I want to search for...
Permit #2022061203
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-01040-0290 |
| GARAGE: 868 sqft |
| CONDITIONED SPACE: 2898 sqft |
| OPENED PORCH (WITH ROOF) : 68 sqft |
| OPENED PORCH (WITH ROOF) : 280 sqft |
| Total Square Footage: 4114 sqft |
| Block: 01040 |
| Subdivision: 2176 - SECTION 37-LAKEVIEW |
| Job Phone: 386-931-5935 |
| Location Address: 36 LOUISIANA DR |
| Type: DU - DUPLEX |
| Issue Date: 07/13/2022 |
| NOC: RECORDED |
| Applicant name: RYAN JAMES PERRY |
| Owner: PIRES RANDY & LUZIA CACOILO PIRES JTWROS |
|
Address 50 BURBANK DR PALM COAST, FL 32137 |
| Lot: 0290 |
| Contracted Stated Job Value: ¤450,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
WATERSIDE HOMES RENOVATIONS AND DESIGNS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
RYAN JAMES PERRY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
DILLON CARRERAS
| Status | Location Address | State License Number |
| ACTIVE |
3504 LUNDY ROAD PALATKA, FL 32177 |
EC13010133 (Exp: 08/31/2026) |
Inspection History
| Type | Request Date | Result | Inspector |
| GRAVITY SEWER TEST | 06/27/2023 | Approval - Private Provider | PPROVIDER |
| Note: 4/13/2023 9:46:43 AM- PREVIOUS INSPECTION NOTES | |||
| BLD - BUILDING FINAL | 06/23/2023 | Approval - Private Provider | PPROVIDER |
| ROW - FINAL APRON (AFTER POUR) | 06/23/2023 | FINAL APPROVED | EMADISON |
| ROW - FINAL INSPECTION | 06/23/2023 | FINAL APPROVED | EMADISON |
| U -UTILITY RESIDENTIAL FINAL | 06/23/2023 | FINAL APPROVED | JHARDING |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/22/2023 | APPROVED | RGROSS |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/22/2023 | APPROVED | RGROSS |
| ELECTRIC - EARLY POWER | 05/19/2023 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 05/08/2023 | APPROVED | EMADISON |
| Note: ** 05/08/23 READY TO POUR BUILDERS RESPONSIBILITY TO ENSURE CULVERT ELEVATION IS WITHIN TOLERANCE BEFORE THE POUR IN THE EVENT OF RAIN CHECK COMPACTION OF MATERIAL **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL _____________________________________________________________________________________________________________________ 5/5/2023 - PREVIOUS INSPECTION NOTES ** 05/05/23 AS INDICATED IN PREVIOUS INSPECTION ** BUILDER NEEDS TO EXTEND FORM BOARDS OF BOTH DRIVEWAYS OR BACK FILL UP TO THEM TO CONTAIN CONCRETE IN THE POUR AREAS OF BOTH DRIVEWAYS _________________________________________________________________________________________________________________________ 5/4/2023 - PREVIOUS INSPECTION NOTES ** 05/04/23 BUILDER NEEDS TO EXTEND FORM BOARDS OF BOTH DRIVEWAYS OR BACK FILL UP TO THEM TO CONTAIN CONCRETE IN THE POUR AREAS OF BOTH DRIVEWAYS ** RIGHT DRIVEWAY NEEDS A MINIMUM OF 4 INCHES OF CONCRETE ABOVE THE ROW ** BOTH APRON AREAS AND ROW NEED MORE COMPACTION OF MATERIAL ITS TOO SOFT ** RIGHT SIDE APRON FACE BOARD NEEDS TO RAISE ABOUT 1 INCH ** BOTH CULVERTS ARE GOOD AT THE TIME OF INSPECTION** ** SEE ATTACHED PHOTOS _____________________________________________________________________________________________________________________ 5/3/2023 - PREVIOUS INSPECTION NOTES ** 05/03/23 ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 | |||
| ROW- PRE-APRON (PRE-POUR) | 05/05/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 05/05/23 AS INDICATED IN PREVIOUS INSPECTION ** BUILDER NEEDS TO EXTEND FORM BOARDS OF BOTH DRIVEWAYS OR BACK FILL UP TO THEM TO CONTAIN CONCRETE IN THE POUR AREAS OF BOTH DRIVEWAYS _________________________________________________________________________________________________________________________ 5/4/2023 - PREVIOUS INSPECTION NOTES ** 05/04/23 BUILDER NEEDS TO EXTEND FORM BOARDS OF BOTH DRIVEWAYS OR BACK FILL UP TO THEM TO CONTAIN CONCRETE IN THE POUR AREAS OF BOTH DRIVEWAYS ** RIGHT DRIVEWAY NEEDS A MINIMUM OF 4 INCHES OF CONCRETE ABOVE THE ROW ** BOTH APRON AREAS AND ROW NEED MORE COMPACTION OF MATERIAL ITS TOO SOFT ** RIGHT SIDE APRON FACE BOARD NEEDS TO RAISE ABOUT 1 INCH ** BOTH CULVERTS ARE GOOD AT THE TIME OF INSPECTION** ** SEE ATTACHED PHOTOS _____________________________________________________________________________________________________________________ 5/3/2023 - PREVIOUS INSPECTION NOTES ** 05/03/23 ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 | |||
