I want to search for...

Permit #2022061215

Permit Details

Status: COED

Parcel Id: 07-11-31-7013-00080-0740
CONDITIONED SPACE: 1517 sqft
GARAGE: 394 sqft
Total Square Footage: 1911 sqft
Block: 00080
Subdivision: 2192 - SECTION 13-BELLE TERRE
Job Phone: 407-432-2344
Location Address: 122 BRESSLER LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/14/2022
NOC: RECORDED
Applicant name: WADE GILMER JURNEY JR
Owner: NATIONAL HOME CORPORATION

Address

4850 TAMIAMI TRAIL N

NAPLES, FL 34103

Lot: 0740
Contracted Stated Job Value: ¤209,353.00
Job Description: Single Family Residence
Type: CN

Contractor

NATIONAL HOME CORPORATION
Status Location Address Mailing Address State License Number Phone
INACTIVE

1080 HOLCOMB BRIDGE ROAD

,

BLDG 100 - 330

ROSWELL , GA 30076

CBC1257700 (Exp: 08/31/2026) 471-817-1259

Sub Contractors

DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JASON PATRICK RIBOCK
Status Location Address State License Number Phone
INACTIVE

620 E PINE ST

, 0

ES12001313 (Exp: 08/31/2026) 407-625-0257
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
RANDALL SCOTT ROSENFELD
Status Location Address State License Number Phone
ACTIVE

