Permit #2022061199

Permit Details

Status: COED

Parcel Id: 07-11-31-7058-00240-0020
CONDITIONED SPACE: 1517 sqft
GARAGE: 394 sqft
Total Square Footage: 1911 sqft
Block: 00240
Subdivision: 2215 - SECTION 58-SEMINOLE PARK
Job Phone: 407-432-2344
Location Address: 16 SEOANE PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/26/2022
NOC: RECORDED
Applicant name: WADE GILMER JURNEY JR
Owner: NATIONAL HOME CORPORATION

Address

4850 TAMIAMI TRAIL N

NAPLES, FL 34103

Lot: 0020
Contracted Stated Job Value: ¤209,353.00
Job Description: Single Family Residence
Type: CN

Contractor

NATIONAL HOME CORPORATION
Status Location Address Mailing Address State License Number Phone
INACTIVE

1080 HOLCOMB BRIDGE ROAD

,

BLDG 100 - 330

ROSWELL , GA 30076

CBC1257700 (Exp: 08/31/2026) 471-817-1259

Sub Contractors

ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JASON PATRICK RIBOCK
Status Location Address State License Number Phone
INACTIVE

620 E PINE ST

, 0

ES12001313 (Exp: 08/31/2026) 407-625-0257
DANIEL P GREGOIRE
Status Location Address State License Number Phone
INACTIVE

64 W. CENTRAL AVENUE

LAKE WALES, FL 33853

CFC057378 (Exp: 08/31/2024) (863)696-3737
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
RANDALL SCOTT ROSENFELD
Status Location Address State License Number Phone
ACTIVE

