Permit #2022061215
Permit Details
Status: COED
| Parcel Id: 07-11-31-7013-00080-0740 |
| CONDITIONED SPACE: 1517 sqft |
| GARAGE: 394 sqft |
| Total Square Footage: 1911 sqft |
| Block: 00080 |
| Subdivision: 2192 - SECTION 13-BELLE TERRE |
| Job Phone: 407-432-2344 |
| Location Address: 122 BRESSLER LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/14/2022 |
| NOC: RECORDED |
| Applicant name: WADE GILMER JURNEY JR |
| Owner: NATIONAL HOME CORPORATION |
|
Address 4850 TAMIAMI TRAIL N NAPLES, FL 34103 |
| Lot: 0740 |
| Contracted Stated Job Value: ¤209,353.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
NATIONAL HOME CORPORATION
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1080 HOLCOMB BRIDGE ROAD , |
BLDG 100 - 330 ROSWELL , GA 30076 |
CBC1257700 (Exp: 08/31/2026) | 471-817-1259 |
Sub Contractors
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JASON PATRICK RIBOCK
| Status | Location Address | State License Number | Phone |
| INACTIVE |
620 E PINE ST , 0 |
ES12001313 (Exp: 08/31/2026) | 407-625-0257 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
RANDALL SCOTT ROSENFELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
234 N WHITNEY ST PALM COAST, FL 32084 |
CAC1816641 (Exp: 08/31/2026) | 904-599-0082 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/27/2023 | FINAL APPROVED | JSTEWART |
| Note: Check for disconnect for WH or lockout breaker | |||
| ROW - STORMWATER FINAL | 07/26/2023 | APPROVED | GBERTOLA |
| Note: 7/26/23= At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ** 11/16/22 NOTE TO INSPECTOR BEFORE ROW FINAL IS APPROVED ** BUILDER IS REQUIRED TO CLEAN ALL SEDIMENT FROM THE CATCH BASIS AND FLUSH THE ROAD CROSSING PIPE TO DITCH AS WELL AS CLEANING SEDIMENT THAT HAS WASHED INTO DITCH FROM THE CONSTRUCTION AT 122 BRESSLER LN | |||
| U -UTILITY RESIDENTIAL FINAL | 07/26/2023 | FINAL APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 07/24/2023 | FINAL APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/24/2023 | APPROVED | EMADISON |
| Note: Inspector Notes from Inspection 9465 ** 07/18/23 NEED TO REPAIR SOD ON LEFT SIDE AS IT WILL HOLD AND POND WATER FLOWING TO THE FRONT ROAD SIDE SWALE ** ALSO RIGHT SIDE CULVERT END IN SWALE LOWER SOD TO GRADE AS DRAIN GOES TO A BASIN 10 FEET AWAY ** CHECK HIGH SPOT IN SWALE LEFT SIDE AT CULVERT END WATER FLOWS LEFT TO RIGHT ** BUILDER NEEDS TO HAVE GRASS CUT SO INSPECTOR CAN SEE THE DRAINAGE FEATURES. _____________________________________________________________________________________________________________________ 5/12/2023 - PREVIOUS INSPECTION NOTES 05/12/23= All slopes must adjoin existing improved properties at no greater than a 4:1 slope. Slopes C. Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(12) THE SLOPE IN THE BACK OF THE PROPERTY IS MORE THE 4/1 AND WHEN YOU FINISHED WITH THE SLOPE THAT WATER NEED TO MOVE TO THE FRONT SWALE .The subject lots drainage must not negatively impact any adjacent property. (J)FJ.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/24/2023 | APPROVED - AS NOTED | EMADISON |
| Note: ** 07/24/23 ON LEFT SIDE IN FRONT NEW SOD WAS SET ON TOP OF EXISTING CREATING BERM WHICH WILL HOLD WATER AND PUSH ONTO ADJACENT PROPERTY BUILD NEEDS TO CORRECT THIS BEFORE THE FINAL ROW. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/18/2023 | APPROVED - AS NOTED | EMADISON |
