Permit #2022060354
Permit Details
Status: COED
| Parcel Id: 07-11-31-7015-00010-0340 |
| GARAGE: 696 sqft |
| CONDITIONED SPACE: 2545 sqft |
| OPENED PORCH (WITH ROOF) : 612 sqft |
| Total Square Footage: 3853 sqft |
| Block: 00010 |
| Subdivision: 2194 - SECTION 15-COUNTRY CLUB COVE |
| Job Phone: 386-627-0430 |
| Location Address: 3 CADILLAC PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/16/2022 |
| NOC: RECORDED |
| Applicant name: ANNA WIKTORIA LISOWSKI |
| Owner: GONCALVES ANTONIO F & MARIA M H&W |
|
Address 11 BARLEY LANE PALM COAST, FL 32137 |
| Lot: 0340 |
| Contracted Stated Job Value: ¤400,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
GOLDEN FOX HOME REMODELING, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
72 HERNANDEZ AVE PALM COAST, FL 32137 |
CBC1259266 (Exp: 08/31/2026) | 386-627-0430 |
Sub Contractors
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
DANIEL J LUSINSKI
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
389 PALM COAST PARKWAY SW PALM COAST, FL 32137 |
#4 PALM COAST, FL 32137 |
CCC1330133 (Exp: 08/31/2026) | 386-338-7926 |
WILLIAM TODD SIKES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
83 PORT ROYAL DR ST AUGUSTINE, FL 32084 |
EC0002726 (Exp: 08/31/2026) | 904-762-8762 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/14/2023 | FINAL APPROVED | TSTAUFFACHER |
| Note: 4/12/2023 - PREVIOUS INSPECTION NOTES 04-12-2023 1. Energy calcs do not match. Please revise to building department and have on site. 2. Outdoor kitchen plumbing drin lines cannot be test caps. 3. Multiple loose outlets. Check all. 4. Seal holes in garage. Inspection stopped. A complete inspection is required. | |||
| BLD - BUILDING FINAL | 04/12/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 04-12-2023 1. Energy calcs do not match. Please revise to building department and have on site. 2. Outdoor kitchen plumbing drin lines cannot be test caps. 3. Multiple loose outlets. Check all. 4. Seal holes in garage. Inspection stopped. A complete inspection is required. | |||
| U-CROSS CONNECTION | 04/06/2023 | APPROVED | DHANEY |
| U -UTILITY RESIDENTIAL FINAL | 04/06/2023 | FINAL APPROVED | DHANEY |
| U -UTILITY RESIDENTIAL FINAL | 04/05/2023 | CANCELLED BY APPLICANT | WEB |
| U-CROSS CONNECTION | 04/05/2023 | CANCELLED BY APPLICANT | WEB |
| ROW - FINAL APRON (AFTER POUR) | 03/22/2023 | APPROVED | FSLADISH |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/22/2023 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/22/2023 | APPROVED | FSLADISH |
| ROW - STORMWATER FINAL | 03/22/2023 | APPROVED | FSLADISH |
| Note: ** 03/22/23 LOOKED GOOD AT TIME OF INSPECTION. | |||
| ELECTRIC - EARLY POWER | 03/01/2023 | APPROVED - AS NOTED | TSTAUFFACHER |
| Note: Approved -release to FPL-03/01/2023-10:20 AM 2/28/2023 - PREVIOUS INSPECTION NOTES 2/27/2023 - PREVIOUS INSPECTION NOTES Main breaker was on prior to approval. House should not be connected prior to inspection 02-28-2023 1. Main breaker was on prior to approval. House should not be connected prior to inspection. 2. Kitchen cook top vent wire not saffed off. | |||
| ELECTRIC - EARLY POWER | 02/28/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 2/27/2023 - PREVIOUS INSPECTION NOTES Main breaker was on prior to approval. House should not be connected prior to inspection 02-28-2023 1. Main breaker was on prior to approval. House should not be connected prior to inspection. 2. Kitchen cook top vent wire not saffed off. | |||
| ELECTRIC - EARLY POWER | 02/27/2023 | Disapproved -FEE REQUIRED | TSTAUFFACHER |
| Note: Main breaker was on prior to approval. House should not be connected prior to inspection | |||
| GRAVITY SEWER TEST | 02/23/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 02/23/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 02/21/2023 | APPROVED | GBERTOLA |
| Note: 02/21/23=READY FOR PAVERS ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 2/14/2023 - PREVIOUS INSPECTION NOTES 2/14/23=NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB BASE OR PAVER BASE SAND, AND COMPACTION IS DONE BASE CAN NO LONGER BE ON SITE IN A PILE. BASE MUST BE SPREAD AND COMPACTED FOR THE SECOND PART OF A PRE-POUR FOR PAVER’S TO BE APPROVED AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL 2/13/2023 - PREVIOUS INSPECTION NOTES CULVERT PIPE IS STILL OUT OF TOLERANCE --------------------------------------------------------------------------------- 2/6/2023 - PREVIOUS INSPECTION NOTES 1) THE SITE PLAN SHOWS A CONCRETE DRIVEWAY NEED TO HAVE THE SITE PLAN SHOW THAT IT IS A CONCRETE/PAVER DRIVE AND SHOW WHERE THE PAVERS ARE GOING IN ON THE DRIVEWAY. SO WE CAN INSPECT IT PROPERLY 2) THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL | |||
| ROW- PAVER RESTRAINTS | 02/14/2023 | APPROVED | GBERTOLA |
| Note: READY TO POUR | |||
| ROW- PRE-APRON (PRE-POUR) | 02/14/2023 | PARTIALLY APPROVED | GBERTOLA |
| Note: 2/14/23=NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB BASE OR PAVER BASE SAND, AND COMPACTION IS DONE BASE CAN NO LONGER BE ON SITE IN A PILE. BASE MUST BE SPREAD AND COMPACTED FOR THE SECOND PART OF A PRE-POUR FOR PAVER’S TO BE APPROVED AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL 2/13/2023 - PREVIOUS INSPECTION NOTES CULVERT PIPE IS STILL OUT OF TOLERANCE --------------------------------------------------------------------------------- 2/6/2023 - PREVIOUS INSPECTION NOTES 1) THE SITE PLAN SHOWS A CONCRETE DRIVEWAY NEED TO HAVE THE SITE PLAN SHOW THAT IT IS A CONCRETE/PAVER DRIVE AND SHOW WHERE THE PAVERS ARE GOING IN ON THE DRIVEWAY. SO WE CAN INSPECT IT PROPERLY 2) THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL | |||
