Permit #2022060091
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00740-0060 |
| CONDITIONED SPACE: 1280 sqft |
| CONDITIONED SPACE: 1280 sqft |
| OPENED PORCH (WITH ROOF) : 36 sqft |
| OPENED PORCH (WITH ROOF) : 36 sqft |
| OPENED PORCH (WITH ROOF) : 144 sqft |
| OPENED PORCH (WITH ROOF) : 144 sqft |
| GARAGE: 250 sqft |
| GARAGE: 250 sqft |
| Total Square Footage: 3420 sqft |
| Block: 00740 |
| Subdivision: - |
| Job Phone: 386-864-2199 |
| Location Address: 2 BUTTONWOOD LN |
| Type: DU - DUPLEX |
| Issue Date: 07/21/2022 |
| NOC: RECORDED |
| Applicant name: MAXIM TARANNIK |
| Owner: JOAQUIM BARBOSA REVOCABLE TRUST |
|
Address 2 BUTTONWOOD LANE PALM COAST, FL 32137 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤337,000.00 |
| Job Description: Duplex |
| Type: CN |
Contractor
GOLDEN MAGNOLIA, INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
1 ROCKEFELLER DRIVE PALM COAST, FL 32164 |
RR282811984 (Exp: 08/31/2025) | 386-447-7007 |
Sub Contractors
FERNANDO MEZA SR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
457 CHELSEA PLACE AVE ORMOND BEACH, FL 32174 |
EC13003906 (Exp: 08/31/2026) | 386-241-5211 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
VICTOR ANTONIO SANCHEZ AREVALO
| Status | Location Address | State License Number | Phone |
| INACTIVE |
9076 EMMA JEAN CT JACKSONVILLE, FL 32211 |
RC29027842 (Exp: 08/31/2025) | 904-982-1504 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/22/2024 | FINAL APPROVED | JSTEWART |
| Note: 7/19/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 7/19/2024 11:45:23 AM *** Previous note not rectified...... Sewer cleanouts need trimed and capped. (Left side by ODU) P3005.2.10.2 7/18/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 7/18/2024 10:20:33 AM *** Previous Notes not fully Rectified... 1. Sewer cleanouts need trimed and capped. (Left side by ODU) P3005.2.10.2 4. Seal all holes in the exterior walls by Penetrations. (right side at hose Bibb) FBC R402.4. 9. Smoke detectors need to be wired and battery back up, and carbon monoxide combo outside of sleeping rooms within 10ft. (Both sides Master bedroom needs a Carbon Monoxide detector within 10ft of doorway, and 10ft from heat source in Kitchen) FBC R315.1 IN ADDITION...Please relocate disconnect for working clearence of 36" cant be behind appliance) NEC 110.26(A) 7/12/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 7/12/2024 2:19:53 PM *** Both sides.....1. Sewer cleanouts need trimed and capped. 2. Exterior receptacles need to be Weather resistant. 3. Need a shut off valve at Main water supply entry. 4. Seal all holes in the exterior walls by Penetrations. 5. Seal Plenums in garages at ceiling penetration. 6. No Hot water 7. Kitchen should have 2 circuits 8. seal all holes in garage walls and ceiling. 9. Smoke detectors need to be wired and battery back up, and carbon monoxide combo outside of sleeping rooms within 10ft. 10. Hood exhausts are not connected and sealed. 11. check all receptacles that are within 6ft of any sink/Lav needs to be GFCI Protected. Will require a full inspection after Items above are fixed. | |||
| BLD - BUILDING FINAL | 07/19/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 7/19/2024 11:45:23 AM *** Previous note not rectified...... Sewer cleanouts need trimed and capped. (Left side by ODU) P3005.2.10.2 7/18/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 7/18/2024 10:20:33 AM *** Previous Notes not fully Rectified... 1. Sewer cleanouts need trimed and capped. (Left side by ODU) P3005.2.10.2 4. Seal all holes in the exterior walls by Penetrations. (right side at hose Bibb) FBC R402.4. 9. Smoke detectors need to be wired and battery back up, and carbon monoxide combo outside of sleeping rooms within 10ft. (Both sides Master bedroom needs a Carbon Monoxide detector within 10ft of doorway, and 10ft from heat source in Kitchen) FBC R315.1 IN ADDITION...Please relocate disconnect for working clearence of 36" cant be behind appliance) NEC 110.26(A) 7/12/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 7/12/2024 2:19:53 PM *** Both sides.....1. Sewer cleanouts need trimed and capped. 2. Exterior receptacles need to be Weather resistant. 3. Need a shut off valve at Main water supply entry. 4. Seal all holes in the exterior walls by Penetrations. 5. Seal Plenums in garages at ceiling penetration. 6. No Hot water 7. Kitchen should have 2 circuits 8. seal all holes in garage walls and ceiling. 9. Smoke detectors need to be wired and battery back up, and carbon monoxide combo outside of sleeping rooms within 10ft. 10. Hood exhausts are not connected and sealed. 11. check all receptacles that are within 6ft of any sink/Lav needs to be GFCI Protected. Will require a full inspection after Items above are fixed. | |||