| ROW- PRE-APRON (PRE-POUR) | 05/04/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 05/04/23 BUILDER NEEDS TO EXTEND FORM BOARDS OF BOTH DRIVEWAYS OR BACK FILL UP TO THEM TO CONTAIN CONCRETE IN THE POUR AREAS OF BOTH DRIVEWAYS ** RIGHT DRIVEWAY NEEDS A MINIMUM OF 4 INCHES OF CONCRETE ABOVE THE ROW ** BOTH APRON AREAS AND ROW NEED MORE COMPACTION OF MATERIAL ITS TOO SOFT ** RIGHT SIDE APRON FACE BOARD NEEDS TO RAISE ABOUT 1 INCH ** BOTH CULVERTS ARE GOOD AT THE TIME OF INSPECTION** ** SEE ATTACHED PHOTOS _____________________________________________________________________________________________________________________ 5/3/2023 - PREVIOUS INSPECTION NOTES ** 05/03/23 ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 | |||
| ROW- PRE-APRON (PRE-POUR) | 05/03/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 05/03/23 ADDRESS MUST BE POSTED AND PLAINLY VISIBLE TO INSPECTORS. IF ADDRESS IS NOT PLAINLY VISIBLE, INSPECTORS WILL NOT PERFORM INSPECTIONS AND A REINSPECTION FEE WILL BE ISSUED. Florida Building Code-Building Section 501.2 | |||
| FIREWALL FINAL | 05/03/2023 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 04/13/2023 | Disapproved- Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 04/12/2023 | APPROVED | DHANEY |
| U - SEWER TIE IN | 04/12/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 04/11/2023 | CANCELLED BY APPLICANT | PPROVIDER |
| PEP TANK INSTALLATION REQUEST | 02/24/2023 | APPROVED | TSCHWEERS |
| PLUMBING 1ST ROUGH UNDERGROUND | 02/21/2023 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 02/21/2023 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 01/11/2023 | APPROVED | TDOAK |
| INSULATION | 01/05/2023 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 01/04/2023 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 12/20/2022 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 11/17/2022 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 10/28/2022 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/28/2022 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 10/28/2022 | Approval - Private Provider | PPROVIDER |
| ROW - DRAINAGE | 10/04/2022 | APPROVED | EMADISON |
| Note: ** BUILDER NEEDS TO REMOVE LARGE PIECE OF CONCRETE FROM SWALE 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 NO CORRECTIONS MADE BUILDER STILL NEEDS TO OPEN SWALE IN FRONT OF SITE. ** FOLLOW UP INSPECTION ON 10/04/22 9/28/2022 - PREVIOUS INSPECTION NOTES Drainage across the new construction site has washed out and needs opened ASAP! W/O 38296 | |||
| ROW - DRAINAGE | 09/30/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 10/03/22 NO CORRECTIONS MADE BUILDER STILL NEEDS TO OPEN SWALE IN FRONT OF SITE. ** FOLLOW UP INSPECTION ON 10/04/22 9/28/2022 - PREVIOUS INSPECTION NOTES Drainage across the new construction site has washed out and needs opened ASAP! W/O 38296 | |||
| ROW - DRAINAGE | 09/28/2022 | Disapproved - NO FEE | RGROSS |
| Note: Drainage across the new construction site has washed out and needs opened ASAP! W/O 38296 | |||
| TIE BEAM / LINTEL | 09/23/2022 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 08/04/2022 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 7/28/2022 8:35:13 AM still clearing | |||
| WATER METER INSTALLATION REQUEST | 07/25/2022 | Disapproved - NO FEE | CSTONE |
