I want to search for...
Permit #2022061200
Permit Details
Status: COED
| Parcel Id: 07-11-31-7024-00100-0200 |
| CONDITIONED SPACE: 1517 sqft |
| GARAGE: 394 sqft |
| Total Square Footage: 1911 sqft |
| Block: 00100 |
| Subdivision: 2167 - SECTION 24-PINE GROVE |
| Job Phone: 407-432-2344 |
| Location Address: 62 PRINCE ERIC LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/26/2022 |
| NOC: RECORDED |
| Applicant name: WADE GILMER JURNEY JR |
| Owner: NATIONAL HOME CORPORATION |
|
Address 4850 TAMIAMI TRAIL N NAPLES, FL 34103 |
| Lot: 0200 |
| Contracted Stated Job Value: ¤208,353.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
NATIONAL HOME CORPORATION
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1080 HOLCOMB BRIDGE ROAD , |
BLDG 100 - 330 ROSWELL , GA 30076 |
CBC1257700 (Exp: 08/31/2026) | 471-817-1259 |
Sub Contractors
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JASON PATRICK RIBOCK
| Status | Location Address | State License Number | Phone |
| INACTIVE |
620 E PINE ST , 0 |
ES12001313 (Exp: 08/31/2026) | 407-625-0257 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
RANDALL SCOTT ROSENFELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
234 N WHITNEY ST PALM COAST, FL 32084 |
CAC1816641 (Exp: 08/31/2026) | 904-599-0082 |
Inspection History
| Type | Request Date | Result | Inspector |
| LATH/BRICK/ WATER BARRIER | 09/27/2023 | APPROVED | KSANDOE |
| Note: 9/22/2023 - PREVIOUS INSPECTION NOTES 3/6/2023 - PREVIOUS INSPECTION NOTES Access hole for ufer and plumbing for hose bib on rear need to be closed up or mesh covered Inspector Notes from Inspection 2420 AC lineset not run | |||
| BLD - BUILDING FINAL | 09/27/2023 | Disapproved - NO FEE | KSANDOE |
| Note: Energy calcs do not match installed equipment. Submit revision for approval | |||
| BLD - BUILDING FINAL | 09/27/2023 | FINAL APPROVED | KSANDOE |
| Note: 9/27/2023 - PREVIOUS INSPECTION NOTES Energy calcs do not match installed equipment. Submit revision for approval | |||
| ROW - FINAL APRON (AFTER POUR) | 09/27/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 09/27/23 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved SWALE HOLDING WATER DUE TO ALL SWALES AHEAD AND BEHIND IT HOLDING WATER DUE TO RECENT HEAVY RAINS. ___________________________________________________________________________________________________________________________ | |||
| U -UTILITY RESIDENTIAL FINAL | 09/27/2023 | FINAL APPROVED | LFITZGERALD |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/26/2023 | APPROVED | GBERTOLA |
| Note: 9/26/23=AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. THE BUILDER IS RESPONSIBLE FOR ENSURING THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - STORMWATER FINAL | 09/26/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. THE BUILDER IS RESPONSIBLE FOR ENSURING THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/26/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. THE BUILDER IS RESPONSIBLE FOR ENSURING THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/22/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 09/22/23 A FIELD SURVEY INSPECTION CAN NOT BE SCHEDULED UNTIL A FINAL SURVEY INSPECTION HAS BEEN SCHEDULED AND PASSED. I WILL NOT FEE YOU TODAY. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 08/15/23 PIPE ELEVATION CORRECTION MADE NOW AT 4.17 FLAT. SPOKE TO CM LET HIM KNOW THE MITERED END FOOTERS NEED TO BE DUG A BIT TO THE CITY'S 6" X 6" STANDARD BEFORE POURING. READY TO POUR AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. _____________________________________________________________________________________________________________________ 8/8/2023 - PREVIOUS INSPECTION NOTES 08/08/23 CULVERT PIPE IS OUT OF TOLERANCE TOO HIGH BY 3 TENTHS. POUR AREA IS TOO SOFT AND FULL OF WATER. NEED TO CLEAN DIRT OF OF MITERED END FOOTERS AND REESTABLISH THEM TO CITY SPECS 6" X 6". Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. __________________________________________________________________________________________________________________________ 8/4/2023 - PREVIOUS INSPECTION NOTES Culvert out of Tolerance. 3 tenths too high. See swale plan. Pipe elevation is the large number over the pipe. Not the smaller numbers at each end of the pipe. | |||
| LATH/BRICK/ WATER BARRIER | 09/22/2023 | CANCELLED BY APPLICANT | KSANDOE |
| Note: 3/6/2023 - PREVIOUS INSPECTION NOTES Access hole for ufer and plumbing for hose bib on rear need to be closed up or mesh covered Inspector Notes from Inspection 2420 AC lineset not run | |||
