Permit #2022061336

Permit Details

Status: COED

Parcel Id: 07-11-31-7037-00720-0030
CONDITIONED SPACE: 1311 sqft
GARAGE: 499 sqft
CONDITIONED SPACE: 1311 sqft
GARAGE: 499 sqft
OPENED PORCH (WITH ROOF) : 158 sqft
OPENED PORCH (WITH ROOF) : 158 sqft
OPENED PORCH (WITH ROOF) : 58 sqft
OPENED PORCH (WITH ROOF) : 58 sqft
Total Square Footage: 4052 sqft
Block: 00720
Subdivision: 2176 - SECTION 37-LAKEVIEW
Job Phone: 386-585-2654
Location Address: 36 LINDSAY DR
Type: DU - DUPLEX
Issue Date: 07/20/2022
NOC: RECORDED
Applicant name: DESIDERIO CARLOS CARREIRO
Owner: MIGUEL MICHELE & CARLOS SOARES

Address

25 GRANT STREET

NEW BEDFORD, MA 02740

Lot: 0030
Contracted Stated Job Value: ¤200,000.00
Job Description: DUPLEX
Type: CN

Contractor

RED LINE CONSTRUCTION CO
Status Location Address State License Number Phone
ACTIVE

6 COMMERCIAL CT

PALM COAST, FL 32137

CGC1527392 (Exp: 08/31/2026) 386-585-2654

Sub Contractors

GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
DESIDERIO CARLOS CARREIRO
Status Location Address State License Number Phone
ACTIVE

6 COMMERCIAL CT

PALM COAST, FL 32137

CGC1527392 (Exp: 08/31/2026) 386-585-2654
FERNANDO M FARIA
Status Location Address State License Number Phone
ACTIVE

23 FREELAND LANE

PALM COAST, FL 32137

RF11067823 (Exp: 08/31/2027) 386-569-4336
MAXIM BUDNIK
Status Location Address State License Number Phone
ACTIVE

