Permit #2022061239
Permit Details
Status: COED
| Parcel Id: 07-11-31-7064-00380-0060 |
| CONDITIONED SPACE: 1771 sqft |
| GARAGE: 473 sqft |
| OPENED PORCH (WITH ROOF) : 116 sqft |
| OPENED PORCH (WITH ROOF) : 263 sqft |
| Total Square Footage: 2623 sqft |
| Block: 00380 |
| Subdivision: - |
| Job Phone: 386-237-1210 |
| Location Address: 31 LLEWELLYN TR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/28/2022 |
| NOC: RECORDED |
| Applicant name: ANDREW POPOV |
| Owner: KOSTIANTYN KORNELIYOVYC TUDAN |
|
Address 10 WHITE HAVEN LANE PALM COAST, FL 32164 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: single family house |
| Type: CN |
Contractor
SILVER BREEZE HOMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1 SEATHORN PATH UNIT A PALM COAST, FL 32164 |
RR282812121 (Exp: 08/31/2027) | 386-237-7700 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/08/2023 | FINAL APPROVED | RMARTIN |
| Note: 4/19/23: Check sliding glass door for matching/correct FBA # since this door was not fully installed at All Rough or Insulation (Noted at Insulation - Do not remove the FPA No. sticker until this inspection is approved). Also check soffit area for tight seal at vertical wall valleys since the wall flashing was not installed per manufacturer's requirements. | |||
| ROW - STORMWATER FINAL | 07/24/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ------------------------------------------------------------------------------------- 7/21/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN ALL DIRT OUT OF CULVERT PIPE 2) NEED TO CUT SOD OFF ALL FENCES 4" NO SOD CAN BE ON FENCES | |||
| U -UTILITY RESIDENTIAL FINAL | 07/21/2023 | FINAL APPROVED | JHARDING |
| ROW - STORMWATER FINAL | 07/21/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO CLEAN ALL DIRT OUT OF CULVERT PIPE 2) NEED TO CUT SOD OFF ALL FENCES 4" NO SOD CAN BE ON FENCES | |||
| ROW - FINAL APRON (AFTER POUR) | 07/20/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/20/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/20/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC - EARLY POWER | 06/16/2023 | APPROVED | RSIMS |
| Note: 6/16/23: FPL emailed to release power. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/13/2023 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATION BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE 3000PSI WITH FIBER OR WITH METAL MESH IN CONCRETE TO BE UP TO CITY'S STANDARTS. | |||
| U - SEWER TIE IN | 05/18/2023 | APPROVED | MGIBSON |
| U-CROSS CONNECTION | 05/18/2023 | APPROVED | DHANEY |
| GRAVITY SEWER TEST | 05/18/2023 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 05/10/2023 | APPROVED | CSTONE |
| Note: 4/11/2023 3:03:38 PM- PREVIOUS INSPECTION NOTES 4/11/2023 Exterior needs to be completed. | |||
| LATH/BRICK/ WATER BARRIER | 04/25/2023 | APPROVED | RSIMS |
| INSULATION | 04/21/2023 | APPROVED | BTAYLOR |
| Note: 4/19/2023 - PREVIOUS INSPECTION NOTES 4/19/23: Notes from All Rough remain unresolved. Moved door Inspection to building final. (do not remove FPA sticker until Building Final is approved). 1). Firestop at top plate of dryer exhaust is incomplete. 2).Missing firestop at Horizontal wire runs over 10ft. per FBC 302.11 Required Locations. ( section: 1.2. Horizontally at intervals not exceeding 10 feet (3048 mm)). Marked with FS on studs where required. 3). Left side back bedroom wall - missing firestop at top plate penetration. (Marked with FS on stud & floor below area). 4). Left bathroom - pack out wall is missing firestop at top plate as required. (FBC 302.11) 5). Missing cardboard baffels at left & right side ceiling level change and at front & back porch/entry/soffit areas as required. 4/10/23: Check noted at Insulation Inspection. Must be complete by Insulation. 1). SGD installation is incomplete. 2). UFER ground needs to be fully protected from CMU into Meter Panel box. | |||
| INSULATION | 04/19/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 4/19/23: Notes from All Rough remain unresolved. Moved door Inspection to building final. (do not remove FPA sticker until Building Final is approved). 1). Firestop at top plate of dryer exhaust is incomplete. 2).Missing firestop at Horizontal wire runs over 10ft. per FBC 302.11 Required Locations. ( section: 1.2. Horizontally at intervals not exceeding 10 feet (3048 mm)). Marked with FS on studs where required. 3). Left side back bedroom wall - missing firestop at top plate penetration. (Marked with FS on stud & floor below area). 4). Left bathroom - pack out wall is missing firestop at top plate as required. (FBC 302.11) 5). Missing cardboard baffels at left & right side ceiling level change and at front & back porch/entry/soffit areas as required. 4/10/23: Check noted at Insulation Inspection. Must be complete by Insulation. 1). SGD installation is incomplete. 2). UFER ground needs to be fully protected from CMU into Meter Panel box. | |||
| PEP TANK INSTALLATION REQUEST | 04/11/2023 | Disapproved - NO FEE | TSCHWEERS |
| Note: 4/11/2023 Exterior needs to be completed. | |||
| ALL ROUGH | 04/10/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 4/10/23: Check noted at Insulation Inspection. Must be complete by Insulation. 1). SGD installation is incomplete. 2). UFER ground needs to be fully protected from CMU into Meter Panel box. | |||
