Permit #2022061336
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-00720-0030 |
| CONDITIONED SPACE: 1311 sqft |
| GARAGE: 499 sqft |
| CONDITIONED SPACE: 1311 sqft |
| GARAGE: 499 sqft |
| OPENED PORCH (WITH ROOF) : 158 sqft |
| OPENED PORCH (WITH ROOF) : 158 sqft |
| OPENED PORCH (WITH ROOF) : 58 sqft |
| OPENED PORCH (WITH ROOF) : 58 sqft |
| Total Square Footage: 4052 sqft |
| Block: 00720 |
| Subdivision: 2176 - SECTION 37-LAKEVIEW |
| Job Phone: 386-585-2654 |
| Location Address: 36 LINDSAY DR |
| Type: DU - DUPLEX |
| Issue Date: 07/20/2022 |
| NOC: RECORDED |
| Applicant name: DESIDERIO CARLOS CARREIRO |
| Owner: MIGUEL MICHELE & CARLOS SOARES |
|
Address 25 GRANT STREET NEW BEDFORD, MA 02740 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
RED LINE CONSTRUCTION CO
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6 COMMERCIAL CT PALM COAST, FL 32137 |
CGC1527392 (Exp: 08/31/2026) | 386-585-2654 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
DESIDERIO CARLOS CARREIRO
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6 COMMERCIAL CT PALM COAST, FL 32137 |
CGC1527392 (Exp: 08/31/2026) | 386-585-2654 |
FERNANDO M FARIA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
23 FREELAND LANE PALM COAST, FL 32137 |
RF11067823 (Exp: 08/31/2027) | 386-569-4336 |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/01/2023 | FINAL APPROVED | JSTEWART |
| Note: 8/29/2023 3:58:17 PM- PREVIOUS INSPECTION NOTES City Hall will be closed Wednesday August 30th. Inspections will not be performed Wednesday; August 30th. Inspections scheduled for Wednesday will cancelled. Please reschedule when you are ready for the inspection. Please be advised, if our community experiences damage, Building Inspectors priority will be providing damage assessment of the area and inspections will be postponed. Please monitor your emails to stay informed. 8/28/2023 - PREVIOUS INSPECTION NOTES 1. E- cals do not match equipment installed 2. All garage wall and ceiling penitartions are required to be sealed 3. Romex exposed behind range and romex outlet not mounted to wall 4. Range anti tip bracket not installed properly 5. All back flow preventer are required to be tamper proof | |||
| BLD - BUILDING FINAL | 08/30/2023 | CANCELLED BY APPLICANT | BBEMBRY |
| Note: City Hall will be closed Wednesday August 30th. Inspections will not be performed Wednesday; August 30th. Inspections scheduled for Wednesday will cancelled. Please reschedule when you are ready for the inspection. Please be advised, if our community experiences damage, Building Inspectors priority will be providing damage assessment of the area and inspections will be postponed. Please monitor your emails to stay informed. 8/28/2023 - PREVIOUS INSPECTION NOTES 1. E- cals do not match equipment installed 2. All garage wall and ceiling penitartions are required to be sealed 3. Romex exposed behind range and romex outlet not mounted to wall 4. Range anti tip bracket not installed properly 5. All back flow preventer are required to be tamper proof | |||
| BLD - BUILDING FINAL | 08/28/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. E- cals do not match equipment installed 2. All garage wall and ceiling penitartions are required to be sealed 3. Romex exposed behind range and romex outlet not mounted to wall 4. Range anti tip bracket not installed properly 5. All back flow preventer are required to be tamper proof | |||
| U-CROSS CONNECTION | 08/28/2023 | APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 08/28/2023 | APPROVED | GBERTOLA |
| Note: At the time of the inspection, all minimum city requirements were met. The builder is responsible for ensuring that nothing changes after this Inspection is approved | |||
| ROW - FINAL INSPECTION | 08/28/2023 | APPROVED | GBERTOLA |
| Note: At the time of the inspection, all minimum city requirements were met. The builder is responsible for ensuring that nothing changes after this Inspection is approved | |||
| U -UTILITY RESIDENTIAL FINAL | 08/28/2023 | FINAL APPROVED | DHANEY |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/25/2023 | APPROVED | EMADISON |
