Permit #2022061189
Permit Details
Status: COED
| Parcel Id: 07-11-31-7039-00050-0020 |
| CONDITIONED SPACE: 1517 sqft |
| GARAGE: 394 sqft |
| Total Square Footage: 1911 sqft |
| Block: 00050 |
| Subdivision: 2228 - SECTION 39-PINE GROVE |
| Job Phone: 475-276-4384 |
| Location Address: 33 PENINSULA LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/14/2022 |
| NOC: RECORDED |
| Applicant name: WADE GILMER JURNEY JR |
| Owner: NATIONAL HOME CORPORATION |
|
Address 4850 TAMIAMI TRAIL NORTH NAPLES, FL 34103 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤207,853.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
NATIONAL HOME CORPORATION
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1080 HOLCOMB BRIDGE ROAD , |
BLDG 100 - 330 ROSWELL , GA 30076 |
CBC1257700 (Exp: 08/31/2026) | 471-817-1259 |
Sub Contractors
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JASON PATRICK RIBOCK
| Status | Location Address | State License Number | Phone |
| INACTIVE |
620 E PINE ST , 0 |
ES12001313 (Exp: 08/31/2026) | 407-625-0257 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
RANDALL SCOTT ROSENFELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
234 N WHITNEY ST PALM COAST, FL 32084 |
CAC1816641 (Exp: 08/31/2026) | 904-599-0082 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/27/2024 | FINAL APPROVED | KSANDOE |
| Note: 2/22/2024 - PREVIOUS INSPECTION NOTES 2/22/24: Cancelled by Applicant via text at @ 11:22. 2/21/2024 - PREVIOUS INSPECTION NOTES 2/21/24: Previously listed item 4 remains unresolved. 2/15/2024 - PREVIOUS INSPECTION NOTES 2/15/24: 1). A/C condenser pad needs to be leveled as required. M1305.1.4.1 Ground clearance. Equipment and appliances supported from the ground shall be level and firmly supported on a concrete slab or other approved material extending not less than 3 inches (76 mm) above the adjoining ground. Such support shall be in accordance with the manufacturer’s installation instructions. Appliances suspended from the floor shall have a clearance of not less than 6 inches (152 mm) from the ground. 2). Exterior temporary light cover needs to be weatherproof per NEC - 406.6 / 406.9(2E) 3). Water heater pan drain pipe needs to be protected from damage on the exterior. (left side yard area) P2603.2.1 4). Off ridge vents are not secured along the front flange as required by Manufacturer & FBC-R806.4 & R903.1. | |||
| BLD - BUILDING FINAL | 02/22/2024 | CANCELLED BY APPLICANT | RSIMS |
| Note: 2/22/24: Cancelled by Applicant via text at @ 11:22. 2/21/2024 - PREVIOUS INSPECTION NOTES 2/21/24: Previously listed item 4 remains unresolved. 2/15/2024 - PREVIOUS INSPECTION NOTES 2/15/24: 1). A/C condenser pad needs to be leveled as required. M1305.1.4.1 Ground clearance. Equipment and appliances supported from the ground shall be level and firmly supported on a concrete slab or other approved material extending not less than 3 inches (76 mm) above the adjoining ground. Such support shall be in accordance with the manufacturer’s installation instructions. Appliances suspended from the floor shall have a clearance of not less than 6 inches (152 mm) from the ground. 2). Exterior temporary light cover needs to be weatherproof per NEC - 406.6 / 406.9(2E) 3). Water heater pan drain pipe needs to be protected from damage on the exterior. (left side yard area) P2603.2.1 4). Off ridge vents are not secured along the front flange as required by Manufacturer & FBC-R806.4 & R903.1. | |||
