Permit #2022061229
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7016-00090-0500 |
| Block: 00090 |
| Subdivision: 2201 - SECTION 16-COUNTRY CLUB COVE |
| Job Phone: 786-512-4421 |
| Location Address: 12 CRANDELL CT |
| Type: DR - DRIVEWAY |
| Issue Date: 07/05/2022 |
| NOC: RECORDED |
| Applicant name: ABEL MENENDEZ |
| Owner: KRAMER ALVIN & BETTY ANN H&W |
|
Address 12 CRANDELL COURT PALM COAST, FL 32137 |
| Lot: 0500 |
| Contracted Stated Job Value: ¤13,600.00 |
| Job Description: DRIVEWAY REPLACE WITH PAVER AND EXISTING WALKWAY |
| Type: CN |
Contractor
ROYAL TILE & PAVERS INC
| Status | Location Address | Phone |
| ACTIVE |
69 FLEETWOOD DR PALM COAST, FL 32137 |
786-512-4421 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL INSPECTION | 09/20/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: THIS IS A REINSPECTION ** 09/20/22 EVERYTHING LOOKS GOOD AT THE TIME OF THIS INSPECTION ** 09/07/22 BARE SPOT NEED TO BE SODDED NEAR EDGE OF ROAD ** LEFT SIDE OF DRIVEWAY WHERE BEND IS SOD MISSING CAUSING A WASHOUT AT EDGE OF DRIVEWAY NEED TO PLACE SOD IN THIS LOCATION AS WELL TO PREVENT FURTHER EROSION Inspector Notes from Inspection 9270 08/5/22=AS A COURTESY INSPECTOR WENT BACK AND RE INSPECTED READY TO PLACE THE PAVERS ....................................................................................................................................................................................................................... ** 08/05/22 NEED TO SPREAD AND COMPACT PAVER BASE BEFORE I CAN DO FINAL APRON CALL THIS INSPECTION BACK IN WHEN THIS IS DONE. Inspector Notes from Inspection 9270 THIS IS A REINSPECTION ** AT THE TIME OF THE INSPECTION EVERYTHING LOOKS GOOD READY TO POUR ** IN THE EVENT OF RAIN BUILDER SHOULD RECHECK ELEVATIONS AND IF SITE IS TOO WET ** TO WET TO POUR TOO MUCH WATER ON SITE | |||
| ROW - FINAL INSPECTION | 09/20/2022 | FINAL APPROVED | EMADISON |
| Note: 9/20/2022 - PREVIOUS INSPECTION NOTES THIS IS A REINSPECTION ** 09/20/22 EVERYTHING LOOKS GOOD AT THE TIME OF THIS INSPECTION ** 09/07/22 BARE SPOT NEED TO BE SODDED NEAR EDGE OF ROAD ** LEFT SIDE OF DRIVEWAY WHERE BEND IS SOD MISSING CAUSING A WASHOUT AT EDGE OF DRIVEWAY NEED TO PLACE SOD IN THIS LOCATION AS WELL TO PREVENT FURTHER EROSION Inspector Notes from Inspection 9270 08/5/22=AS A COURTESY INSPECTOR WENT BACK AND RE INSPECTED READY TO PLACE THE PAVERS ....................................................................................................................................................................................................................... ** 08/05/22 NEED TO SPREAD AND COMPACT PAVER BASE BEFORE I CAN DO FINAL APRON CALL THIS INSPECTION BACK IN WHEN THIS IS DONE. Inspector Notes from Inspection 9270 THIS IS A REINSPECTION ** AT THE TIME OF THE INSPECTION EVERYTHING LOOKS GOOD READY TO POUR ** IN THE EVENT OF RAIN BUILDER SHOULD RECHECK ELEVATIONS AND IF SITE IS TOO WET ** TO WET TO POUR TOO MUCH WATER ON SITE | |||
| ROW - FINAL APRON (AFTER POUR) | 09/08/2022 | APPROVED | EMADISON |
| Note: Inspector Notes from Inspection 9270 08/5/22=AS A COURTESY INSPECTOR WENT BACK AND RE INSPECTED READY TO PLACE THE PAVERS ....................................................................................................................................................................................................................... ** 08/05/22 NEED TO SPREAD AND COMPACT PAVER BASE BEFORE I CAN DO FINAL APRON CALL THIS INSPECTION BACK IN WHEN THIS IS DONE. Inspector Notes from Inspection 9270 THIS IS A REINSPECTION ** AT THE TIME OF THE INSPECTION EVERYTHING LOOKS GOOD READY TO POUR ** IN THE EVENT OF RAIN BUILDER SHOULD RECHECK ELEVATIONS AND IF SITE IS TOO WET ** TO WET TO POUR TOO MUCH WATER ON SITE | |||
