOSE E ORTIZ JR
Status Location Address Mailing Address State License Number Phone
CANCEL

4601 E MOODY BLVD

BUNNELL, FL 32110

SUITE B7

BUNNELL, FL 32110

RC29027619 (Exp: 08/31/2023) 386-503-6922

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/17/2023 FINAL APPROVED TSTAUFFACHER
LATH/BRICK/ WATER BARRIER 11/09/2022 APPROVED DCUSHING
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/31/2022 APPROVED AGAETANO
Note: 10/27/2022 - PREVIOUS INSPECTION NOTES 10/21/2022 - PREVIOUS INSPECTION NOTES 10/19/2022 - PREVIOUS INSPECTION NOTES 9/23/2022 - PREVIOUS INSPECTION NOTES 9/22/2022 - PREVIOUS INSPECTION NOTES 09-22-2022 1. SD1 indicates straps at valley rafters. Right side straps not installed. 2. Please expose header attachment and connection for inspection. SD1 indicates glued and screwed. Unable to verify. 3. SD1 Roof framing to filled column CMU detail indicates two straps per side of each header. Only one installed. Expose for connection to framing. 09-23-2022 Above issues not addressed. 1. SD1 indicates straps at valley rafters. Right side straps not installed. 2. Please expose header attachment and connection for inspection. SD1 indicates glued and screwed. Unable to verify. 3. SD1 Roof framing to filled column CMU detail indicates two straps per side of each header. Only one installed. Expose for connection to framing. 10-19-2022 1. SD1 indicates straps at valley rafters. Right side straps not installed. Typical Framig detail shows H2.5 top and bottom. Bottom right rafters not installed. 2. Please expose header attachment and connection for inspection. SD1 indicates glued and screwed. Unable to verify. Please see Framing to Filled CMU Column detail. 10-21-2022 Issues have not been addressed. Only one side of two headers are exposed and screwed. H2.5 on right side of valley rafters not installed at bottom. Please expose all three sides of headers for inspection and screws. 10-27-2022 Above has not been addressed. 1. Please expose headers for fastening inspection. SD1 Typical Framing. 2. H2.5 on right side of valley rafters not installed at bottom.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/27/2022 Disapproved -FEE REQUIRED AGAETANO
Note: 10/21/2022 - PREVIOUS INSPECTION NOTES 10/19/2022 - PREVIOUS INSPECTION NOTES 9/23/2022 - PREVIOUS INSPECTION NOTES 9/22/2022 - PREVIOUS INSPECTION NOTES 09-22-2022 1. SD1 indicates straps at valley rafters. Right side straps not installed. 2. Please expose header attachment and connection for inspection. SD1 indicates glued and screwed. Unable to verify. 3. SD1 Roof framing to filled column CMU detail indicates two straps per side of each header. Only one installed. Expose for connection to framing. 09-23-2022 Above issues not addressed. 1. SD1 indicates straps at valley rafters. Right side straps not installed. 2. Please expose header attachment and connection for inspection. SD1 indicates glued and screwed. Unable to verify. 3. SD1 Roof framing to filled column CMU detail indicates two straps per side of each header. Only one installed. Expose for connection to framing. 10-19-2022 1. SD1 indicates straps at valley rafters. Right side straps not installed. Typical Framig detail shows H2.5 top and bottom. Bottom right rafters not installed. 2. Please expose header attachment and connection for inspection. SD1 indicates glued and screwed. Unable to verify. Please see Framing to Filled CMU Column detail. 10-21-2022 Issues have not been addressed. Only one side of two headers are exposed and screwed. H2.5 on right side of valley rafters not installed at bottom. Please expose all three sides of headers for inspection and screws. 10-27-2022 Above has not been addressed. 1. Please expose headers for fastening inspection. SD1 Typical Framing. 2. H2.5 on right side of valley rafters not installed at bottom.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/21/2022 Disapproved -FEE REQUIRED AGAETANO
Note: 10/19/2022 - PREVIOUS INSPECTION NOTES 9/23/2022 - PREVIOUS INSPECTION NOTES 9/22/2022 - PREVIOUS INSPECTION NOTES 09-22-2022 1. SD1 indicates straps at valley rafters. Right side straps not installed. 2. Please expose header attachment and connection for inspection. SD1 indicates glued and screwed. Unable to verify. 3. SD1 Roof framing to filled column CMU detail indicates two straps per side of each header. Only one installed. Expose for connection to framing. 09-23-2022 Above issues not addressed. 1. SD1 indicates straps at valley rafters. Right side straps not installed. 2. Please expose header attachment and connection for inspection. SD1 indicates glued and screwed. Unable to verify. 3. SD1 Roof framing to filled column CMU detail indicates two straps per side of each header. Only one installed. Expose for connection to framing. 10-19-2022 1. SD1 indicates straps at valley rafters. Right side straps not installed. Typical Framig detail shows H2.5 top and bottom. Bottom right rafters not installed. 2. Please expose header attachment and connection for inspection. SD1 indicates glued and screwed. Unable to verify. Please see Framing to Filled CMU Column detail. 10-21-2022 Issues have not been addressed. Only one side of two headers are exposed and screwed. H2.5 on right side of valley rafters not installed at bottom. Please expose both sides of all three headers for inspection and screws.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/19/2022 Disapproved -FEE REQUIRED AGAETANO
Note: 9/23/2022 - PREVIOUS INSPECTION NOTES 9/22/2022 - PREVIOUS INSPECTION NOTES 09-22-2022 1. SD1 indicates straps at valley rafters. Right side straps not installed. 2. Please expose header attachment and connection for inspection. SD1 indicates glued and screwed. Unable to verify. 3. SD1 Roof framing to filled column CMU detail indicates two straps per side of each header. Only one installed. Expose for connection to framing. 09-23-2022 Above issues not addressed. 1. SD1 indicates straps at valley rafters. Right side straps not installed. 2. Please expose header attachment and connection for inspection. SD1 indicates glued and screwed. Unable to verify. 3. SD1 Roof framing to filled column CMU detail indicates two straps per side of each header. Only one installed. Expose for connection to framing. 10-19-2022 1. SD1 indicates straps at valley rafters. Right side straps not installed. Typical Framig detail shows H2.5 top and bottom. Bottom right rafters not installed. 2. Please expose header attachment and connection for inspection. SD1 indicates glued and screwed. Unable to verify. Please see Framing to Filled CMU Column detail.
ROOF IN PROGRESS- MIDROOF 09/27/2022 APPROVED DCUSHING
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/23/2022 Disapproved -FEE REQUIRED AGAETANO
Note: 9/22/2022 - PREVIOUS INSPECTION NOTES 09-22-2022 1. SD1 indicates straps at valley rafters. Right side straps not installed. 2. Please expose header attachment and connection for inspection. SD1 indicates glued and screwed. Unable to verify. 3. SD1 Roof framing to filled column CMU detail indicates two straps per side of each header. Only one installed. Expose for connection to framing. 09-23-2022 Above issues not addressed. 1. SD1 indicates straps at valley rafters. Right side straps not installed. 2. Please expose header attachment and connection for inspection. SD1 indicates glued and screwed. Unable to verify. 3. SD1 Roof framing to filled column CMU detail indicates two straps per side of each header. Only one installed. Expose for connection to framing.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/22/2022 Disapproved - NO FEE AGAETANO
Note: 09-22-2022 1. SD1 indicates staraps at valley rafters. Right side straps not installed. 2. Please expose header attachment and connection for inspection. SD1 indicates glued and screwed. Unable to verify. 3. SD1 Roof framing to filled column CMU detail indicates two straps per side of each header. Only one installed. Expose for connection to framing.
TIE BEAM / LINTEL 08/22/2022 APPROVED AGAETANO
FOOTER 07/13/2022 APPROVED AGAETANO
Note: THIS IS A REINSPECTION DOCUMENTS: NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1.
FOOTER 07/12/2022 Disapproved - NO FEE AGAETANO
Note: DOCUMENTS: NEED THE APPROVED DOCUMENTS ON SITE FOR INSPECTION 107.3,1.