| ROW- PRE-APRON (PRE-POUR) | 08/15/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 08/15/23 PIPE ELEVATION CORRECTION MADE NOW AT 4.17 FLAT. SPOKE TO CM LET HIM KNOW THE MITERED END FOOTERS NEED TO BE DUG A BIT TO THE CITY'S 6" X 6" STANDARD BEFORE POURING. READY TO POUR AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. _____________________________________________________________________________________________________________________ 8/8/2023 - PREVIOUS INSPECTION NOTES 08/08/23 CULVERT PIPE IS OUT OF TOLERANCE TOO HIGH BY 3 TENTHS. POUR AREA IS TOO SOFT AND FULL OF WATER. NEED TO CLEAN DIRT OF OF MITERED END FOOTERS AND REESTABLISH THEM TO CITY SPECS 6" X 6". Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. __________________________________________________________________________________________________________________________ 8/4/2023 - PREVIOUS INSPECTION NOTES Culvert out of Tolerance. 3 tenths too high. See swale plan. Pipe elevation is the large number over the pipe. Not the smaller numbers at each end of the pipe. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/08/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 08/08/23 CULVERT PIPE IS OUT OF TOLERANCE TOO HIGH BY 3 TENTHS. POUR AREA IS TOO SOFT AND FULL OF WATER. NEED TO CLEAN DIRT OF OF MITERED END FOOTERS AND REESTABLISH THEM TO CITY SPECS 6" X 6". Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. __________________________________________________________________________________________________________________________ 8/4/2023 - PREVIOUS INSPECTION NOTES Culvert out of Tolerance. 3 tenths too high. See swale plan. Pipe elevation is the large number over the pipe. Not the smaller numbers at each end of the pipe. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/04/2023 | Disapproved -FEE REQUIRED | RGROSS |
| Note: Culvert out of Tolerance. 3 tenths too high. See swale plan. Pipe elevation is the large number over the pipe. Not the smaller numbers at each end of the pipe. | |||
| ELECTRIC - EARLY POWER | 07/11/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 1146. Release Power Inspector Notes from Inspection 2200 Emailed FPL @ 1103. Release Power 7/5/2023 - PREVIOUS INSPECTION NOTES Still missing schedule 80 for wire protection 4/28/2023 - PREVIOUS INSPECTION NOTES Plans call for 150a service. 200a breaker in panel. No UG pedestal installed | |||
| ELECTRIC-TUG | 07/07/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 1103. Release Power 7/5/2023 - PREVIOUS INSPECTION NOTES Still missing schedule 80 for wire protection 4/28/2023 - PREVIOUS INSPECTION NOTES Plans call for 150a service. 200a breaker in panel. No UG pedestal installed | |||
| U-CROSS CONNECTION | 07/07/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| U - SEWER TIE IN | 07/07/2023 | APPROVED | MGIBSON |
| ELECTRIC-TUG | 07/05/2023 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Still missing schedule 80 for wire protection 4/28/2023 - PREVIOUS INSPECTION NOTES Plans call for 150a service. 200a breaker in panel. No UG pedestal installed | |||
| ELECTRIC-TUG | 04/28/2023 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Plans call for 150a service. 200a breaker in panel. No UG pedestal installed | |||
| INSULATION | 03/17/2023 | APPROVED | KSANDOE |
| Note: 3/16/2023 - PREVIOUS INSPECTION NOTES Vents for plumbing drains need to be sealed with fire rated foam at top plate penetrations | |||
| INSULATION | 03/16/2023 | Disapproved - NO FEE | KSANDOE |
| Note: Vents for plumbing drains need to be sealed with fire rated foam at top plate penetrations | |||
| LATH/BRICK/ WATER BARRIER | 03/06/2023 | Disapproved - NO FEE | KSANDOE |
| Note: Access hole for ufer and plumbing for hose bib on rear need to be closed up or mesh covered Inspector Notes from Inspection 2420 AC lineset not run | |||
| ALL ROUGH | 03/03/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: AC lineset not run | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/02/2023 | APPROVED | KSANDOE |
| Note: 1/26/2023 - PREVIOUS INSPECTION NOTES T4 QTY 2. Missing bracing on T4 front Need building plans on site for inspector use | |||
| ROOF VALLEY & METAL | 01/26/2023 | APPROVED | KSANDOE |
| WALL SHEATHING | 01/26/2023 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/26/2023 | Disapproved - NO FEE | KSANDOE |
| Note: T4 QTY 2. Missing bracing on T4 front Need building plans on site for inspector use | |||
| FOUND SURVEY APPROVED (OFFICE) | 01/19/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 12/12/2022 | APPROVED | KSANDOE |