| Note: ** 07/18/23 NEED TO REPAIR SOD ON LEFT SIDE AS IT WILL HOLD AND POND WATER FLOWING TO THE FRONT ROAD SIDE SWALE ** ALSO RIGHT SIDE CULVERT END IN SWALE LOWER SOD TO GRADE AS DRAIN GOES TO A BASIN 10 FEET AWAY ** CHECK HIGH SPOT IN SWALE LEFT SIDE AT CULVERT END WATER FLOWS LEFT TO RIGHT ** BUILDER NEEDS TO HAVE GRASS CUT SO INSPECTOR CAN SEE THE DRAINAGE FEATURES. _____________________________________________________________________________________________________________________ 5/12/2023 - PREVIOUS INSPECTION NOTES 05/12/23= All slopes must adjoin existing improved properties at no greater than a 4:1 slope. Slopes C. Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(12) THE SLOPE IN THE BACK OF THE PROPERTY IS MORE THE 4/1 AND WHEN YOU FINISHED WITH THE SLOPE THAT WATER NEED TO MOVE TO THE FRONT SWALE .The subject lots drainage must not negatively impact any adjacent property. (J)FJ.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/12/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: 05/12/23= All slopes must adjoin existing improved properties at no greater than a 4:1 slope. Slopes C. Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(12) THE SLOPE IN THE BACK OF THE PROPERTY IS MORE THE 4/1 AND WHEN YOU FINISHED WITH THE SLOPE THAT WATER NEED TO MOVE TO THE FRONT SWALE .The subject lots drainage must not negatively impact any adjacent property. (J)FJ.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6) | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/12/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD | |||
| U-CROSS CONNECTION | 04/20/2023 | APPROVED | DHANEY |
| ELECTRIC - EARLY POWER | 04/20/2023 | APPROVED - AS NOTED | TSTAUFFACHER |
| Note: 04/20/2023- Approved-release to FPL at 08:39 AM Inspector Notes from Inspection 2200 Emailed FPL @ 0845. Release Power | |||
| ROW- PRE-APRON (PRE-POUR) | 04/13/2023 | APPROVED | FSLADISH |
| Note: 04/13/23 READY TO POUR. IN CASE OF RAIN CONTRACTORS RESPONSIBILTY TO RECHECK CULVERT PIPE ELEVATION AND COMPACTION BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| INSULATION | 03/02/2023 | APPROVED | JSTEWART |
| Note: 3/1/2023 - PREVIOUS INSPECTION NOTES 3/1/2023--Please fire foam edges of Plywood ceiling in AC/WH room. | |||
| INSULATION | 03/01/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 3/1/2023--Please fire foam edges of Plywood ceiling in AC/WH room. | |||
| ALL ROUGH | 02/16/2023 | APPROVED | TSTAUFFACHER |
| U - SEWER TIE IN | 02/09/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 01/27/2023 | APPROVED | FWILLIS |
| ELECTRIC-TUG | 01/09/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 0845. Release Power | |||
| ROOF VALLEY & METAL | 01/09/2023 | APPROVED | KSANDOE |
| WALL SHEATHING | 01/04/2023 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/04/2023 | APPROVED | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 12/29/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 12/19/2022 | APPROVED | LMILLER |
| MONOLITHIC SLAB | 12/08/2022 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/06/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 12/06/2022 | APPROVED | MGIBSON |
| ROW - DRAINAGE | 11/21/2022 | APPROVED | EMADISON |
| Note: ** 11/21/22 ALL CORRECTIONS HAVE BEEN MADE 11/16/2022 - PREVIOUS INSPECTION NOTES **11/16/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN TO PREVENT SEDIMENT FROM ENTERING THE STORMWATER DRAINAGE SYSTEM ** FOLLOW UP INSPECTION ON 11/17/22 10/17/2022 - PREVIOUS INSPECTION NOTES ** 10/17/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN ** BUILDER NEEDS TO OPE3N SWALE OR INSTALL A TEMPORARY CULVERT YOUR MATERIAL IS BLOCKING THE DRAINAGE CONVEYANCE. ** BUILDER ALSO NEEDS TO REPAIR AND SOD SWALE ACROSS THE STREET WHERE THEY CAUSED DAMAGE TO SWALE WORK MUST MATCH EXISTING GRADE. ** *** A STOP WORK ORDER WILL BE SUBMITTED IF CORRECTIONS ARE NOT MADE *** ** FOLLOW UP INSPECTION ON 10/18/22 10/11/2022 - PREVIOUS INSPECTION NOTES Builder has graded to allow for drainage and has a temporary culvert on site for installation. 