| BLD - BUILDING FINAL | 02/21/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 2/21/24: Previously listed item 4 remains unresolved. 2/15/2024 - PREVIOUS INSPECTION NOTES 2/15/24: 1). A/C condenser pad needs to be leveled as required. M1305.1.4.1 Ground clearance. Equipment and appliances supported from the ground shall be level and firmly supported on a concrete slab or other approved material extending not less than 3 inches (76 mm) above the adjoining ground. Such support shall be in accordance with the manufacturer’s installation instructions. Appliances suspended from the floor shall have a clearance of not less than 6 inches (152 mm) from the ground. 2). Exterior temporary light cover needs to be weatherproof per NEC - 406.6 / 406.9(2E) 3). Water heater pan drain pipe needs to be protected from damage on the exterior. (left side yard area) P2603.2.1 4). Off ridge vents are not secured along the front flange as required by Manufacturer & FBC-R806.4 & R903.1. | |||
| BLD - BUILDING FINAL | 02/15/2024 | Disapproved - NO FEE | RSIMS |
| Note: 2/15/24: 1). A/C condenser pad needs to be leveled as required. M1305.1.4.1 Ground clearance. Equipment and appliances supported from the ground shall be level and firmly supported on a concrete slab or other approved material extending not less than 3 inches (76 mm) above the adjoining ground. Such support shall be in accordance with the manufacturer’s installation instructions. Appliances suspended from the floor shall have a clearance of not less than 6 inches (152 mm) from the ground. 2). Exterior temporary light cover needs to be weatherproof per NEC - 406.6 / 406.9(2E) 3). Water heater pan drain pipe needs to be protected from damage on the exterior. (left side yard area) P2603.2.1 4). Off ridge vents are not secured along the front flange as required by Manufacturer & FBC-R806.4 & R903.1. | |||
| U -UTILITY RESIDENTIAL FINAL | 02/12/2024 | FINAL APPROVED | LFITZGERALD |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/09/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. -------------------------------------------------------------------------------------------- 9/22/2023 - PREVIOUS INSPECTION NOTES 09/22/23 UPON WALKING THE PROPERTY A COUPLE OF ISSUES NEED TO BE ADDRESSED. THE RIGHT SIDE PROPERTY LINE THE HUMP NEEDS TO BE REMOVED AND A COMMON SWALE ATTAINED. Common Swale required when possible Sec 300.03 C1c Sec 300.03 C1c When grading against a developable vacant lot a 'Common Swale' (meaning the drainage conveyance is on the property line) is required. SWALE NEEDS TO MATCH GRADE ON BOTH PROPERTY LINE TO ALLOW POSITIVE FLOW. SPOKE TO CM ADN WENT OVER WHAT NEEDS TO BE ACCOMPLISHED. WILL MAKE CORRECTIONS. | |||
| ROW - STORMWATER FINAL | 02/09/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PROJECT STATUS | 02/09/2024 | APPROVED | PFLANAGAN |
| Note: MEET CM ON SITE FOR GRADE | |||
| ROW - FINAL APRON (AFTER POUR) | 02/09/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC TEMP POLE | 02/09/2024 | CANCELLED BY INSPECTOR | RMARTIN |
| Note: Inspector Notes from Inspection 2190 Emailed FPL @ 0817. Release Power | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/22/2023 | APPROVED | FSLADISH |
| Note: 9/21/2023 - PREVIOUS INSPECTION NOTES 09/21/23 NOTHING HAS CHANGED, YOU HAVE RESUBMITTED THE SAME SURVEY AS PREVIOUSLY WITH NO W SWALE ELEVATION SHOTS ON BOTH SIDE PROPERTY LINES AS REQUESTED AND CONFIRMED BY YOUR SURVEYOR THAT THESE WOULD BE PROVIDED, RECORDED AND SURVEY RESUBMITTED FOR REVIEW. 09/21/23 NOTED AFTER MAKING A SITE VISIT I DETERMINED THAT YOUR SURVEY DOES NOT MATCH WHAT IS IN THE FIELD. YOUR SURVEY SHOWS A COMMON SWALE ON BOTH SIDES. NEITHER HAVE A COMMON SWALE. WE CALLED THE SURVEYOR AND ALERTED THEM TO THIS DISCREPENCY AND WERE TOLD THAT SOMEONE WOULD GO OUT AND RESHOOT THE W SWALES. THE RIGHT SIDE WILL STILL NEED TO BE A COMMON SWALE, BUT WE STILL NEED THE SWALE ELEVATION SHOTS. NOT GOING TO FEE YOU TODAY. ________________________________________________________________________________________________________________________. 