| Note: Inspector Notes from Inspection 9270 ** 08/09/23 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. Inspector Notes from Inspection 9470 ** 08/07/23 CORRECTIONS MADE ___________________________________________________________________________________________________________________ 8/1/2023 - PREVIOUS INSPECTION NOTES ** 08/01/23 FOLLOW UP ON 07/07/23 _____________________________________________________________________________________________________________________ 7/31/2023 - PREVIOUS INSPECTION NOTES ** 07/31/23 BOTH CULVERT PIPES ARE CLOGGED DUE TO BUILDER DID NOT USE ANY EROSION CONTROL DEVISE TO CONTAIN ERODED MATERIAL ONTO THE JOB SITE ** BUILDER NEEDS TO OPEN ROAD SIDE SWALE IMMEDIATELY TO ALLOW FOR THE STORMWATER TO FLOW ** REMOVE YOUR DISCARDED PLASTIC CULVERT PIPES FROM THE ROAD SIDE SWALE IN FRONT OF THE VACANT ON RIGHT ** YOUR SITE IS CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST ** SEE ATACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/01/23 ___________________________________________________________________________________________________________________ 7/28/2023 - PREVIOUS INSPECTION NOTES ** 07/28/23 NEED TO OPEN SWALE BETWEEN (2) CULVERT PIPES TO ALLLOW STORMWATER TP FLOW ** FOLLOW UP INSPECTION ON 07/31/23 __________________________________________________________________________________________________________________ 7/27/2023 - PREVIOUS INSPECTION NOTES ** 07/27/23 BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE 7/26/2023 - PREVIOUS INSPECTION NOTES 7/26/23=STOP WORK ORDER IS IN EFFECT BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/25/2023 - PREVIOUS INSPECTION NOTES 7/25/23= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 7/26/23 I WILL ADD A STOP WORK ORDER, THE DIRT FROM THE ROAD WAS CLEAN ALREADY 7/24/2023 - PREVIOUS INSPECTION NOTES ** 07/24/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/25/2 _____________________________________________________________________________________________________________________ 7/21/2023 - PREVIOUS INSPECTION NOTES ** 07/21/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/24/21 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/13/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every . NEED TO REMOVE THE SILT FROM THE CITY ROAD.Temporary access culvert in ROW is buried blocking the swale and needs to be opened. Next inspection 7/21/23 PICTURE ATTACHED | |||
| FINAL SURVEY (OFFICE USE ONLY) | 08/25/2023 | APPROVED | EMADISON |
| ROW- PRE-APRON (PRE-POUR) | 08/09/2023 | APPROVED - AS NOTED | EMADISON |
| Note: ** 08/09/23 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. Inspector Notes from Inspection 9470 ** 08/07/23 CORRECTIONS MADE ___________________________________________________________________________________________________________________ 8/1/2023 - PREVIOUS INSPECTION NOTES ** 08/01/23 FOLLOW UP ON 07/07/23 _____________________________________________________________________________________________________________________ 7/31/2023 - PREVIOUS INSPECTION NOTES ** 07/31/23 BOTH CULVERT PIPES ARE CLOGGED DUE TO BUILDER DID NOT USE ANY EROSION CONTROL DEVISE TO CONTAIN ERODED MATERIAL ONTO THE JOB SITE ** BUILDER NEEDS TO OPEN ROAD SIDE SWALE IMMEDIATELY TO ALLOW FOR THE STORMWATER TO FLOW ** REMOVE YOUR DISCARDED PLASTIC CULVERT PIPES FROM THE ROAD SIDE SWALE IN FRONT OF THE VACANT ON RIGHT ** YOUR SITE IS CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST ** SEE ATACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/01/23 ___________________________________________________________________________________________________________________ 7/28/2023 - PREVIOUS INSPECTION NOTES ** 07/28/23 NEED TO OPEN SWALE BETWEEN (2) CULVERT PIPES TO ALLLOW STORMWATER TP FLOW ** FOLLOW UP INSPECTION ON 07/31/23 __________________________________________________________________________________________________________________ 7/27/2023 - PREVIOUS INSPECTION NOTES ** 07/27/23 BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE 7/26/2023 - PREVIOUS INSPECTION NOTES 7/26/23=STOP WORK ORDER IS IN EFFECT BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/25/2023 - PREVIOUS INSPECTION NOTES 7/25/23= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 7/26/23 I WILL ADD A STOP WORK ORDER, THE DIRT FROM THE ROAD WAS CLEAN ALREADY 7/24/2023 - PREVIOUS INSPECTION NOTES ** 07/24/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/25/2 _____________________________________________________________________________________________________________________ 7/21/2023 - PREVIOUS INSPECTION NOTES ** 07/21/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/24/21 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/13/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every . NEED TO REMOVE THE SILT FROM THE CITY ROAD.Temporary access culvert in ROW is buried blocking the swale and needs to be opened. Next inspection 7/21/23 PICTURE ATTACHED | |||
| ROW - DRAINAGE | 08/07/2023 | APPROVED - AS NOTED | EMADISON |