| Note: still clearing |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 10/06/2022 | 10/07/2022 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/06/2022 | 10/07/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 09/27/2022 | 09/28/2022 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Slab elevation on foundation survey is 10'+/- lower than approved site plan. | |||
| ZON | COMPLETE | 09/27/2022 | 09/27/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 09/27/2022 | 09/27/2022 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Inspection results from the private provider are to be submitted via email by the private provider. Do not load them to the permit portal. This leads to duplicate work for administrative staff. Please refer to the private provider instructions on the city building department webpage. The PP is familiar with the process. | |||
| ELEC | COMPLETE | 07/07/2022 | 07/08/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/07/2022 | 07/13/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/07/2022 | 07/07/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/07/2022 | 07/08/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/21/2022 | 06/24/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 06/21/2022 | 06/23/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 06/21/2022 | 06/21/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need correct outlet spacing in all bedrooms. NEC 2017 210.52 | |||
| ENGIN1 | COMPLETE | 06/21/2022 | 06/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/21/2022 | 06/24/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/21/2022 | 06/21/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 06/21/2022 | 06/28/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO PUT A BERM IN THE BACK PROPERTY LINE SO THE DRAINAGE DOESNT INPACT THE LOT BEHIND YOUR LOT | |||
| ZON | COMPLETE | 06/21/2022 | 06/23/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 06/21/2022 | 09/16/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 06/26/2023 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 06/26/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/26/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/26/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 06/26/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 06/26/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 06/26/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 06/26/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/13/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/13/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤82.14) | 07/13/2022 |
| SEWER CREDIT | (¤4,564.44) | 07/13/2022 |
| SEWER INSPECTION | ¤25.00 | 07/13/2022 |
| SEWER CAPITAL FACILITY | ¤9,879.52 | 07/13/2022 |
| WATER CREDIT | (¤218.30) | 07/13/2022 |
| WATER CAPITAL FACILITY FEE | ¤7,253.00 | 07/13/2022 |
| SITE PLAN 30 | ¤30.00 | 07/13/2022 |
| WATER- TURN ON | ¤50.00 | 07/13/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/13/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/13/2022 |
| SW ENG PRE APRON | ¤30.00 | 07/13/2022 |
| INSPECTION - RESIDENTIAL | ¤1,237.50 | 07/13/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤351.00 | 07/13/2022 |
| CONNECTION FEES | ¤2,155.76 | 07/13/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤23.32) | 07/13/2022 |
| IMPACT FEE FIRE | ¤777.30 | 07/13/2022 |
| IMPACT FEE PARKS | ¤2,910.26 | 07/13/2022 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 07/13/2022 |
| IMPACT FEE TRANSPORTATION | ¤2,738.00 | 07/13/2022 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 07/13/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤87.31) | 07/13/2022 |
| SURCHARGE FS 533.721 | ¤13.31 | 07/13/2022 |
| SURCHARGE - FS 468.631 | ¤19.96 | 07/13/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/13/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤30,490.10 |