I want to search for...
Permit #2022060015
Permit Details
Status: COED
| Parcel Id: 07-11-31-7063-00070-0060 |
| CONDITIONED SPACE: 1906 sqft |
| GARAGE: 400 sqft |
| OPENED PORCH (WITH ROOF) : 20 sqft |
| Total Square Footage: 2326 sqft |
| Block: 00070 |
| Subdivision: 2174 - SECTION 63-ZEBULAHS TRAIL |
| Job Phone: 407-432-2344 |
| Location Address: 5 ZOLLINGER PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/06/2022 |
| NOC: RECORDED |
| Applicant name: WADE GILMER JURNEY JR |
| Owner: NATIONAL HOME CORPORATION |
|
Address 4850 TAMIAMI TRAIL NORTH NAPLES, FL 34103 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤198,291.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
NATIONAL HOME CORPORATION
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1080 HOLCOMB BRIDGE ROAD , |
BLDG 100 - 330 ROSWELL , GA 30076 |
CBC1257700 (Exp: 08/31/2026) | 471-817-1259 |
Sub Contractors
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JASON PATRICK RIBOCK
| Status | Location Address | State License Number | Phone |
| INACTIVE |
620 E PINE ST , 0 |
ES12001313 (Exp: 08/31/2026) | 407-625-0257 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
RANDALL SCOTT ROSENFELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
234 N WHITNEY ST PALM COAST, FL 32084 |
CAC1816641 (Exp: 08/31/2026) | 904-599-0082 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/03/2023 | FINAL APPROVED | RSIMS |
| Note: 2/2/2023 - PREVIOUS INSPECTION NOTES 2/2/23: Cancelled due to energy calc revision being rejected. 2/1/2023 - PREVIOUS INSPECTION NOTES 2/1/23: 1). Model number for AHU still does not match the revised energy calcs submitted to & approved by the City. 2). Oven is now istalled but is missing the connector for the plug cord to the junction box & oven will not fully engage into the anti tip bracket. ** Also please seal the back top right corner of AHU duct through the ceiling with mastic. 1/27/2023 - PREVIOUS INSPECTION NOTES 1/27/23: 1). AHU lineset sleeve is not sealed as required. 2). Condensing unit does not have a disconnect within working distance from the unit. Breaker is installed in the meter panel box and is oversized. 30 amp (Max 25). (Breaker should be installed in breaker box.) 3). Oven is on-site but not installed. Anti-tip cannot be verified. 4). AHU closet is missing one of the french style doors. 5). Energy calculations do not match installed units. Need new energy calculations from the new installer submitted to & approbed by the City. *** front light is missing bulb - cannot verify operation. One smoke detector has low battery. | |||
| BLD - BUILDING FINAL | 02/02/2023 | CANCELLED BY APPLICANT | RSIMS |
| Note: 2/2/23: Cancelled due to energy calc revision being rejected. 2/1/2023 - PREVIOUS INSPECTION NOTES 2/1/23: 1). Model number for AHU still does not match the revised energy calcs submitted to & approved by the City. 2). Oven is now istalled but is missing the connector for the plug cord to the junction box & oven will not fully engage into the anti tip bracket. ** Also please seal the back top right corner of AHU duct through the ceiling with mastic. 1/27/2023 - PREVIOUS INSPECTION NOTES 1/27/23: 1). AHU lineset sleeve is not sealed as required. 2). Condensing unit does not have a disconnect within working distance from the unit. Breaker is installed in the meter panel box and is oversized. 30 amp (Max 25). (Breaker should be installed in breaker box.) 3). Oven is on-site but not installed. Anti-tip cannot be verified. 4). AHU closet is missing one of the french style doors. 5). Energy calculations do not match installed units. Need new energy calculations from the new installer submitted to & approbed by the City. *** front light is missing bulb - cannot verify operation. One smoke detector has low battery. | |||
| BLD - BUILDING FINAL | 02/01/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 2/1/23: 1). Model number for AHU still does not match the revised energy calcs submitted to & approved by the City. 2). Oven is now istalled but is missing the connector for the plug cord to the junction box & oven will not fully engage into the anti tip bracket. ** Also please seal the back top right corner of AHU duct through the ceiling with mastic. 1/27/2023 - PREVIOUS INSPECTION NOTES 1/27/23: 1). AHU lineset sleeve is not sealed as required. 2). Condensing unit does not have a disconnect within working distance from the unit. Breaker is installed in the meter panel box and is oversized. 30 amp (Max 25). (Breaker should be installed in breaker box.) 3). Oven is on-site but not installed. Anti-tip cannot be verified. 4). AHU closet is missing one of the french style doors. 5). Energy calculations do not match installed units. Need new energy calculations from the new installer submitted to & approbed by the City. *** front light is missing bulb - cannot verify operation. One smoke detector has low battery. | |||