10/10/2022 - PREVIOUS INSPECTION NOTES TEMPORARY CULVERT IS STILL NOT PUT IN ------------------------------------------------------------------------------------------ 10/6/2022 - PREVIOUS INSPECTION NOTES Temporary Culvert on site. Giving the builder and E for Effort. Rescheduling another one to ensure proper installation. 10/5/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** BUILDER STILL HAS NOT INSTALLED THE TEMPORARY CULVERT AT SITE ENTRANCE ** BUILDER HAS NOT INSTALLED ANY FORM OF EROSION CONTROL AROUND CATCH BASIN ** **A STOP WORK ORDER WILL BE IMPOSED ON JOB SITE** ** ** FOLLOW UP INSPECTION ON 10/06/22 10/4/2022 - PREVIOUS INSPECTION NOTES 10/04/22 SEE NOTES FROM PREVIOUS INSPECTION 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN AT THE PROJECT SITE, SEROIOUS EROSION HAS DEPOSITED A LARGE AMOUNT OF MATERIAL IN THE DITCH ACROSS FROM THE PROJECT SITE WHICH WAS WASHED THROUGHT THE CATCH BASIN AND ROAD CROSSING PIPE. ** BUILDER WILL BE REQUIRED TO ENSURE CATCH BASIN, CULVERT AND DITCH ARE CLEANED OF ALL SEDIMENT THAT HAS ERODED FROM THE PROJECT SITE PRIOR TO ROW FINALS APPROVAL ** 09/29/22 RESCHEDULED DUE TO HURRICANE IAN 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22*** | |||
| ROW - DRAINAGE | 11/17/2022 | CANCELLED BY INSPECTOR | EMADISON |
| Note: 11/16/2022 - PREVIOUS INSPECTION NOTES **11/16/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN TO PREVENT SEDIMENT FROM ENTERING THE STORMWATER DRAINAGE SYSTEM ** FOLLOW UP INSPECTION ON 11/17/22 10/17/2022 - PREVIOUS INSPECTION NOTES ** 10/17/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN ** BUILDER NEEDS TO OPE3N SWALE OR INSTALL A TEMPORARY CULVERT YOUR MATERIAL IS BLOCKING THE DRAINAGE CONVEYANCE. ** BUILDER ALSO NEEDS TO REPAIR AND SOD SWALE ACROSS THE STREET WHERE THEY CAUSED DAMAGE TO SWALE WORK MUST MATCH EXISTING GRADE. ** *** A STOP WORK ORDER WILL BE SUBMITTED IF CORRECTIONS ARE NOT MADE *** ** FOLLOW UP INSPECTION ON 10/18/22 10/11/2022 - PREVIOUS INSPECTION NOTES Builder has graded to allow for drainage and has a temporary culvert on site for installation. 10/10/2022 - PREVIOUS INSPECTION NOTES TEMPORARY CULVERT IS STILL NOT PUT IN ------------------------------------------------------------------------------------------ 10/6/2022 - PREVIOUS INSPECTION NOTES Temporary Culvert on site. Giving the builder and E for Effort. Rescheduling another one to ensure proper installation. 10/5/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** BUILDER STILL HAS NOT INSTALLED THE TEMPORARY CULVERT AT SITE ENTRANCE ** BUILDER HAS NOT INSTALLED ANY FORM OF EROSION CONTROL AROUND CATCH BASIN ** **A STOP WORK ORDER WILL BE IMPOSED ON JOB SITE** ** ** FOLLOW UP INSPECTION ON 10/06/22 10/4/2022 - PREVIOUS INSPECTION NOTES 10/04/22 SEE NOTES FROM PREVIOUS INSPECTION 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN AT THE PROJECT SITE, SEROIOUS EROSION HAS DEPOSITED A LARGE AMOUNT OF MATERIAL IN THE DITCH ACROSS FROM THE PROJECT SITE WHICH WAS WASHED THROUGHT THE CATCH BASIN AND ROAD CROSSING PIPE. ** BUILDER WILL BE REQUIRED TO ENSURE CATCH BASIN, CULVERT AND DITCH ARE CLEANED OF ALL SEDIMENT THAT HAS ERODED FROM THE PROJECT SITE PRIOR TO ROW FINALS APPROVAL ** 09/29/22 RESCHEDULED DUE TO HURRICANE IAN 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22*** | |||