| WALL SHEATHING | 04/10/2023 | APPROVED | RSIMS |
| ELECTRIC TEMP POLE | 03/31/2023 | APPROVED | RSIMS |
| Note: 3/31/23: FPL emailed at @ 11:30 | |||
| FRAMING | 02/27/2023 | CANCELLED BY APPLICANT | WEB |
| Note: This inspection added due to incomplete interior framing during the Roof sheathing/ Braces/Ties/ Down Cell inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/24/2023 | APPROVED | BTAYLOR |
| Note: ***** Roof Sheathing (only) was bump checked during Inspection 2467 Roof Valley Metal - Approved 2/3/2023 - PREVIOUS INSPECTION NOTES 2/3/23: No changes! Still working on interior framing. Framing contractor was yelling and cursing at me. 2/2/2023 - PREVIOUS INSPECTION NOTES 2/2/23: INSPECTION STOPPED! INCOMPLETE INSPECTION! Not ready. 1). Most of the interior framing has been dismantled. 2). Load bearing walls are not built per plan detail. (ex. 12ft high) 3). Garage wall was not kept back 1/2" as required on plan. 4). On the load bearing walls the plan calls for SP2s at top and bottom of each stud but H2.5As were used in numerous locations. Need to replace with correct ones or an engineer's revision needs to be submitted to and approved by the City. 5). Garage door buck is not installed at this time. | |||
| ROOF VALLEY & METAL | 02/24/2023 | APPROVED | BTAYLOR |
| Note: 2/23/2023 - PREVIOUS INSPECTION NOTES 2/23/23: Met with Builder to discuss what needs to be done as they were confused about needed changes. 2/13/2023 - PREVIOUS INSPECTION NOTES 2/13/23: Roof Valley Metal cannot be approved before approved roof sheathing so (although I am not required to do it) I bump checked the roof sheathing at this inspection.- Approved (Roof Sheathing only). 1). Vertical wall flashing (5" x 5") is installed incorrectly and not completely sealed along the wall. 2). Underlayment at all ridges is run vertically. Underlayment must be run horizontally across the roof plane & overlapped as required. 3). Underlayment nailing pattern does not meet Manufacturer's or Florida Building Code requirements. 905.1.1.1(5) - Synthetic underlayment shall be attached to a nailable deck with corrosion-resistant fasteners with a maximum fastener spacing, measured hoizontally and vertically of 12 inches (305 mm) O.C. between side laps and one row at the end and side laps fastened at 6 inches (152 mm) O.C. maximum. 4). Need revision submitted to & approved by the City for the different underlayment used then what was originally submitted. Roofing worksheet calls for self adhering underlayment byt synthetic barricade underlayment was installed. | |||
| ROOF VALLEY & METAL | 02/23/2023 | Disapproved - NO FEE | RSIMS |
| Note: 2/23/23: Met with Builder to discuss what needs to be done as they were confused about needed changes. 2/13/2023 - PREVIOUS INSPECTION NOTES 2/13/23: Roof Valley Metal cannot be approved before approved roof sheathing so (although I am not required to do it) I bump checked the roof sheathing at this inspection.- Approved (Roof Sheathing only). 1). Vertical wall flashing (5" x 5") is installed incorrectly and not completely sealed along the wall. 2). Underlayment at all ridges is run vertically. Underlayment must be run horizontally across the roof plane & overlapped as required. 3). Underlayment nailing pattern does not meet Manufacturer's or Florida Building Code requirements. 905.1.1.1(5) - Synthetic underlayment shall be attached to a nailable deck with corrosion-resistant fasteners with a maximum fastener spacing, measured hoizontally and vertically of 12 inches (305 mm) O.C. between side laps and one row at the end and side laps fastened at 6 inches (152 mm) O.C. maximum. 4). Need revision submitted to & approved by the City for the different underlayment used then what was originally submitted. Roofing worksheet calls for self adhering underlayment byt synthetic barricade underlayment was installed. | |||
| ROOF VALLEY & METAL | 02/13/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 2/13/23: Roof Valley Metal cannot be approved before approved roof sheathing so (although I am not required to do it) I bump checked the roof sheathing at this inspection.- Approved (Roof Sheathing only). 1). Vertical wall flashing (5" x 5") is installed incorrectly and not completely sealed along the wall. 2). Underlayment at all ridges is run vertically. Underlayment must be run horizontally across the roof plane & overlapped as required. 3). Underlayment nailing pattern does not meet Manufacturer's or Florida Building Code requirements. 905.1.1.1(5) - Synthetic underlayment shall be attached to a nailable deck with corrosion-resistant fasteners with a maximum fastener spacing, measured hoizontally and vertically of 12 inches (305 mm) O.C. between side laps and one row at the end and side laps fastened at 6 inches (152 mm) O.C. maximum. 4). Need revision submitted to & approved by the City for the different underlayment used than what was originally submitted. Roofing worksheet calls for self adhering underlayment byt synthetic barricade underlayment was installed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/03/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 2/3/23: No changes! Still working on interior framing. Framing contractor was yelling and cursing at me. Added framing inspection to permit. 