Permit #2022061197

Permit Details

Status: COED

Parcel Id: 07-11-31-7031-00370-0180
CONDITIONED SPACE: 1517 sqft
GARAGE: 394 sqft
Total Square Footage: 1911 sqft
Block: 00370
Subdivision: 2166 - SECTION 31-ROYAL PALMS
Job Phone: 407-432-2344
Location Address: 2 RICHFIELD LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/25/2022
NOC: RECORDED
Applicant name: WADE GILMER JURNEY JR
Owner: NATIONAL HOME CORP

Address

4850 TAMIAMI TRAIL N

NAPLES, FL 34103

Lot: 0180
Contracted Stated Job Value: ¤209,353.00
Job Description: Single Family Residence
Type: CN

Contractor

NATIONAL HOME CORPORATION
Status Location Address Mailing Address State License Number Phone
INACTIVE

1080 HOLCOMB BRIDGE ROAD

,

BLDG 100 - 330

ROSWELL , GA 30076

CBC1257700 (Exp: 08/31/2026) 471-817-1259

Sub Contractors

DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JASON PATRICK RIBOCK
Status Location Address State License Number Phone
INACTIVE

620 E PINE ST

, 0

ES12001313 (Exp: 08/31/2026) 407-625-0257
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
RANDALL SCOTT ROSENFELD
Status Location Address State License Number Phone
ACTIVE