| MONOLITHIC SLAB | 12/06/2022 | APPROVED | KSANDOE |
| GRAVITY SEWER TEST | 12/02/2022 | APPROVED | MGIBSON |
| Note: 12/1/2022 - PREVIOUS INSPECTION NOTES BELL END OF SEWER DRAIN FACING THE WRONG DIRECTION, CUT OUT AND INSTALL TO WHERE HUB FACES THE HOUSE DRAIN | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 12/01/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 12/01/2022 | Disapproved - NO FEE | MGIBSON |
| Note: BELL END OF SEWER DRAIN FACING THE WRONG DIRECTION, CUT OUT AND INSTALL TO WHERE HUB FACES THE HOUSE DRAIN | |||
| WATER METER INSTALLATION REQUEST | 09/16/2022 | APPROVED | TCHURCHILL |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 09/21/2023 | 09/21/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM rename your files correctly. | |||
| BADMIN | INFORMATION | 06/16/2023 | 06/16/2023 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM NOC MISSING NOTARY AT BOTTOM | |||
| BADMIN | INFORMATION | 02/14/2023 | 02/14/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please rename your files correctly | |||
| ENGIN1 | COMPLETE | 01/19/2023 | 01/19/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/19/2023 | 01/19/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/20/2022 | 07/20/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/20/2022 | 07/20/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/20/2022 | 07/26/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/14/2022 | 07/14/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM REPEAT COMMENT: Please provide width of walkway on site plan/survey | |||
| BLD | COMPLETE | 07/14/2022 | 07/14/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/14/2022 | 07/20/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/14/2022 | 07/14/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/21/2022 | 06/23/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Plans submitted are noted as a Master Plan. There is no Master Plan on file. | |||
| CUSVC | COMPLETE | 06/21/2022 | 06/23/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 06/21/2022 | 06/21/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/21/2022 | 06/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/21/2022 | 06/24/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/21/2022 | 06/21/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 06/21/2022 | 06/27/2022 |
| Note: Held By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM need proposed elevation showing right of way line across front of property is equal or higher than centerline of road | |||
| ZON | HOLD | 06/21/2022 | 06/22/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide width of walkway on site plan/survey One additional 7 gallon shrub required around AC | |||
| SWALE | COMPLETE | 06/21/2022 | 09/19/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/25/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 09/25/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 09/25/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 09/25/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 04/13/2023 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 08/26/2022 |
| IMPACT FEE FIRE | ¤388.65 | 08/26/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 08/26/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/26/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 08/26/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/26/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 08/26/2022 |
| SURCHARGE FS 533.721 | ¤2.57 | 08/26/2022 |
| SURCHARGE - FS 468.631 | ¤3.86 | 08/26/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/26/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/26/2022 |
| SW ENG PRE APRON | ¤30.00 | 08/26/2022 |
| CONNECTION FEES | ¤1,077.88 | 08/26/2022 |
| CONTRACTOR CHANGE | ¤40.00 | 08/26/2022 |
| WATER- TURN ON | ¤25.00 | 08/26/2022 |
| ADJUSTMENT 50% | (¤383.89) | 08/26/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/26/2022 |
| INSPECTION - RESIDENTIAL | ¤574.75 | 08/26/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤163.02 | 08/26/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/26/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/26/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 08/26/2022 |
| SEWER CREDIT | (¤1,147.00) | 08/26/2022 |
| SEWER INSPECTION | ¤25.00 | 08/26/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 08/26/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 08/26/2022 |
| SITE PLAN 30 | ¤30.00 | 08/26/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,642.00 |