| BLD - BUILDING FINAL | 01/27/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 1/27/23: 1). AHU lineset sleeve is not sealed as required. 2). Condensing unit does not have a disconnect within working distance from the unit. Breaker is installed in the meter panel box and is oversized. 30 amp (Max 25). (Breaker should be installed in breaker box.) 3). Oven is on-site but not installed. Anti-tip cannot be verified. 4). AHU closet is missing one of the french style doors. 5). Energy calculations do not match installed units. Need new energy calculations from the new installer submitted to & approbed by the City. *** front light is missing bulb - cannot verify operation. One smoke detector has low battery. | |||
| U -UTILITY RESIDENTIAL FINAL | 01/27/2023 | FINAL APPROVED | DHANEY |
| Note: 1/24/2023 - PREVIOUS INSPECTION NOTES Not ready | |||
| ROW - STORMWATER FINAL | 01/26/2023 | FINAL APPROVED | PFLANAGAN |
| U -UTILITY RESIDENTIAL FINAL | 01/24/2023 | CANCELLED BY APPLICANT | JHARDING |
| Note: Not ready | |||
| ROW - FINAL APRON (AFTER POUR) | 01/19/2023 | APPROVED | PFLANAGAN |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/19/2023 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/19/2023 | APPROVED | PFLANAGAN |
| ELECTRIC - EARLY POWER | 01/11/2023 | APPROVED | JMUNSON |
| Note: 1/4/2023 - PREVIOUS INSPECTION NOTES 1/4/23: POWER IS ENERGIZED TO HOUSE PRIOR TO INSPECTION! ******** wires cannot be landed at meter panel prior to early power inspection! 1). water heater wire is not properly safed off. 2). wire on right exterior of the house is not safed off. 1/11/23 Vitrual inspection | |||
| ELECTRIC - EARLY POWER | 01/04/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 1/4/23: POWER IS ENERGIZED TO HOUSE PRIOR TO INSPECTION! ******** wires cannot be landed at meter panel prior to early power inspection! 1). water heater wire is not properly safed off. 2). wire on right exterior of the house is not safed off. | |||
| U - SEWER TIE IN | 12/15/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 12/15/2022 | APPROVED | PFLANAGAN |
| Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING THE CONCRETE FOR THE DRIVEWAY | |||
| PEP TANK INSTALLATION REQUEST | 12/06/2022 | APPROVED | CSTONE |
| Note: 12/5/2022 8:01:32 AM- PREVIOUS INSPECTION NOTES Exterior (stucco, stone, brick, or siding must be applied | |||
| U-CROSS CONNECTION | 12/02/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| PEP TANK INSTALLATION REQUEST | 12/02/2022 | Disapproved - NO FEE | CSTONE |
| Note: Exterior (stucco, stone, brick, or siding must be applied | |||
| INSULATION | 11/28/2022 | APPROVED | RSIMS |
| Note: Inspector Notes from Inspection 2420 11/23/2022: Spoke to Superintendent yesterday evening. He has insulation being done on Friday. We will check below at insulation inspection so that the job can continue. 11/22/2022 - PREVIOUS INSPECTION NOTES 11/22/2022: 1). Water heater wire is not phased out in the panel. 2). Back right bathrooms exhaust fans: Exhaust pipe is not hooked up. 3). Front left bathroom exhaust fan: exhaust pipe is not secured to the fan properly. | |||
| LATH/BRICK/ WATER BARRIER | 11/28/2022 | APPROVED | RSIMS |
| Note: Inspector Notes from Inspection 2420 11/23/2022: Spoke to Superintendent yesterday evening. He has insulation being done on Friday. We will check below at insulation inspection so that the job can continue. 11/22/2022 - PREVIOUS INSPECTION NOTES 11/22/2022: 1). Water heater wire is not phased out in the panel. 2). Back right bathrooms exhaust fans: Exhaust pipe is not hooked up. 3). Front left bathroom exhaust fan: exhaust pipe is not secured to the fan properly. | |||
| ALL ROUGH | 11/23/2022 | APPROVED - AS NOTED | RSIMS |
| Note: 11/23/2022: Spoke to Superintendent yesterday evening. He has insulation being done on Friday. We will check below at insulation inspection so that the job can continue. 11/22/2022 - PREVIOUS INSPECTION NOTES 11/22/2022: 1). Water heater wire is not phased out in the panel. 2). Back right bathrooms exhaust fans: Exhaust pipe is not hooked up. 3). Front left bathroom exhaust fan: exhaust pipe is not secured to the fan properly. | |||