| ROW - DRAINAGE | 11/16/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: **11/16/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN TO PREVENT SEDIMENT FROM ENTERING THE STORMWATER DRAINAGE SYSTEM ** FOLLOW UP INSPECTION ON 11/17/22 10/17/2022 - PREVIOUS INSPECTION NOTES ** 10/17/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN ** BUILDER NEEDS TO OPE3N SWALE OR INSTALL A TEMPORARY CULVERT YOUR MATERIAL IS BLOCKING THE DRAINAGE CONVEYANCE. ** BUILDER ALSO NEEDS TO REPAIR AND SOD SWALE ACROSS THE STREET WHERE THEY CAUSED DAMAGE TO SWALE WORK MUST MATCH EXISTING GRADE. ** *** A STOP WORK ORDER WILL BE SUBMITTED IF CORRECTIONS ARE NOT MADE *** ** FOLLOW UP INSPECTION ON 10/18/22 10/11/2022 - PREVIOUS INSPECTION NOTES Builder has graded to allow for drainage and has a temporary culvert on site for installation. 10/10/2022 - PREVIOUS INSPECTION NOTES TEMPORARY CULVERT IS STILL NOT PUT IN ------------------------------------------------------------------------------------------ 10/6/2022 - PREVIOUS INSPECTION NOTES Temporary Culvert on site. Giving the builder and E for Effort. Rescheduling another one to ensure proper installation. 10/5/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** BUILDER STILL HAS NOT INSTALLED THE TEMPORARY CULVERT AT SITE ENTRANCE ** BUILDER HAS NOT INSTALLED ANY FORM OF EROSION CONTROL AROUND CATCH BASIN ** **A STOP WORK ORDER WILL BE IMPOSED ON JOB SITE** ** ** FOLLOW UP INSPECTION ON 10/06/22 10/4/2022 - PREVIOUS INSPECTION NOTES 10/04/22 SEE NOTES FROM PREVIOUS INSPECTION 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN AT THE PROJECT SITE, SEROIOUS EROSION HAS DEPOSITED A LARGE AMOUNT OF MATERIAL IN THE DITCH ACROSS FROM THE PROJECT SITE WHICH WAS WASHED THROUGHT THE CATCH BASIN AND ROAD CROSSING PIPE. ** BUILDER WILL BE REQUIRED TO ENSURE CATCH BASIN, CULVERT AND DITCH ARE CLEANED OF ALL SEDIMENT THAT HAS ERODED FROM THE PROJECT SITE PRIOR TO ROW FINALS APPROVAL ** 09/29/22 RESCHEDULED DUE TO HURRICANE IAN 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22*** | |||
| ROW - DRAINAGE | 10/17/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 10/17/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN ** BUILDER NEEDS TO OPE3N SWALE OR INSTALL A TEMPORARY CULVERT YOUR MATERIAL IS BLOCKING THE DRAINAGE CONVEYANCE. ** BUILDER ALSO NEEDS TO REPAIR AND SOD SWALE ACROSS THE STREET WHERE THEY CAUSED DAMAGE TO SWALE WORK MUST MATCH EXISTING GRADE. ** *** A STOP WORK ORDER WILL BE SUBMITTED IF CORRECTIONS ARE NOT MADE *** ** FOLLOW UP INSPECTION ON 10/18/22 10/11/2022 - PREVIOUS INSPECTION NOTES Builder has graded to allow for drainage and has a temporary culvert on site for installation. 10/10/2022 - PREVIOUS INSPECTION NOTES TEMPORARY CULVERT IS STILL NOT PUT IN ------------------------------------------------------------------------------------------ 10/6/2022 - PREVIOUS INSPECTION NOTES Temporary Culvert on site. Giving the builder and E for Effort. Rescheduling another one to ensure proper installation. 10/5/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** BUILDER STILL HAS NOT INSTALLED THE TEMPORARY CULVERT AT SITE ENTRANCE ** BUILDER HAS NOT INSTALLED ANY FORM OF EROSION CONTROL AROUND CATCH BASIN ** **A STOP WORK ORDER WILL BE IMPOSED ON JOB SITE** ** ** FOLLOW UP INSPECTION ON 10/06/22 10/4/2022 - PREVIOUS INSPECTION NOTES 10/04/22 SEE NOTES FROM PREVIOUS INSPECTION 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN AT THE PROJECT SITE, SEROIOUS EROSION HAS DEPOSITED A LARGE AMOUNT OF MATERIAL IN THE DITCH ACROSS FROM THE PROJECT SITE WHICH WAS WASHED THROUGHT THE CATCH BASIN AND ROAD CROSSING PIPE. ** BUILDER WILL BE REQUIRED TO ENSURE CATCH BASIN, CULVERT AND DITCH ARE CLEANED OF ALL SEDIMENT THAT HAS ERODED FROM THE PROJECT SITE PRIOR TO ROW FINALS APPROVAL ** 09/29/22 RESCHEDULED DUE TO HURRICANE IAN 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22*** | |||
| ROW - DRAINAGE | 10/11/2022 | PARTIALLY APPROVED | RGROSS |