| BLD - BUILDING FINAL | 07/18/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 7/18/2024 10:20:33 AM *** Previous Notes not fully Rectified... 1. Sewer cleanouts need trimed and capped. (Left side by ODU) P3005.2.10.2 4. Seal all holes in the exterior walls by Penetrations. (right side at hose Bibb) FBC R402.4. 9. Smoke detectors need to be wired and battery back up, and carbon monoxide combo outside of sleeping rooms within 10ft. (Both sides Master bedroom needs a Carbon Monoxide detector within 10ft of doorway, and 10ft from heat source in Kitchen) FBC R315.1 IN ADDITION...Please relocate disconnect for working clearence of 36" cant be behind appliance) NEC 110.26(A) 7/12/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 7/12/2024 2:19:53 PM *** Both sides.....1. Sewer cleanouts need trimed and capped. 2. Exterior receptacles need to be Weather resistant. 3. Need a shut off valve at Main water supply entry. 4. Seal all holes in the exterior walls by Penetrations. 5. Seal Plenums in garages at ceiling penetration. 6. No Hot water 7. Kitchen should have 2 circuits 8. seal all holes in garage walls and ceiling. 9. Smoke detectors need to be wired and battery back up, and carbon monoxide combo outside of sleeping rooms within 10ft. 10. Hood exhausts are not connected and sealed. 11. check all receptacles that are within 6ft of any sink/Lav needs to be GFCI Protected. Will require a full inspection after Items above are fixed. | |||
| BLD - BUILDING FINAL | 07/12/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 7/12/2024 2:19:53 PM *** Both sides.....1. Sewer cleanouts need trimed and capped. 2. Exterior receptacles need to be Weather resistant. 3. Need a shut off valve at Main water supply entry. 4. Seal all holes in the exterior walls by Penetrations. 5. Seal Plenums in garages at ceiling penetration. 6. No Hot water 7. Kitchen should have 2 circuits 8. seal all holes in garage walls and ceiling. 9. Smoke detectors need to be wired and battery back up, and carbon monoxide combo outside of sleeping rooms within 10ft. 10. Hood exhausts are not connected and sealed. 11. check all receptacles that are within 6ft of any sink/Lav needs to be GFCI Protected. Will require a full inspection after Items above are fixed. | |||
| ROW - FINAL APRON (AFTER POUR) | 07/12/2024 | APPROVED - AS NOTED | PFLANAGAN |
| Note: TALKED TO HOMEOWNER ABOUT THE DRIVEWAY AND HE IS TAKING RESPONSIBILITY FOR THE DRIVEWAY AND IF ANYTHING HAPPENS HE STATED THAT HE WILL TAKE CARE OF IT PER MR. BABOSA ------------------------------------------------------------------- 7/9/2024 - PREVIOUS INSPECTION NOTES ** 07/09/24 AFTER INSPECTION OF DRIVEWAYS THERE IS LARGE CRACK THAT IS SPANNING THE DRIVEWAY OVER THE TOP OF A 4 FT DEEP HOLE DUG AND BORED UNDERNEATH DRIVEWAY TO RUN SEWER PIPE ON LEFT SIDE DRIVEWAY THERE ARE ALSO SEVERAL OTHER SMALLER CRACKERS NOTED ON BOTH DRIVEWAYS BASED UPON TRACK MARKS THAT A MACHINE USED TO DIG ON EITHER SIDE OF THE DRIVWAY HAS DONE IT FROM ATOP OF THE DRIVEWAY ** SEE ATTACHED PHOTOS ____________________________________________________________________________________________________________________ 7/8/2024 - PREVIOUS INSPECTION NOTES ROAD PATCH IS CRUMBLING AND IS TOO SOFT NEED TO REMOVE THE PATCH AND REDO THE PATCH SO IT DOESN'T CRUMBLE APART. ---------------------------------------------------------------------------- 6/26/2024 - PREVIOUS INSPECTION NOTES 6/17/2024 - PREVIOUS INSPECTION NOTES ** 06/17/24 NEED TO CLEAN OUT CULVERT ENDS OF OVERPOURED CONCRETE AS INDICATED IN THE INSPECTION CONDUCTED ON 06/05/24 _________________________________________________________________________________________________________________ 6/5/2024 - PREVIOUS INSPECTION NOTES ** 06/05/24 NEED TO HAVE HOT PATCH ROAD REPAIR IN PLACE FOR AFTER POUR AT DRIVEWAYS EDGE AND ALONG BUTTONWORTH (SEE ALL WHITE PAINTED AREAS) ** CLEAN OUT CULVERTS OF OVER POURED CONCRETE AND DEBRIS | |||
| ROW - FINAL INSPECTION | 07/12/2024 | APPROVED - AS NOTED | PFLANAGAN |
| Note: PASSING AS NOTED THAT MR. BABOSA STATES THAT HE WILL PUT GRASS WHERE IT WAS DUG UP. AREAS ARE NOT IN THE RIGHT OF WAY. -------------------------------------------------------------------------- 7/9/2024 - PREVIOUS INSPECTION NOTES ** 07/09/24 FRONT YARD ON LEFT SIDE AND IN MIDDLE ARE DUG UP AT TIME OF THIS INSPECTION SITE NOT READY FOR ROW FINAL INSPECTION ** SEE ATTACHED PHOTOS _________________________________________________________________________________________________________ 6/5/2024 - PREVIOUS INSPECTION NOTES ** 06/05/24 BUILDER NEEDS TO READ ALL NOTES LEFT IN FIELD SURVEY BEFORE FINAL ROW STORMWATER CAN BE APPROVED THOSE NOTES ALSO TRANSFERED OVER TO THIS INSPECTION ** 06/04/24 NEED TO REMOVE HIGH SPOT ON LEFT SIDE IN ROW NEAR POWER POLE ** NEED TO REMOVE SOD AWAY FROM FENCE 4 INCHES ON LEFT SIDE ** LEFT SIDE ALONG FENCE NEAR REAR NOTE WHITE PAINT OUTLINING A LARGE LOW AREA ALONG FENCE NEED TO FILL AND SOD ENSURE THE BERM ALONG ENTIRE LEFT SIDE IS A MINIMUM OF .30 TENTHS FROM TOP TO THE BOTTOM OF DRAIANAGE CONVEYANCE ** NEED A 2:1 SLOPE ACROSS LEFT REAR PROPERTY LINE WHERE IT IS NOT FLAT AND SOD SLOP ** NOTE WHITE PAINT IN ALL AREAS WHERE ROAD REPAIR IS REQUIRED _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 ** 06/04/24 NEED TO REMOVE HIGH SPOT ON LEFT SIDE IN ROW NEAR POWER POLE ** NEED TO REMOVE SOD AWAY FROM FENCE 4 INCHES ON LEFT SIDE ** LEFT SIDE ALONG FENCE NEAR REAR NOTE WHITE PAINT OUTLINING A LARGE LOW AREA ALONG FENCE NEED TO FILL AND SOD ENSURE THE BERM ALONG ENTIRE LEFT SIDE IS A MINIMUM OF .30 TENTHS FROM TOP TO THE BOTTOM OF DRAIANAGE CONVEYANCE ** NEED A 2:1 SLOPE ACROSS LEFT REAR PROPERTY LINE WHERE IT IS NOT FLAT AND SOD SLOP ** NOTE WHITE PAINT IN ALL AREAS WHERE ROAD REPAIR IS REQUIRED | |||