9788 HALSEY RD

JACKSONVILLE, FL 32246

EC13007415 (Exp: 08/31/2026) 904-509-7306

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 09/01/2023 FINAL APPROVED JSTEWART
Note: 8/29/2023 3:58:17 PM- PREVIOUS INSPECTION NOTES City Hall will be closed Wednesday August 30th. Inspections will not be performed Wednesday; August 30th. Inspections scheduled for Wednesday will cancelled. Please reschedule when you are ready for the inspection. Please be advised, if our community experiences damage, Building Inspectors priority will be providing damage assessment of the area and inspections will be postponed. Please monitor your emails to stay informed. 8/28/2023 - PREVIOUS INSPECTION NOTES 1. E- cals do not match equipment installed 2. All garage wall and ceiling penitartions are required to be sealed 3. Romex exposed behind range and romex outlet not mounted to wall 4. Range anti tip bracket not installed properly 5. All back flow preventer are required to be tamper proof
BLD - BUILDING FINAL 08/30/2023 CANCELLED BY APPLICANT BBEMBRY
Note: City Hall will be closed Wednesday August 30th. Inspections will not be performed Wednesday; August 30th. Inspections scheduled for Wednesday will cancelled. Please reschedule when you are ready for the inspection. Please be advised, if our community experiences damage, Building Inspectors priority will be providing damage assessment of the area and inspections will be postponed. Please monitor your emails to stay informed. 8/28/2023 - PREVIOUS INSPECTION NOTES 1. E- cals do not match equipment installed 2. All garage wall and ceiling penitartions are required to be sealed 3. Romex exposed behind range and romex outlet not mounted to wall 4. Range anti tip bracket not installed properly 5. All back flow preventer are required to be tamper proof
BLD - BUILDING FINAL 08/28/2023 Disapproved - NO FEE MKRASKI
Note: 1. E- cals do not match equipment installed 2. All garage wall and ceiling penitartions are required to be sealed 3. Romex exposed behind range and romex outlet not mounted to wall 4. Range anti tip bracket not installed properly 5. All back flow preventer are required to be tamper proof
U-CROSS CONNECTION 08/28/2023 APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 08/28/2023 APPROVED GBERTOLA
Note: At the time of the inspection, all minimum city requirements were met. The builder is responsible for ensuring that nothing changes after this Inspection is approved
ROW - FINAL INSPECTION 08/28/2023 APPROVED GBERTOLA
Note: At the time of the inspection, all minimum city requirements were met. The builder is responsible for ensuring that nothing changes after this Inspection is approved
U -UTILITY RESIDENTIAL FINAL 08/28/2023 FINAL APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 08/25/2023 APPROVED EMADISON
Note: Inspector Notes from Inspection 9270 ** 08/09/23 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. Inspector Notes from Inspection 9470 ** 08/07/23 CORRECTIONS MADE ___________________________________________________________________________________________________________________ 8/1/2023 - PREVIOUS INSPECTION NOTES ** 08/01/23 FOLLOW UP ON 07/07/23 _____________________________________________________________________________________________________________________ 7/31/2023 - PREVIOUS INSPECTION NOTES ** 07/31/23 BOTH CULVERT PIPES ARE CLOGGED DUE TO BUILDER DID NOT USE ANY EROSION CONTROL DEVISE TO CONTAIN ERODED MATERIAL ONTO THE JOB SITE ** BUILDER NEEDS TO OPEN ROAD SIDE SWALE IMMEDIATELY TO ALLOW FOR THE STORMWATER TO FLOW ** REMOVE YOUR DISCARDED PLASTIC CULVERT PIPES FROM THE ROAD SIDE SWALE IN FRONT OF THE VACANT ON RIGHT ** YOUR SITE IS CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST ** SEE ATACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/01/23 ___________________________________________________________________________________________________________________ 7/28/2023 - PREVIOUS INSPECTION NOTES ** 07/28/23 NEED TO OPEN SWALE BETWEEN (2) CULVERT PIPES TO ALLLOW STORMWATER TP FLOW ** FOLLOW UP INSPECTION ON 07/31/23 __________________________________________________________________________________________________________________ 7/27/2023 - PREVIOUS INSPECTION NOTES ** 07/27/23 BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE 7/26/2023 - PREVIOUS INSPECTION NOTES 7/26/23=STOP WORK ORDER IS IN EFFECT BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/25/2023 - PREVIOUS INSPECTION NOTES 7/25/23= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 