| Note: Builder has graded to allow for drainage and has a temporary culvert on site for installation. 10/10/2022 - PREVIOUS INSPECTION NOTES TEMPORARY CULVERT IS STILL NOT PUT IN ------------------------------------------------------------------------------------------ 10/6/2022 - PREVIOUS INSPECTION NOTES Temporary Culvert on site. Giving the builder and E for Effort. Rescheduling another one to ensure proper installation. 10/5/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** BUILDER STILL HAS NOT INSTALLED THE TEMPORARY CULVERT AT SITE ENTRANCE ** BUILDER HAS NOT INSTALLED ANY FORM OF EROSION CONTROL AROUND CATCH BASIN ** **A STOP WORK ORDER WILL BE IMPOSED ON JOB SITE** ** ** FOLLOW UP INSPECTION ON 10/06/22 10/4/2022 - PREVIOUS INSPECTION NOTES 10/04/22 SEE NOTES FROM PREVIOUS INSPECTION 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN AT THE PROJECT SITE, SEROIOUS EROSION HAS DEPOSITED A LARGE AMOUNT OF MATERIAL IN THE DITCH ACROSS FROM THE PROJECT SITE WHICH WAS WASHED THROUGHT THE CATCH BASIN AND ROAD CROSSING PIPE. ** BUILDER WILL BE REQUIRED TO ENSURE CATCH BASIN, CULVERT AND DITCH ARE CLEANED OF ALL SEDIMENT THAT HAS ERODED FROM THE PROJECT SITE PRIOR TO ROW FINALS APPROVAL ** 09/29/22 RESCHEDULED DUE TO HURRICANE IAN 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22*** | |||
| ROW - DRAINAGE | 10/10/2022 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: TEMPORARY CULVERT IS STILL NOT PUT IN ------------------------------------------------------------------------------------------ 10/6/2022 - PREVIOUS INSPECTION NOTES Temporary Culvert on site. Giving the builder and E for Effort. Rescheduling another one to ensure proper installation. 10/5/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** BUILDER STILL HAS NOT INSTALLED THE TEMPORARY CULVERT AT SITE ENTRANCE ** BUILDER HAS NOT INSTALLED ANY FORM OF EROSION CONTROL AROUND CATCH BASIN ** **A STOP WORK ORDER WILL BE IMPOSED ON JOB SITE** ** ** FOLLOW UP INSPECTION ON 10/06/22 10/4/2022 - PREVIOUS INSPECTION NOTES 10/04/22 SEE NOTES FROM PREVIOUS INSPECTION 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN AT THE PROJECT SITE, SEROIOUS EROSION HAS DEPOSITED A LARGE AMOUNT OF MATERIAL IN THE DITCH ACROSS FROM THE PROJECT SITE WHICH WAS WASHED THROUGHT THE CATCH BASIN AND ROAD CROSSING PIPE. ** BUILDER WILL BE REQUIRED TO ENSURE CATCH BASIN, CULVERT AND DITCH ARE CLEANED OF ALL SEDIMENT THAT HAS ERODED FROM THE PROJECT SITE PRIOR TO ROW FINALS APPROVAL ** 09/29/22 RESCHEDULED DUE TO HURRICANE IAN 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22*** | |||
| ROW - DRAINAGE | 10/06/2022 | PARTIALLY APPROVED | RGROSS |
| Note: Temporary Culvert on site. Giving the builder and E for Effort. Rescheduling another one to ensure proper installation. 10/5/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** BUILDER STILL HAS NOT INSTALLED THE TEMPORARY CULVERT AT SITE ENTRANCE ** BUILDER HAS NOT INSTALLED ANY FORM OF EROSION CONTROL AROUND CATCH BASIN ** **A STOP WORK ORDER WILL BE IMPOSED ON JOB SITE** ** ** FOLLOW UP INSPECTION ON 10/06/22 10/4/2022 - PREVIOUS INSPECTION NOTES 10/04/22 SEE NOTES FROM PREVIOUS INSPECTION 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN AT THE PROJECT SITE, SEROIOUS EROSION HAS DEPOSITED A LARGE AMOUNT OF MATERIAL IN THE DITCH ACROSS FROM THE PROJECT SITE WHICH WAS WASHED THROUGHT THE CATCH BASIN AND ROAD CROSSING PIPE. ** BUILDER WILL BE REQUIRED TO ENSURE CATCH BASIN, CULVERT AND DITCH ARE CLEANED OF ALL SEDIMENT THAT HAS ERODED FROM THE PROJECT SITE PRIOR TO ROW FINALS APPROVAL ** 09/29/22 RESCHEDULED DUE TO HURRICANE IAN 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22*** | |||