9/20/2023 - PREVIOUS INSPECTION NOTES 09/20/23 AFTER MAKING A SITE VISIT I DETERMINED THAT YOUR SURVEY DOES NOT MATCH WHAT IS IN THE FIELD. YOUR SUEVEY SHOWS A COMMON SWALE ON BOTH SIDES. NEITHER HAVE A COMMON SWALE. WE CALLED THE SURVEYOR AND ALERTED THEM TO THIS DISCREPENCY AND WERE TOLD THAT SOMEONE WOULD GO OUT AND RESHOOT THE W SWALES. THE RIGHT SIDE WILL STILL NEED TO BE A COMMON SWALE, BUT WE STILL NEED THE SWALE ELEVATION SHOTS. NOT GOING TO FEE YOU TODAY. 9/14/2023 - PREVIOUS INSPECTION NOTES 09/14/23 YOUR SWALE ELEVATION ON THE RIGHT SHOWS THE PROPERTY LINE 25.40 WHICH IS 4 TENTHS HIGHER THAN THE SHOT TO THE RIGHT OF IT INDICATING 25.00. THAT SHOWS UPHILL FLOW. ON THE LEFT SIDE COMING OUT OF THE DOWNSTREAM SIDE AT THE CULVERT YOU SHOW 24.7 GOING UPHILL TO 25.30 YOUR LAST SHOT AT PROPERTY LINE. THESE NUMBERS INDICATE THAT THE WATER WILL NOT HAVE POSITIVE FLOW. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/22/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 09/22/23 UPON WALKING THE PROPERTY A COUPLE OF ISSUES NEED TO BE ADDRESSED. THE RIGHT SIDE PROPERTY LINE THE HUMP NEEDS TO BE REMOVED AND A COMMON SWALE ATTAINED. Common Swale required when possible Sec 300.03 C1c Sec 300.03 C1c When grading against a developable vacant lot a 'Common Swale' (meaning the drainage conveyance is on the property line) is required. SWALE NEEDS TO MATCH GRADE ON BOTH PROPERTY LINE TO ALLOW POSITIVE FLOW. SPOKE TO CM ADN WENT OVER WHAT NEEDS TO BE ACCOMPLISHED. WILL MAKE CORRECTIONS. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/21/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 09/21/23 NOTHING HAS CHANGED, YOU HAVE RESUBMITTED THE SAME SURVEY AS PREVIOUSLY WITH NO W SWALE ELEVATION SHOTS ON BOTH SIDE PROPERTY LINES AS REQUESTED AND CONFIRMED BY YOUR SURVEYOR THAT THESE WOULD BE PROVIDED, RECORDED AND SURVEY RESUBMITTED FOR REVIEW. 09/21/23 NOTED AFTER MAKING A SITE VISIT I DETERMINED THAT YOUR SURVEY DOES NOT MATCH WHAT IS IN THE FIELD. YOUR SURVEY SHOWS A COMMON SWALE ON BOTH SIDES. NEITHER HAVE A COMMON SWALE. WE CALLED THE SURVEYOR AND ALERTED THEM TO THIS DISCREPENCY AND WERE TOLD THAT SOMEONE WOULD GO OUT AND RESHOOT THE W SWALES. THE RIGHT SIDE WILL STILL NEED TO BE A COMMON SWALE, BUT WE STILL NEED THE SWALE ELEVATION SHOTS. NOT GOING TO FEE YOU TODAY. ________________________________________________________________________________________________________________________. 9/20/2023 - PREVIOUS INSPECTION NOTES 09/20/23 AFTER MAKING A SITE VISIT I DETERMINED THAT YOUR SURVEY DOES NOT MATCH WHAT IS IN THE FIELD. YOUR SUEVEY SHOWS A COMMON SWALE ON BOTH SIDES. NEITHER HAVE A COMMON SWALE. WE CALLED THE SURVEYOR AND ALERTED THEM TO THIS DISCREPENCY AND WERE TOLD THAT SOMEONE WOULD GO OUT AND RESHOOT THE W SWALES. THE RIGHT SIDE WILL STILL NEED TO BE A COMMON SWALE, BUT WE STILL NEED THE SWALE ELEVATION SHOTS. NOT GOING TO FEE YOU TODAY. 9/14/2023 - PREVIOUS INSPECTION NOTES 09/14/23 YOUR SWALE ELEVATION ON THE RIGHT SHOWS THE PROPERTY LINE 25.40 WHICH IS 4 TENTHS HIGHER THAN THE SHOT TO THE RIGHT OF IT INDICATING 25.00. THAT SHOWS UPHILL FLOW. ON THE LEFT SIDE COMING OUT OF THE DOWNSTREAM SIDE AT THE CULVERT YOU SHOW 24.7 GOING UPHILL TO 25.30 YOUR LAST SHOT AT PROPERTY LINE. THESE NUMBERS INDICATE THAT THE WATER WILL NOT HAVE POSITIVE FLOW. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/20/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 09/20/23 AFTER MAKING A SITE VISIT I DETERMINED THAT YOUR SURVEY DOES NOT MATCH WHAT IS IN THE FIELD. YOUR SURVEY SHOWS A COMMON SWALE ON BOTH SIDES. NEITHER HAVE A COMMON SWALE. WE CALLED THE SURVEYOR AND ALERTED THEM TO THIS DISCREPENCY AND WERE TOLD THAT SOMEONE WOULD GO OUT AND RESHOOT THE W SWALES. THE RIGHT SIDE WILL STILL NEED TO BE A COMMON SWALE, BUT WE STILL NEED THE SWALE ELEVATION SHOTS. NOT GOING TO FEE YOU TODAY. 9/14/2023 - PREVIOUS INSPECTION NOTES 09/14/23 YOUR SWALE ELEVATION ON THE RIGHT SHOWS THE PROPERTY LINE 25.40 WHICH IS 4 TENTHS HIGHER THAN THE SHOT TO THE RIGHT OF IT INDICATING 25.00. THAT SHOWS UPHILL FLOW. ON THE LEFT SIDE COMING OUT OF THE DOWNSTREAM SIDE AT THE CULVERT YOU SHOW 24.7 GOING UPHILL TO 25.30 YOUR LAST SHOT AT PROPERTY LINE. THESE NUMBERS INDICATE THAT THE WATER WILL NOT HAVE POSITIVE FLOW. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/14/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 09/14/23 YOUR SWALE ELEVATION ON THE RIGHT SHOWS THE PROPERTY LINE 25.40 WHICH IS 4 TENTHS HIGHER THAN THE SHOT TO THE RIGHT OF IT INDICATING 25.00. THAT SHOWS UPHILL FLOW. ON THE LEFT SIDE COMING OUT OF THE DOWNSTREAM SIDE AT THE CULVERT YOU SHOW 24.7 GOING UPHILL TO 25.30 YOUR LAST SHOT AT PROPERTY LINE. THESE NUMBERS INDICATE THAT THE WATER WILL NOT HAVE POSITIVE FLOW. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. | |||
| ELECTRIC - EARLY POWER | 07/12/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 0817. Release Power | |||
| GRAVITY SEWER TEST | 07/12/2023 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 07/11/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION, C/M NEEDS TO SCHEDUAL GRAVITY SEWER FOR 7/12/23 | |||
| U-CROSS CONNECTION | 07/11/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ROW- PRE-APRON (PRE-POUR) | 05/16/2023 | APPROVED | FSLADISH |
| Note: 05/16/23 LOOKED GOOD AT TIME OF INSPECTION. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| INSULATION | 05/16/2023 | APPROVED | KSANDOE |
| Note: 5/2/2023 - PREVIOUS INSPECTION NOTES Submit revised electrical detail for 200a service Inspector Notes from Inspection 2420 Submit revised electrical detail for 200a service 3/22/2023 - PREVIOUS INSPECTION NOTES Overhead service wire has been corrected to match 200A breaker. Cannot connect 150A service wire from main panel to sub panel. Building plans still reflect 150A service. 3/16/2023 - PREVIOUS INSPECTION NOTES Breaker and service wire still need to be addressed 3/10/2023 - PREVIOUS INSPECTION NOTES No change from previous inspection notes. Walk your jobs before scheduling inspections 3/6/2023 - PREVIOUS INSPECTION NOTES No mechanical installed Plans call for 150a service. 200a in panel. Wiring for overhead service must be sunlight resistant | |||
| INSULATION | 05/02/2023 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Submit revised electrical detail for 200a service Inspector Notes from Inspection 2420 Submit revised electrical detail for 200a service 3/22/2023 - PREVIOUS INSPECTION NOTES Overhead service wire has been corrected to match 200A breaker. Cannot connect 150A service wire from main panel to sub panel. Building plans still reflect 150A service. 3/16/2023 - PREVIOUS INSPECTION NOTES Breaker and service wire still need to be addressed 3/10/2023 - PREVIOUS INSPECTION NOTES No change from previous inspection notes. Walk your jobs before scheduling inspections 3/6/2023 - PREVIOUS INSPECTION NOTES No mechanical installed Plans call for 150a service. 200a in panel. Wiring for overhead service must be sunlight resistant | |||
| ELECTRIC TEMP POLE | 04/27/2023 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: No temp pole installed. Not ready for inspection | |||