| ALL ROUGH | 11/22/2022 | Disapproved - NO FEE | RSIMS |
| Note: 11/22/2022: 1). Water heater wire is not phased out in the panel. 2). Back right bathrooms exhaust fans: Exhaust pipe is not hooked up. 3). Front left bathroom exhaust fan: exhaust pipe is not secured to the fan properly. | |||
| ALL ROUGH | 11/21/2022 | CANCELLED BY APPLICANT | WEB |
| WALL SHEATHING | 10/25/2022 | APPROVED | RSIMS |
| Note: 10/24/2022: Fully blocked house - no wall sheathing - approved to advance inspection process. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/25/2022 | APPROVED | RSIMS |
| ROOF VALLEY & METAL | 10/25/2022 | APPROVED | RSIMS |
| ELECTRIC-TUG | 10/25/2022 | APPROVED | JMUNSON |
| FOUND SURVEY APPROVED (OFFICE) | 10/24/2022 | APPROVED | TBAKER |
| ELECTRIC-TUG | 10/21/2022 | CANCELLED BY APPLICANT | WEB |
| ELECTRIC-TUG | 09/22/2022 | APPROVED | TSTAUFFACHER |
| TIE BEAM / LINTEL | 09/14/2022 | APPROVED | TSTAUFFACHER |
| MONOLITHIC SLAB | 08/30/2022 | APPROVED | BTAYLOR |
| GRAVITY SEWER TEST | 08/26/2022 | APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/26/2022 | APPROVED | MGIBSON |
| Note: THIS IS A REINSPECTION | |||
| GRAVITY SEWER TEST | 08/23/2022 | CANCELLED BY APPLICANT | MGIBSON |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/23/2022 | CANCELLED BY APPLICANT | MGIBSON |
| WATER METER INSTALLATION REQUEST | 08/01/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/03/2023 | 02/03/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 02/02/2023 | 02/02/2023 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM FIRST PAGE ON ENERGY CALCS CUT OFF ON RIGHT SIDE. PLEASE RESUBMIT. | |||
| MECH | HOLD | 01/30/2023 | 01/30/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide Entire energy calc. (Second Request) | |||
| MECH | COMPLETE | 01/30/2023 | 01/31/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 01/27/2023 | 01/30/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide Entire energy calc. 2. Duct layout needs to be signed by the AC contractor | |||
| ZON | COMPLETE | 10/24/2022 | 10/24/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/24/2022 | 10/24/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 09/27/2022 | 09/27/2022 |
| Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM Wrong File Name Uploaded file name was not correct - Example: Site plan=site plan (do not add anything to the file names like numbers.) | |||
| ENGIN1 | HOLD | 09/27/2022 | 09/27/2022 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Two different foundation surveys submitted - both rejected. One is wrong site. | |||
| ZON | HOLD | 09/27/2022 | 09/27/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Foundation survey submitted is for another address | |||
| BLD | COMPLETE | 08/09/2022 | 08/10/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/21/2022 | 06/21/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/17/2022 | 06/21/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/17/2022 | 06/21/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Must have at least two 7 gallon shrubs around ac unit. Plan only shows 1 | |||
| BADMIN | INFORMATION | 06/15/2022 | 06/15/2022 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Need to submit also zoning hold not just building. | |||
| MECH | COMPLETE | 06/15/2022 | 06/15/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/15/2022 | 06/15/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: Repeat Comment 1. OK 2. Provide which product will be installed. Various products have several sub approvals noted under them. a. Ply Gem FL16103 (16103.#) b. Ply Gem FL14634 (14634.#) | |||
| ZON | HOLD | 06/15/2022 | 06/15/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Residential homes shall provide foundation plantings consisting of sixteen (16) shrubs. On interior lots, eight (8) shrubs shall be planted in front of the home, and four (4) shrubs planted on each side of the home. On corner lots, six (6) shrubs shall be planted on each side of the home facing a street, and (4) shrubs planted on the interior side of the home. All of these required shrubs shall be planted between two and one-half (2 ½) and eight (8) feet of the home’s foundation. The corners of the house shall be wrapped with shrubbery 1 tree required for each 2500sqft - Need 3 additional trees Must have a minimum 5/12 roof pitch | |||
| MECH | HOLD | 06/13/2022 | 06/14/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the builder. (Second Request) | |||
