I want to search for...
Permit #2022061294
Permit Details
Status: COED
| Parcel Id: 07-11-31-7007-00040-0090 |
| GARAGE: 446 sqft |
| CONDITIONED SPACE: 1853 sqft |
| OPENED PORCH (WITH ROOF) : 142 sqft |
| OPENED PORCH (WITH ROOF) : 80 sqft |
| Total Square Footage: 2521 sqft |
| Block: 00040 |
| Subdivision: 2185 - SECTION 7-FLORIDA PARK |
| Job Phone: 386-931-5935 |
| Location Address: 55 FOXHALL LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/13/2022 |
| NOC: RECORDED |
| Applicant name: RYAN JAMES PERRY |
| Owner: WATERSIDE HOMES RENOVATIONS AND DESIGNS INC |
|
Address 10 BISCAYNE DRIVE PALM COAST, FL 32137 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
WATERSIDE HOMES RENOVATIONS AND DESIGNS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
PETER JOSEPH LYDEN
| Status | Location Address | State License Number | Phone |
| CANCEL |
17 UNIMAY CT BUNNELL, FL 32110 |
EC0002436 (Exp: 08/31/2022) | 386-931-2568 |
RYAN JAMES PERRY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
DILLON CARRERAS
| Status | Location Address | State License Number |
| ACTIVE |
3504 LUNDY ROAD PALATKA, FL 32177 |
EC13010133 (Exp: 08/31/2026) |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 04/13/2023 | FINAL APPROVED | EMADISON |
| Note: ** 04/13/23 CORRECTIONS MADE EVERYTHING LOOKS GOOD AT THE TIME OF INSPECTION ____________________________________________________________________________________________________________________ 4/11/2023 - PREVIOUS INSPECTION NOTES ** RIGHT SIDE PROPERTY LINE NEED TO PUT SOD ON BARE EARTH WHERE YOUR CONSTRUCTION HAS NEGATIVELY IMPACTED THE ADJACENT LOT. ** NEED TO REMOVE ALL TRASH AND CONTRUCTION DEBRIS FROM THE DITCH LINE EASEMENT AND PROPERTY ** NEED TO REPAIR SWALE ACROSS STREET IN FRONT OF VACANT SOD TO MATCH EXISTING GRADE** (NOTE THIS REPAIR WAS INADVERTINLY LEFT OUT OF PREVIOUS INSPECTIONS HOWEVER IT IS NOT THE REASON FOR YOUR FAILED INSPECTIONWAS IS REPAIRS THAT HAVE NOT BEEN MADE AS NOTED IN PREVIOUS INSPECTIONS SEE NOTES FROM 04/10/23 INSPECTION AS IT WAS ALSO LISTED AS A REPAIR)** 4/10/2023 - PREVIOUS INSPECTION NOTES **BEFORE ROW STORMWATER FINAL IS APPROVED** ** 04/10/23 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** RIGHT SIDE PROPERTY LINE NEED TO PUT SOD ON BARE EARTH WHERE YOUR CONSTRUCTION HAS NEGATIVELY IMPACTED THE ADJACENT LOT. ** LEFT SIDE NEED TO PUT SOD WHERE BARE EARTH IS ALONG DITCH LINE AND ACROSS STREET IN SWALE ** NEED TO REMOVE ALL TRASH AND CONTRUCTION DEBRIS FROM THE DITCH LINE EASEMENT AND PROPERTY ** NEED TO REPAIR SWALE ACROSS STREET IN FRONT OF VACANT SOD TO MATCH EXISTING GRADE. ______________________________________________________________________________________________________________________ **BEFORE ROW STORMWATER FINAL IS APPROVED** ** 04/06/23 RIGHT SIDE PROPERTY LINE NEED TO PUT SOD ON BARE EARTH WHERE YOUR CONSTRUCTION HAS NEGATIVELY IMPACTED THE ADJACENT LOT. ** LEFT SIDE NEED TO PUT SOD WHERE BARE EARTH IS ALONG DITCH LINE AND ACROSS STREET IN SWALE ** NEED TO REMOVE ALL TRASH AND CONTRUCTION DEBRIS FROM THE DITCH LINE EASEMENT AND PROPERTY | |||
| PLUMBING FINAL | 04/11/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 4/7/2023 10:37:03 PM- PREVIOUS INSPECTION NOTES | |||
| PLUMBING FINAL | 04/11/2023 | CANCELLED BY APPLICANT | WEB |
| Note: New inspection due to canceled inspection 4/7/2023 10:37:03 PM- PREVIOUS INSPECTION NOTES | |||
| HVAC FINAL | 04/11/2023 | Disapproved- Private Provider | PPROVIDER |
| Note: 4/7/2023 10:39:17 PM- PREVIOUS INSPECTION NOTES | |||
| ELECTRIC FINAL | 04/11/2023 | Approval - Private Provider | STHOMAS |
| Note: 4/7/2023 10:38:52 PM- PREVIOUS INSPECTION NOTES | |||
| BLD - BUILDING FINAL | 04/11/2023 | Approval - Private Provider | PPROVIDER |
| Note: 4/7/2023 10:38:27 PM- PREVIOUS INSPECTION NOTES | |||