7/26/23 I WILL ADD A STOP WORK ORDER, THE DIRT FROM THE ROAD WAS CLEAN ALREADY 7/24/2023 - PREVIOUS INSPECTION NOTES ** 07/24/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/25/2 _____________________________________________________________________________________________________________________ 7/21/2023 - PREVIOUS INSPECTION NOTES ** 07/21/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/24/21 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/13/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every . NEED TO REMOVE THE SILT FROM THE CITY ROAD.Temporary access culvert in ROW is buried blocking the swale and needs to be opened. Next inspection 7/21/23 PICTURE ATTACHED
FINAL SURVEY (OFFICE USE ONLY) 08/25/2023 APPROVED EMADISON
ROW- PRE-APRON (PRE-POUR) 08/09/2023 APPROVED - AS NOTED EMADISON
Note: ** 08/09/23 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. Inspector Notes from Inspection 9470 ** 08/07/23 CORRECTIONS MADE ___________________________________________________________________________________________________________________ 8/1/2023 - PREVIOUS INSPECTION NOTES ** 08/01/23 FOLLOW UP ON 07/07/23 _____________________________________________________________________________________________________________________ 7/31/2023 - PREVIOUS INSPECTION NOTES ** 07/31/23 BOTH CULVERT PIPES ARE CLOGGED DUE TO BUILDER DID NOT USE ANY EROSION CONTROL DEVISE TO CONTAIN ERODED MATERIAL ONTO THE JOB SITE ** BUILDER NEEDS TO OPEN ROAD SIDE SWALE IMMEDIATELY TO ALLOW FOR THE STORMWATER TO FLOW ** REMOVE YOUR DISCARDED PLASTIC CULVERT PIPES FROM THE ROAD SIDE SWALE IN FRONT OF THE VACANT ON RIGHT ** YOUR SITE IS CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST ** SEE ATACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/01/23 ___________________________________________________________________________________________________________________ 7/28/2023 - PREVIOUS INSPECTION NOTES ** 07/28/23 NEED TO OPEN SWALE BETWEEN (2) CULVERT PIPES TO ALLLOW STORMWATER TP FLOW ** FOLLOW UP INSPECTION ON 07/31/23 __________________________________________________________________________________________________________________ 7/27/2023 - PREVIOUS INSPECTION NOTES ** 07/27/23 BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE 7/26/2023 - PREVIOUS INSPECTION NOTES 7/26/23=STOP WORK ORDER IS IN EFFECT BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/25/2023 - PREVIOUS INSPECTION NOTES 7/25/23= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 7/26/23 I WILL ADD A STOP WORK ORDER, THE DIRT FROM THE ROAD WAS CLEAN ALREADY 7/24/2023 - PREVIOUS INSPECTION NOTES ** 07/24/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/25/2 _____________________________________________________________________________________________________________________ 7/21/2023 - PREVIOUS INSPECTION NOTES ** 07/21/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/24/21 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/13/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every . NEED TO REMOVE THE SILT FROM THE CITY ROAD.Temporary access culvert in ROW is buried blocking the swale and needs to be opened. Next inspection 7/21/23 PICTURE ATTACHED
ROW - DRAINAGE 08/07/2023 APPROVED - AS NOTED EMADISON
Note: ** 08/07/23 CORRECTIONS MADE ___________________________________________________________________________________________________________________ 8/1/2023 - PREVIOUS INSPECTION NOTES ** 08/01/23 FOLLOW UP ON 07/07/23 _____________________________________________________________________________________________________________________ 7/31/2023 - PREVIOUS INSPECTION NOTES ** 07/31/23 BOTH CULVERT PIPES ARE CLOGGED DUE TO BUILDER DID NOT USE ANY EROSION CONTROL DEVISE TO CONTAIN ERODED MATERIAL ONTO THE JOB SITE ** BUILDER NEEDS TO OPEN ROAD SIDE SWALE IMMEDIATELY TO ALLOW FOR THE STORMWATER TO FLOW ** REMOVE YOUR DISCARDED PLASTIC CULVERT PIPES FROM THE ROAD SIDE SWALE IN FRONT OF THE VACANT ON RIGHT ** YOUR SITE IS CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST ** SEE ATACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/01/23 ___________________________________________________________________________________________________________________ 7/28/2023 - PREVIOUS INSPECTION NOTES ** 07/28/23 NEED TO OPEN SWALE BETWEEN (2) CULVERT PIPES TO ALLLOW STORMWATER TP FLOW ** FOLLOW UP INSPECTION ON 07/31/23 __________________________________________________________________________________________________________________ 7/27/2023 - PREVIOUS