| Note: ** 08/07/23 CORRECTIONS MADE ___________________________________________________________________________________________________________________ 8/1/2023 - PREVIOUS INSPECTION NOTES ** 08/01/23 FOLLOW UP ON 07/07/23 _____________________________________________________________________________________________________________________ 7/31/2023 - PREVIOUS INSPECTION NOTES ** 07/31/23 BOTH CULVERT PIPES ARE CLOGGED DUE TO BUILDER DID NOT USE ANY EROSION CONTROL DEVISE TO CONTAIN ERODED MATERIAL ONTO THE JOB SITE ** BUILDER NEEDS TO OPEN ROAD SIDE SWALE IMMEDIATELY TO ALLOW FOR THE STORMWATER TO FLOW ** REMOVE YOUR DISCARDED PLASTIC CULVERT PIPES FROM THE ROAD SIDE SWALE IN FRONT OF THE VACANT ON RIGHT ** YOUR SITE IS CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST ** SEE ATACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/01/23 ___________________________________________________________________________________________________________________ 7/28/2023 - PREVIOUS INSPECTION NOTES ** 07/28/23 NEED TO OPEN SWALE BETWEEN (2) CULVERT PIPES TO ALLLOW STORMWATER TP FLOW ** FOLLOW UP INSPECTION ON 07/31/23 __________________________________________________________________________________________________________________ 7/27/2023 - PREVIOUS INSPECTION NOTES ** 07/27/23 BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE 7/26/2023 - PREVIOUS INSPECTION NOTES 7/26/23=STOP WORK ORDER IS IN EFFECT BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/25/2023 - PREVIOUS INSPECTION NOTES 7/25/23= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 7/26/23 I WILL ADD A STOP WORK ORDER, THE DIRT FROM THE ROAD WAS CLEAN ALREADY 7/24/2023 - PREVIOUS INSPECTION NOTES ** 07/24/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/25/2 _____________________________________________________________________________________________________________________ 7/21/2023 - PREVIOUS INSPECTION NOTES ** 07/21/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/24/21 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/13/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every . NEED TO REMOVE THE SILT FROM THE CITY ROAD.Temporary access culvert in ROW is buried blocking the swale and needs to be opened. Next inspection 7/21/23 PICTURE ATTACHED | |||
| ROW - DRAINAGE | 08/01/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 08/01/23 FOLLOW UP ON 07/07/23 _____________________________________________________________________________________________________________________ 7/31/2023 - PREVIOUS INSPECTION NOTES ** 07/31/23 BOTH CULVERT PIPES ARE CLOGGED DUE TO BUILDER DID NOT USE ANY EROSION CONTROL DEVISE TO CONTAIN ERODED MATERIAL ONTO THE JOB SITE ** BUILDER NEEDS TO OPEN ROAD SIDE SWALE IMMEDIATELY TO ALLOW FOR THE STORMWATER TO FLOW ** REMOVE YOUR DISCARDED PLASTIC CULVERT PIPES FROM THE ROAD SIDE SWALE IN FRONT OF THE VACANT ON RIGHT ** YOUR SITE IS CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST ** SEE ATACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/01/23 ___________________________________________________________________________________________________________________ 7/28/2023 - PREVIOUS INSPECTION NOTES ** 07/28/23 NEED TO OPEN SWALE BETWEEN (2) CULVERT PIPES TO ALLLOW STORMWATER TP FLOW ** FOLLOW UP INSPECTION ON 07/31/23 __________________________________________________________________________________________________________________ 7/27/2023 - PREVIOUS INSPECTION NOTES ** 07/27/23 BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE 7/26/2023 - PREVIOUS INSPECTION NOTES 7/26/23=STOP WORK ORDER IS IN EFFECT BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/25/2023 - PREVIOUS INSPECTION NOTES 7/25/23= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 7/26/23 I WILL ADD A STOP WORK ORDER, THE DIRT FROM THE ROAD WAS CLEAN ALREADY 7/24/2023 - PREVIOUS INSPECTION NOTES ** 07/24/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/25/2 _____________________________________________________________________________________________________________________ 7/21/2023 - PREVIOUS INSPECTION NOTES ** 07/21/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/24/21 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/13/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every . NEED TO REMOVE THE SILT FROM THE CITY ROAD.Temporary access culvert in ROW is buried blocking the swale and needs to be opened. Next inspection 7/21/23 PICTURE ATTACHED | |||