234 N WHITNEY ST

PALM COAST, FL 32084

CAC1816641 (Exp: 08/31/2026) 904-599-0082

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/03/2023 FINAL APPROVED BTAYLOR
U -UTILITY RESIDENTIAL FINAL 05/03/2023 FINAL APPROVED JHARDING
ROW - STORMWATER FINAL 05/02/2023 FINAL APPROVED PFLANAGAN
Note: ALL LOOKS GOOD AT THE TIME OF INSPECTION
ROW - FINAL APRON (AFTER POUR) 05/02/2023 APPROVED PFLANAGAN
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/02/2023 APPROVED PFLANAGAN
Note: 4/28/2023 - PREVIOUS INSPECTION NOTES 4/28/23= YOU ADD IT A BERM ON THE LEFT SIDE BUT IS NOT REFLECTED ON THE FINAL SURVEY. YOUR FINAL SURVEY STILL SHOING WATER IS MOVING TO THE NEIGHBORING LOT 4/25/2023 - PREVIOUS INSPECTION NOTES THERE IS ALOT OF SOD MISSING IN THE FRONT FINAL SURVEYS NEEDS TO BEEN DONE AFTER THE SOD IS DOWN ------------------------------------------------------------------------------------------------- 4/24/2023 - PREVIOUS INSPECTION NOTES 1) ALL SOD ELEVATIONS AGAINST THE HOME NEED TO BE A MINIMUM OF 4" BELOW FFE FOR A BLOCK STRUCTURE AND 6" FOR A WOOD FRAME STRUCTURE. 2) THE DRAINAGE ON THE LEFT SIDE IS IMPACTING THE ADJACENT LOT TO THE LEFT
ROW FIELD SURVEY /GRADING CERTIFICATION 05/02/2023 APPROVED PFLANAGAN
Note: 3/27/2023 - PREVIOUS INSPECTION NOTES ** 03/27/23 FIELD SURVEY IS DONE AFTER THE FINAL SURVEY HAS BEEN SUBMITTED AND APPROVED
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/28/2023 Disapproved - NO FEE GBERTOLA
Note: 4/28/23= YOU ADD IT A BERM ON THE LEFT SIDE BUT IS NOT REFLECTED ON THE FINAL SURVEY. YOUR FINAL SURVEY STILL SHOING WATER IS MOVING TO THE NEIGHBORING LOT 4/25/2023 - PREVIOUS INSPECTION NOTES THERE IS ALOT OF SOD MISSING IN THE FRONT FINAL SURVEYS NEEDS TO BEEN DONE AFTER THE SOD IS DOWN ------------------------------------------------------------------------------------------------- 4/24/2023 - PREVIOUS INSPECTION NOTES 1) ALL SOD ELEVATIONS AGAINST THE HOME NEED TO BE A MINIMUM OF 4" BELOW FFE FOR A BLOCK STRUCTURE AND 6" FOR A WOOD FRAME STRUCTURE. 2) THE DRAINAGE ON THE LEFT SIDE IS IMPACTING THE ADJACENT LOT TO THE LEFT
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/25/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: THERE IS ALOT OF SOD MISSING IN THE FRONT FINAL SURVEYS NEEDS TO BEEN DONE AFTER THE SOD IS DOWN ------------------------------------------------------------------------------------------------- 4/24/2023 - PREVIOUS INSPECTION NOTES 1) ALL SOD ELEVATIONS AGAINST THE HOME NEED TO BE A MINIMUM OF 4" BELOW FFE FOR A BLOCK STRUCTURE AND 6" FOR A WOOD FRAME STRUCTURE. 2) THE DRAINAGE ON THE LEFT SIDE IS IMPACTING THE ADJACENT LOT TO THE LEFT
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/24/2023 Disapproved - NO FEE PFLANAGAN
Note: 1) ALL SOD ELEVATIONS AGAINST THE HOME NEED TO BE A MINIMUM OF 4" BELOW FFE FOR A BLOCK STRUCTURE AND 6" FOR A WOOD FRAME STRUCTURE. 2) THE DRAINAGE ON THE LEFT SIDE IS IMPACTING THE ADJACENT LOT TO THE LEFT
ROW FIELD SURVEY /GRADING CERTIFICATION 03/27/2023 Disapproved - NO FEE EMADISON
Note: ** 03/27/23 FIELD SURVEY IS DONE AFTER THE FINAL SURVEY HAS BEEN SUBMITTED AND APPROVED
U-CROSS CONNECTION 03/27/2023 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
ROW- PRE-APRON (PRE-POUR) 03/24/2023 APPROVED EMADISON
Note: ** 03/24/23 CORRECTIONS MADE READY TO POUR IN THE EVENT OF RAIN RECHECK CULVERT ELEVATION AND COMPACTION ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ________________________________________________________________________________________________________________________ 3/22/2023 - PREVIOUS INSPECTION NOTES ** 03/22/23 CANCELLED BY INSPECTOR CONTRACTOR HAS VEHICLE IN POUR AREA BROKE FORM BOARDS ** SEE ATTACHED PHOTOS DATED FOR 03/22/23 ________________________________________________________________________________________________________________________ 3/20/2023 - PREVIOUS INSPECTION NOTES ** 03/20/23 NEED MINIMUM OF 6" IN APRON AND EDGE OF ROAD ______________________________________________________________________________________________________________________ 3/16/2023 - PREVIOUS INSPECTION NOTES ** 03/16/23 NEED TO CHIP AWAY ALL CONCRETE OVERPOUR ABUTTING GARAGE NEED MINIMUM OF 4" POURED IN AREAS ABOVE ROW NEED MINIMUM OF 6" IN APRON AND EDGE OF ROAD NEED TO CUT AND REMOVE ROOTS OUT OF POUR AREA. SEE ATTACHED PHOTOS.