| U -UTILITY RESIDENTIAL FINAL | 07/10/2024 | FINAL APPROVED | BWRIGHT |
| ROW - FINAL INSPECTION | 07/09/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 07/09/24 FRONT YARD ON LEFT SIDE AND IN MIDDLE ARE DUG UP AT TIME OF THIS INSPECTION SITE NOT READY FOR ROW FINAL INSPECTION ** SEE ATTACHED PHOTOS _________________________________________________________________________________________________________ 6/5/2024 - PREVIOUS INSPECTION NOTES ** 06/05/24 BUILDER NEEDS TO READ ALL NOTES LEFT IN FIELD SURVEY BEFORE FINAL ROW STORMWATER CAN BE APPROVED THOSE NOTES ALSO TRANSFERED OVER TO THIS INSPECTION ** 06/04/24 NEED TO REMOVE HIGH SPOT ON LEFT SIDE IN ROW NEAR POWER POLE ** NEED TO REMOVE SOD AWAY FROM FENCE 4 INCHES ON LEFT SIDE ** LEFT SIDE ALONG FENCE NEAR REAR NOTE WHITE PAINT OUTLINING A LARGE LOW AREA ALONG FENCE NEED TO FILL AND SOD ENSURE THE BERM ALONG ENTIRE LEFT SIDE IS A MINIMUM OF .30 TENTHS FROM TOP TO THE BOTTOM OF DRAIANAGE CONVEYANCE ** NEED A 2:1 SLOPE ACROSS LEFT REAR PROPERTY LINE WHERE IT IS NOT FLAT AND SOD SLOP ** NOTE WHITE PAINT IN ALL AREAS WHERE ROAD REPAIR IS REQUIRED _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 ** 06/04/24 NEED TO REMOVE HIGH SPOT ON LEFT SIDE IN ROW NEAR POWER POLE ** NEED TO REMOVE SOD AWAY FROM FENCE 4 INCHES ON LEFT SIDE ** LEFT SIDE ALONG FENCE NEAR REAR NOTE WHITE PAINT OUTLINING A LARGE LOW AREA ALONG FENCE NEED TO FILL AND SOD ENSURE THE BERM ALONG ENTIRE LEFT SIDE IS A MINIMUM OF .30 TENTHS FROM TOP TO THE BOTTOM OF DRAIANAGE CONVEYANCE ** NEED A 2:1 SLOPE ACROSS LEFT REAR PROPERTY LINE WHERE IT IS NOT FLAT AND SOD SLOP ** NOTE WHITE PAINT IN ALL AREAS WHERE ROAD REPAIR IS REQUIRED | |||
| ROW - FINAL APRON (AFTER POUR) | 07/09/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 07/09/24 AFTER INSPECTION OF DRIVEWAYS THERE IS LARGE CRACK THAT IS SPANNING THE DRIVEWAY OVER THE TOP OF A 4 FT DEEP HOLE DUG AND BORED UNDERNEATH DRIVEWAY TO RUN SEWER PIPE ON LEFT SIDE DRIVEWAY THERE ARE ALSO SEVERAL OTHER SMALLER CRACKERS NOTED ON BOTH DRIVEWAYS BASED UPON TRACK MARKS THAT A MACHINE USED TO DIG ON EITHER SIDE OF THE DRIVWAY HAS DONE IT FROM ATOP OF THE DRIVEWAY ** SEE ATTACHED PHOTOS ____________________________________________________________________________________________________________________ 7/8/2024 - PREVIOUS INSPECTION NOTES ROAD PATCH IS CRUMBLING AND IS TOO SOFT NEED TO REMOVE THE PATCH AND REDO THE PATCH SO IT DOESN'T CRUMBLE APART. ---------------------------------------------------------------------------- 6/26/2024 - PREVIOUS INSPECTION NOTES 6/17/2024 - PREVIOUS INSPECTION NOTES ** 06/17/24 NEED TO CLEAN OUT CULVERT ENDS OF OVERPOURED CONCRETE AS INDICATED IN THE INSPECTION CONDUCTED ON 06/05/24 _________________________________________________________________________________________________________________ 6/5/2024 - PREVIOUS INSPECTION NOTES ** 06/05/24 NEED TO HAVE HOT PATCH ROAD REPAIR IN PLACE FOR AFTER POUR AT DRIVEWAYS EDGE AND ALONG BUTTONWORTH (SEE ALL WHITE PAINTED AREAS) ** CLEAN OUT CULVERTS OF OVER POURED CONCRETE AND DEBRIS | |||
| U - SEWER TIE IN | 07/09/2024 | APPROVED | MGIBSON |
| Note: 7/3/2024 - PREVIOUS INSPECTION NOTES READ GRAVITY SEWER NOTE | |||
| U-CROSS CONNECTION | 07/09/2024 | APPROVED | DHANEY |
| GRAVITY SEWER TEST | 07/09/2024 | APPROVED | MGIBSON |
| Note: 7/3/2024 - PREVIOUS INSPECTION NOTES THIS IS A DUPLEX ONLY ONE SIDE IS DONE TESTED AND APPROVED DUE TO HAVING TO TUNNEL UNDER DRIVEWAY | |||
| ROW - FINAL APRON (AFTER POUR) | 07/08/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: ROAD PATCH IS CRUMBLING AND IS TOO SOFT NEED TO REMOVE THE PATCH AND REDO THE PATCH SO IT DOESN'T CRUMBLE APART. ---------------------------------------------------------------------------- 6/26/2024 - PREVIOUS INSPECTION NOTES 6/17/2024 - PREVIOUS INSPECTION NOTES ** 06/17/24 NEED TO CLEAN OUT CULVERT ENDS OF OVERPOURED CONCRETE AS INDICATED IN THE INSPECTION CONDUCTED ON 06/05/24 _________________________________________________________________________________________________________________ 6/5/2024 - PREVIOUS INSPECTION NOTES ** 06/05/24 NEED TO HAVE HOT PATCH ROAD REPAIR IN PLACE FOR AFTER POUR AT DRIVEWAYS EDGE AND ALONG BUTTONWORTH (SEE ALL WHITE PAINTED AREAS) ** CLEAN OUT CULVERTS OF OVER POURED CONCRETE AND DEBRIS | |||
| U - SEWER TIE IN | 07/03/2024 | PARTIALLY APPROVED | MGIBSON |
| Note: READ GRAVITY SEWER NOTE | |||
| GRAVITY SEWER TEST | 07/03/2024 | PARTIALLY APPROVED | MGIBSON |
| Note: THIS IS A DUPLEX ONLY ONE SIDE IS DONE TESTED AND APPROVED DUE TO HAVING TO TUNNEL UNDER DRIVEWAY | |||
| ROW - FINAL APRON (AFTER POUR) | 06/26/2024 | CANCELLED BY APPLICANT | EMADISON |