INSPECTION NOTES ** 07/27/23 BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE 7/26/2023 - PREVIOUS INSPECTION NOTES 7/26/23=STOP WORK ORDER IS IN EFFECT BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/25/2023 - PREVIOUS INSPECTION NOTES 7/25/23= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 7/26/23 I WILL ADD A STOP WORK ORDER, THE DIRT FROM THE ROAD WAS CLEAN ALREADY 7/24/2023 - PREVIOUS INSPECTION NOTES ** 07/24/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/25/2 _____________________________________________________________________________________________________________________ 7/21/2023 - PREVIOUS INSPECTION NOTES ** 07/21/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/24/21 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/13/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every . NEED TO REMOVE THE SILT FROM THE CITY ROAD.Temporary access culvert in ROW is buried blocking the swale and needs to be opened. Next inspection 7/21/23 PICTURE ATTACHED
ROW - DRAINAGE 08/01/2023 Disapproved - NO FEE EMADISON
Note: ** 08/01/23 FOLLOW UP ON 07/07/23 _____________________________________________________________________________________________________________________ 7/31/2023 - PREVIOUS INSPECTION NOTES ** 07/31/23 BOTH CULVERT PIPES ARE CLOGGED DUE TO BUILDER DID NOT USE ANY EROSION CONTROL DEVISE TO CONTAIN ERODED MATERIAL ONTO THE JOB SITE ** BUILDER NEEDS TO OPEN ROAD SIDE SWALE IMMEDIATELY TO ALLOW FOR THE STORMWATER TO FLOW ** REMOVE YOUR DISCARDED PLASTIC CULVERT PIPES FROM THE ROAD SIDE SWALE IN FRONT OF THE VACANT ON RIGHT ** YOUR SITE IS CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST ** SEE ATACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/01/23 ___________________________________________________________________________________________________________________ 7/28/2023 - PREVIOUS INSPECTION NOTES ** 07/28/23 NEED TO OPEN SWALE BETWEEN (2) CULVERT PIPES TO ALLLOW STORMWATER TP FLOW ** FOLLOW UP INSPECTION ON 07/31/23 __________________________________________________________________________________________________________________ 7/27/2023 - PREVIOUS INSPECTION NOTES ** 07/27/23 BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE 7/26/2023 - PREVIOUS INSPECTION NOTES 7/26/23=STOP WORK ORDER IS IN EFFECT BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/25/2023 - PREVIOUS INSPECTION NOTES 7/25/23= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 7/26/23 I WILL ADD A STOP WORK ORDER, THE DIRT FROM THE ROAD WAS CLEAN ALREADY 7/24/2023 - PREVIOUS INSPECTION NOTES ** 07/24/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/25/2 _____________________________________________________________________________________________________________________ 7/21/2023 - PREVIOUS INSPECTION NOTES ** 07/21/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/24/21 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/13/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every . NEED TO REMOVE THE SILT FROM THE CITY ROAD.Temporary access culvert in ROW is buried blocking the swale and needs to be opened. Next inspection 7/21/23 PICTURE ATTACHED
ROW - DRAINAGE 07/31/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 07/31/23 BOTH CULVERT PIPES ARE CLOGGED DUE TO BUILDER DID NOT USE ANY EROSION CONTROL DEVISE TO CONTAIN ERODED MATERIAL ONTO THE JOB SITE. ** BUILDER NEEDS TO OPEN ROAD SIDE SWALE IMMEDIATELY TO ALLOW FOR THE STORMWATER TO FLOW ** REMOVE YOUR DISCARDED PLASTIC CULVERT PIPES FROM THE ROAD SIDE SWALE IN FRONT OF THE VACANT ON RIGHT ** YOUR SITE IS CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLISTS, AND MOTORIST ** SEE ATACHED PHOTOS ** FOLLOW UP INSPECTION ON 08/01/23 ___________________________________________________________________________________________________________________ 7/28/2023 - PREVIOUS INSPECTION NOTES ** 07/28/23 NEED TO OPEN SWALE BETWEEN (2) CULVERT PIPES TO ALLLOW STORMWATER TP FLOW ** FOLLOW UP INSPECTION ON 07/31/23 __________________________________________________________________________________________________________________ 7/27/2023 - PREVIOUS INSPECTION NOTES ** 07/27/23 BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE 7/26/2023 - PREVIOUS INSPECTION NOTES 7/26/23=STOP WORK ORDER IS IN EFFECT BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/25/2023 - PREVIOUS INSPECTION NOTES 7/25/23= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 7/26/23 I WILL ADD A STOP WORK ORDER, THE DIRT FROM THE ROAD WAS CLEAN ALREADY 7/24/2023 - PREVIOUS INSPECTION NOTES ** 07/24/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/25/2 _____________________________________________________________________________________________________________________ 7/21/2023 - PREVIOUS INSPECTION NOTES ** 07/21/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/24/21 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/13/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every . NEED TO REMOVE THE SILT FROM THE CITY ROAD.Temporary access culvert in ROW is buried blocking the swale and needs to be opened. Next inspection 7/21/23 PICTURE ATTACHED