234 N WHITNEY ST

PALM COAST, FL 32084

CAC1816641 (Exp: 08/31/2026) 904-599-0082

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/27/2023 FINAL APPROVED JSTEWART
Note: Check for disconnect for WH or lockout breaker
ROW - STORMWATER FINAL 07/26/2023 APPROVED GBERTOLA
Note: 7/26/23= At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ ** 11/16/22 NOTE TO INSPECTOR BEFORE ROW FINAL IS APPROVED ** BUILDER IS REQUIRED TO CLEAN ALL SEDIMENT FROM THE CATCH BASIS AND FLUSH THE ROAD CROSSING PIPE TO DITCH AS WELL AS CLEANING SEDIMENT THAT HAS WASHED INTO DITCH FROM THE CONSTRUCTION AT 122 BRESSLER LN
U -UTILITY RESIDENTIAL FINAL 07/26/2023 FINAL APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 07/24/2023 FINAL APPROVED EMADISON
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/24/2023 APPROVED EMADISON
Note: Inspector Notes from Inspection 9465 ** 07/18/23 NEED TO REPAIR SOD ON LEFT SIDE AS IT WILL HOLD AND POND WATER FLOWING TO THE FRONT ROAD SIDE SWALE ** ALSO RIGHT SIDE CULVERT END IN SWALE LOWER SOD TO GRADE AS DRAIN GOES TO A BASIN 10 FEET AWAY ** CHECK HIGH SPOT IN SWALE LEFT SIDE AT CULVERT END WATER FLOWS LEFT TO RIGHT ** BUILDER NEEDS TO HAVE GRASS CUT SO INSPECTOR CAN SEE THE DRAINAGE FEATURES. _____________________________________________________________________________________________________________________ 5/12/2023 - PREVIOUS INSPECTION NOTES 05/12/23= All slopes must adjoin existing improved properties at no greater than a 4:1 slope. Slopes C. Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(12) THE SLOPE IN THE BACK OF THE PROPERTY IS MORE THE 4/1 AND WHEN YOU FINISHED WITH THE SLOPE THAT WATER NEED TO MOVE TO THE FRONT SWALE .The subject lots drainage must not negatively impact any adjacent property. (J)FJ.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6)
ROW FIELD SURVEY /GRADING CERTIFICATION 07/24/2023 APPROVED - AS NOTED EMADISON
Note: ** 07/24/23 ON LEFT SIDE IN FRONT NEW SOD WAS SET ON TOP OF EXISTING CREATING BERM WHICH WILL HOLD WATER AND PUSH ONTO ADJACENT PROPERTY BUILD NEEDS TO CORRECT THIS BEFORE THE FINAL ROW.
ROW FIELD SURVEY /GRADING CERTIFICATION 07/18/2023 APPROVED - AS NOTED EMADISON
Note: ** 07/18/23 NEED TO REPAIR SOD ON LEFT SIDE AS IT WILL HOLD AND POND WATER FLOWING TO THE FRONT ROAD SIDE SWALE ** ALSO RIGHT SIDE CULVERT END IN SWALE LOWER SOD TO GRADE AS DRAIN GOES TO A BASIN 10 FEET AWAY ** CHECK HIGH SPOT IN SWALE LEFT SIDE AT CULVERT END WATER FLOWS LEFT TO RIGHT ** BUILDER NEEDS TO HAVE GRASS CUT SO INSPECTOR CAN SEE THE DRAINAGE FEATURES. _____________________________________________________________________________________________________________________ 5/12/2023 - PREVIOUS INSPECTION NOTES 05/12/23= All slopes must adjoin existing improved properties at no greater than a 4:1 slope. Slopes C. Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(12) THE SLOPE IN THE BACK OF THE PROPERTY IS MORE THE 4/1 AND WHEN YOU FINISHED WITH THE SLOPE THAT WATER NEED TO MOVE TO THE FRONT SWALE .The subject lots drainage must not negatively impact any adjacent property. (J)FJ.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6)
ROW FIELD SURVEY /GRADING CERTIFICATION 05/12/2023 Disapproved - NO FEE GBERTOLA
Note: 05/12/23= All slopes must adjoin existing improved properties at no greater than a 4:1 slope. Slopes C. Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(12) THE SLOPE IN THE BACK OF THE PROPERTY IS MORE THE 4/1 AND WHEN YOU FINISHED WITH THE SLOPE THAT WATER NEED TO MOVE TO THE FRONT SWALE .The subject lots drainage must not negatively impact any adjacent property. (J)FJ.Land Development Code Technical Manual, Section 300.01 (A)(1)(C)(6)