| Note: 6/17/2024 - PREVIOUS INSPECTION NOTES ** 06/17/24 NEED TO CLEAN OUT CULVERT ENDS OF OVERPOURED CONCRETE AS INDICATED IN THE INSPECTION CONDUCTED ON 06/05/24 _________________________________________________________________________________________________________________ 6/5/2024 - PREVIOUS INSPECTION NOTES ** 06/05/24 NEED TO HAVE HOT PATCH ROAD REPAIR IN PLACE FOR AFTER POUR AT DRIVEWAYS EDGE AND ALONG BUTTONWORTH (SEE ALL WHITE PAINTED AREAS) ** CLEAN OUT CULVERTS OF OVER POURED CONCRETE AND DEBRIS | |||
| ROW - FINAL APRON (AFTER POUR) | 06/17/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 06/17/24 NEED TO CLEAN OUT CULVERT ENDS OF OVERPOURED CONCRETE AS INDICATED IN THE INSPECTION CONDUCTED ON 06/05/24 _________________________________________________________________________________________________________________ 6/5/2024 - PREVIOUS INSPECTION NOTES ** 06/05/24 NEED TO HAVE HOT PATCH ROAD REPAIR IN PLACE FOR AFTER POUR AT DRIVEWAYS EDGE AND ALONG BUTTONWORTH (SEE ALL WHITE PAINTED AREAS) ** CLEAN OUT CULVERTS OF OVER POURED CONCRETE AND DEBRIS | |||
| ROW - FINAL APRON (AFTER POUR) | 06/05/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 06/05/24 NEED TO HAVE HOT PATCH ROAD REPAIR IN PLACE FOR AFTER POUR AT DRIVEWAYS EDGE AND ALONG BUTTONWORTH (SEE ALL WHITE PAINTED AREAS) ** CLEAN OUT CULVERTS OF OVER POURED CONCRETE AND DEBRIS | |||
| ROW - FINAL INSPECTION | 06/05/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 06/05/24 BUILDER NEEDS TO READ ALL NOTES LEFT IN FIELD SURVEY BEFORE FINAL ROW STORMWATER CAN BE APPROVED THOSE NOTES ALSO TRANSFERED OVER TO THIS INSPECTION ** 06/04/24 NEED TO REMOVE HIGH SPOT ON LEFT SIDE IN ROW NEAR POWER POLE ** NEED TO REMOVE SOD AWAY FROM FENCE 4 INCHES ON LEFT SIDE ** LEFT SIDE ALONG FENCE NEAR REAR NOTE WHITE PAINT OUTLINING A LARGE LOW AREA ALONG FENCE NEED TO FILL AND SOD ENSURE THE BERM ALONG ENTIRE LEFT SIDE IS A MINIMUM OF .30 TENTHS FROM TOP TO THE BOTTOM OF DRAIANAGE CONVEYANCE ** NEED A 2:1 SLOPE ACROSS LEFT REAR PROPERTY LINE WHERE IT IS NOT FLAT AND SOD SLOP ** NOTE WHITE PAINT IN ALL AREAS WHERE ROAD REPAIR IS REQUIRED _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 ** 06/04/24 NEED TO REMOVE HIGH SPOT ON LEFT SIDE IN ROW NEAR POWER POLE ** NEED TO REMOVE SOD AWAY FROM FENCE 4 INCHES ON LEFT SIDE ** LEFT SIDE ALONG FENCE NEAR REAR NOTE WHITE PAINT OUTLINING A LARGE LOW AREA ALONG FENCE NEED TO FILL AND SOD ENSURE THE BERM ALONG ENTIRE LEFT SIDE IS A MINIMUM OF .30 TENTHS FROM TOP TO THE BOTTOM OF DRAIANAGE CONVEYANCE ** NEED A 2:1 SLOPE ACROSS LEFT REAR PROPERTY LINE WHERE IT IS NOT FLAT AND SOD SLOP ** NOTE WHITE PAINT IN ALL AREAS WHERE ROAD REPAIR IS REQUIRED | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/04/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 06/04/24 NEED TO REMOVE HIGH SPOT ON LEFT SIDE IN ROW NEAR POWER POLE ** NEED TO REMOVE SOD AWAY FROM FENCE 4 INCHES ON LEFT SIDE ** LEFT SIDE ALONG FENCE NEAR REAR NOTE WHITE PAINT OUTLINING A LARGE LOW AREA ALONG FENCE NEED TO FILL AND SOD ENSURE THE BERM ALONG ENTIRE LEFT SIDE IS A MINIMUM OF .30 TENTHS FROM TOP TO THE BOTTOM OF DRAIANAGE CONVEYANCE ** NEED A 2:1 SLOPE ACROSS LEFT REAR PROPERTY LINE WHERE IT IS NOT FLAT AND SOD SLOP ** NOTE WHITE PAINT IN ALL AREAS WHERE ROAD REPAIR IS REQUIRED | |||
| FINAL SURVEY (OFFICE USE ONLY) | 06/04/2024 | APPROVED | EMADISON |
| Note: | |||
| FINAL SURVEY (OFFICE USE ONLY) | 05/30/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 06/03/24 BUILDER NEEDS TO PROVIDE A FINAL SURVEY THAT CAPTURES THE DRAINAGE OF THE PROPERTY WITH ACTUAL ELEVATION SHOTS NO FLOW ARROWS ARE NEEDED ** YOU HAVE PROVIDED A COPY OF A SITE PLAN WITH PROPOSED | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/23/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 05/23/24 BUILDER NEEDS TO SUBMITTED A FINAL SURVEY DOCUMENT THAT NEEDS TO BE APPROVED BEFORE A FIELD SURVEY INSPECTION CAN BE CONDUCTED | |||
| ELECTRIC - EARLY POWER | 05/21/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 5/21/2024 10:33:09 AM *** Authorize release of email to FPL @ 10:33a 5/13/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 5/13/2024 9:35:40 AM *** 5/13/24- Ac Power is not safed off at AHU on A side, No caps and AHU has no covers protecting live parts. 5/9/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 5/9/2024 2:01:27 PM *** 1. Both sides, Please place romex into holding box with cap at range exhaust, disposal/dishwasher. NEC 230.62 / 110.27 2. Both sides, Please safe off and place in holding box with cap at Hot water, and AHU. NEC 230.62 / 110.27 3. Please post Address. R319.1 Address identification… 4. Please label meter/Main disconnect with unit side (A and B). Inspector Notes from Inspection 2170 1/12/24- Building Dept will be doing frequent status inspection Moving Forward. Authorize release of email to FPL @ 9:14a 1/10/2024 - PREVIOUS INSPECTION NOTES 1/10/24- Timeline to Early Power inspection to close for a temporary Power Pole. | |||