ROW - DRAINAGE 07/28/2023 PARTIALLY APPROVED EMADISON
Note: ** 07/28/23 NEED TO OPEN SWALE BETWEEN (2) CULVERT PIPES TO ALLLOW STORMWATER TP FLOW ** FOLLOW UP INSPECTION ON 07/31/23 __________________________________________________________________________________________________________________ 7/27/2023 - PREVIOUS INSPECTION NOTES ** 07/27/23 BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE 7/26/2023 - PREVIOUS INSPECTION NOTES 7/26/23=STOP WORK ORDER IS IN EFFECT BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/25/2023 - PREVIOUS INSPECTION NOTES 7/25/23= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 7/26/23 I WILL ADD A STOP WORK ORDER, THE DIRT FROM THE ROAD WAS CLEAN ALREADY 7/24/2023 - PREVIOUS INSPECTION NOTES ** 07/24/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/25/2 _____________________________________________________________________________________________________________________ 7/21/2023 - PREVIOUS INSPECTION NOTES ** 07/21/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/24/21 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/13/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every . NEED TO REMOVE THE SILT FROM THE CITY ROAD.Temporary access culvert in ROW is buried blocking the swale and needs to be opened. Next inspection 7/21/23 PICTURE ATTACHED
ROW - DRAINAGE 07/27/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 07/27/23 BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE 7/26/2023 - PREVIOUS INSPECTION NOTES 7/26/23=STOP WORK ORDER IS IN EFFECT BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/25/2023 - PREVIOUS INSPECTION NOTES 7/25/23= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 7/26/23 I WILL ADD A STOP WORK ORDER, THE DIRT FROM THE ROAD WAS CLEAN ALREADY 7/24/2023 - PREVIOUS INSPECTION NOTES ** 07/24/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/25/2 _____________________________________________________________________________________________________________________ 7/21/2023 - PREVIOUS INSPECTION NOTES ** 07/21/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/24/21 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/13/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every . NEED TO REMOVE THE SILT FROM THE CITY ROAD.Temporary access culvert in ROW is buried blocking the swale and needs to be opened. Next inspection 7/21/23 PICTURE ATTACHED
ROW - DRAINAGE 07/26/2023 Disapproved -FEE REQUIRED GBERTOLA
Note: 7/26/23=STOP WORK ORDER IS IN EFFECT BUILDER NEEDS TO OPEN DRIANAGE ACROSS FRONT SWALE +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/25/2023 - PREVIOUS INSPECTION NOTES 7/25/23= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 7/26/23 I WILL ADD A STOP WORK ORDER, THE DIRT FROM THE ROAD WAS CLEAN ALREADY 7/24/2023 - PREVIOUS INSPECTION NOTES ** 07/24/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/25/2 _____________________________________________________________________________________________________________________ 7/21/2023 - PREVIOUS INSPECTION NOTES ** 07/21/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/24/21 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/13/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every . NEED TO REMOVE THE SILT FROM THE CITY ROAD.Temporary access culvert in ROW is buried blocking the swale and needs to be opened. Next inspection 7/21/23 PICTURE ATTACHED
ROW - DRAINAGE 07/25/2023 Disapproved -FEE REQUIRED GBERTOLA
Note: 7/25/23= NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK 7/26/23 I WILL ADD A STOP WORK ORDER, THE DIRT FROM THE ROAD WAS CLEAN ALREADY 7/24/2023 - PREVIOUS INSPECTION NOTES ** 07/24/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/25/2 _____________________________________________________________________________________________________________________ 7/21/2023 - PREVIOUS INSPECTION NOTES ** 07/21/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/24/21 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/13/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every . NEED TO REMOVE THE SILT FROM THE CITY ROAD.Temporary access culvert in ROW is buried blocking the swale and needs to be opened. Next inspection 7/21/23 PICTURE ATTACHED