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/12/2023 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
U-CROSS CONNECTION 04/20/2023 APPROVED DHANEY
ELECTRIC - EARLY POWER 04/20/2023 APPROVED - AS NOTED TSTAUFFACHER
Note: 04/20/2023- Approved-release to FPL at 08:39 AM Inspector Notes from Inspection 2200 Emailed FPL @ 0845. Release Power
ROW- PRE-APRON (PRE-POUR) 04/13/2023 APPROVED FSLADISH
Note: 04/13/23 READY TO POUR. IN CASE OF RAIN CONTRACTORS RESPONSIBILTY TO RECHECK CULVERT PIPE ELEVATION AND COMPACTION BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
INSULATION 03/02/2023 APPROVED JSTEWART
Note: 3/1/2023 - PREVIOUS INSPECTION NOTES 3/1/2023--Please fire foam edges of Plywood ceiling in AC/WH room.
INSULATION 03/01/2023 Disapproved - NO FEE JSTEWART
Note: 3/1/2023--Please fire foam edges of Plywood ceiling in AC/WH room.
ALL ROUGH 02/16/2023 APPROVED TSTAUFFACHER
U - SEWER TIE IN 02/09/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 01/27/2023 APPROVED FWILLIS
ELECTRIC-TUG 01/09/2023 APPROVED - AS NOTED KSANDOE
Note: Emailed FPL @ 0845. Release Power
ROOF VALLEY & METAL 01/09/2023 APPROVED KSANDOE
WALL SHEATHING 01/04/2023 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/04/2023 APPROVED FWILLIS
FOUND SURVEY APPROVED (OFFICE) 12/29/2022 APPROVED TBAKER
TIE BEAM / LINTEL 12/19/2022 APPROVED LMILLER
MONOLITHIC SLAB 12/08/2022 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 12/06/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 12/06/2022 APPROVED MGIBSON
ROW - DRAINAGE 11/21/2022 APPROVED EMADISON
Note: ** 11/21/22 ALL CORRECTIONS HAVE BEEN MADE 11/16/2022 - PREVIOUS INSPECTION NOTES **11/16/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN TO PREVENT SEDIMENT FROM ENTERING THE STORMWATER DRAINAGE SYSTEM ** FOLLOW UP INSPECTION ON 11/17/22 10/17/2022 - PREVIOUS INSPECTION NOTES ** 10/17/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN ** BUILDER NEEDS TO OPE3N SWALE OR INSTALL A TEMPORARY CULVERT YOUR MATERIAL IS BLOCKING THE DRAINAGE CONVEYANCE. ** BUILDER ALSO NEEDS TO REPAIR AND SOD SWALE ACROSS THE STREET WHERE THEY CAUSED DAMAGE TO SWALE WORK MUST MATCH EXISTING GRADE. ** *** A STOP WORK ORDER WILL BE SUBMITTED IF CORRECTIONS ARE NOT MADE *** ** FOLLOW UP INSPECTION ON 10/18/22 10/11/2022 - PREVIOUS INSPECTION NOTES Builder has graded to allow for drainage and has a temporary culvert on site for installation. 10/10/2022 - PREVIOUS INSPECTION NOTES TEMPORARY CULVERT IS STILL NOT PUT IN ------------------------------------------------------------------------------------------ 10/6/2022 - PREVIOUS INSPECTION NOTES Temporary Culvert on site. Giving the builder and E for Effort. Rescheduling another one to ensure proper installation. 10/5/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** BUILDER STILL HAS NOT INSTALLED THE TEMPORARY CULVERT AT SITE ENTRANCE ** BUILDER HAS NOT INSTALLED ANY FORM OF EROSION CONTROL AROUND CATCH BASIN ** **A STOP WORK ORDER WILL BE IMPOSED ON JOB SITE** ** ** FOLLOW UP INSPECTION ON 10/06/22 10/4/2022 - PREVIOUS INSPECTION NOTES 10/04/22 SEE NOTES FROM PREVIOUS INSPECTION 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN AT THE PROJECT SITE, SEROIOUS EROSION HAS DEPOSITED A LARGE AMOUNT OF MATERIAL IN THE DITCH ACROSS FROM THE PROJECT SITE WHICH WAS WASHED THROUGHT THE CATCH BASIN AND ROAD CROSSING PIPE. ** BUILDER WILL BE REQUIRED TO ENSURE CATCH BASIN, CULVERT AND DITCH ARE CLEANED OF ALL SEDIMENT THAT HAS ERODED FROM THE PROJECT SITE PRIOR TO ROW FINALS APPROVAL ** 09/29/22 RESCHEDULED DUE TO HURRICANE IAN 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22***