234 N WHITNEY ST

PALM COAST, FL 32084

CAC1816641 (Exp: 08/31/2026) 904-599-0082

Inspection History

Type Request Date Result Inspector
U-CROSS CONNECTION 07/28/2023 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
U - SEWER TIE IN 07/28/2023 APPROVED MGIBSON
U -UTILITY RESIDENTIAL FINAL 07/13/2023 FINAL APPROVED LFITZGERALD
Note: 7/12/2023 - PREVIOUS INSPECTION NOTES pep breakr required to be a 20 amp DEDICATED-not a test breaker 7/7/2023 - PREVIOUS INSPECTION NOTES pep tank required to have its own dedicated circuit breaker in e-panel
U -UTILITY RESIDENTIAL FINAL 07/12/2023 Disapproved -FEE REQUIRED LFITZGERALD
Note: pep breakr required to be a 20 amp DEDICATED-not a test breaker 7/7/2023 - PREVIOUS INSPECTION NOTES pep tank required to have its own dedicated circuit breaker in e-panel
BLD - BUILDING FINAL 07/12/2023 FINAL APPROVED JWALKER
Note: 7/7/2023 - PREVIOUS INSPECTION NOTES 1. Circuit breaker for the Heat pump calls for a 25amp max. 35 installed at the exterior disconnect. 2. Garage to living space door missing lockset.
BLD - BUILDING FINAL 07/07/2023 Disapproved - NO FEE JWALKER
Note: 1. Circuit breaker for the Heat pump calls for a 25amp max. 35 installed at the exterior disconnect. 2. Garage to living space door missing lockset.
ROW - STORMWATER FINAL 07/07/2023 FINAL APPROVED FSLADISH
Note: 07007/23 CORRECTION MADE. LOOKED GOOD AT TIME OF THIS INSPECTION. ____________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 07/05/23 SMALL AREA IN LEFT REAR CORNER HAS WASHED OUT, NEED TO PUT A LITTLE DIRT UNDER IT AND RESET SOD TO MAINTAIN 4:1 SLOPE. MARKED IN WHITE PAINT. _______________________________________________________________________________________________________________________ 6/30/2023 - PREVIOUS INSPECTION NOTES NEED TO RAISE SWALE ON THE LEFT SIDE OF DRIVEWAY SO SOD MATCH ADJACENT LOTS SWALE ------------------------------------------------------------------------------------------------ 6/27/2023 - PREVIOUS INSPECTION NOTES THE FINAL SURVEY NEEDS PASSED BEFORE THIS INSPECTION ------------------------------------------------------------------------------------------------- 6/26/2023 - PREVIOUS INSPECTION NOTES THE FINAL SURVEY MUST PASS BEFORE THIS INSPECTION IS DONE
U -UTILITY RESIDENTIAL FINAL 07/07/2023 Disapproved -FEE REQUIRED LFITZGERALD
Note: pep tank required to have its own dedicated circuit breaker in e-panel
ROW - FINAL APRON (AFTER POUR) 07/07/2023 APPROVED FSLADISH
Note: 07/07/23 PIPE IS GOOD. CUTS MADE. LOKED GOOD AT THE TIME OF THIS INSPECTION. _____________________________________________________________________________________________________________________ nspector Notes from Inspection 9465 07/05/23 SMALL AREA IN LEFT REAR CORNER HAS WASHED OUT, NEED TO PUT A LITTLE DIRT UNDER IT AND RESET SOD TO MAINTAIN 4:1 SLOPE. MARKED IN WHITE PAINT. _______________________________________________________________________________________________________________________ 6/30/2023 - PREVIOUS INSPECTION NOTES NEED TO RAISE SWALE ON THE LEFT SIDE OF DRIVEWAY SO SOD MATCH ADJACENT LOTS SWALE ------------------------------------------------------------------------------------------------ 6/27/2023 - PREVIOUS INSPECTION NOTES THE FINAL SURVEY NEEDS PASSED BEFORE THIS INSPECTION ------------------------------------------------------------------------------------------------- 6/26/2023 - PREVIOUS INSPECTION NOTES THE FINAL SURVEY MUST PASS BEFORE THIS INSPECTION IS DONE
ROW FIELD SURVEY /GRADING CERTIFICATION 07/05/2023 APPROVED - AS NOTED FSLADISH
Note: 07/05/23 SMALL AREA IN LEFT REAR CORNER HAS WASHED OUT, NEED TO PUT A LITTLE DIRT UNDER IT AND RESET SOD TO MAINTAIN 4:1 SLOPE. MARKED IN WHITE PAINT. _______________________________________________________________________________________________________________________ 6/30/2023 - PREVIOUS INSPECTION NOTES NEED TO RAISE SWALE ON THE LEFT SIDE OF DRIVEWAY SO SOD MATCH ADJACENT LOTS SWALE ------------------------------------------------------------------------------------------------ 6/27/2023 - PREVIOUS INSPECTION NOTES THE FINAL SURVEY NEEDS PASSED BEFORE THIS INSPECTION ------------------------------------------------------------------------------------------------- 6/26/2023 - PREVIOUS INSPECTION NOTES THE FINAL SURVEY MUST PASS BEFORE THIS INSPECTION IS DONE
ROW FIELD SURVEY /GRADING CERTIFICATION 06/30/2023 Disapproved - NO FEE PFLANAGAN
Note: NEED TO RAISE SWALE ON THE LEFT SIDE OF DRIVEWAY SO SOD MATCH ADJACENT LOTS SWALE ------------------------------------------------------------------------------------------------ 6/27/2023 - PREVIOUS INSPECTION NOTES THE FINAL SURVEY NEEDS PASSED BEFORE THIS INSPECTION ------------------------------------------------------------------------------------------------- 6/26/2023 - PREVIOUS INSPECTION NOTES THE FINAL SURVEY MUST PASS BEFORE THIS INSPECTION IS DONE
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/30/2023 APPROVED FSLADISH
Note: 06/29/23 UPON FURTHER REVIEW IT HAS BEEN DETERMINED THAT ALL THE REQUIRED ELEVATION SHOTS ARE SUFFICIENT. APPROVED 6/29/2023 - PREVIOUS INSPECTION NOTES 06/29/23 PLEASE SEE PREVIOUS INSPECTORS NOTES. THERE ARE NO ELEVATION SHOTS ALONG THE RIGHT SIDE PROPERTY LINE. THEY NEED TO BE SHOWN IN 20' INTERVALS. FRONT SWALE IS STILL SHOWING HIGH AND LOW SPOTS. 1) Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. 2) The road side swale does not allow the water to flow to outfalls there are areas that are low and areas that are high not allow it to flow. ------------------------------------------------------------------------------------------------------------------------------- 6/27/2023 - PREVIOUS INSPECTION NOTES 1) Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. 2) The road side swale does not allow the water to flow to outfalls there are areas that are low and areas that are high not allow it to flow. ------------------------------------------------------------------------------------------- 6/26/2023 - PREVIOUS INSPECTION NOTES 1) Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. 2) Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey 3) Drawing 300.D,The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. 4) The road side swale does not allow the water to flow to outfalls there are areas that are low and areas that are high not allow it to flow.
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/29/2023 Disapproved -FEE REQUIRED FSLADISH
Note: 06/29/23 PLEASE SEE PREVIOUS INSPECTORS NOTES. THERE ARE NO ELEVATION SHOTS ALONG THE RIGHT SIDE PROPERTY LINE. THEY NEED TO BE SHOWN IN 20' INTERVALS. FRONT SWALE IS STILL SHOWING HIGH AND LOW SPOTS. 1) Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. 2) The road side swale does not allow the water to flow to outfalls there are areas that are low and areas that are high not allow it to flow. ------------------------------------------------------------------------------------------------------------------------------- 6/27/2023 - PREVIOUS INSPECTION NOTES 1) Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. 2) The road side swale does not allow the water to flow to outfalls there are areas that are low and areas that are high not allow it to flow. ------------------------------------------------------------------------------------------- 6/26/2023 - PREVIOUS INSPECTION NOTES 1) Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. 2) Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey 3) Drawing 300.D,The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. 4) The road side swale does not allow the water to flow to outfalls there are areas that are low and areas that are high not allow it to flow.
