Permit #2022060015

Permit Details

Status: COED

Parcel Id: 07-11-31-7063-00070-0060
CONDITIONED SPACE: 1906 sqft
GARAGE: 400 sqft
OPENED PORCH (WITH ROOF) : 20 sqft
Total Square Footage: 2326 sqft
Block: 00070
Subdivision: 2174 - SECTION 63-ZEBULAHS TRAIL
Job Phone: 407-432-2344
Location Address: 5 ZOLLINGER PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/06/2022
NOC: RECORDED
Applicant name: WADE GILMER JURNEY JR
Owner: NATIONAL HOME CORPORATION

Address

4850 TAMIAMI TRAIL NORTH

NAPLES, FL 34103

Lot: 0060
Contracted Stated Job Value: ¤198,291.00
Job Description: Single Family Residence
Type: CN

Contractor

NATIONAL HOME CORPORATION
Status Location Address Mailing Address State License Number Phone
INACTIVE

1080 HOLCOMB BRIDGE ROAD

,

BLDG 100 - 330

ROSWELL , GA 30076

CBC1257700 (Exp: 08/31/2026) 471-817-1259

Sub Contractors

DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JASON PATRICK RIBOCK
Status Location Address State License Number Phone
INACTIVE

620 E PINE ST

, 0

ES12001313 (Exp: 08/31/2026) 407-625-0257
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
RANDALL SCOTT ROSENFELD
Status Location Address State License Number Phone
ACTIVE