| ROW - FINAL INSPECTION | 09/07/2022 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 09/07/22 BARE SPOT NEED TO BE SODDED NEAR EDGE OF ROAD ** LEFT SIDE OF DRIVEWAY WHERE BEND IS SOD MISSING CAUSING A WASHOUT AT EDGE OF DRIVEWAY NEED TO PLACE SOD IN THIS LOCATION AS WELL TO PREVENT FURTHER EROSION Inspector Notes from Inspection 9270 08/5/22=AS A COURTESY INSPECTOR WENT BACK AND RE INSPECTED READY TO PLACE THE PAVERS ....................................................................................................................................................................................................................... ** 08/05/22 NEED TO SPREAD AND COMPACT PAVER BASE BEFORE I CAN DO FINAL APRON CALL THIS INSPECTION BACK IN WHEN THIS IS DONE. Inspector Notes from Inspection 9270 THIS IS A REINSPECTION ** AT THE TIME OF THE INSPECTION EVERYTHING LOOKS GOOD READY TO POUR ** IN THE EVENT OF RAIN BUILDER SHOULD RECHECK ELEVATIONS AND IF SITE IS TOO WET ** TO WET TO POUR TOO MUCH WATER ON SITE | |||
| U -UTILITY RESIDENTIAL FINAL | 09/07/2022 | FINAL APPROVED | DHANEY |
| Note: Per homeowner request Alvin - 9-6--22 | |||
| ROW- PRE-APRON (PRE-POUR) | 08/05/2022 | PARTIALLY APPROVED | EMADISON |
| Note: ** 08/05/22 NEED TO SPREAD AND COMPACT PAVER BASE BEFORE I CAN DO FINAL APRON CALL THIS INSPECTION BACK IN WHEN THIS IS DONE. Inspector Notes from Inspection 9270 THIS IS A REINSPECTION ** AT THE TIME OF THE INSPECTION EVERYTHING LOOKS GOOD READY TO POUR ** IN THE EVENT OF RAIN BUILDER SHOULD RECHECK ELEVATIONS AND IF SITE IS TOO WET ** TO WET TO POUR TOO MUCH WATER ON SITE | |||
| ROW- PRE-APRON (PRE-POUR) | 08/05/2022 | APPROVED - AS NOTED | GBERTOLA |
| Note: 08/5/22=AS A COURTESY INSPECTOR WENT BACK AND RE INSPECTED READY TO PLACE THE PAVERS ....................................................................................................................................................................................................................... ** 08/05/22 NEED TO SPREAD AND COMPACT PAVER BASE BEFORE I CAN DO FINAL APRON CALL THIS INSPECTION BACK IN WHEN THIS IS DONE. Inspector Notes from Inspection 9270 THIS IS A REINSPECTION ** AT THE TIME OF THE INSPECTION EVERYTHING LOOKS GOOD READY TO POUR ** IN THE EVENT OF RAIN BUILDER SHOULD RECHECK ELEVATIONS AND IF SITE IS TOO WET ** TO WET TO POUR TOO MUCH WATER ON SITE | |||
| ROW - FINAL APRON (AFTER POUR) | 08/05/2022 | Disapproved - NO FEE | EMADISON |
| Note: ** 08/05/22 SEE NOTES FOR PARTIALLY APPROVED APRON PRE-POUR, ONCE YOU HAVE SPREAD AND COMPACTED PAVER BASE AND ITS APPROVED THEN YOU CAN SET PAVERS AND CALL IN FINAL. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/26/2022 | APPROVED - AS NOTED | EMADISON |
| Note: THIS IS A REINSPECTION ** AT THE TIME OF THE INSPECTION EVERYTHING LOOKS GOOD READY TO POUR ** IN THE EVENT OF RAIN BUILDER SHOULD RECHECK ELEVATIONS AND IF SITE IS TOO WET ** TO WET TO POUR TOO MUCH WATER ON SITE | |||
| ROW- PRE-APRON (PRE-POUR) | 07/20/2022 | CANCELLED BY APPLICANT | EMADISON |
| Note: ** TO WET TO POUR TOO MUCH WATER ON SITE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 06/21/2022 | 06/24/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| UTL | COMPLETE | 06/21/2022 | 06/27/2022 |
| Note: Released By: LARRY FITZGERALD - - LFITZGERALD@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/21/2022 | 06/21/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 09/19/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/05/2022 |
| SITE PLAN 15 | ¤15.00 | 07/05/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/05/2022 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 07/05/2022 |
| SW ENG INSPECTION 40 | ¤40.00 | 07/05/2022 |
| SW ENG PRE APRON | ¤30.00 | 07/05/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤379.00 |