ROW - DRAINAGE 07/24/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 07/24/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/25/2 _____________________________________________________________________________________________________________________ 7/21/2023 - PREVIOUS INSPECTION NOTES ** 07/21/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY* ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/24/21 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/13/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every . NEED TO REMOVE THE SILT FROM THE CITY ROAD.Temporary access culvert in ROW is buried blocking the swale and needs to be opened. Next inspection 7/21/23 PICTURE ATTACHED
ELECTRIC - EARLY POWER 07/24/2023 APPROVED - AS NOTED MKRASKI
Note: 7/24/23 Emailed FPL @ 9:50 AM 7/6/2023 - PREVIOUS INSPECTION NOTES 1. Main breakers undersized 2. Wiring for overhead service undersized 3. Electrical riser diagram does not match what is installed, Revision is needed to be submitted to the Building Dept.
ROW - DRAINAGE 07/21/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 07/21/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE EITHER INSTALL A TEMPORARY CULVERT OR OPEN SWALE AND MAINTAIN ON A DAILY BASIS ** NEED TO REMOVE ERODED SEDIMENT FROM THE ROADWAY AS YOU ARE CREATING A SAFETY HAZARD FOR PEDESTRIANS, BICYCLIST AND MOTORIST ** REMOVE SEDIMENT FROM THE ROADWAY** ** NEED TO INSTALL A FORM OF EROSION CONTROL TO PREVENT MATERIAL FROM NEGATIVELY IMPACTING THE ROADWAY ** IF CORRECTIONS ARE NOT MADE BY 07/25/23 A **STOP WORK ORDER** WILL BE IMPOSED ON THE JOB SITE ** FOLLOW UP INSPECTION ON 07/24/21 _________________________________________________________________________________________________________________________ 7/17/2023 - PREVIOUS INSPECTION NOTES 7/13/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every . NEED TO REMOVE THE SILT FROM THE CITY ROAD.Temporary access culvert in ROW is buried blocking the swale and needs to be opened. Next inspection 7/21/23 PICTURE ATTACHED
ROW - DRAINAGE 07/17/2023 Disapproved -FEE REQUIRED GBERTOLA
Note: 7/13/23= Builder needs to keep the swale drainage open during the entire course of construction. Either by regrading every . NEED TO REMOVE THE SILT FROM THE CITY ROAD.Temporary access culvert in ROW is buried blocking the swale and needs to be opened. Next inspection 7/21/23 PICTURE ATTACHED
U - SEWER TIE IN 07/06/2023 APPROVED MGIBSON
GRAVITY SEWER TEST 07/06/2023 APPROVED MGIBSON
ELECTRIC - EARLY POWER 07/06/2023 Disapproved - NO FEE MKRASKI
Note: 1. Main breakers undersized 2. Wiring for overhead service undersized 3. Electrical riser diagram does not match what is installed, Revision is needed to be submitted to the Building Dept.
PEP TANK INSTALLATION REQUEST 05/19/2023 APPROVED CSTONE
FIREWALL FINAL 05/09/2023 APPROVED FWILLIS
LATH/BRICK/ WATER BARRIER 05/05/2023 APPROVED FWILLIS
INSULATION 05/03/2023 APPROVED FWILLIS
Note: 5/1/2023 - PREVIOUS INSPECTION NOTES 5/1/2023-Please seal holes in draft stop party wall. please instsall barricade for blown in Insulation at rear Porches. A side please fill to romex Penetrations at TP. Inspector Notes from Inspection 2420 Check at insulation//draft stop notice and weatherhead complete at service entry Inspector Notes from Inspection 2450 Inspector Notes from Inspection 2443 3/29/2023---Nailing passes, with regards that a revision is obtained for Draft stop process. before next inspection. 04-24-2023 Wall sheathing passes. Please submit a revision to the building department for the draft stop as noted on 3/29/2023.
INSULATION 05/01/2023 Disapproved - NO FEE JSTEWART
Note: 5/1/2023-Please seal holes in draft stop party wall. please instsall barricade for blown in Insulation at rear Porches. A side please fill to romex Penetrations at TP. Inspector Notes from Inspection 2420 Check at insulation//draft stop notice and weatherhead complete at service entry Inspector Notes from Inspection 2450 Inspector Notes from Inspection 2443 3/29/2023---Nailing passes, with regards that a revision is obtained for Draft stop process. before next inspection. 04-24-2023 Wall sheathing passes. Please submit a revision to the building department for the draft stop as noted on 3/29/2023.