Review History

Department Status Date In Date Out
BLD COMPLETE 09/26/2022 09/26/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD COMPLETE 06/22/2022 06/22/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON COMPLETE 06/22/2022 06/23/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD HOLD 06/21/2022 06/22/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. OK 2. OK 3. OK 4. OK 5. Provide Product Approval for proposed Soffit Material. Per F.S. 471.025 and F.A.C. 61 G15-23.005.
ZON HOLD 06/21/2022 06/22/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Please submit all you changes to the site plan with dimensions and setbacks for approval.
PLFM CANCEL 06/01/2022 06/01/2022
BLD HOLD 05/31/2022 06/01/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Provide a completed City of Palm Coast Roofing Worksheet. 2. Roof Framing Detail calls-out hand framed 2 x 6 rafters. Roof Framing Detail calls-out 2 x 8 rafters. Provide which rafters are to be installed and revise the details to match FBC [A]107.3. 3. Roof Nailing Detail calls-out 5/8 sheathing. Roof Framing Detail calls-out 1/2 sheathing. Revise to reflect the correct sheathing to be installed FBC [A] 107.3. 4. Simpson PCZ6 is called-out. PCZ6 is for a wood post to beam connection. The proposed construction is a masonry column. Provide the correct column to beam connection. FBC [A] 107.3. 5. Provide Product Approval for proposed Soffit Material. Per F.S. 471.025 and F.A.C. 61 G15-23.005.
ELEC COMPLETE 05/31/2022 05/31/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH CANCEL 05/31/2022 06/01/2022
Note: not needed
PLUM CANCEL 05/31/2022 06/01/2022
ZON HOLD 05/31/2022 06/01/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM whats labeled as a walkway can not exceed 6ft in width according to code. You may call it a front patio with the width of 10.5 but it can not go past the 20' setback from property line to patio. Closest point is the arc.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 10/31/2022
REINSPECTION RESIDENTIAL ¤40.00 10/24/2022
REINSPECTION RESIDENTIAL ¤40.00 10/21/2022
PLAN REVIEW - REVISION ¤32.50 10/21/2022
REINSPECTION RESIDENTIAL ¤40.00 10/21/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/23/2022
INSPECTION - RESIDENTIAL ¤60.00 06/23/2022
PLAN REVIEW - RESIDENTIAL ¤65.00 06/23/2022
SURCHARGE FS 533.721 ¤2.00 06/23/2022
SURCHARGE - FS 468.631 ¤2.00 06/23/2022
SITE PLAN 30 ¤30.00 06/23/2022
Fees Total Due: ¤0.00 Total Paid: ¤381.50