| ROW - DRAINAGE | 07/31/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 07/31/23 BOTH CULVERT PIPES ARE CLOGGED DUE TO BUILDER DID NOT USE ANY EROSION CONTROL DEVISE TO CONTAIN ERODED MATERIAL ONTO THE JOB SITE. ** BUILDER NEEDS TO OPEN ROAD SIDE SWALE IMMEDIATELY TO ALLOW FOR THE STORMWATER TO FLOW ** REMOVE YOUR DISCARDED PLASTIC CULVERT PIPES FROM THE ROAD SIDE SWALE IN FRONT OF THE VACANT ON RIGHT ** YOUR SITE IS CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST ** SEE ATACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/01/23 ___________________________________________________________________________________________________________________ 7/28/2023 - PREVIOUS INSPECTION NOTES ** 07/28/23 NEED TO OPEN SWALE BETWEEN (2) CULVERT PIPES TO ALLLOW STORMWATER TP FLOW ** FOLLOW UP INSPECTION ON 07/31/23 __________________________________________________________________________________________________________________ 7/27/2023 - PREVIOUS INSPECTION NOTES ** 07/27/23 BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE 7/26/2023 - PREVIOUS INSPECTION NOTES 7/26/23=STOP WORK ORDER IS IN EFFECT BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/25/2023 - PREVIOUS INSPECTION NOTES 7/25/23= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 7/26/23 I WILL ADD A STOP WORK ORDER, THE DIRT FROM THE ROAD WAS CLEAN ALREADY 7/24/2023 - PREVIOUS INSPECTION NOTES ** 07/24/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/25/2 _____________________________________________________________________________________________________________________ 7/21/2023 - PREVIOUS INSPECTION NOTES ** 07/21/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/24/21 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/13/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every . NEED TO REMOVE THE SILT FROM THE CITY ROAD.Temporary access culvert in ROW is buried blocking the swale and needs to be opened. Next inspection 7/21/23 PICTURE ATTACHED | |||
| ROW - DRAINAGE | 07/28/2023 | PARTIALLY APPROVED | EMADISON |
| Note: ** 07/28/23 NEED TO OPEN SWALE BETWEEN (2) CULVERT PIPES TO ALLLOW STORMWATER TP FLOW ** FOLLOW UP INSPECTION ON 07/31/23 __________________________________________________________________________________________________________________ 7/27/2023 - PREVIOUS INSPECTION NOTES ** 07/27/23 BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE 7/26/2023 - PREVIOUS INSPECTION NOTES 7/26/23=STOP WORK ORDER IS IN EFFECT BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/25/2023 - PREVIOUS INSPECTION NOTES 7/25/23= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 7/26/23 I WILL ADD A STOP WORK ORDER, THE DIRT FROM THE ROAD WAS CLEAN ALREADY 7/24/2023 - PREVIOUS INSPECTION NOTES ** 07/24/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/25/2 _____________________________________________________________________________________________________________________ 7/21/2023 - PREVIOUS INSPECTION NOTES ** 07/21/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/24/21 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/13/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every . NEED TO REMOVE THE SILT FROM THE CITY ROAD.Temporary access culvert in ROW is buried blocking the swale and needs to be opened. Next inspection 7/21/23 PICTURE ATTACHED | |||
| ROW - DRAINAGE | 07/27/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 07/27/23 BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE 7/26/2023 - PREVIOUS INSPECTION NOTES 7/26/23=STOP WORK ORDER IS IN EFFECT BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/25/2023 - PREVIOUS INSPECTION NOTES 7/25/23= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 7/26/23 I WILL ADD A STOP WORK ORDER, THE DIRT FROM THE ROAD WAS CLEAN ALREADY 7/24/2023 - PREVIOUS INSPECTION NOTES ** 07/24/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/25/2 _____________________________________________________________________________________________________________________ 7/21/2023 - PREVIOUS INSPECTION NOTES ** 07/21/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/24/21 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/13/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every . NEED TO REMOVE THE SILT FROM THE CITY ROAD.Temporary access culvert in ROW is buried blocking the swale and needs to be opened. Next inspection 7/21/23 PICTURE ATTACHED | |||