ROW FIELD SURVEY /GRADING CERTIFICATION 06/27/2023 Disapproved - NO FEE PFLANAGAN
Note: THE FINAL SURVEY NEEDS PASSED BEFORE THIS INSPECTION ------------------------------------------------------------------------------------------------- 6/26/2023 - PREVIOUS INSPECTION NOTES THE FINAL SURVEY MUST PASS BEFORE THIS INSPECTION IS DONE
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/27/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. 2) The road side swale does not allow the water to flow to outfalls there are areas that are low and areas that are high not allow it to flow. ------------------------------------------------------------------------------------------- 6/26/2023 - PREVIOUS INSPECTION NOTES 1) Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. 2) Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey 3) Drawing 300.D,The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. 4) The road side swale does not allow the water to flow to outfalls there are areas that are low and areas that are high not allow it to flow.
ROW FIELD SURVEY /GRADING CERTIFICATION 06/26/2023 Disapproved - NO FEE PFLANAGAN
Note: THE FINAL SURVEY MUST PASS BEFORE THIS INSPECTION IS DONE
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/26/2023 Disapproved - NO FEE PFLANAGAN
Note: 1) Sec 300.01D1 The elevations along all property lines must be at a minimum of 20 foot intervals. 2) Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey 3) Drawing 300.D,The front property line/right away elevation are to be equal to or greater than the centerline of the road elevation. 4) The road side swale does not allow the water to flow to outfalls there are areas that are low and areas that are high not allow it to flow.
ELECTRIC - EARLY POWER 05/30/2023 APPROVED LMILLER
ROW- PRE-APRON (PRE-POUR) 05/11/2023 APPROVED FSLADISH
Note: 05/11/23 READY TO POUR. LOOKED GOOD AT TIME OF INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
PEP TANK INSTALLATION REQUEST 03/22/2023 APPROVED TSCHWEERS
INSULATION 03/22/2023 APPROVED - AS NOTED JWALKER
Note: 3/22/23 Item 1 listed below the plumbing inspector Mark Gibson stated the trap was in place at plumbing 1st rough. Inspector Notes from Inspection 2420 1. Unable to see the washing machine drian line trap concealed in the block. Please have exposed for reinspection. 2. Bathroom exhaust duct not attached to fan. Attach and seal. 3. Install missing nail plate front bedroom right side wall 14-2 wire at the furring strip. Check above needed corrections at insulation inspection.
ALL ROUGH 03/03/2023 APPROVED - AS NOTED JWALKER
Note: 1. Unable to see the washing machine drian line trap concealed in the block. Please have exposed for reinspection. 2. Bathroom exhaust duct not attached to fan. Attach and seal. 3. Install missing nail plate front bedroom right side wall 14-2 wire at the furring strip. Check above needed corrections at insulation inspection.
LATH/BRICK/ WATER BARRIER 02/16/2023 APPROVED JWALKER
ROOF VALLEY & METAL 02/07/2023 APPROVED JWALKER
Note: 4 x 4 L flashing at the gable end is to be set in roofing cement.
WALL SHEATHING 02/01/2023 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/01/2023 APPROVED - AS NOTED JWALKER
Note: Gable end bracing and blocking has not been installed. Roof detail GE01. Please have complete before all rough inspection.
FOUND SURVEY APPROVED (OFFICE) 01/31/2023 APPROVED TBAKER
TIE BEAM / LINTEL 01/26/2023 APPROVED JWALKER
MONOLITHIC SLAB 01/12/2023 APPROVED JWALKER
Note: 1/11/2023 - PREVIOUS INSPECTION NOTES Please have a full set of approved drawings. Multilple pages missing.
MONOLITHIC SLAB 01/11/2023 Disapproved - NO FEE JWALKER
Note: Please have a full set of approved drawings. Multilple pages missing.
GRAVITY SEWER TEST 12/28/2022 APPROVED - AS NOTED MGIBSON
Note: THIS WAS APPROVED ON 12/27/22
PLUMBING 1ST ROUGH UNDERGROUND 12/27/2022 APPROVED MGIBSON
Note: GRAVITY SEWER IS APPROVED C/M TO SCHEDULE FOR 12/28/22
WATER METER INSTALLATION REQUEST 11/21/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 02/02/2023 02/03/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/31/2023 01/31/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/31/2023 01/31/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/18/2023 01/19/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/18/2023 01/19/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/07/2022 07/07/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 07/07/2022 07/07/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 07/07/2022 07/08/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
SW1 COMPLETE 07/07/2022 07/13/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
SWALE COMPLETE 07/07/2022 09/19/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 06/21/2022 06/23/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Plans submitted are noted as a Master Plan. There is no Master Plan on file.
CUSVC COMPLETE 06/21/2022 06/23/2022
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 06/21/2022 06/21/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 HOLD 06/21/2022 06/21/2022
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM No benchmark on survey
LOCATE COMPLETE 06/21/2022 06/24/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 06/21/2022 06/21/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 06/21/2022 06/27/2022
Note: Held By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM need flow arrows throughout site plan indicating drainage conveyance
ZON HOLD 06/21/2022 06/23/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan : Please include the walkway from driveway to the entrance of the home. Landscape plan: Please include proposed shrubs that will provide coverage for the mechanical equipment in front and the side *Six Shrubs shall be planted on each side of the home facing the street wrap the back corner with shrubs. Trees: One tree for every 2500 square ft. All calculations are rounded to the nearest whole number. This property requires 5 trees. color sheet: Remove the accent body color - which is not currently allowed under the Land Development Code tea chest is too dark please follow the LRV of 25 or greater with Earth tones Elevation plans: missing banding on right side windows facing the ROW
BADMIN INFORMATION 06/21/2022 06/21/2022
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM for future submittals, do not name any files starting with the street address (NOC and Deed)