ROW- PRE-APRON (PRE-POUR) 03/22/2023 Disapproved - NO FEE EMADISON
Note: ** 03/22/23 CANCELLED BY INSPECTOR CONTRACTOR HAS VEHICLE IN POUR AREA BROKE FORM BOARDS ** SEE ATTACHED PHOTOS DATED FOR 03/22/23 ________________________________________________________________________________________________________________________ 3/20/2023 - PREVIOUS INSPECTION NOTES ** 03/20/23 NEED MINIMUM OF 6" IN APRON AND EDGE OF ROAD ______________________________________________________________________________________________________________________ 3/16/2023 - PREVIOUS INSPECTION NOTES ** 03/16/23 NEED TO CHIP AWAY ALL CONCRETE OVERPOUR ABUTTING GARAGE NEED MINIMUM OF 4" POURED IN AREAS ABOVE ROW NEED MINIMUM OF 6" IN APRON AND EDGE OF ROAD NEED TO CUT AND REMOVE ROOTS OUT OF POUR AREA. SEE ATTACHED PHOTOS.
ROW- PRE-APRON (PRE-POUR) 03/20/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 03/20/23 NEED MINIMUM OF 6" IN APRON AND EDGE OF ROAD ______________________________________________________________________________________________________________________ 3/16/2023 - PREVIOUS INSPECTION NOTES ** 03/16/23 NEED TO CHIP AWAY ALL CONCRETE OVERPOUR ABUTTING GARAGE NEED MINIMUM OF 4" POURED IN AREAS ABOVE ROW NEED MINIMUM OF 6" IN APRON AND EDGE OF ROAD NEED TO CUT AND REMOVE ROOTS OUT OF POUR AREA. SEE ATTACHED PHOTOS.
ROW- PRE-APRON (PRE-POUR) 03/16/2023 Disapproved -FEE REQUIRED FSLADISH
Note: ** 03/16/23 NEED TO CHIP AWAY ALL CONCRETE OVERPOUR ABUTTING GARAGE NEED MINIMUM OF 4" POURED IN AREAS ABOVE ROW NEED MINIMUM OF 6" IN APRON AND EDGE OF ROAD NEED TO CUT AND REMOVE ROOTS OUT OF POUR AREA. SEE ATTACHED PHOTOS.
ELECTRIC - EARLY POWER 03/16/2023 APPROVED - AS NOTED BTAYLOR
Note: 3/15/2023 - PREVIOUS INSPECTION NOTES 3/14/2023 - PREVIOUS INSPECTION NOTES 3/6/2023 - PREVIOUS INSPECTION NOTES 3-6-23 1. Not ready. 3-14-23 1. Outlet on the end of island needs to be safed off. 3-15-23 1. Outlet on the end of island needs to be safed off. 3-16-23 1. Emailwd FPL at 3:00.
ELECTRIC - EARLY POWER 03/15/2023 Disapproved - NO FEE BTAYLOR
Note: 3/14/2023 - PREVIOUS INSPECTION NOTES 3/6/2023 - PREVIOUS INSPECTION NOTES 3-6-23 1. Not ready. 3-14-23 1. Outlet on the end of island needs to be safed off. 3-15-23 1. Outlet on the end of island needs to be safed off.
ELECTRIC - EARLY POWER 03/14/2023 Disapproved - NO FEE BTAYLOR
Note: 3/6/2023 - PREVIOUS INSPECTION NOTES 3-6-23 1. Not ready. 3-14-23 1. Outlet on the end of island needs to be safed off.
TUB SET 03/14/2023 CANCELLED BY INSPECTOR MGIBSON
Note: 3/6/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION 3-6-23 1. Drywall needs to be removed in order to see that tub drain is sealed to earth below. this was approved at all rough inspection
ELECTRIC - EARLY POWER 03/06/2023 Disapproved - NO FEE BTAYLOR
Note: 3-6-23 1. Not ready.
TUB SET 03/06/2023 Disapproved - NO FEE BTAYLOR
Note: Inspector Notes from Inspection 2075 THIS WAS A VIRTUAL INSPECTION 3-6-23 1. Drywall needs to be removed in order to see that tub drain is sealed to earth below.
GRAVITY SEWER TEST 03/01/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 03/01/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
INSULATION 02/08/2023 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2320 Inspector Notes from Inspection 2420 12-20-22 1. No SER cable installed. 2. No shingles. 12-29-22 the following notes were still not resolved 1. No SER cable installed. 2. No shingles.
LATH/BRICK/ WATER BARRIER 12/29/2022 APPROVED - AS NOTED LMILLER