234 N WHITNEY ST

PALM COAST, FL 32084

CAC1816641 (Exp: 08/31/2026) 904-599-0082

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/03/2023 FINAL APPROVED RSIMS
Note: 2/2/2023 - PREVIOUS INSPECTION NOTES 2/2/23: Cancelled due to energy calc revision being rejected. 2/1/2023 - PREVIOUS INSPECTION NOTES 2/1/23: 1). Model number for AHU still does not match the revised energy calcs submitted to & approved by the City. 2). Oven is now istalled but is missing the connector for the plug cord to the junction box & oven will not fully engage into the anti tip bracket. ** Also please seal the back top right corner of AHU duct through the ceiling with mastic. 1/27/2023 - PREVIOUS INSPECTION NOTES 1/27/23: 1). AHU lineset sleeve is not sealed as required. 2). Condensing unit does not have a disconnect within working distance from the unit. Breaker is installed in the meter panel box and is oversized. 30 amp (Max 25). (Breaker should be installed in breaker box.) 3). Oven is on-site but not installed. Anti-tip cannot be verified. 4). AHU closet is missing one of the french style doors. 5). Energy calculations do not match installed units. Need new energy calculations from the new installer submitted to & approbed by the City. *** front light is missing bulb - cannot verify operation. One smoke detector has low battery.
BLD - BUILDING FINAL 02/02/2023 CANCELLED BY APPLICANT RSIMS
Note: 2/2/23: Cancelled due to energy calc revision being rejected. 2/1/2023 - PREVIOUS INSPECTION NOTES 2/1/23: 1). Model number for AHU still does not match the revised energy calcs submitted to & approved by the City. 2). Oven is now istalled but is missing the connector for the plug cord to the junction box & oven will not fully engage into the anti tip bracket. ** Also please seal the back top right corner of AHU duct through the ceiling with mastic. 1/27/2023 - PREVIOUS INSPECTION NOTES 1/27/23: 1). AHU lineset sleeve is not sealed as required. 2). Condensing unit does not have a disconnect within working distance from the unit. Breaker is installed in the meter panel box and is oversized. 30 amp (Max 25). (Breaker should be installed in breaker box.) 3). Oven is on-site but not installed. Anti-tip cannot be verified. 4). AHU closet is missing one of the french style doors. 5). Energy calculations do not match installed units. Need new energy calculations from the new installer submitted to & approbed by the City. *** front light is missing bulb - cannot verify operation. One smoke detector has low battery.
BLD - BUILDING FINAL 02/01/2023 Disapproved -FEE REQUIRED RSIMS
Note: 2/1/23: 1). Model number for AHU still does not match the revised energy calcs submitted to & approved by the City. 2). Oven is now istalled but is missing the connector for the plug cord to the junction box & oven will not fully engage into the anti tip bracket. ** Also please seal the back top right corner of AHU duct through the ceiling with mastic. 1/27/2023 - PREVIOUS INSPECTION NOTES 1/27/23: 1). AHU lineset sleeve is not sealed as required. 2). Condensing unit does not have a disconnect within working distance from the unit. Breaker is installed in the meter panel box and is oversized. 30 amp (Max 25). (Breaker should be installed in breaker box.) 3). Oven is on-site but not installed. Anti-tip cannot be verified. 4). AHU closet is missing one of the french style doors. 5). Energy calculations do not match installed units. Need new energy calculations from the new installer submitted to & approbed by the City. *** front light is missing bulb - cannot verify operation. One smoke detector has low battery.
BLD - BUILDING FINAL 01/27/2023 Disapproved -FEE REQUIRED RSIMS
Note: 1/27/23: 1). AHU lineset sleeve is not sealed as required. 2). Condensing unit does not have a disconnect within working distance from the unit. Breaker is installed in the meter panel box and is oversized. 30 amp (Max 25). (Breaker should be installed in breaker box.) 3). Oven is on-site but not installed. Anti-tip cannot be verified. 4). AHU closet is missing one of the french style doors. 5). Energy calculations do not match installed units. Need new energy calculations from the new installer submitted to & approbed by the City. *** front light is missing bulb - cannot verify operation. One smoke detector has low battery.
U -UTILITY RESIDENTIAL FINAL 01/27/2023 FINAL APPROVED DHANEY
Note: 1/24/2023 - PREVIOUS INSPECTION NOTES Not ready
ROW - STORMWATER FINAL 01/26/2023 FINAL APPROVED PFLANAGAN
U -UTILITY RESIDENTIAL FINAL 01/24/2023 CANCELLED BY APPLICANT JHARDING
Note: Not ready
ROW - FINAL APRON (AFTER POUR) 01/19/2023 APPROVED PFLANAGAN
ROW- FINAL SURVEY/GRADING CERTIFICATION 01/19/2023 APPROVED PFLANAGAN
ROW FIELD SURVEY /GRADING CERTIFICATION 01/19/2023 APPROVED PFLANAGAN
ELECTRIC - EARLY POWER 01/11/2023 APPROVED JMUNSON
Note: 1/4/2023 - PREVIOUS INSPECTION NOTES 1/4/23: POWER IS ENERGIZED TO HOUSE PRIOR TO INSPECTION! ******** wires cannot be landed at meter panel prior to early power inspection! 1). water heater wire is not properly safed off. 2). wire on right exterior of the house is not safed off. 1/11/23 Vitrual inspection
ELECTRIC - EARLY POWER 01/04/2023 Disapproved -FEE REQUIRED RSIMS
Note: 1/4/23: POWER IS ENERGIZED TO HOUSE PRIOR TO INSPECTION! ******** wires cannot be landed at meter panel prior to early power inspection! 1). water heater wire is not properly safed off. 2). wire on right exterior of the house is not safed off.
U - SEWER TIE IN 12/15/2022 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ROW- PRE-APRON (PRE-POUR) 12/15/2022 APPROVED PFLANAGAN
Note: IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING THE CONCRETE FOR THE DRIVEWAY
PEP TANK INSTALLATION REQUEST 12/06/2022 APPROVED CSTONE
Note: 12/5/2022 8:01:32 AM- PREVIOUS INSPECTION NOTES Exterior (stucco, stone, brick, or siding must be applied
U-CROSS CONNECTION 12/02/2022 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation-no cross connection
PEP TANK INSTALLATION REQUEST 12/02/2022 Disapproved - NO FEE CSTONE
Note: Exterior (stucco, stone, brick, or siding must be applied
INSULATION 11/28/2022 APPROVED RSIMS
Note: Inspector Notes from Inspection 2420 11/23/2022: Spoke to Superintendent yesterday evening. He has insulation being done on Friday. We will check below at insulation inspection so that the job can continue. 11/22/2022 - PREVIOUS INSPECTION NOTES 11/22/2022: 1). Water heater wire is not phased out in the panel. 2). Back right bathrooms exhaust fans: Exhaust pipe is not hooked up. 3). Front left bathroom exhaust fan: exhaust pipe is not secured to the fan properly.
LATH/BRICK/ WATER BARRIER 11/28/2022 APPROVED RSIMS
Note: Inspector Notes from Inspection 2420 11/23/2022: Spoke to Superintendent yesterday evening. He has insulation being done on Friday. We will check below at insulation inspection so that the job can continue. 11/22/2022 - PREVIOUS INSPECTION NOTES 11/22/2022: 1). Water heater wire is not phased out in the panel. 2). Back right bathrooms exhaust fans: Exhaust pipe is not hooked up. 3). Front left bathroom exhaust fan: exhaust pipe is not secured to the fan properly.
ALL ROUGH 11/23/2022 APPROVED - AS NOTED RSIMS