| ELECTRIC - EARLY POWER | 05/13/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 5/13/2024 9:35:40 AM *** 5/13/24- Ac Power is not safed off at AHU on A side, No caps and AHU has no covers protecting live parts. 5/9/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 5/9/2024 2:01:27 PM *** 1. Both sides, Please place romex into holding box with cap at range exhaust, disposal/dishwasher. NEC 230.62 / 110.27 2. Both sides, Please safe off and place in holding box with cap at Hot water, and AHU. NEC 230.62 / 110.27 3. Please post Address. R319.1 Address identification… 4. Please label meter/Main disconnect with unit side (A and B). Inspector Notes from Inspection 2170 1/12/24- Building Dept will be doing frequent status inspection Moving Forward. Authorize release of email to FPL @ 9:14a 1/10/2024 - PREVIOUS INSPECTION NOTES 1/10/24- Timeline to Early Power inspection to close for a temporary Power Pole. | |||
| ELECTRIC - EARLY POWER | 05/09/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 5/9/2024 2:01:27 PM *** 1. Both sides, Please place romex into holding box with cap at range exhaust, disposal/dishwasher. NEC 230.62 / 110.27 2. Both sides, Please safe off and place in holding box with cap at Hot water, and AHU. NEC 230.62 / 110.27 3. Please post Address. R319.1 Address identification… 4. Please label meter/Main disconnect with unit side (A and B). Inspector Notes from Inspection 2170 1/12/24- Building Dept will be doing frequent status inspection Moving Forward. Authorize release of email to FPL @ 9:14a 1/10/2024 - PREVIOUS INSPECTION NOTES 1/10/24- Timeline to Early Power inspection to close for a temporary Power Pole. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/02/2024 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 9270 04/29/24 READY TO POUR ** READY TO POUR BUILDERS RESPONSIBILITY TO ENSURE CULVERT ELEVATION IS WITHIN TOLERANCE BEFORE THE POUR IN THE EVENT OF RAIN CHECK COMPACTION OF MATERIAL **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ____________________________________________________________________________________________________________________ 4/26/2024 - PREVIOUS INSPECTION NOTES ** 04/26/24 HOMEOWNER ON SITE REQUESTING WITH BUILDER HE WANTS DRIVEWAY AREA TO BE 5 INCHES OF CONCRETE OVER COMPACTED MATERIAL REQUESTED TO CANCEL THIS INSPECTION UNTIL CORRECTIONS HAVE BEEN MADE. ** CHECK MITERED ENDS FOR A MINIMUM OF 2 INCHES OF CONCRETE OVER MTERED ENDS ** RAISE FORM BOARDS AT EDGE OF ROAD SO THE ARE APPROXIMATELY 1/2 INCH TO 1 INCHE ABOVE EDGE OF ROADWAY ** SPOKE WITH JULIE IN OFFICE WHO AGREED TO CANCEL INSPECTIONS UNTIL HOMEOWNERS REQUEST HAVE BEEN MET ______________________________________________________________________________________________________________________ New inspection due to canceled inspection 4/24/2024 - PREVIOUS INSPECTION NOTES | |||
| ROW- PRE-APRON (PRE-POUR) | 04/29/2024 | APPROVED - AS NOTED | EMADISON |
| Note: 04/29/24 READY TO POUR ** READY TO POUR BUILDERS RESPONSIBILITY TO ENSURE CULVERT ELEVATION IS WITHIN TOLERANCE BEFORE THE POUR IN THE EVENT OF RAIN CHECK COMPACTION OF MATERIAL **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ____________________________________________________________________________________________________________________ 4/26/2024 - PREVIOUS INSPECTION NOTES ** 04/26/24 HOMEOWNER ON SITE REQUESTING WITH BUILDER HE WANTS DRIVEWAY AREA TO BE 5 INCHES OF CONCRETE OVER COMPACTED MATERIAL REQUESTED TO CANCEL THIS INSPECTION UNTIL CORRECTIONS HAVE BEEN MADE. ** CHECK MITERED ENDS FOR A MINIMUM OF 2 INCHES OF CONCRETE OVER MTERED ENDS ** RAISE FORM BOARDS AT EDGE OF ROAD SO THE ARE APPROXIMATELY 1/2 INCH TO 1 INCHE ABOVE EDGE OF ROADWAY ** SPOKE WITH JULIE IN OFFICE WHO AGREED TO CANCEL INSPECTIONS UNTIL HOMEOWNERS REQUEST HAVE BEEN MET ______________________________________________________________________________________________________________________ New inspection due to canceled inspection 4/24/2024 - PREVIOUS INSPECTION NOTES | |||
| ROW- PRE-APRON (PRE-POUR) | 04/26/2024 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** 04/26/24 HOMEOWNER ON SITE REQUESTING WITH BUILDER HE WANTS DRIVEWAY AREA TO BE 5 INCHES OF CONCRETE OVER COMPACTED MATERIAL REQUESTED TO CANCEL THIS INSPECTION UNTIL CORRECTIONS HAVE BEEN MADE. ** CHECK MITERED ENDS FOR A MINIMUM OF 2 INCHES OF CONCRETE OVER MTERED ENDS ** RAISE FORM BOARDS AT EDGE OF ROAD SO THE ARE APPROXIMATELY 1/2 INCH TO 1 INCHE ABOVE EDGE OF ROADWAY ** SPOKE WITH JULIE IN OFFICE WHO AGREED TO CANCEL INSPECTIONS UNTIL HOMEOWNERS REQUEST HAVE BEEN MET ______________________________________________________________________________________________________________________ New inspection due to canceled inspection 4/24/2024 - PREVIOUS INSPECTION NOTES | |||
| ROW- PRE-APRON (PRE-POUR) | 04/25/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 4/24/2024 - PREVIOUS INSPECTION NOTES | |||
| ROW- PRE-APRON (PRE-POUR) | 04/24/2024 | CANCELLED BY APPLICANT | EMADISON |
| INSULATION | 03/27/2024 | APPROVED | FWILLIS |