Note: Inspector Notes from Inspection 2420 12-20-22 1. No SER cable installed. 2. No shingles. 12-29-22 the following notes were still not resolved 1. No SER cable installed. 2. No shingles.
ALL ROUGH 12/20/2022 APPROVED - AS NOTED BTAYLOR
Note: 12-20-22 1. No SER cable installed. 2. No shingles.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/19/2022 APPROVED BTAYLOR
Note: 11/28/2022 - PREVIOUS INSPECTION NOTES 11-28-22 1. Straps on trusses need to be secured better.
ELECTRIC-TUG 12/19/2022 APPROVED BTAYLOR
ROOF VALLEY & METAL 12/01/2022 APPROVED BTAYLOR
WALL SHEATHING 11/28/2022 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/28/2022 Disapproved - NO FEE BTAYLOR
Note: 11-28-22 1. Straps on trusses need to be secured better.
TIE BEAM / LINTEL 11/17/2022 APPROVED BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 11/15/2022 APPROVED TBAKER
MONOLITHIC SLAB 11/08/2022 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 11/03/2022 APPROVED BTAYLOR
ROW - DRAINAGE 11/02/2022 APPROVED PFLANAGAN
Note: 10/20/2022 - PREVIOUS INSPECTION NOTES THIS JOB HAS A STOP WORK ON IT NEED FIX ALL AREAS BELOW ------------------------------------------------------------------------------- 10/19/2022 - PREVIOUS INSPECTION NOTES AT THE TIME OF THE INSPECTION LOOKS LIKE NOTHING HAS CHANGED YOU HAVE INTILL TOMORROW TO FIX THE ISSUE WITH THE SWALE OR THERE WILL STOP WORK ON THIS SITE ----------------------------------------------------------------------------------------------------------- 10/18/2022 - PREVIOUS INSPECTION NOTES LOOKS LIKE THAT THERE WAY NOTHING WAS DONE SINCE LAST INSPECTION. YOU HAVE 2 MORE INSPECTIONS BEFORE THERE WILL BE A STOP WORK ON THIS PERMIT IF CORRECTIONS WAS NOT MADE NEXT INSPECTION 10/19/22 ------------------------------------------------------------------------------------------- 10/17/2022 - PREVIOUS INSPECTION NOTES NEED TO KEEP SWALE CLEAR AT ALL TIMES YOU HAVE ONLY 3 MORE INSPECTION BEFORE YOU WILL HAVE A STOP WORK ON THE CONSTRUCTION SITE IF YOU CORRECT THE ISSUES ______________________________________________________________________________________________________________________ 10/14/2022 - PREVIOUS INSPECTION NOTES NEED TO HAVE THE SWALE OPEN AT ALL TIMES DURING CONSTRUCTION ---------------------------------------------------------------------------------- 10/11/2022 - PREVIOUS INSPECTION NOTES Remove all dirt from the swale to open up the drainage.
ROW - DRAINAGE 10/20/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: THIS JOB HAS A STOP WORK ON IT NEED FIX ALL AREAS BELOW ------------------------------------------------------------------------------- 10/19/2022 - PREVIOUS INSPECTION NOTES AT THE TIME OF THE INSPECTION LOOKS LIKE NOTHING HAS CHANGED YOU HAVE INTILL TOMORROW TO FIX THE ISSUE WITH THE SWALE OR THERE WILL STOP WORK ON THIS SITE ----------------------------------------------------------------------------------------------------------- 10/18/2022 - PREVIOUS INSPECTION NOTES LOOKS LIKE THAT THERE WAY NOTHING WAS DONE SINCE LAST INSPECTION. YOU HAVE 2 MORE INSPECTIONS BEFORE THERE WILL BE A STOP WORK ON THIS PERMIT IF CORRECTIONS WAS NOT MADE NEXT INSPECTION 10/19/22 ------------------------------------------------------------------------------------------- 10/17/2022 - PREVIOUS INSPECTION NOTES NEED TO KEEP SWALE CLEAR AT ALL TIMES YOU HAVE ONLY 3 MORE INSPECTION BEFORE YOU WILL HAVE A STOP WORK ON THE CONSTRUCTION SITE IF YOU CORRECT THE ISSUES ______________________________________________________________________________________________________________________ 10/14/2022 - PREVIOUS INSPECTION NOTES NEED TO HAVE THE SWALE OPEN AT ALL TIMES DURING CONSTRUCTION ---------------------------------------------------------------------------------- 10/11/2022 - PREVIOUS INSPECTION NOTES Remove all dirt from the swale to open up the drainage.