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION FEE ¤40.00 07/19/2023
REINSPECTION FEE ¤40.00 07/19/2023
PLAN REVIEW - REVISION ¤32.50 04/13/2023
CONTRACTOR CHANGE ¤20.00 01/04/2023
IMPACT FEE FIRE ¤388.65 08/25/2022
IMPACT FEE PARKS ¤1,455.13 08/25/2022
IMPACT FEE PARKS ¤1,455.13 08/25/2022
IMPACT FEE SCHOOL ¤3,600.00 08/25/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 08/25/2022
WATER -IRRIGATION INSPECTION ¤25.00 08/25/2022
WATER- TURN ON ¤25.00 08/25/2022
ADJUSTMENT 50% (¤385.65) 08/25/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 08/25/2022
INSPECTION - RESIDENTIAL ¤577.50 08/25/2022
PLAN REVIEW - RESIDENTIAL ¤163.80 08/25/2022
SURCHARGE FS 533.721 ¤2.58 08/25/2022
SURCHARGE - FS 468.631 ¤3.88 08/25/2022
SW ENG - FOUNDATION SURVEY ¤20.00 08/25/2022
SW ENG INSPECTION 80 ¤80.00 08/25/2022
SW ENG PRE APRON ¤30.00 08/25/2022
SW ENG - REVIEW 20 ¤20.00 08/25/2022
SW ENG RES REVIEW 200 ¤200.00 08/25/2022
SEWER CREDIT (¤2,160.28) 08/25/2022
SEWER INSPECTION ¤25.00 08/25/2022
SEWER CAPITAL FACILITY ¤4,939.76 08/25/2022
WATER CREDIT (¤475.42) 08/25/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 08/25/2022
SITE PLAN 30 ¤30.00 08/25/2022
CONNECTION FEES ¤1,077.88 08/25/2022
CONTRACTOR CHANGE ¤40.00 08/25/2022
Fees Total Due: ¤0.00 Total Paid: ¤16,690.96