| ZON | HOLD | 06/13/2022 | 06/14/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Landscape plan must state sod type and if irrigation will be installed. Landscape plan must show the locations of all required foundation plantings and trees with their types and gallon sizes for review. Must have a minumum 5/12 roof pitch | |||
| ELEC | COMPLETE | 06/13/2022 | 06/14/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/13/2022 | 06/14/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: Repeat Comment 1. Provide Product Approvals for the following Per F.S. 471.025 and F.A.C. 61 G15-23.005. a. Garage Door b. Wood Connectors c. Wood Anchors d. Truss Plates 2. Provide which product will be installed. Various products have several sub approvals noted under them. a. Ply Gem FL16103 (16103.#) b. Ply Gem FL14634 (14634.#) | |||
| BLD | HOLD | 06/01/2022 | 06/06/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Provide Product Approvals for the following Per F.S. 471.025 and F.A.C. 61 G15-23.005. a. Garage Door b. Wood Connectors c. Wood Anchors d. Truss Plates 2. Provide which product will be installed. Various products have several sub approvals noted under them. a. Ply Gem FL16103 (16103.#) b. Ply Gem FL14634 (14634.#) | |||
| CUSVC | COMPLETE | 06/01/2022 | 06/03/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | HOLD | 06/01/2022 | 06/03/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit electric load calcs 2. Need correct outlet spacing in bed 4 on switch wall. NEC 2017 210.52 | |||
| ENGIN1 | COMPLETE | 06/01/2022 | 06/01/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/01/2022 | 06/07/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 06/01/2022 | 06/01/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs do not match the house plans. 2. Energy Calcs need to be signed by the builder | |||
| SW1 | COMPLETE | 06/01/2022 | 06/13/2022 |
| Note: Released By: CONRAD TROHA - (386)986-4767 - CTROHA@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/01/2022 | 06/02/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan/Survey states 1 story but plans are for a 2 story. Rear patio location and AC pad location on plans are different than the location on the site plan/survey. . Front entry on plans show it further than the garage. Site plan must show this and front setback will need to be from that entry to property line. Landscape plan must state sod type and if irrigation will be installed. Landscape plan must show the locations of all required foundation plantings and trees with their types and gallon sizes for review. | |||
| SWALE | COMPLETE | 06/01/2022 | 06/13/2022 |
| Note: Released By: CONRAD TROHA - (386)986-4767 - CTROHA@PALMCOASTGOV.COM See site plan mark ups |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 02/03/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/03/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/31/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/31/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 01/31/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 01/31/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 01/31/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 01/31/2023 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 07/06/2022 |
| IMPACT FEE FIRE | ¤388.65 | 07/06/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 07/06/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/06/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 07/06/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/06/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 07/06/2022 |
| SURCHARGE FS 533.721 | ¤7.05 | 07/06/2022 |
| SURCHARGE - FS 468.631 | ¤10.57 | 07/06/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/06/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/06/2022 |
| SW ENG PRE APRON | ¤30.00 | 07/06/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/06/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/06/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 07/06/2022 |
| SEWER INSPECTION | ¤25.00 | 07/06/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 07/06/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 07/06/2022 |
| SITE PLAN 30 | ¤30.00 | 07/06/2022 |
| CONNECTION FEES | ¤1,077.88 | 07/06/2022 |
| WATER- TURN ON | ¤25.00 | 07/06/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/06/2022 |
| INSPECTION - RESIDENTIAL | ¤627.00 | 07/06/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤177.84 | 07/06/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,328.65 |