Note: 11/23/2022: Spoke to Superintendent yesterday evening. He has insulation being done on Friday. We will check below at insulation inspection so that the job can continue. 11/22/2022 - PREVIOUS INSPECTION NOTES 11/22/2022: 1). Water heater wire is not phased out in the panel. 2). Back right bathrooms exhaust fans: Exhaust pipe is not hooked up. 3). Front left bathroom exhaust fan: exhaust pipe is not secured to the fan properly.
ALL ROUGH 11/22/2022 Disapproved - NO FEE RSIMS
Note: 11/22/2022: 1). Water heater wire is not phased out in the panel. 2). Back right bathrooms exhaust fans: Exhaust pipe is not hooked up. 3). Front left bathroom exhaust fan: exhaust pipe is not secured to the fan properly.
ALL ROUGH 11/21/2022 CANCELLED BY APPLICANT WEB
WALL SHEATHING 10/25/2022 APPROVED RSIMS
Note: 10/24/2022: Fully blocked house - no wall sheathing - approved to advance inspection process.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/25/2022 APPROVED RSIMS
ROOF VALLEY & METAL 10/25/2022 APPROVED RSIMS
ELECTRIC-TUG 10/25/2022 APPROVED JMUNSON
FOUND SURVEY APPROVED (OFFICE) 10/24/2022 APPROVED TBAKER
ELECTRIC-TUG 10/21/2022 CANCELLED BY APPLICANT WEB
ELECTRIC-TUG 09/22/2022 APPROVED TSTAUFFACHER
TIE BEAM / LINTEL 09/14/2022 APPROVED TSTAUFFACHER
MONOLITHIC SLAB 08/30/2022 APPROVED BTAYLOR
GRAVITY SEWER TEST 08/26/2022 APPROVED MGIBSON
Note: THIS IS A REINSPECTION
PLUMBING 1ST ROUGH UNDERGROUND 08/26/2022 APPROVED MGIBSON
Note: THIS IS A REINSPECTION
GRAVITY SEWER TEST 08/23/2022 CANCELLED BY APPLICANT MGIBSON
PLUMBING 1ST ROUGH UNDERGROUND 08/23/2022 CANCELLED BY APPLICANT MGIBSON
WATER METER INSTALLATION REQUEST 08/01/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 02/03/2023 02/03/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN COMPLETE 02/02/2023 02/02/2023
Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM FIRST PAGE ON ENERGY CALCS CUT OFF ON RIGHT SIDE. PLEASE RESUBMIT.
MECH HOLD 01/30/2023 01/30/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide Entire energy calc. (Second Request)
MECH COMPLETE 01/30/2023 01/31/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 01/27/2023 01/30/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide Entire energy calc. 2. Duct layout needs to be signed by the AC contractor
ZON COMPLETE 10/24/2022 10/24/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/24/2022 10/24/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN INFORMATION 09/27/2022 09/27/2022
Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM Wrong File Name Uploaded file name was not correct - Example: Site plan=site plan (do not add anything to the file names like numbers.)
ENGIN1 HOLD 09/27/2022 09/27/2022
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Two different foundation surveys submitted - both rejected. One is wrong site.
ZON HOLD 09/27/2022 09/27/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Foundation survey submitted is for another address
BLD COMPLETE 08/09/2022 08/10/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON COMPLETE 06/21/2022 06/21/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 06/17/2022 06/21/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON HOLD 06/17/2022 06/21/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Must have at least two 7 gallon shrubs around ac unit. Plan only shows 1
BADMIN INFORMATION 06/15/2022 06/15/2022
Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Need to submit also zoning hold not just building.
MECH COMPLETE 06/15/2022 06/15/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 06/15/2022 06/15/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: Repeat Comment 1. OK 2. Provide which product will be installed. Various products have several sub approvals noted under them. a. Ply Gem FL16103 (16103.#) b. Ply Gem FL14634 (14634.#)
ZON HOLD 06/15/2022 06/15/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Residential homes shall provide foundation plantings consisting of sixteen (16) shrubs. On interior lots, eight (8) shrubs shall be planted in front of the home, and four (4) shrubs planted on each side of the home. On corner lots, six (6) shrubs shall be planted on each side of the home facing a street, and (4) shrubs planted on the interior side of the home. All of these required shrubs shall be planted between two and one-half (2 ½) and eight (8) feet of the home’s foundation. The corners of the house shall be wrapped with shrubbery 1 tree required for each 2500sqft - Need 3 additional trees Must have a minimum 5/12 roof pitch
MECH HOLD 06/13/2022 06/14/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the builder. (Second Request)
ZON HOLD 06/13/2022 06/14/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Landscape plan must state sod type and if irrigation will be installed. Landscape plan must show the locations of all required foundation plantings and trees with their types and gallon sizes for review. Must have a minumum 5/12 roof pitch
ELEC COMPLETE 06/13/2022 06/14/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 06/13/2022 06/14/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: Repeat Comment 1. Provide Product Approvals for the following Per F.S. 471.025 and F.A.C. 61 G15-23.005. a. Garage Door b. Wood Connectors c. Wood Anchors d. Truss Plates 2. Provide which product will be installed. Various products have several sub approvals noted under them. a. Ply Gem FL16103 (16103.#) b. Ply Gem FL14634 (14634.#)
BLD HOLD 06/01/2022 06/06/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Provide Product Approvals for the following Per F.S. 471.025 and F.A.C. 61 G15-23.005. a. Garage Door b. Wood Connectors c. Wood Anchors d. Truss Plates 2. Provide which product will be installed. Various products have several sub approvals noted under them. a. Ply Gem FL16103 (16103.#) b. Ply Gem FL14634 (14634.#)
CUSVC COMPLETE 06/01/2022 06/03/2022
Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM
ELEC HOLD 06/01/2022 06/03/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit electric load calcs 2. Need correct outlet spacing in bed 4 on switch wall. NEC 2017 210.52
ENGIN1 COMPLETE 06/01/2022 06/01/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 06/01/2022 06/07/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 06/01/2022 06/01/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs do not match the house plans. 2. Energy Calcs need to be signed by the builder
SW1 COMPLETE 06/01/2022 06/13/2022
Note: Released By: CONRAD TROHA - (386)986-4767 - CTROHA@PALMCOASTGOV.COM
ZON HOLD 06/01/2022 06/02/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan/Survey states 1 story but plans are for a 2 story. Rear patio location and AC pad location on plans are different than the location on the site plan/survey. . Front entry on plans show it further than the garage. Site plan must show this and front setback will need to be from that entry to property line. Landscape plan must state sod type and if irrigation will be installed. Landscape plan must show the locations of all required foundation plantings and trees with their types and gallon sizes for review.
SWALE COMPLETE 06/01/2022 06/13/2022
Note: Released By: CONRAD TROHA - (386)986-4767 - CTROHA@PALMCOASTGOV.COM See site plan mark ups