ROW - DRAINAGE 10/19/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: AT THE TIME OF THE INSPECTION LOOKS LIKE NOTHING HAS CHANGED YOU HAVE INTILL TOMORROW TO FIX THE ISSUE WITH THE SWALE OR THERE WILL STOP WORK ON THIS SITE ----------------------------------------------------------------------------------------------------------- 10/18/2022 - PREVIOUS INSPECTION NOTES LOOKS LIKE THAT THERE WAY NOTHING WAS DONE SINCE LAST INSPECTION. YOU HAVE 2 MORE INSPECTIONS BEFORE THERE WILL BE A STOP WORK ON THIS PERMIT IF CORRECTIONS WAS NOT MADE NEXT INSPECTION 10/19/22 ------------------------------------------------------------------------------------------- 10/17/2022 - PREVIOUS INSPECTION NOTES NEED TO KEEP SWALE CLEAR AT ALL TIMES YOU HAVE ONLY 3 MORE INSPECTION BEFORE YOU WILL HAVE A STOP WORK ON THE CONSTRUCTION SITE IF YOU CORRECT THE ISSUES ______________________________________________________________________________________________________________________ 10/14/2022 - PREVIOUS INSPECTION NOTES NEED TO HAVE THE SWALE OPEN AT ALL TIMES DURING CONSTRUCTION ---------------------------------------------------------------------------------- 10/11/2022 - PREVIOUS INSPECTION NOTES Remove all dirt from the swale to open up the drainage.
ROW - DRAINAGE 10/18/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: LOOKS LIKE THAT THERE WAY NOTHING WAS DONE SINCE LAST INSPECTION. YOU HAVE 2 MORE INSPECTIONS BEFORE THERE WILL BE A STOP WORK ON THIS PERMIT IF CORRECTIONS WAS NOT MADE NEXT INSPECTION 10/19/22 ------------------------------------------------------------------------------------------- 10/17/2022 - PREVIOUS INSPECTION NOTES NEED TO KEEP SWALE CLEAR AT ALL TIMES YOU HAVE ONLY 3 MORE INSPECTION BEFORE YOU WILL HAVE A STOP WORK ON THE CONSTRUCTION SITE IF YOU CORRECT THE ISSUES ______________________________________________________________________________________________________________________ 10/14/2022 - PREVIOUS INSPECTION NOTES NEED TO HAVE THE SWALE OPEN AT ALL TIMES DURING CONSTRUCTION ---------------------------------------------------------------------------------- 10/11/2022 - PREVIOUS INSPECTION NOTES Remove all dirt from the swale to open up the drainage.
ROW - DRAINAGE 10/17/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: NEED TO KEEP SWALE CLEAR AT ALL TIMES YOU HAVE ONLY 3 MORE INSPECTION BEFORE YOU WILL HAVE A STOP WORK ON THE CONSTRUCTION SITE IF YOU CORRECT THE ISSUES ______________________________________________________________________________________________________________________ 10/14/2022 - PREVIOUS INSPECTION NOTES NEED TO HAVE THE SWALE OPEN AT ALL TIMES DURING CONSTRUCTION ---------------------------------------------------------------------------------- 10/11/2022 - PREVIOUS INSPECTION NOTES Remove all dirt from the swale to open up the drainage.
ROW - DRAINAGE 10/14/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: NEED TO HAVE THE SWALE OPEN AT ALL TIMES DURING CONSTRUCTION ---------------------------------------------------------------------------------- 10/11/2022 - PREVIOUS INSPECTION NOTES Remove all dirt from the swale to open up the drainage.
ROW - DRAINAGE 10/11/2022 Disapproved -FEE REQUIRED CTROHA
Note: Remove all dirt from the swale to open up the drainage.
ROW - DRAINAGE 09/26/2022 APPROVED PFLANAGAN
Note: 9/26/22 GRADE GUY AT SITE AT THE TIME OF THE INSPECTION PUTTING IN TEMP. PIPE TO ALLOW WATER TO FLOW TO THE DITCH ---------------------------------------------------------------------------------------------------------------------------- 9/19/2022 - PREVIOUS INSPECTION NOTES NEED TO HAVE THE SWALE CLEAR ALL TIME THROUGH OUT CONSTRUCTION OR PUT IN A TEMP. PIPE TO ALLOW WATER TO FLOW TO CATCH BASIN. ALSON NEED TO HAVE PORTER JOHN MOVED ON JOB SITE NOT IN THE RIGHT OF WAY
ROW - DRAINAGE 09/19/2022 Disapproved - NO FEE PFLANAGAN
Note: NEED TO HAVE THE SWALE CLEAR ALL TIME THROUGH OUT CONSTRUCTION OR PUT IN A TEMP. PIPE TO ALLOW WATER TO FLOW TO CATCH BASIN. ALSON NEED TO HAVE PORTER JOHN MOVED ON JOB SITE NOT IN THE RIGHT OF WAY NEXT INSPECTION ON 9/26/22
WATER METER INSTALLATION REQUEST 09/15/2022 APPROVED TCHURCHILL