| ALL ROUGH | 04/10/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Submit revised electrical detail for 200a service 3/22/2023 - PREVIOUS INSPECTION NOTES Overhead service wire has been corrected to match 200A breaker. Cannot connect 150A service wire from main panel to sub panel. Building plans still reflect 150A service. 3/16/2023 - PREVIOUS INSPECTION NOTES Breaker and service wire still need to be addressed 3/10/2023 - PREVIOUS INSPECTION NOTES No change from previous inspection notes. Walk your jobs before scheduling inspections 3/6/2023 - PREVIOUS INSPECTION NOTES No mechanical installed Plans call for 150a service. 200a in panel. Wiring for overhead service must be sunlight resistant | |||
| ALL ROUGH | 03/22/2023 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Overhead service wire has been corrected to match 200A breaker. Cannot connect 150A service wire from main panel to sub panel. Building plans still reflect 150A service. 3/16/2023 - PREVIOUS INSPECTION NOTES Breaker and service wire still need to be addressed 3/10/2023 - PREVIOUS INSPECTION NOTES No change from previous inspection notes. Walk your jobs before scheduling inspections 3/6/2023 - PREVIOUS INSPECTION NOTES No mechanical installed Plans call for 150a service. 200a in panel. Wiring for overhead service must be sunlight resistant | |||
| ALL ROUGH | 03/16/2023 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Breaker and service wire still need to be addressed 3/10/2023 - PREVIOUS INSPECTION NOTES No change from previous inspection notes. Walk your jobs before scheduling inspections 3/6/2023 - PREVIOUS INSPECTION NOTES No mechanical installed Plans call for 150a service. 200a in panel. Wiring for overhead service must be sunlight resistant | |||
| ALL ROUGH | 03/10/2023 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: No change from previous inspection notes. Walk your jobs before scheduling inspections 3/6/2023 - PREVIOUS INSPECTION NOTES No mechanical installed Plans call for 150a service. 200a in panel. Wiring for overhead service must be sunlight resistant | |||
| ALL ROUGH | 03/06/2023 | Disapproved - NO FEE | KSANDOE |
| Note: No mechanical installed Plans call for 150a service. 200a in panel. Wiring for overhead service must be sunlight resistant | |||
| ROOF VALLEY & METAL | 03/03/2023 | APPROVED | KSANDOE |
| Note: 2/21/2023 - PREVIOUS INSPECTION NOTES maximum spacing on nails at overlaps of 6 inches exceeded FBC-R Table 905.1.1 (2) | |||
| LATH/BRICK/ WATER BARRIER | 02/27/2023 | APPROVED | KSANDOE |
| ROOF VALLEY & METAL | 02/21/2023 | Disapproved -FEE REQUIRED | LMILLER |
| Note: maximum spacing on nails at overlaps of 6 inches exceeded FBC-R Table 905.1.1 (2) | |||
| WALL SHEATHING | 02/10/2023 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/10/2023 | APPROVED | TSTAUFFACHER |
| FOUND SURVEY APPROVED (OFFICE) | 02/09/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 01/30/2023 | APPROVED | KSANDOE |
| TIE BEAM / LINTEL | 01/27/2023 | CANCELLED BY APPLICANT | WEB |
| MONOLITHIC SLAB | 01/12/2023 | APPROVED | LMILLER |
| Note: 1/11/2023 - PREVIOUS INSPECTION NOTES Missing notice of termite treatment or intent Slab and footer areas need to be clear of roots and veg minimum 12" clean compacted earth. Root protruding into footer area in front of garage needs to be removed. 1-12-23 notes above resolved | |||
| MONOLITHIC SLAB | 01/11/2023 | Disapproved - NO FEE | KSANDOE |