| ROW- PRE-APRON (PRE-POUR) | 02/13/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: CULVERT PIPE IS STILL OUT OF TOLERANCE --------------------------------------------------------------------------------- 2/6/2023 - PREVIOUS INSPECTION NOTES 1) THE SITE PLAN SHOWS A CONCRETE DRIVEWAY NEED TO HAVE THE SITE PLAN SHOW THAT IT IS A CONCRETE/PAVER DRIVE AND SHOW WHERE THE PAVERS ARE GOING IN ON THE DRIVEWAY. SO WE CAN INSPECT IT PROPERLY 2) THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL | |||
| ROW- PRE-APRON (PRE-POUR) | 02/06/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) THE SITE PLAN SHOWS A CONCRETE DRIVEWAY NEED TO HAVE THE SITE PLAN SHOW THAT IT IS A CONCRETE/PAVER DRIVE AND SHOW WHERE THE PAVERS ARE GOING IN ON THE DRIVEWAY. SO WE CAN INSPECT IT PROPERLY 2) THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL | |||
| LATH/BRICK/ WATER BARRIER | 12/07/2022 | APPROVED | AGAETANO |
| INSULATION | 12/01/2022 | APPROVED | FWILLIS |
| ALL ROUGH | 11/03/2022 | APPROVED | AGAETANO |
| ROOF VALLEY & METAL | 10/27/2022 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2460 10-14-2022 Piggy back trusses not installed as per specs. NP37 plates not installed. Superintendent on site and will address. | |||
| ELECTRIC-TUG | 10/21/2022 | APPROVED | AGAETANO |
| WALL SHEATHING | 10/14/2022 | APPROVED | AGAETANO |
| Note: Wall sheathing not needed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/14/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: 10-14-2022 Piggy back trusses not installed as per specs. NP37 plates not installed. Superintendent on site and will address. | |||
| TIE BEAM / LINTEL | 08/24/2022 | APPROVED | AGAETANO |
| FOUND SURVEY APPROVED (OFFICE) | 08/23/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/03/2022 | APPROVED | DCUSHING |
| Note: THIS IS A REINSPECTION Compaction test not posted. | |||
| MONOLITHIC SLAB | 08/02/2022 | Disapproved - NO FEE | AGAETANO |
| Note: Compaction test not posted. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/25/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 07/11/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 04/13/2023 | 04/13/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/10/2023 | 02/10/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Electronic copy approved. Please turn in original right of way for recording. | |||
| ZON | COMPLETE | 02/10/2023 | 02/10/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 02/06/2023 | 02/06/2023 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 02/06/2023 | 02/10/2023 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 02/06/2023 | 02/06/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide a right of way agreement for pavers signed by all owners and notarized. Once electronic copy is approved original will need to be turned into us for recording. | |||
| ENGIN1 | COMPLETE | 08/23/2022 | 08/23/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/23/2022 | 08/23/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/13/2022 | 06/14/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/13/2022 | 06/15/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/06/2022 | 06/10/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 06/06/2022 | 06/07/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 06/06/2022 | 06/07/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/06/2022 | 06/06/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/06/2022 | 06/13/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/06/2022 | 06/07/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/06/2022 | 06/13/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/06/2022 | 06/08/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM floor plan : Is missing all detailed information please label all areas | |||
| SWALE | COMPLETE | 06/06/2022 | 08/30/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 04/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/12/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/12/2023 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 04/12/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/12/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/12/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/16/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/16/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 06/16/2022 |
| SEWER INSPECTION | ¤25.00 | 06/16/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 06/16/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 06/16/2022 |
| SITE PLAN 30 | ¤30.00 | 06/16/2022 |
| WATER-METER | ¤467.09 | 06/16/2022 |
| WATER- TURN ON | ¤25.00 | 06/16/2022 |
| WATER- TURN ON | ¤25.00 | 06/16/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/16/2022 |
| INSPECTION - RESIDENTIAL | ¤1,100.00 | 06/16/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤312.00 | 06/16/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 06/16/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/16/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/16/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 06/16/2022 |
| SURCHARGE FS 533.721 | ¤11.90 | 06/16/2022 |
| SURCHARGE - FS 468.631 | ¤17.85 | 06/16/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/16/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/16/2022 |
| SW ENG PRE APRON | ¤30.00 | 06/16/2022 |
| CONNECTION FEES | ¤1,077.88 | 06/16/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 06/16/2022 |
| IMPACT FEE FIRE | ¤388.65 | 06/16/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 06/16/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/16/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤19,404.03 |