| ROW - STORMWATER FINAL | 04/11/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** RIGHT SIDE PROPERTY LINE NEED TO PUT SOD ON BARE EARTH WHERE YOUR CONSTRUCTION HAS NEGATIVELY IMPACTED THE ADJACENT LOT. ** NEED TO REMOVE ALL TRASH AND CONTRUCTION DEBRIS FROM THE DITCH LINE EASEMENT AND PROPERTY ** NEED TO REPAIR SWALE ACROSS STREET IN FRONT OF VACANT SOD TO MATCH EXISTING GRADE** (NOTE THIS REPAIR WAS INADVERTINLY LEFT OUT OF PREVIOUS INSPECTIONS HOWEVER IT IS NOT THE REASON FOR YOUR FAILED INSPECTIONWAS IS REPAIRS THAT HAVE NOT BEEN MADE AS NOTED IN PREVIOUS INSPECTIONS)** 4/10/2023 - PREVIOUS INSPECTION NOTES **BEFORE ROW STORMWATER FINAL IS APPROVED** ** 04/10/23 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** RIGHT SIDE PROPERTY LINE NEED TO PUT SOD ON BARE EARTH WHERE YOUR CONSTRUCTION HAS NEGATIVELY IMPACTED THE ADJACENT LOT. ** LEFT SIDE NEED TO PUT SOD WHERE BARE EARTH IS ALONG DITCH LINE AND ACROSS STREET IN SWALE ** NEED TO REMOVE ALL TRASH AND CONTRUCTION DEBRIS FROM THE DITCH LINE EASEMENT AND PROPERTY ** NEED TO REPAIR SWALE ACROSS STREET IN FRONT OF VACANT SOD TO MATCH EXISTING GRADE. ______________________________________________________________________________________________________________________ **BEFORE ROW STORMWATER FINAL IS APPROVED** ** 04/06/23 RIGHT SIDE PROPERTY LINE NEED TO PUT SOD ON BARE EARTH WHERE YOUR CONSTRUCTION HAS NEGATIVELY IMPACTED THE ADJACENT LOT. ** LEFT SIDE NEED TO PUT SOD WHERE BARE EARTH IS ALONG DITCH LINE AND ACROSS STREET IN SWALE ** NEED TO REMOVE ALL TRASH AND CONTRUCTION DEBRIS FROM THE DITCH LINE EASEMENT AND PROPERTY | |||
| ROW - STORMWATER FINAL | 04/10/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: **BEFORE ROW STORMWATER FINAL IS APPROVED** ** 04/10/23 NO CORRECTIONS HAVE BEEN MADE SINCE PREVIOUS INSPECTION ** RIGHT SIDE PROPERTY LINE NEED TO PUT SOD ON BARE EARTH WHERE YOUR CONSTRUCTION HAS NEGATIVELY IMPACTED THE ADJACENT LOT. ** LEFT SIDE NEED TO PUT SOD WHERE BARE EARTH IS ALONG DITCH LINE AND ACROSS STREET IN SWALE ** NEED TO REMOVE ALL TRASH AND CONTRUCTION DEBRIS FROM THE DITCH LINE EASEMENT AND PROPERTY ** ______________________________________________________________________________________________________________________ **BEFORE ROW STORMWATER FINAL IS APPROVED** ** 04/06/23 RIGHT SIDE PROPERTY LINE NEED TO PUT SOD ON BARE EARTH WHERE YOUR CONSTRUCTION HAS NEGATIVELY IMPACTED THE ADJACENT LOT. ** LEFT SIDE NEED TO PUT SOD WHERE BARE EARTH IS ALONG DITCH LINE AND ACROSS STREET IN SWALE ** NEED TO REMOVE ALL TRASH AND CONTRUCTION DEBRIS FROM THE DITCH LINE EASEMENT AND PROPERTY | |||
| BLD - BUILDING FINAL | 04/10/2023 | Disapproved- Private Provider | PPROVIDER |
| U -UTILITY RESIDENTIAL FINAL | 04/10/2023 | FINAL APPROVED | JHARDING |
| PLUMBING FINAL | 04/06/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC FINAL | 04/06/2023 | Disapproved- Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 04/06/2023 | APPROVED | DHANEY |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/06/2023 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/06/2023 | APPROVED | EMADISON |
| Note: ** 04/06/23 RIGHT SIDE PROPERTY LINE NEED TO PUT SOD ON BARE EARTH WHERE YOUR CONSTRUCTION HAS NEGATIVELY IMPACTED THE ADJACENT LOT. ** LEFT SIDE NEED TO PUT SOD WHERE BARE EARTH IS ALONG DITCH LINE AND ACROSS STREET IN SWALE ** NEED TO REMOVE ALL TRASH AND CONTRUCTION DEBRIS FROM THE DITCH LINE EASEMENT AND PROPERTY | |||
| ROW - FINAL APRON (AFTER POUR) | 04/06/2023 | FINAL APPROVED | EMADISON |
| HVAC FINAL | 04/06/2023 | Disapproved- Private Provider | PPROVIDER |
| ELECTRIC - EARLY POWER | 04/04/2023 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 03/09/2023 | APPROVED | GBERTOLA |
| Note: 3/9/23=AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/8/2023 - PREVIOUS INSPECTION NOTES 3/823=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/7/2023 - PREVIOUS INSPECTION NOTES 1. THERE ARE AREAS IN DRIVEWAY THAT WON'T GIVE YOU THE MINIMUM AMOUNT OF CONCRETE. NEED TO HAVE A MINIMUM OF 6" IN THE RIGHT OF WAY AND 4" ABOVE RIGHT OF WAY. 2. NEED MORE COMPACTION IN POURING AREA. MINIMUM OF 95% COMPACTION THRUOUT DRIVEWAY. 3. FACEBOARD ALONG EDGE OF PAVEMENT NEEDS TO BE ABOVE EDGE OF PAVEMENT. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/08/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 3/823=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 3/7/2023 - PREVIOUS INSPECTION NOTES 1. THERE ARE AREAS IN DRIVEWAY THAT WON'T GIVE YOU THE MINIMUM AMOUNT OF CONCRETE. NEED TO HAVE A MINIMUM OF 6" IN THE RIGHT OF WAY AND 4" ABOVE RIGHT OF WAY. 2. NEED MORE COMPACTION IN POURING AREA. MINIMUM OF 95% COMPACTION THRUOUT DRIVEWAY. 3. FACEBOARD ALONG EDGE OF PAVEMENT NEEDS TO BE ABOVE EDGE OF PAVEMENT. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/07/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1. THERE ARE AREAS IN DRIVEWAY THAT WON'T GIVE YOU THE MINIMUM AMOUNT OF CONCRETE. NEED TO HAVE A MINIMUM OF 6" IN THE RIGHT OF WAY AND 4" ABOVE RIGHT OF WAY. 2. NEED MORE COMPACTION IN POURING AREA. MINIMUM OF 95% COMPACTION THRUOUT DRIVEWAY. 3. FACEBOARD ALONG EDGE OF PAVEMENT NEEDS TO BE ABOVE EDGE OF PAVEMENT. | |||