ROW - DRAINAGE 11/17/2022 CANCELLED BY INSPECTOR EMADISON
Note: 11/16/2022 - PREVIOUS INSPECTION NOTES **11/16/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN TO PREVENT SEDIMENT FROM ENTERING THE STORMWATER DRAINAGE SYSTEM ** FOLLOW UP INSPECTION ON 11/17/22 10/17/2022 - PREVIOUS INSPECTION NOTES ** 10/17/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN ** BUILDER NEEDS TO OPE3N SWALE OR INSTALL A TEMPORARY CULVERT YOUR MATERIAL IS BLOCKING THE DRAINAGE CONVEYANCE. ** BUILDER ALSO NEEDS TO REPAIR AND SOD SWALE ACROSS THE STREET WHERE THEY CAUSED DAMAGE TO SWALE WORK MUST MATCH EXISTING GRADE. ** *** A STOP WORK ORDER WILL BE SUBMITTED IF CORRECTIONS ARE NOT MADE *** ** FOLLOW UP INSPECTION ON 10/18/22 10/11/2022 - PREVIOUS INSPECTION NOTES Builder has graded to allow for drainage and has a temporary culvert on site for installation. 10/10/2022 - PREVIOUS INSPECTION NOTES TEMPORARY CULVERT IS STILL NOT PUT IN ------------------------------------------------------------------------------------------ 10/6/2022 - PREVIOUS INSPECTION NOTES Temporary Culvert on site. Giving the builder and E for Effort. Rescheduling another one to ensure proper installation. 10/5/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** BUILDER STILL HAS NOT INSTALLED THE TEMPORARY CULVERT AT SITE ENTRANCE ** BUILDER HAS NOT INSTALLED ANY FORM OF EROSION CONTROL AROUND CATCH BASIN ** **A STOP WORK ORDER WILL BE IMPOSED ON JOB SITE** ** ** FOLLOW UP INSPECTION ON 10/06/22 10/4/2022 - PREVIOUS INSPECTION NOTES 10/04/22 SEE NOTES FROM PREVIOUS INSPECTION 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN AT THE PROJECT SITE, SEROIOUS EROSION HAS DEPOSITED A LARGE AMOUNT OF MATERIAL IN THE DITCH ACROSS FROM THE PROJECT SITE WHICH WAS WASHED THROUGHT THE CATCH BASIN AND ROAD CROSSING PIPE. ** BUILDER WILL BE REQUIRED TO ENSURE CATCH BASIN, CULVERT AND DITCH ARE CLEANED OF ALL SEDIMENT THAT HAS ERODED FROM THE PROJECT SITE PRIOR TO ROW FINALS APPROVAL ** 09/29/22 RESCHEDULED DUE TO HURRICANE IAN 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22***
ROW - DRAINAGE 11/16/2022 Disapproved -FEE REQUIRED EMADISON
Note: **11/16/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN TO PREVENT SEDIMENT FROM ENTERING THE STORMWATER DRAINAGE SYSTEM ** FOLLOW UP INSPECTION ON 11/17/22 10/17/2022 - PREVIOUS INSPECTION NOTES ** 10/17/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN ** BUILDER NEEDS TO OPE3N SWALE OR INSTALL A TEMPORARY CULVERT YOUR MATERIAL IS BLOCKING THE DRAINAGE CONVEYANCE. ** BUILDER ALSO NEEDS TO REPAIR AND SOD SWALE ACROSS THE STREET WHERE THEY CAUSED DAMAGE TO SWALE WORK MUST MATCH EXISTING GRADE. ** *** A STOP WORK ORDER WILL BE SUBMITTED IF CORRECTIONS ARE NOT MADE *** ** FOLLOW UP INSPECTION ON 10/18/22 10/11/2022 - PREVIOUS INSPECTION NOTES Builder has graded to allow for drainage and has a temporary culvert on site for installation. 10/10/2022 - PREVIOUS INSPECTION NOTES TEMPORARY CULVERT IS STILL NOT PUT IN ------------------------------------------------------------------------------------------ 10/6/2022 - PREVIOUS INSPECTION NOTES Temporary Culvert on site. Giving the builder and E for Effort. Rescheduling another one to ensure proper installation. 