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 02/03/2023
REINSPECTION RESIDENTIAL ¤40.00 02/03/2023
REINSPECTION RESIDENTIAL ¤40.00 01/31/2023
REINSPECTION RESIDENTIAL ¤40.00 01/31/2023
PLAN REVIEW - REVISION ¤32.50 01/31/2023
PLAN REVIEW - REVISION ¤32.50 01/31/2023
CONTRACTOR CHANGE ¤20.00 01/31/2023
CONTRACTOR CHANGE ¤40.00 01/31/2023
3% FIRE IMPACT FEE CREDIT (¤11.66) 07/06/2022
IMPACT FEE FIRE ¤388.65 07/06/2022
IMPACT FEE PARKS ¤1,455.13 07/06/2022
IMPACT FEE SCHOOL ¤3,600.00 07/06/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 07/06/2022
WATER -IRRIGATION INSPECTION ¤25.00 07/06/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 07/06/2022
SURCHARGE FS 533.721 ¤7.05 07/06/2022
SURCHARGE - FS 468.631 ¤10.57 07/06/2022
SW ENG - FOUNDATION SURVEY ¤20.00 07/06/2022
SW ENG INSPECTION 80 ¤80.00 07/06/2022
SW ENG PRE APRON ¤30.00 07/06/2022
SW ENG - REVIEW 20 ¤20.00 07/06/2022
SW ENG RES REVIEW 200 ¤200.00 07/06/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 07/06/2022
SEWER INSPECTION ¤25.00 07/06/2022
SEWER CAPITAL FACILITY ¤4,939.76 07/06/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 07/06/2022
SITE PLAN 30 ¤30.00 07/06/2022
CONNECTION FEES ¤1,077.88 07/06/2022
WATER- TURN ON ¤25.00 07/06/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/06/2022
INSPECTION - RESIDENTIAL ¤627.00 07/06/2022
PLAN REVIEW - RESIDENTIAL ¤177.84 07/06/2022
Fees Total Due: ¤0.00 Total Paid: ¤18,328.65