| ROW - DRAINAGE | 07/26/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 7/26/23=STOP WORK ORDER IS IN EFFECT BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/25/2023 - PREVIOUS INSPECTION NOTES 7/25/23= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 7/26/23 I WILL ADD A STOP WORK ORDER, THE DIRT FROM THE ROAD WAS CLEAN ALREADY 7/24/2023 - PREVIOUS INSPECTION NOTES ** 07/24/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/25/2 _____________________________________________________________________________________________________________________ 7/21/2023 - PREVIOUS INSPECTION NOTES ** 07/21/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/24/21 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/13/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every . NEED TO REMOVE THE SILT FROM THE CITY ROAD.Temporary access culvert in ROW is buried blocking the swale and needs to be opened. Next inspection 7/21/23 PICTURE ATTACHED | |||
| ROW - DRAINAGE | 07/25/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 7/25/23= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 7/26/23 I WILL ADD A STOP WORK ORDER, THE DIRT FROM THE ROAD WAS CLEAN ALREADY 7/24/2023 - PREVIOUS INSPECTION NOTES ** 07/24/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/25/2 _____________________________________________________________________________________________________________________ 7/21/2023 - PREVIOUS INSPECTION NOTES ** 07/21/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/24/21 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/13/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every . NEED TO REMOVE THE SILT FROM THE CITY ROAD.Temporary access culvert in ROW is buried blocking the swale and needs to be opened. Next inspection 7/21/23 PICTURE ATTACHED | |||
| ROW - DRAINAGE | 07/24/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 07/24/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/25/2 _____________________________________________________________________________________________________________________ 7/21/2023 - PREVIOUS INSPECTION NOTES ** 07/21/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/24/21 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/13/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every . NEED TO REMOVE THE SILT FROM THE CITY ROAD.Temporary access culvert in ROW is buried blocking the swale and needs to be opened. Next inspection 7/21/23 PICTURE ATTACHED | |||
| ELECTRIC - EARLY POWER | 07/24/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: 7/24/23 Emailed FPL @ 9:50 AM 7/6/2023 - PREVIOUS INSPECTION NOTES 1. Main breakers undersized 2. Wiring for overhead service undersized 3. Electrical riser diagram does not match what is installed, Revision is needed to be submitted to the Building Dept. | |||
| ROW - DRAINAGE | 07/21/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 07/21/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY** ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/24/21 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/13/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every . NEED TO REMOVE THE SILT FROM THE CITY ROAD.Temporary access culvert in ROW is buried blocking the swale and needs to be opened. Next inspection 7/21/23 PICTURE ATTACHED | |||
| ROW - DRAINAGE | 07/17/2023 | Disapproved -FEE REQUIRED | GBERTOLA |
| Note: 7/13/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every . NEED TO REMOVE THE SILT FROM THE CITY ROAD.Temporary access culvert in ROW is buried blocking the swale and needs to be opened. Next inspection 7/21/23 PICTURE ATTACHED | |||
| U - SEWER TIE IN | 07/06/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 07/06/2023 | APPROVED | MGIBSON |
| ELECTRIC - EARLY POWER | 07/06/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Main breakers undersized 2. Wiring for overhead service undersized 3. Electrical riser diagram does not match what is installed, Revision is needed to be submitted to the Building Dept. | |||
| PEP TANK INSTALLATION REQUEST | 05/19/2023 | APPROVED | CSTONE |
| FIREWALL FINAL | 05/09/2023 | APPROVED | FWILLIS |
| LATH/BRICK/ WATER BARRIER | 05/05/2023 | APPROVED | FWILLIS |
| INSULATION | 05/03/2023 | APPROVED | FWILLIS |
| Note: 5/1/2023 - PREVIOUS INSPECTION NOTES 5/1/2023-Please seal holes in draft stop party wall. please instsall barricade for blown in Insulation at rear Porches. A side please fill to romex Penetrations at TP. Inspector Notes from Inspection 2420 Check at insulation//draft stop notice and weatherhead complete at service entry Inspector Notes from Inspection 2450 Inspector Notes from Inspection 2443 3/29/2023---Nailing passes, with regards that a revision is obtained for Draft stop process. before next inspection. 04-24-2023 Wall sheathing passes. Please submit a revision to the building department for the draft stop as noted on 3/29/2023. | |||