2/2/2023 - PREVIOUS INSPECTION NOTES 2/2/23: INSPECTION STOPPED! INCOMPLETE INSPECTION! Not ready. 1). Most of the interior framing has been dismantled. 2). Load bearing walls are not built per plan detail. (ex. 12ft high) 3). Garage wall was not kept back 1/2" as required on plan. 4). On the load bearing walls the plan calls for SP2s at top and bottom of each stud but H2.5As were used in numerous locations. Need to replace with correct ones or an engineer's revision needs to be submitted to and approved by the City. 5). Garage door buck is not installed at this time. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/02/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 2/2/23: INSPECTION STOPPED! INCOMPLETE INSPECTION! Not ready. 1). Most of the interior framing has been dismanted. 2). Load bearing walls are not built per plan detail. (ex. 12ft high) 3). Garage wall was not kept back 1/2" as required on plan. 4). On the load bearing walls the plan calls for SP2s at top and bottom of each stud but H2.5As were used in numerous locations. Need to replace with correct ones or an engineer's revision needs to be submitted to and approved by the City. 5). Garage door buck is not installed at this time. | |||
| TIE BEAM / LINTEL | 11/09/2022 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 10/21/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 09/27/2022 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/17/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 07/18/2022 | APPROVED | TCHURCHILL |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 02/16/2023 | 02/21/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 02/15/2023 | 02/16/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide FL. Product approval number from 2020 code cycle. Fl-10124 R26 is from 2017 | |||
| BLD | COMPLETE | 02/10/2023 | 02/15/2023 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/21/2022 | 10/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/21/2022 | 10/21/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/15/2022 | 08/16/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/22/2022 | 07/22/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/22/2022 | 07/27/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/22/2022 | 07/22/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/28/2022 | 06/28/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/21/2022 | 06/23/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 06/21/2022 | 06/23/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 06/21/2022 | 06/21/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/21/2022 | 06/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/21/2022 | 06/24/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/21/2022 | 06/21/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/21/2022 | 06/28/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/21/2022 | 06/23/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: Front walkway missing on site plan. Please include dimensions and material. Site plan and landscape dont match the drive and entrance are different in both plans Landscape plan: please provide sod and iirigation if required by LDC. Elevation: Banding is required on all windows and doors facing public Right of Way. | |||
| SWALE | COMPLETE | 06/21/2022 | 09/20/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 07/28/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 07/28/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 07/28/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/28/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/28/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/28/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/28/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/28/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/28/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/28/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 06/28/2022 |
| SEWER CREDIT | (¤1,390.00) | 06/28/2022 |
| SEWER INSPECTION | ¤25.00 | 06/28/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 06/28/2022 |
| WATER CREDIT | (¤1,733.75) | 06/28/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 06/28/2022 |
| SITE PLAN 30 | ¤30.00 | 06/28/2022 |
| WATER- TURN ON | ¤25.00 | 06/28/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/28/2022 |
| INSPECTION - RESIDENTIAL | ¤687.50 | 06/28/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤195.00 | 06/28/2022 |
| CONNECTION FEES | ¤1,077.88 | 06/28/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 06/28/2022 |
| IMPACT FEE FIRE | ¤388.65 | 06/28/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 06/28/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 06/28/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 06/28/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/28/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 06/28/2022 |
| SURCHARGE FS 533.721 | ¤7.67 | 06/28/2022 |
| SURCHARGE - FS 468.631 | ¤11.50 | 06/28/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/28/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/28/2022 |
| SW ENG PRE APRON | ¤30.00 | 06/28/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,284.11 |