Permit #2022061198
Permit Details
Status: COED
| Parcel Id: 07-11-31-7032-00120-0060 |
| CONDITIONED SPACE: 1517 sqft |
| GARAGE: 394 sqft |
| Total Square Footage: 1911 sqft |
| Block: 00120 |
| Subdivision: 2155 - SECTION 32-ROYAL PALMS |
| Job Phone: 407-432-2344 |
| Location Address: 8 ROUND TABLE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/14/2022 |
| NOC: RECORDED |
| Applicant name: WADE GILMER JURNEY JR |
| Owner: NATIONAL HOME CORP |
|
Address 4850 TAMIAMI TRAIL N NAPLES, FL 34103 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤197,291.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
NATIONAL HOME CORPORATION
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1080 HOLCOMB BRIDGE ROAD , |
BLDG 100 - 330 ROSWELL , GA 30076 |
CBC1257700 (Exp: 08/31/2026) | 471-817-1259 |
Sub Contractors
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JASON PATRICK RIBOCK
| Status | Location Address | State License Number | Phone |
| INACTIVE |
620 E PINE ST , 0 |
ES12001313 (Exp: 08/31/2026) | 407-625-0257 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
RANDALL SCOTT ROSENFELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
234 N WHITNEY ST PALM COAST, FL 32084 |
CAC1816641 (Exp: 08/31/2026) | 904-599-0082 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/06/2023 | FINAL APPROVED | JWALKER |
| Note: 2/3/2023 - PREVIOUS INSPECTION NOTES 1. Outdoor A/C unit calls for a max breaker of 25amp. 30 amp at panel installed. 2. Outdoor Missing a screw at the A/C access panel. 3. Indoor AHU label is torn unable to read max circut amp. | |||
| BLD - BUILDING FINAL | 02/03/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. Outdoor A/C unit calls for a max breaker of 25amp. 30 amp at panel installed. 2. Outdoor Missing a screw at the A/C access panel. 3. Indoor AHU label is torn unable to read max circut amp. | |||
| U -UTILITY RESIDENTIAL FINAL | 02/01/2023 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: unable to locate sewer clean out for sewer tap | |||
| U -UTILITY RESIDENTIAL FINAL | 02/01/2023 | FINAL APPROVED | LFITZGERALD |
| Note: 2/1/2023 - PREVIOUS INSPECTION NOTES unable to locate sewer clean out for sewer tap | |||
| ELECTRIC - EARLY POWER | 01/26/2023 | APPROVED - AS NOTED | JMUNSON |
| Note: Inspector Notes from Inspection 2200 Emailed FPL @ 2:30 PM 1/26/23 UFER ground needs to be protected by final NEC 2017 250.64 | |||
| U -UTILITY RESIDENTIAL FINAL | 01/24/2023 | CANCELLED BY APPLICANT | WEB |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/23/2023 | APPROVED | GBERTOLA |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/23/2023 | APPROVED | GBERTOLA |
| ROW - STORMWATER FINAL | 01/23/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW - FINAL APRON (AFTER POUR) | 01/23/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| ROW- PRE-APRON (PRE-POUR) | 12/14/2022 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| INSULATION | 12/07/2022 | APPROVED | JWALKER |
| Note: 12/5/2022 - PREVIOUS INSPECTION NOTES The service wire from disconnect to interior panel needs to be 4/0 aluminum. Phase out wire in the electrical panel. Check above at insulation inspection. 12/5/22 Items listed above from the all rough inspection. Have not been corrected. | |||
| INSULATION | 12/05/2022 | Disapproved -FEE REQUIRED | JWALKER |
| Note: The service wire from disconnect to interior panel needs to be 4/0 aluminum. Phase out wire in the electrical panel. Check above at insulation inspection. 12/5/22 Items listed above from the all rough inspection. Have not been corrected. | |||
| GRAVITY SEWER TEST | 12/05/2022 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 12/05/2022 | APPROVED | MGIBSON |
| U-CROSS CONNECTION | 12/02/2022 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| LATH/BRICK/ WATER BARRIER | 12/02/2022 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2420 The service wire from disconnect to interior panel needs to be 4/0 aluminum. Phase out wire in the electrical panel. Check above at insulation inspection. | |||
| ALL ROUGH | 11/30/2022 | APPROVED - AS NOTED | JWALKER |
| Note: The service wire from disconnect to interior panel needs to be 4/0 aluminum. Phase out wire in the electrical panel. Check above at insulation inspection. | |||
| ROOF VALLEY & METAL | 11/21/2022 | APPROVED | KSANDOE |
| Note: 11/16/2022 - PREVIOUS INSPECTION NOTES Missing simplex nails on back check entire roof New inspection due to canceled inspection Inspector Notes from Inspection 2460 1. Trusses V1, V2 and V3 have been thrown in the dumpster and Over framing using spruce 2x4 have been installed. Please have engineer submitt a revision showing the valley overframing and specifi matertail to be used or install and anchor missing trusses. 2. Truss T4 front of building, cut the engineering board where it is being held up by the gusset plated and nail down. 3. Page D2. Detail TBO5. Required minimum permanent bracing. Missing X bracing. and the 10' o.c. lateral bracing. CHECK FOR CORRECTIONS AT THE ALL ROUGH INSPECTION. | |||
| ROOF VALLEY & METAL | 11/16/2022 | Disapproved - NO FEE | MKRASKI |
| Note: Missing simplex nails on back check entire roof New inspection due to canceled inspection Inspector Notes from Inspection 2460 1. Trusses V1, V2 and V3 have been thrown in the dumpster and Over framing using spruce 2x4 have been installed. Please have engineer submitt a revision showing the valley overframing and specifi matertail to be used or install and anchor missing trusses. 2. Truss T4 front of building, cut the engineering board where it is being held up by the gusset plated and nail down. 3. Page D2. Detail TBO5. Required minimum permanent bracing. Missing X bracing. and the 10' o.c. lateral bracing. CHECK FOR CORRECTIONS AT THE ALL ROUGH INSPECTION. | |||