10/5/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** BUILDER STILL HAS NOT INSTALLED THE TEMPORARY CULVERT AT SITE ENTRANCE ** BUILDER HAS NOT INSTALLED ANY FORM OF EROSION CONTROL AROUND CATCH BASIN ** **A STOP WORK ORDER WILL BE IMPOSED ON JOB SITE** ** ** FOLLOW UP INSPECTION ON 10/06/22 10/4/2022 - PREVIOUS INSPECTION NOTES 10/04/22 SEE NOTES FROM PREVIOUS INSPECTION 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN AT THE PROJECT SITE, SEROIOUS EROSION HAS DEPOSITED A LARGE AMOUNT OF MATERIAL IN THE DITCH ACROSS FROM THE PROJECT SITE WHICH WAS WASHED THROUGHT THE CATCH BASIN AND ROAD CROSSING PIPE. ** BUILDER WILL BE REQUIRED TO ENSURE CATCH BASIN, CULVERT AND DITCH ARE CLEANED OF ALL SEDIMENT THAT HAS ERODED FROM THE PROJECT SITE PRIOR TO ROW FINALS APPROVAL ** 09/29/22 RESCHEDULED DUE TO HURRICANE IAN 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22***
ROW - DRAINAGE 10/17/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/17/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN ** BUILDER NEEDS TO OPE3N SWALE OR INSTALL A TEMPORARY CULVERT YOUR MATERIAL IS BLOCKING THE DRAINAGE CONVEYANCE. ** BUILDER ALSO NEEDS TO REPAIR AND SOD SWALE ACROSS THE STREET WHERE THEY CAUSED DAMAGE TO SWALE WORK MUST MATCH EXISTING GRADE. ** *** A STOP WORK ORDER WILL BE SUBMITTED IF CORRECTIONS ARE NOT MADE *** ** FOLLOW UP INSPECTION ON 10/18/22 10/11/2022 - PREVIOUS INSPECTION NOTES Builder has graded to allow for drainage and has a temporary culvert on site for installation. 10/10/2022 - PREVIOUS INSPECTION NOTES TEMPORARY CULVERT IS STILL NOT PUT IN ------------------------------------------------------------------------------------------ 10/6/2022 - PREVIOUS INSPECTION NOTES Temporary Culvert on site. Giving the builder and E for Effort. Rescheduling another one to ensure proper installation. 10/5/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** BUILDER STILL HAS NOT INSTALLED THE TEMPORARY CULVERT AT SITE ENTRANCE ** BUILDER HAS NOT INSTALLED ANY FORM OF EROSION CONTROL AROUND CATCH BASIN ** **A STOP WORK ORDER WILL BE IMPOSED ON JOB SITE** ** ** FOLLOW UP INSPECTION ON 10/06/22 10/4/2022 - PREVIOUS INSPECTION NOTES 10/04/22 SEE NOTES FROM PREVIOUS INSPECTION 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN AT THE PROJECT SITE, SEROIOUS EROSION HAS DEPOSITED A LARGE AMOUNT OF MATERIAL IN THE DITCH ACROSS FROM THE PROJECT SITE WHICH WAS WASHED THROUGHT THE CATCH BASIN AND ROAD CROSSING PIPE. ** BUILDER WILL BE REQUIRED TO ENSURE CATCH BASIN, CULVERT AND DITCH ARE CLEANED OF ALL SEDIMENT THAT HAS ERODED FROM THE PROJECT SITE PRIOR TO ROW FINALS APPROVAL ** 09/29/22 RESCHEDULED DUE TO HURRICANE IAN 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22***
ROW - DRAINAGE 10/11/2022 PARTIALLY APPROVED RGROSS
Note: Builder has graded to allow for drainage and has a temporary culvert on site for installation. 10/10/2022 - PREVIOUS INSPECTION NOTES TEMPORARY CULVERT IS STILL NOT PUT IN ------------------------------------------------------------------------------------------ 10/6/2022 - PREVIOUS INSPECTION NOTES Temporary Culvert on site. Giving the builder and E for Effort. Rescheduling another one to ensure proper installation. 10/5/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** BUILDER STILL HAS NOT INSTALLED THE TEMPORARY CULVERT AT SITE ENTRANCE ** BUILDER HAS NOT INSTALLED ANY FORM OF EROSION CONTROL AROUND CATCH BASIN ** **A STOP WORK ORDER WILL BE IMPOSED ON JOB SITE** ** ** FOLLOW UP INSPECTION ON 10/06/22 10/4/2022 - PREVIOUS INSPECTION NOTES 10/04/22 SEE NOTES FROM PREVIOUS INSPECTION 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN AT THE PROJECT SITE, SEROIOUS EROSION HAS DEPOSITED A LARGE AMOUNT OF MATERIAL IN THE DITCH ACROSS FROM THE PROJECT SITE WHICH WAS WASHED THROUGHT THE CATCH BASIN AND ROAD CROSSING PIPE. ** BUILDER WILL BE REQUIRED TO ENSURE CATCH BASIN, CULVERT AND DITCH ARE CLEANED OF ALL SEDIMENT THAT HAS ERODED FROM THE PROJECT SITE PRIOR TO ROW FINALS APPROVAL ** 09/29/22 RESCHEDULED DUE TO HURRICANE IAN 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22***