| Note: 3/22/2024 - PREVIOUS INSPECTION NOTES | |||
| PEP TANK INSTALLATION REQUEST | 03/27/2024 | APPROVED | CBOWERMASTER |
| INSULATION | 03/22/2024 | CANCELLED BY APPLICANT | MKRASKI |
| ALL ROUGH | 03/22/2024 | APPROVED | MKRASKI |
| ALL ROUGH | 03/18/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 3/18/24- Previous notes not rectified........3. Please check all Romex to be fastened with 12" of entering Holding box ( A side at front bedroom outlet, and 3way switch at pass thru to hallway.) 5. Please install strap for TP at Dryer duct for more then 40% Notched, and install approved shield (nail plate) both sides. M1308.2 PROTECTION FROM PHYSICAL DAMAGE (Duct is outside of wall 2x4 wall). Both units. 6. Please install gasket seal at the face of all supply and return registers.FBEC R402.4.1.1 in addition....side A- Wall at master bath and master closet needs anchored to floor Moving and on a angle. Side B- Refridgerator water supply needs to be installed in wall and secured and shield protected if need be. 3/12/2024 - PREVIOUS INSPECTION NOTES 3/12/24- Side B......1. Kitchen Exhaust duct needs removed and relocated, and fire rated plywood repaired. per plans no penetration within 4ft of fire wall. 2. Living room wall outlet Romex sheathing needs to enter holding box min 1/4". (exposed wireing) 314.17(B) Metal Boxes and Conduit Bodies 3. Please check all Romex to be fastened with 12" of entering Holding box. 4. Nail plates at romex running horizontal to the vertical screwing pattern. FBC E3802.1 5. Please install strap for TP at Dryer duct for more then 40% Notched, and install approved shield (nail plate) both sides. M1308.2 PROTECTION FROM PHYSICAL DAMAGE 6. Please install gasket seal at the face of all supply and return registers.FBEC R402.4.1.1 7. Please install Mechanical fastener (ex. zip tie) at all bathroom exhaust duct connection to fan assembly. 8. Please have all ducts properly sealed at vents and Plenums. Side B.....Please use notes above for both sides. Stopped Inspection, Please walk the Building and Bring to Code Compliance. 1/12/2024 - PREVIOUS INSPECTION NOTES | |||
| ALL ROUGH | 03/12/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 3/12/24- Side B......1. Kitchen Exhaust duct needs removed and relocated, and fire rated plywood repaired. per plans no penetration within 4ft of fire wall. 2. Living room wall outlet Romex sheathing needs to enter holding box min 1/4". (exposed wireing) 314.17(B) Metal Boxes and Conduit Bodies 3. Please check all Romex to be fastened with 12" of entering Holding box. 4. Nail plates at romex running horizontal to the vertical screwing pattern. FBC E3802.1 5. Please install strap for TP at Dryer duct for more then 40% Notched, and install approved shield (nail plate) both sides. M1308.2 PROTECTION FROM PHYSICAL DAMAGE 6. Please install gasket seal at the face of all supply and return registers.FBEC R402.4.1.1 7. Please install Mechanical fastener (ex. zip tie) at all bathroom exhaust duct connection to fan assembly. 8. Please have all ducts properly sealed at vents and Plenums. Side B.....Please use notes above for both sides. Stopped Inspection, Please walk the Building and Bring to Code Compliance. 1/12/2024 - PREVIOUS INSPECTION NOTES | |||
| LATH/BRICK/ WATER BARRIER | 03/06/2024 | APPROVED | JSTEWART |
| Note: 3/4/2024 - PREVIOUS INSPECTION NOTES 3/4/24- 1. Please fill and repair Blown out block above window right side. 2. Please install mesh at large hole right side. 3. Please install water barrier (flashing) at Front entry doors per plans sheet #8 (Step #6). R703.4 (1) Flashing | |||
| FIREWALL FRAMING | 03/05/2024 | APPROVED | KSANDOE |
| LATH/BRICK/ WATER BARRIER | 03/04/2024 | Disapproved - NO FEE | JSTEWART |
| Note: 3/4/24- 1. Please fill and repair Blown out block above window right side. 2. Please install mesh at large hole right side. 3. Please install water barrier (flashing) at Front entry doors per plans sheet #8 (Step #6). R703.4 (1) Flashing | |||
| FIREWALL FINAL | 02/26/2024 | APPROVED | FWILLIS |
| Note: 2/9/2024 - PREVIOUS INSPECTION NOTES 2/9/24- Please Sleeve with steel Pipe the firewall penetration of the breaker panel service power line, penetrating the firewall. per R032.4.1, R302.4.1.2, Ul 1479 | |||
| FIREWALL FINAL | 02/09/2024 | Disapproved - NO FEE | JSTEWART |
| Note: 2/9/24- Please Sleeve with steel Pipe the firewall penetration of the breaker panel service power line, penetrating the firewall. per R032.4.1, R302.4.1.2, Ul 1479 | |||
| FIREWALL DRYWALL NAILING | 02/06/2024 | APPROVED | FWILLIS |
| ALL ROUGH | 01/12/2024 | CANCELLED BY APPLICANT | JSTEWART |
| Note: 1/12/24- Not ready | |||
| ELECTRIC TEMP POLE | 01/12/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: 1/12/24- Building Dept will be doing frequent status inspection Moving Forward. Authorize release of email to FPL @ 9:14a 1/10/2024 - PREVIOUS INSPECTION NOTES 1/10/24- Timeline to Early Power inspection to close for a temporary Power Pole. | |||
| ELECTRIC TEMP POLE | 01/10/2024 | Disapproved - NO FEE | JSTEWART |