| Note: Missing notice of termite treatment or intent Slab and footer areas need to be clear of roots and veg minimum 12" clean compacted earth. Root protruding into footer area in front of garage needs to be removed. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 01/05/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 09/06/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 09/21/2023 | 09/21/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM rename your files correctly. | |||
| BADMIN | INFORMATION | 06/22/2023 | 06/22/2023 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM NOC ILLEGIBLE | |||
| BADMIN | INFORMATION | 06/22/2023 | 06/22/2023 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM NOC ILLEGIBLE | |||
| BADMIN | INFORMATION | 06/16/2023 | 06/16/2023 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM NOC MISSING NOTARY AT BOTTOM | |||
| ENGIN1 | COMPLETE | 02/07/2023 | 02/09/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 02/07/2023 | 02/08/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/01/2022 | 07/01/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/01/2022 | 07/05/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/21/2022 | 06/23/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Plans submitted are noted as a Master Plan. There is no Master Plan on file. | |||
| CUSVC | COMPLETE | 06/21/2022 | 06/23/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 06/21/2022 | 06/21/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/21/2022 | 06/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/21/2022 | 06/24/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/21/2022 | 06/21/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/21/2022 | 06/28/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/21/2022 | 06/22/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide width of walkway on site plan/survey One additional 7 gallon shrub required around AC Plantings must wrap both corners of house Need four shrubs along the left side the ones by driveway do not count | |||
| SWALE | COMPLETE | 06/21/2022 | 09/19/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/26/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 02/14/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/25/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/25/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/13/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 04/13/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 04/13/2023 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 07/14/2022 |
| IMPACT FEE FIRE | ¤388.65 | 07/14/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 07/14/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/14/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 07/14/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/14/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 07/14/2022 |
| SURCHARGE FS 533.721 | ¤6.48 | 07/14/2022 |
| SURCHARGE - FS 468.631 | ¤9.72 | 07/14/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/14/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/14/2022 |
| SW ENG PRE APRON | ¤30.00 | 07/14/2022 |
| WATER- TURN ON | ¤25.00 | 07/14/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/14/2022 |
| INSPECTION - RESIDENTIAL | ¤572.00 | 07/14/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤162.24 | 07/14/2022 |
| CONNECTION FEES | ¤1,077.88 | 07/14/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/14/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/14/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 07/14/2022 |
| SEWER CREDIT | (¤2,465.75) | 07/14/2022 |
| SEWER INSPECTION | ¤25.00 | 07/14/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 07/14/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 07/14/2022 |
| SITE PLAN 30 | ¤30.00 | 07/14/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,873.38 |