| ROW - DRAINAGE | 10/05/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** BUILDER STILL HAS NOT INSTALLED THE TEMPORARY CULVERT AT SITE ENTRANCE ** BUILDER HAS NOT INSTALLED ANY FORM OF EROSION CONTROL AROUND CATCH BASIN ** **A STOP WORK ORDER WILL BE IMPOSED ON JOB SITE** ** ** FOLLOW UP INSPECTION ON 10/06/22 10/4/2022 - PREVIOUS INSPECTION NOTES 10/04/22 SEE NOTES FROM PREVIOUS INSPECTION 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN AT THE PROJECT SITE, SEROIOUS EROSION HAS DEPOSITED A LARGE AMOUNT OF MATERIAL IN THE DITCH ACROSS FROM THE PROJECT SITE WHICH WAS WASHED THROUGHT THE CATCH BASIN AND ROAD CROSSING PIPE. ** BUILDER WILL BE REQUIRED TO ENSURE CATCH BASIN, CULVERT AND DITCH ARE CLEANED OF ALL SEDIMENT THAT HAS ERODED FROM THE PROJECT SITE PRIOR TO ROW FINALS APPROVAL ** 09/29/22 RESCHEDULED DUE TO HURRICANE IAN 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22*** | |||
| ROW - DRAINAGE | 10/04/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: 10/04/22 SEE NOTES FROM PREVIOUS INSPECTION 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN AT THE PROJECT SITE, SEROIOUS EROSION HAS DEPOSITED A LARGE AMOUNT OF MATERIAL IN THE DITCH ACROSS FROM THE PROJECT SITE WHICH WAS WASHED THROUGHT THE CATCH BASIN AND ROAD CROSSING PIPE. ** BUILDER WILL BE REQUIRED TO ENSURE CATCH BASIN, CULVERT AND DITCH ARE CLEANED OF ALL SEDIMENT THAT HAS ERODED FROM THE PROJECT SITE PRIOR TO ROW FINALS APPROVAL ** FOLLOW UP INSPECTION 10/05/22 ** 09/29/22 RESCHEDULED DUE TO HURRICANE IAN 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22*** | |||
| ROW - DRAINAGE | 10/03/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 10/03/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN AT THE PROJECT SITE, SEROIOUS EROSION HAS DEPOSITED A LARGE AMOUNT OF MATERIAL IN THE DITCH ACROSS FROM THE PROJECT SITE WHICH WAS WASHED THROUGHT THE CATCH BASIN AND ROAD CROSSING PIPE. ** BUILDER WILL BE REQUIRED TO ENSURE CATCH BASIN, CULVERT AND DITCH ARE CLEANED OF ALL SEDIMENT THAT HAS ERODED FROM THE PROJECT SITE PRIOR TO ROW FINALS APPROVAL ** FOLLOW UP INSPECTION ON 10/04/22 ** 09/29/22 RESCHEDULED DUE TO HURRICANE IAN 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22*** | |||
| ROW - DRAINAGE | 09/29/2022 | CANCELLED BY INSPECTOR | EMADISON |
| Note: ** 09/29/22 INSPECTION CANCELLED DUE TON HURRICANE IAN RECHEDULED FOR 10/03/22 9/22/2022 - PREVIOUS INSPECTION NOTES Drainage opened for now. Temporary Culvert not permenantly installed yet. It is on site. Next inpseciton 9/29/22 9/21/2022 - PREVIOUS INSPECTION NOTES ** 09/21/22 NO WORK DONE SINCE PREVIOIUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/22/22 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22*** | |||
| ROW - DRAINAGE | 09/22/2022 | PARTIALLY APPROVED | RGROSS |
| Note: Drainage opened for now. Temporary Culvert not permenantly installed yet. It is on site. Next inpseciton 9/29/22 9/21/2022 - PREVIOUS INSPECTION NOTES ** 09/21/22 NO WORK DONE SINCE PREVIOIUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/22/22 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22*** | |||
| ROW - DRAINAGE | 09/21/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/21/22 NO WORK DONE SINCE PREVIOIUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22*** | |||
| ROW - DRAINAGE | 09/20/2022 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22*** | |||
| ROW - DRAINAGE | 09/19/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22*** | |||
| ROW - DRAINAGE | 09/14/2022 | Disapproved - NO FEE | EMADISON |
| Note: ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22*** | |||
| WATER METER INSTALLATION REQUEST | 09/06/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 06/28/2023 | 06/28/2023 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Unable to process final survey. Expired NOC. Once recorded NOC is uploaded please upload finaly survey again. | |||
| MECH | COMPLETE | 02/08/2023 | 02/08/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| MECH | HOLD | 02/02/2023 | 02/03/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition | |||