| Note: 1/10/24- Timeline to Early Power inspection to close for a temporary Power Pole. | |||
| TUB SET | 01/08/2024 | CANCELLED BY INSPECTOR | MGIBSON |
| Note: BUILDING DEPARTMENT DOES NOT DO ONE&TWO FAMILY SINGLE TRADE INSPECTIONS, PLEASE SCHEDUAL A ALLROUGH INSPECTION | |||
| TUB SET | 01/04/2024 | CANCELLED BY INSPECTOR | MGIBSON |
| Note: CAN BE LOOKED AT ALL ROUGH INSPECTION | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/12/2023 | APPROVED | TSTAUFFACHER |
| Note: 7/5/2023 - PREVIOUS INSPECTION NOTES 6/14/2023 - PREVIOUS INSPECTION NOTES 6/14/23--Previous notes not rectified....Left side-front entry Hip H5 missing tapcons in strap, Girder in garage strap not properly nailed. Right side-Front entry Hip H5 missing tapcons in strap. R319.1 Address identification. Buildings shall be provided with approved address identification. 6/6/2023 - PREVIOUS INSPECTION NOTES 6/6/2023-previous notes partialy rectified........Left side-front entry Hip H5 missing tapcons in strap, Girder in garage strap not properly nailed. Right side-ront entry Hip H5 missing tapcons in strap. R319.1 Address identification. Buildings shall be provided with approved address identificatio New inspection due to canceled inspection 5/30/2023 - PREVIOUS INSPECTION NOTES Tiedowns on built up columns missing. Both units. Left Plans in garage, Hornets nest in construction box. 7/5/23 - 2 HORNETS NEST IN CONSTERUCTION BOX. NO APPROVED DRAWINGS ON SITE. MANUF. SPECS, TWIST STRAPS CANNOT BE HAMMERED AND BENT. MISSING THE ADDRESS ON BUILDING AS REQUIRED BY EMERGENCY SERVICES AND CODE ADDRESS NUMBERS, SITE ADDRESS NUMBERS FBC R319.1 4 INCH MINIMUM WITH .5 INCH STROKE WIDTH | |||
| ROOF VALLEY & METAL | 07/12/2023 | APPROVED | TSTAUFFACHER |
| Note: Approved with tie downs | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/05/2023 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: 6/14/2023 - PREVIOUS INSPECTION NOTES 6/14/23--Previous notes not rectified....Left side-front entry Hip H5 missing tapcons in strap, Girder in garage strap not properly nailed. Right side-Front entry Hip H5 missing tapcons in strap. R319.1 Address identification. Buildings shall be provided with approved address identification. 6/6/2023 - PREVIOUS INSPECTION NOTES 6/6/2023-previous notes partialy rectified........Left side-front entry Hip H5 missing tapcons in strap, Girder in garage strap not properly nailed. Right side-ront entry Hip H5 missing tapcons in strap. R319.1 Address identification. Buildings shall be provided with approved address identificatio New inspection due to canceled inspection 5/30/2023 - PREVIOUS INSPECTION NOTES Tiedowns on built up columns missing. Both units. Left Plans in garage, Hornets nest in construction box. 7/5/23 - 2 HORNETS NEST IN CONSTERUCTION BOX. NO APPROVED DRAWINGS ON SITE. MANUF. SPECS, TWIST STRAPS CANNOT BE HAMMERED AND BENT. MISSING THE ADDRESS ON BUILDING AS REQUIRED BY EMERGENCY SERVICES AND CODE ADDRESS NUMBERS, SITE ADDRESS NUMBERS FBC R319.1 4 INCH MINIMUM WITH .5 INCH STROKE WIDTH | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/14/2023 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 6/14/23--Previous notes not rectified....Left side-front entry Hip H5 missing tapcons in strap, Girder in garage strap not properly nailed. Right side-Front entry Hip H5 missing tapcons in strap. R319.1 Address identification. Buildings shall be provided with approved address identification. 6/6/2023 - PREVIOUS INSPECTION NOTES 6/6/2023-previous notes partialy rectified........Left side-front entry Hip H5 missing tapcons in strap, Girder in garage strap not properly nailed. Right side-ront entry Hip H5 missing tapcons in strap. R319.1 Address identification. Buildings shall be provided with approved address identificatio New inspection due to canceled inspection 5/30/2023 - PREVIOUS INSPECTION NOTES Tiedowns on built up columns missing. Both units. Left Plans in garage, Hornets nest in construction box. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/06/2023 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 6/6/2023-previous notes partialy rectified........Left side-front entry Hip H5 missing tapcons in strap, Girder in garage strap not properly nailed. Right side-ront entry Hip H5 missing tapcons in strap. R319.1 Address identification. Buildings shall be provided with approved address identificatio New inspection due to canceled inspection 5/30/2023 - PREVIOUS INSPECTION NOTES Tiedowns on built up columns missing. Both units. Left Plans in garage, Hornets nest in construction box. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 06/02/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 5/30/2023 - PREVIOUS INSPECTION NOTES Tiedowns on built up columns missing. Both units. Left Plans in garage, Hornets nest in construction box. | |||
| WALL SHEATHING | 05/30/2023 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 05/30/2023 | Disapproved - NO FEE | FWILLIS |
| Note: Tiedowns on built up columns missing. Both units. Left Plans in garage, Hornets nest in construction box. | |||