Review History

Department Status Date In Date Out
MECH COMPLETE 02/08/2023 02/09/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/14/2022 11/15/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 11/14/2022 11/14/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 07/01/2022 07/01/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 07/01/2022 07/05/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD HOLD 06/21/2022 06/23/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Plans submitted are noted as a Master Plan. There is no Master Plan on file.
CUSVC COMPLETE 06/21/2022 06/23/2022
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 06/21/2022 06/21/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/21/2022 06/21/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 06/21/2022 06/24/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 06/21/2022 06/21/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 06/21/2022 06/27/2022
Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM
ZON HOLD 06/21/2022 06/22/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide width of walkway on site plan/survey One additional 7 gallon shrub required around AC Plantings must wrap both corners of house. None on the right side
SWALE COMPLETE 06/21/2022 09/19/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 04/13/2023
CONTRACTOR CHANGE ¤40.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG REINSPECTION 30 ¤30.00 04/13/2023
SW ENG REINSPECTION 30 ¤30.00 04/13/2023
PLAN REVIEW - REVISION ¤32.50 04/13/2023
CONNECTION FEES ¤1,077.88 07/26/2022
WATER- TURN ON ¤25.00 07/26/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/26/2022
INSPECTION - RESIDENTIAL ¤577.50 07/26/2022
PLAN REVIEW - RESIDENTIAL ¤163.80 07/26/2022
SW ENG - REVIEW 20 ¤20.00 07/26/2022
SW ENG RES REVIEW 200 ¤200.00 07/26/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 07/26/2022
SEWER CREDIT (¤850.00) 07/26/2022
SEWER INSPECTION ¤25.00 07/26/2022
SEWER CAPITAL FACILITY ¤4,939.76 07/26/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 07/26/2022
SITE PLAN 30 ¤30.00 07/26/2022
SW ENG INSPECTION 80 ¤80.00 07/26/2022
SW ENG PRE APRON ¤30.00 07/26/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 07/26/2022
IMPACT FEE FIRE ¤388.65 07/26/2022
IMPACT FEE PARKS ¤1,455.13 07/26/2022
IMPACT FEE SCHOOL ¤3,600.00 07/26/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 07/26/2022
WATER -IRRIGATION INSPECTION ¤25.00 07/26/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 07/26/2022
SURCHARGE FS 533.721 ¤6.54 07/26/2022
SURCHARGE - FS 468.631 ¤9.81 07/26/2022
SW ENG - FOUNDATION SURVEY ¤20.00 07/26/2022
Fees Total Due: ¤0.00 Total Paid: ¤17,468.84