| U - SEWER TIE IN | 02/21/2023 | APPROVED | MGIBSON |
| MONOLITHIC SLAB | 02/21/2023 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 02/06/2023 | Approval - Private Provider | PPROVIDER |
| SEWER SERVICE | 02/06/2023 | Approval - Private Provider | PPROVIDER |
| ELECTRIC-TUG | 01/05/2023 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 12/12/2022 | Approval - Private Provider | PPROVIDER |
| INSULATION | 12/05/2022 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 11/18/2022 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 11/04/2022 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/04/2022 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 11/04/2022 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 09/16/2022 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 09/16/2022 | APPROVED | TBAKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 09/06/2022 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 08/11/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 09/15/2022 | 09/16/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/15/2022 | 09/15/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/29/2022 | 06/29/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 06/24/2022 | 06/27/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/22/2022 | 06/24/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 06/22/2022 | 06/23/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 06/22/2022 | 06/22/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/22/2022 | 06/22/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/22/2022 | 06/29/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/22/2022 | 06/23/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/22/2022 | 06/27/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/22/2022 | 06/24/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Need at least four shrubs along each side of house | |||
| SWALE | COMPLETE | 06/22/2022 | 09/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 04/11/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/11/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/11/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/11/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/11/2023 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 04/11/2023 |
| INSPECTION - RESIDENTIAL | ¤687.50 | 07/13/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤195.00 | 07/13/2022 |
| CONNECTION FEES | ¤1,077.88 | 07/13/2022 |
| WATER- TURN ON | ¤25.00 | 07/13/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/13/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/13/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/13/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 07/13/2022 |
| SEWER INSPECTION | ¤25.00 | 07/13/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 07/13/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 07/13/2022 |
| SITE PLAN 30 | ¤30.00 | 07/13/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 07/13/2022 |
| IMPACT FEE FIRE | ¤388.65 | 07/13/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 07/13/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/13/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 07/13/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/13/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 07/13/2022 |
| SURCHARGE FS 533.721 | ¤7.67 | 07/13/2022 |
| SURCHARGE - FS 468.631 | ¤11.50 | 07/13/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/13/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/13/2022 |
| SW ENG PRE APRON | ¤30.00 | 07/13/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,475.36 |