ROW - DRAINAGE 10/10/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: TEMPORARY CULVERT IS STILL NOT PUT IN ------------------------------------------------------------------------------------------ 10/6/2022 - PREVIOUS INSPECTION NOTES Temporary Culvert on site. Giving the builder and E for Effort. Rescheduling another one to ensure proper installation. 10/5/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** BUILDER STILL HAS NOT INSTALLED THE TEMPORARY CULVERT AT SITE ENTRANCE ** BUILDER HAS NOT INSTALLED ANY FORM OF EROSION CONTROL AROUND CATCH BASIN ** **A STOP WORK ORDER WILL BE IMPOSED ON JOB SITE** ** ** FOLLOW UP INSPECTION ON 10/06/22 10/4/2022 - PREVIOUS INSPECTION NOTES 10/04/22 SEE NOTES FROM PREVIOUS INSPECTION 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN AT THE PROJECT SITE, SEROIOUS EROSION HAS DEPOSITED A LARGE AMOUNT OF MATERIAL IN THE DITCH ACROSS FROM THE PROJECT SITE WHICH WAS WASHED THROUGHT THE CATCH BASIN AND ROAD CROSSING PIPE. ** BUILDER WILL BE REQUIRED TO ENSURE CATCH BASIN, CULVERT AND DITCH ARE CLEANED OF ALL SEDIMENT THAT HAS ERODED FROM THE PROJECT SITE PRIOR TO ROW FINALS APPROVAL ** 09/29/22 RESCHEDULED DUE TO HURRICANE IAN 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22***
ROW - DRAINAGE 10/06/2022 PARTIALLY APPROVED RGROSS
Note: Temporary Culvert on site. Giving the builder and E for Effort. Rescheduling another one to ensure proper installation. 10/5/2022 - PREVIOUS INSPECTION NOTES ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** BUILDER STILL HAS NOT INSTALLED THE TEMPORARY CULVERT AT SITE ENTRANCE ** BUILDER HAS NOT INSTALLED ANY FORM OF EROSION CONTROL AROUND CATCH BASIN ** **A STOP WORK ORDER WILL BE IMPOSED ON JOB SITE** ** ** FOLLOW UP INSPECTION ON 10/06/22 10/4/2022 - PREVIOUS INSPECTION NOTES 10/04/22 SEE NOTES FROM PREVIOUS INSPECTION 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN AT THE PROJECT SITE, SEROIOUS EROSION HAS DEPOSITED A LARGE AMOUNT OF MATERIAL IN THE DITCH ACROSS FROM THE PROJECT SITE WHICH WAS WASHED THROUGHT THE CATCH BASIN AND ROAD CROSSING PIPE. ** BUILDER WILL BE REQUIRED TO ENSURE CATCH BASIN, CULVERT AND DITCH ARE CLEANED OF ALL SEDIMENT THAT HAS ERODED FROM THE PROJECT SITE PRIOR TO ROW FINALS APPROVAL ** 09/29/22 RESCHEDULED DUE TO HURRICANE IAN 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22***
ROW - DRAINAGE 10/05/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/05/22 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** BUILDER STILL HAS NOT INSTALLED THE TEMPORARY CULVERT AT SITE ENTRANCE ** BUILDER HAS NOT INSTALLED ANY FORM OF EROSION CONTROL AROUND CATCH BASIN ** **A STOP WORK ORDER WILL BE IMPOSED ON JOB SITE** ** ** FOLLOW UP INSPECTION ON 10/06/22 10/4/2022 - PREVIOUS INSPECTION NOTES 10/04/22 SEE NOTES FROM PREVIOUS INSPECTION 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN AT THE PROJECT SITE, SEROIOUS EROSION HAS DEPOSITED A LARGE AMOUNT OF MATERIAL IN THE DITCH ACROSS FROM THE PROJECT SITE WHICH WAS WASHED THROUGHT THE CATCH BASIN AND ROAD CROSSING PIPE. ** BUILDER WILL BE REQUIRED TO ENSURE CATCH BASIN, CULVERT AND DITCH ARE CLEANED OF ALL SEDIMENT THAT HAS ERODED FROM THE PROJECT SITE PRIOR TO ROW FINALS APPROVAL ** 09/29/22 RESCHEDULED DUE TO HURRICANE IAN 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22***