| ENGIN1 | COMPLETE | 12/28/2022 | 12/29/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/28/2022 | 12/28/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/05/2022 | 07/05/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/05/2022 | 07/05/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/21/2022 | 06/23/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Plans submitted are noted as a Master Plan. There is no Master Plan on file. | |||
| CUSVC | COMPLETE | 06/21/2022 | 06/23/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 06/21/2022 | 06/21/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/21/2022 | 06/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/21/2022 | 06/24/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/21/2022 | 06/21/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/21/2022 | 06/27/2022 |
| Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/21/2022 | 06/23/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Walkway width required on site plan/survey One additional 7 gallon shrub required around AC Must have a minimum 8 plantings along the front foundation of home. The ones around the walkway do not count | |||
| SWALE | COMPLETE | 06/21/2022 | 09/20/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/13/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/13/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/13/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/13/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/13/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/13/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/13/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/13/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/13/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/13/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/13/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/13/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/13/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/13/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/13/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/13/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 01/04/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 01/04/2023 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 07/14/2022 |
| IMPACT FEE FIRE | ¤388.65 | 07/14/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 07/14/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/14/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 07/14/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/14/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 07/14/2022 |
| SURCHARGE FS 533.721 | ¤6.54 | 07/14/2022 |
| SURCHARGE - FS 468.631 | ¤9.81 | 07/14/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/14/2022 |
| WATER- TURN ON | ¤25.00 | 07/14/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/14/2022 |
| INSPECTION - RESIDENTIAL | ¤577.50 | 07/14/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤163.80 | 07/14/2022 |
| CONNECTION FEES | ¤1,077.88 | 07/14/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/14/2022 |
| SW ENG PRE APRON | ¤30.00 | 07/14/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/14/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/14/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 07/14/2022 |
| SEWER CREDIT | (¤1,342.00) | 07/14/2022 |
| SEWER INSPECTION | ¤25.00 | 07/14/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 07/14/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 07/14/2022 |
| SITE PLAN 30 | ¤30.00 | 07/14/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,024.34 |