| INSULATION | 05/01/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 5/1/2023-Please seal holes in draft stop party wall. please instsall barricade for blown in Insulation at rear Porches. A side please fill to romex Penetrations at TP. Inspector Notes from Inspection 2420 Check at insulation//draft stop notice and weatherhead complete at service entry Inspector Notes from Inspection 2450 Inspector Notes from Inspection 2443 3/29/2023---Nailing passes, with regards that a revision is obtained for Draft stop process. before next inspection. 04-24-2023 Wall sheathing passes. Please submit a revision to the building department for the draft stop as noted on 3/29/2023. | |||
| ALL ROUGH | 04/25/2023 | APPROVED - AS NOTED | TSTAUFFACHER |
| Note: Check at insulation//draft stop notice and weatherhead complete at service entry Inspector Notes from Inspection 2450 Inspector Notes from Inspection 2443 3/29/2023---Nailing passes, with regards that a revision is obtained for Draft stop process. before next inspection. 04-24-2023 Wall sheathing passes. Please submit a revision to the building department for the draft stop as noted on 3/29/2023. | |||
| WALL SHEATHING | 04/24/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: Inspector Notes from Inspection 2443 3/29/2023---Nailing passes, with regards that a revision is obtained for Draft stop process. before next inspection. 04-24-2023 Wall sheathing passes. Please submit a revision to the building department for the draft stop as noted on 3/29/2023. | |||
| FIREWALL DRYWALL NAILING | 03/29/2023 | APPROVED - AS NOTED | JSTEWART |
| Note: 3/29/2023---Nailing passes, with regards that a revision is obtained for Draft stop process. before next inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/01/2023 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2340 NEED ADDRESS POSTED BY NEXT INSPECTION | |||
| ROOF VALLEY & METAL | 03/01/2023 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2340 NEED ADDRESS POSTED BY NEXT INSPECTION | |||
| TIE BEAM / LINTEL | 12/21/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: NEED ADDRESS POSTED BY NEXT INSPECTION | |||
| FOUND SURVEY APPROVED (OFFICE) | 11/14/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 10/25/2022 | APPROVED | FWILLIS |
| Note: 10/24/2022 - PREVIOUS INSPECTION NOTES PROOF OF COMPACTION NOT IN CONSTRUCTION BOX. 1804.3 | |||
| MONOLITHIC SLAB | 10/24/2022 | Disapproved - NO FEE | FWILLIS |
| Note: PROOF OF COMPACTION NOT IN CONSTRUCTION BOX. 1804.3 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/14/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 09/02/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 09/01/2023 | 09/01/2023 |
| Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM Wrong File Name Uploaded file name was not correct - Example: Site plan=site plan (do not add anything to the file names like numbers.) | |||
| BADMIN | INFORMATION | 08/28/2023 | 08/28/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator | |||
| MECH | COMPLETE | 08/28/2023 | 08/29/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 08/25/2023 | 08/25/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator | |||
| ELEC | COMPLETE | 07/18/2023 | 07/20/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 07/13/2023 | 07/17/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. The clothes dryer must be done at 5,000 not 4500. NEC 2017 220.54 | |||
| BLD | COMPLETE | 04/25/2023 | 05/01/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/20/2022 | 12/21/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/14/2022 | 11/14/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/14/2022 | 11/14/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/14/2022 | 07/14/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/14/2022 | 07/14/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | HOLD | 07/13/2022 | 07/13/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM Product approval specification sheet per F.S. 553.842: 1. Product Approval for roofing underlayment and asphalt singles noted on the Roofing Worksheet, does not match the Product Approval number on the submitted Product Approval sheet. | |||
| ZON | HOLD | 07/13/2022 | 07/13/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Sitwe plan does not match other plans. Please include walkways, drive way and patio area | |||
| SW1 | COMPLETE | 07/13/2022 | 07/18/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/13/2022 | 07/13/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 07/13/2022 | 07/14/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| SWALE | COMPLETE | 07/13/2022 | 09/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| CUSVC | HOLD | 07/08/2022 | 07/08/2022 |