ROW - DRAINAGE 10/04/2022 Disapproved -FEE REQUIRED EMADISON
Note: 10/04/22 SEE NOTES FROM PREVIOUS INSPECTION 10/3/2022 - PREVIOUS INSPECTION NOTES ** 10/03/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN AT THE PROJECT SITE, SEROIOUS EROSION HAS DEPOSITED A LARGE AMOUNT OF MATERIAL IN THE DITCH ACROSS FROM THE PROJECT SITE WHICH WAS WASHED THROUGHT THE CATCH BASIN AND ROAD CROSSING PIPE. ** BUILDER WILL BE REQUIRED TO ENSURE CATCH BASIN, CULVERT AND DITCH ARE CLEANED OF ALL SEDIMENT THAT HAS ERODED FROM THE PROJECT SITE PRIOR TO ROW FINALS APPROVAL ** FOLLOW UP INSPECTION 10/05/22 ** 09/29/22 RESCHEDULED DUE TO HURRICANE IAN 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22***
ROW - DRAINAGE 10/03/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 10/03/22 BUILDER STILL HAS NOT INSTALLED EROSION CONTROL AROUND THE CATCH BASIN AT THE PROJECT SITE, SEROIOUS EROSION HAS DEPOSITED A LARGE AMOUNT OF MATERIAL IN THE DITCH ACROSS FROM THE PROJECT SITE WHICH WAS WASHED THROUGHT THE CATCH BASIN AND ROAD CROSSING PIPE. ** BUILDER WILL BE REQUIRED TO ENSURE CATCH BASIN, CULVERT AND DITCH ARE CLEANED OF ALL SEDIMENT THAT HAS ERODED FROM THE PROJECT SITE PRIOR TO ROW FINALS APPROVAL ** FOLLOW UP INSPECTION ON 10/04/22 ** 09/29/22 RESCHEDULED DUE TO HURRICANE IAN 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22***
ROW - DRAINAGE 09/29/2022 CANCELLED BY INSPECTOR EMADISON
Note: ** 09/29/22 INSPECTION CANCELLED DUE TON HURRICANE IAN RECHEDULED FOR 10/03/22 9/22/2022 - PREVIOUS INSPECTION NOTES Drainage opened for now. Temporary Culvert not permenantly installed yet. It is on site. Next inpseciton 9/29/22 9/21/2022 - PREVIOUS INSPECTION NOTES ** 09/21/22 NO WORK DONE SINCE PREVIOIUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/22/22 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22***
ROW - DRAINAGE 09/22/2022 PARTIALLY APPROVED RGROSS
Note: Drainage opened for now. Temporary Culvert not permenantly installed yet. It is on site. Next inpseciton 9/29/22 9/21/2022 - PREVIOUS INSPECTION NOTES ** 09/21/22 NO WORK DONE SINCE PREVIOIUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/22/22 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22***
ROW - DRAINAGE 09/21/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 09/21/22 NO WORK DONE SINCE PREVIOIUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 9/20/2022 - PREVIOUS INSPECTION NOTES 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22***
ROW - DRAINAGE 09/20/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 9/20/22=ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, . BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE, NEED TO MOVE THE PORTA POTTY OUT OF THE SWALE INSIDE YOUR PROPERTY OUT OF THE ROW NEED TO NSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots INSPECTOR BE BACK 09/21/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 9/19/2022 - PREVIOUS INSPECTION NOTES ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22***
ROW - DRAINAGE 09/19/2022 Disapproved -FEE REQUIRED EMADISON
Note: ** 09/19/22 REINSPECTION OF SITE BUILDER HAS NOT INSTALLED ANY EROSION CONTROL TO PREVENT MATERIAL FROM ERODING INTO THE STORM DRAINAGE SYSTEM ON BOTH SIDES OF THE CATCH BASIN ** BUILDER NEEDS TO INSTALL A TEMPORARY PIPE A MINIMUM OF 12 INCHES IN DIAMITER ** NEXT INSPECTION ON 09/20/22 9/14/2022 - PREVIOUS INSPECTION NOTES ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22***