| FOUND SURVEY APPROVED (OFFICE) | 05/25/2023 | APPROVED | TBAKER |
| GRAVITY SEWER TEST | 05/18/2023 | CANCELLED BY APPLICANT | WEB |
| U - SEWER TIE IN | 05/18/2023 | CANCELLED BY APPLICANT | WEB |
| TIE BEAM / LINTEL | 12/06/2022 | APPROVED | DCUSHING |
| MONOLITHIC SLAB | 10/11/2022 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/05/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 08/09/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| SW1 | COMPLETE | 01/03/2024 | 01/09/2024 |
| Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/03/2024 | 01/04/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/03/2024 | 01/03/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 05/23/2023 | 05/24/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 05/23/2023 | 05/31/2023 |
| Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM The subject lots drainage must not negatively impact any adjacent property. (B) the water is affcting the adjacent lot in the back | |||
| ZON | COMPLETE | 05/23/2023 | 05/23/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/03/2022 | 11/03/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 11/03/2022 | 11/08/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/03/2022 | 11/03/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 10/25/2022 | 10/25/2022 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Slab elevation on foundation survey is 1.22' higher than that of approved site plan. Please revise the appropriate drawing and resubmit. | |||
| ZON | COMPLETE | 10/25/2022 | 10/25/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 08/04/2022 | 08/04/2022 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM NOC is not recorded | |||
| BADMIN | INFORMATION | 08/04/2022 | 08/04/2022 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM NOC NOTARIZED INCORRECTLY AT BOTTM. MUST BE RE-RECORDED WITH FLAGLER COUNTY CLERK OF COURT WITH DIFFERENT INSTRUMENT # (2022040197) | |||
| ELEC | COMPLETE | 06/20/2022 | 06/21/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/20/2022 | 06/21/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 06/02/2022 | 08/17/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/01/2022 | 06/02/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 06/01/2022 | 06/03/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | HOLD | 06/01/2022 | 06/03/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Submit electric load calcs | |||
| ENGIN1 | COMPLETE | 06/01/2022 | 06/02/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/01/2022 | 06/07/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/01/2022 | 06/02/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/01/2022 | 06/13/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/01/2022 | 06/03/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/22/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/22/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/22/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/22/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/22/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/22/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/22/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/22/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/22/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/22/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 07/22/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 07/22/2024 |
| CONTRACTOR CHANGE | ¤40.00 | 07/22/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/22/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/22/2024 |
| EXTENSION | ¤40.00 | 07/22/2024 |
| INSPECTION - RESIDENTIAL | ¤926.75 | 07/21/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤262.86 | 07/21/2022 |
| WATER- TURN ON | ¤50.00 | 07/21/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/21/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/21/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/21/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤82.14) | 07/21/2022 |
| SEWER CREDIT | (¤1,700.00) | 07/21/2022 |
| SEWER INSPECTION | ¤25.00 | 07/21/2022 |
| SEWER CAPITAL FACILITY | ¤9,879.52 | 07/21/2022 |
| WATER CAPITAL FACILITY FEE | ¤7,253.00 | 07/21/2022 |
| SITE PLAN 30 | ¤30.00 | 07/21/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤23.32) | 07/21/2022 |
| IMPACT FEE FIRE | ¤777.30 | 07/21/2022 |
| IMPACT FEE PARKS | ¤2,910.26 | 07/21/2022 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 07/21/2022 |
| IMPACT FEE TRANSPORTATION | ¤2,738.00 | 07/21/2022 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 07/21/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤87.31) | 07/21/2022 |
| SURCHARGE FS 533.721 | ¤10.12 | 07/21/2022 |
| SURCHARGE - FS 468.631 | ¤15.18 | 07/21/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/21/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/21/2022 |
| SW ENG PRE APRON | ¤30.00 | 07/21/2022 |
| CONNECTION FEES | ¤2,155.76 | 07/21/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤33,330.98 |