| Note: Held By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM NO APPLICATION ATTACHED | |||
| CUSVC | HOLD | 07/07/2022 | 07/07/2022 |
| Note: Held By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM NO APPLICATION ATTACHED. | |||
| CUSVC | HOLD | 06/29/2022 | 06/29/2022 |
| Note: Held By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM No application for Utilities provided. | |||
| BLD | HOLD | 06/22/2022 | 06/24/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Provide an updated City of Palm Coast Roofing Worksheet. | |||
| CUSVC | HOLD | 06/22/2022 | 06/23/2022 |
| Note: Held By: HALEIGH HAND - - Please upload a utility application | |||
| ELEC | COMPLETE | 06/22/2022 | 06/23/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 06/22/2022 | 06/23/2022 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Survey/Site Plan incomplete - no benchmark, center of road elevations, site spot grades, etc | |||
| LOCATE | COMPLETE | 06/22/2022 | 06/29/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/22/2022 | 06/23/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 06/22/2022 | 06/27/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE A NEW SITE PLAN THAT HAS ELEVATIONS | |||
| ZON | HOLD | 06/22/2022 | 06/27/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Your site plan / survey needs to include all of the above:Some information is still missing Site plan information that Zoning Dept. is looking for: Address of lot, Section, lot, and block. Width and length of property All easements on property Square footage of entire lot Width of walk way and driveway and materials Impervious ratio %- we would only ask for this if it’s close to meeting the maximum impervious for the zoning district of the lot Include the Ac pads and all other pads or patios with dimensions All legal description information with map book and page number All Flood zones if multiple on property please include on site plan, Map Panel Number All setbacks Front, Rear, and both sides - the setbacks should be provided from the CLOSEST point of the structure to the described property lines Please make sure Site plan and landscape and floor plan all match. Back porch missing from Survey. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/01/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/01/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/01/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/01/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/01/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/01/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/01/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/01/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/01/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 09/01/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 09/01/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 09/01/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 09/01/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 09/01/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 09/01/2023 |
| CONNECTION FEES | ¤2,155.76 | 07/20/2022 |
| 07/20/2022 | ||
| 07/20/2022 | ||
| WATER- TURN ON | ¤50.00 | 07/20/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/20/2022 |
| INSPECTION - RESIDENTIAL | ¤962.50 | 07/20/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤273.00 | 07/20/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤23.32) | 07/20/2022 |
| IMPACT FEE FIRE | ¤777.30 | 07/20/2022 |
| IMPACT FEE PARKS | ¤2,910.26 | 07/20/2022 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 07/20/2022 |
| IMPACT FEE TRANSPORTATION | ¤2,738.00 | 07/20/2022 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 07/20/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤87.31) | 07/20/2022 |
| SURCHARGE FS 533.721 | ¤10.49 | 07/20/2022 |
| SURCHARGE - FS 468.631 | ¤15.73 | 07/20/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/20/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/20/2022 |
| SW ENG PRE APRON | ¤30.00 | 07/20/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/20/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/20/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤82.14) | 07/20/2022 |
| SEWER CREDIT | (¤2,932.00) | 07/20/2022 |
| SEWER INSPECTION | ¤25.00 | 07/20/2022 |
| SEWER CAPITAL FACILITY | ¤9,879.52 | 07/20/2022 |
| WATER CAPITAL FACILITY FEE | ¤7,253.00 | 07/20/2022 |
| SITE PLAN 30 | ¤30.00 | 07/20/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤31,930.79 |