| ELECTRIC-TUG | 11/16/2022 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 2:30 PM | |||
| ROOF VALLEY & METAL | 11/14/2022 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2460 1. Trusses V1, V2 and V3 have been thrown in the dumpster and Over framing using spruce 2x4 have been installed. Please have engineer submitt a revision showing the valley overframing and specifi matertail to be used or install and anchor missing trusses. 2. Truss T4 front of building, cut the engineering board where it is being held up by the gusset plated and nail down. 3. Page D2. Detail TBO5. Required minimum permanent bracing. Missing X bracing. and the 10' o.c. lateral bracing. CHECK FOR CORRECTIONS AT THE ALL ROUGH INSPECTION. | |||
| WALL SHEATHING | 11/07/2022 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/07/2022 | APPROVED - AS NOTED | JWALKER |
| Note: 1. Trusses V1, V2 and V3 have been thrown in the dumpster and Over framing using spruce 2x4 have been installed. Please have engineer submitt a revision showing the valley overframing and specifi matertail to be used or install and anchor missing trusses. 2. Truss T4 front of building, cut the engineering board where it is being held up by the gusset plated and nail down. 3. Page D2. Detail TBO5. Required minimum permanent bracing. Missing X bracing. and the 10' o.c. lateral bracing. CHECK FOR CORRECTIONS AT THE ALL ROUGH INSPECTION. | |||
| FOUND SURVEY APPROVED (OFFICE) | 10/27/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 10/17/2022 | APPROVED | JWALKER |
| MONOLITHIC SLAB | 10/05/2022 | APPROVED | MKRASKI |
| PLUMBING 1ST ROUGH UNDERGROUND | 09/26/2022 | APPROVED | JWALKER |
| WATER METER INSTALLATION REQUEST | 08/26/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/03/2023 | 02/03/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 01/25/2023 | 01/25/2023 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM SELECT 'PLANS' FOR LATEST DOCUMENT UPLOADED, NOT 'TERMITE' | |||
| ENGIN1 | COMPLETE | 10/27/2022 | 10/27/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/27/2022 | 10/27/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/06/2022 | 07/06/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 07/01/2022 | 07/06/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/01/2022 | 07/05/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/01/2022 | 07/05/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Landscape plan needs to have screening on the side as well as in front please correct | |||
| BLD | COMPLETE | 07/01/2022 | 07/05/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/21/2022 | 06/23/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Plans submitted are noted as a Master Plan. There is no Master Plan on file. | |||
| CUSVC | COMPLETE | 06/21/2022 | 06/23/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 06/21/2022 | 06/21/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Electric load calcs do not match the square footage of the home. | |||
| ENGIN1 | COMPLETE | 06/21/2022 | 06/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/21/2022 | 06/24/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 06/21/2022 | 06/21/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Square footage on Energy calcs does not match the house plans | |||
| SW1 | COMPLETE | 06/21/2022 | 06/27/2022 |
| Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/21/2022 | 06/22/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM One additional 7 gallon shrub required around AC for screening Concrete pad location on plans does not meet the location on site and landscape plans | |||
| SWALE | COMPLETE | 06/21/2022 | 09/19/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 02/03/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 02/03/2023 |
| REINSPECTION FEE | ¤40.00 | 02/03/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 02/03/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/03/2023 |
| CONNECTION FEES | ¤1,077.88 | 07/14/2022 |
| WATER- TURN ON | ¤25.00 | 07/14/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/14/2022 |
| INSPECTION - RESIDENTIAL | ¤544.50 | 07/14/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤154.44 | 07/14/2022 |
| SURCHARGE FS 533.721 | ¤6.20 | 07/14/2022 |
| SURCHARGE - FS 468.631 | ¤9.30 | 07/14/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/14/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/14/2022 |
| SW ENG PRE APRON | ¤30.00 | 07/14/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/14/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/14/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 07/14/2022 |
| SEWER CREDIT | (¤2,043.39) | 07/14/2022 |
| SEWER INSPECTION | ¤25.00 | 07/14/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 07/14/2022 |
| WATER CREDIT | (¤463.76) | 07/14/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 07/14/2022 |
| SITE PLAN 30 | ¤30.00 | 07/14/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 07/14/2022 |
| IMPACT FEE FIRE | ¤388.65 | 07/14/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 07/14/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/14/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 07/14/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/14/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 07/14/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,608.48 |