ROW - DRAINAGE 09/14/2022 Disapproved - NO FEE EMADISON
Note: ** 09/14/22 BUILDER NEEDS TO OPEN SWALE AND INSTALL TEMPORARY CULVERT ON EACH SIDE OF THE OF THE CATCH BASIN OR ESTABLISH WHICH SIDE WILL BE THE CONSTRUCTION DRIVEWAY ENTRANCE. ** ALSO NEED TO INSTALL EROSION CONTROL AT THE CATCH BASIN TO PREVENT MATERIAL FROM WASHING INTO THE DRAINAGE CONVEYANCE SYSTEM ** IT THE BUILDERS RESPONSIBILITY TO MAINTAIN THE SWALE ON A DAILY BASIS. ** SEE ATTACHED PHOTOS ***NEXT INSPECTION ON 09/19/22***
WATER METER INSTALLATION REQUEST 09/06/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
BADMIN INFORMATION 06/28/2023 06/28/2023
Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Unable to process final survey. Expired NOC. Once recorded NOC is uploaded please upload finaly survey again.
MECH COMPLETE 02/08/2023 02/08/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
MECH HOLD 02/02/2023 02/03/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition
ENGIN1 COMPLETE 12/28/2022 12/29/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/28/2022 12/28/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 07/05/2022 07/05/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 07/05/2022 07/05/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD HOLD 06/21/2022 06/23/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Plans submitted are noted as a Master Plan. There is no Master Plan on file.
CUSVC COMPLETE 06/21/2022 06/23/2022
Note: Released By: HALEIGH HAND - -
ELEC COMPLETE 06/21/2022 06/21/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/21/2022 06/21/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 06/21/2022 06/24/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 06/21/2022 06/21/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 06/21/2022 06/27/2022
Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM
ZON HOLD 06/21/2022 06/23/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Walkway width required on site plan/survey One additional 7 gallon shrub required around AC Must have a minimum 8 plantings along the front foundation of home. The ones around the walkway do not count
SWALE COMPLETE 06/21/2022 09/20/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
CONTRACTOR CHANGE ¤40.00 01/04/2023
CONTRACTOR CHANGE ¤20.00 01/04/2023
3% FIRE IMPACT FEE CREDIT (¤11.66) 07/14/2022
IMPACT FEE FIRE ¤388.65 07/14/2022
IMPACT FEE PARKS ¤1,455.13 07/14/2022
IMPACT FEE SCHOOL ¤3,600.00 07/14/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 07/14/2022
WATER -IRRIGATION INSPECTION ¤25.00 07/14/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 07/14/2022
SURCHARGE FS 533.721 ¤6.54 07/14/2022
SURCHARGE - FS 468.631 ¤9.81 07/14/2022
SW ENG - FOUNDATION SURVEY ¤20.00 07/14/2022
WATER- TURN ON ¤25.00 07/14/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/14/2022
INSPECTION - RESIDENTIAL ¤577.50 07/14/2022
PLAN REVIEW - RESIDENTIAL ¤163.80 07/14/2022
CONNECTION FEES ¤1,077.88 07/14/2022
SW ENG INSPECTION 80 ¤80.00 07/14/2022
SW ENG PRE APRON ¤30.00 07/14/2022
SW ENG - REVIEW 20 ¤20.00 07/14/2022
SW ENG RES REVIEW 200 ¤200.00 07/14/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 07/14/2022
SEWER CREDIT (¤1,342.00) 07/14/2022
SEWER INSPECTION ¤25.00 07/14/2022
SEWER CAPITAL FACILITY ¤4,939.76 07/14/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 07/14/2022
SITE PLAN 30 ¤30.00 07/14/2022
Fees Total Due: ¤0.00 Total Paid: ¤17,024.34