ALL ROUGH 04/25/2023 APPROVED - AS NOTED TSTAUFFACHER
Note: Check at insulation//draft stop notice and weatherhead complete at service entry Inspector Notes from Inspection 2450 Inspector Notes from Inspection 2443 3/29/2023---Nailing passes, with regards that a revision is obtained for Draft stop process. before next inspection. 04-24-2023 Wall sheathing passes. Please submit a revision to the building department for the draft stop as noted on 3/29/2023.
WALL SHEATHING 04/24/2023 APPROVED - AS NOTED AGAETANO
Note: Inspector Notes from Inspection 2443 3/29/2023---Nailing passes, with regards that a revision is obtained for Draft stop process. before next inspection. 04-24-2023 Wall sheathing passes. Please submit a revision to the building department for the draft stop as noted on 3/29/2023.
FIREWALL DRYWALL NAILING 03/29/2023 APPROVED - AS NOTED JSTEWART
Note: 3/29/2023---Nailing passes, with regards that a revision is obtained for Draft stop process. before next inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/01/2023 APPROVED FWILLIS
Note: Inspector Notes from Inspection 2340 NEED ADDRESS POSTED BY NEXT INSPECTION
ROOF VALLEY & METAL 03/01/2023 APPROVED FWILLIS
Note: Inspector Notes from Inspection 2340 NEED ADDRESS POSTED BY NEXT INSPECTION
TIE BEAM / LINTEL 12/21/2022 APPROVED - AS NOTED RMARTIN
Note: NEED ADDRESS POSTED BY NEXT INSPECTION
FOUND SURVEY APPROVED (OFFICE) 11/14/2022 APPROVED TBAKER
MONOLITHIC SLAB 10/25/2022 APPROVED FWILLIS
Note: 10/24/2022 - PREVIOUS INSPECTION NOTES PROOF OF COMPACTION NOT IN CONSTRUCTION BOX. 1804.3
MONOLITHIC SLAB 10/24/2022 Disapproved - NO FEE FWILLIS
Note: PROOF OF COMPACTION NOT IN CONSTRUCTION BOX. 1804.3
PLUMBING 1ST ROUGH UNDERGROUND 10/14/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 09/02/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
BADMIN INFORMATION 09/01/2023 09/01/2023
Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM Wrong File Name Uploaded file name was not correct - Example: Site plan=site plan (do not add anything to the file names like numbers.)
BADMIN INFORMATION 08/28/2023 08/28/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents/Files named incorrectly o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator
MECH COMPLETE 08/28/2023 08/29/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 08/25/2023 08/25/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator
ELEC COMPLETE 07/18/2023 07/20/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ELEC HOLD 07/13/2023 07/17/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. The clothes dryer must be done at 5,000 not 4500. NEC 2017 220.54
BLD COMPLETE 04/25/2023 05/01/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 12/20/2022 12/21/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/14/2022 11/14/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 11/14/2022 11/14/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 07/14/2022 07/14/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON COMPLETE 07/14/2022 07/14/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD HOLD 07/13/2022 07/13/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM Product approval specification sheet per F.S. 553.842: 1. Product Approval for roofing underlayment and asphalt singles noted on the Roofing Worksheet, does not match the Product Approval number on the submitted Product Approval sheet.
ZON HOLD 07/13/2022 07/13/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Sitwe plan does not match other plans. Please include walkways, drive way and patio area
SW1 COMPLETE 07/13/2022 07/18/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/13/2022 07/13/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
CUSVC COMPLETE 07/13/2022 07/14/2022
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
SWALE COMPLETE 07/13/2022 09/21/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
CUSVC HOLD 07/08/2022 07/08/2022
Note: Held By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM NO APPLICATION ATTACHED
CUSVC HOLD 07/07/2022 07/07/2022
Note: Held By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM NO APPLICATION ATTACHED.
CUSVC HOLD 06/29/2022 06/29/2022
Note: Held By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM No application for Utilities provided.
BLD HOLD 06/22/2022 06/24/2022
Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code REVIEW COMMENTS: 1. Provide an updated City of Palm Coast Roofing Worksheet.
CUSVC HOLD 06/22/2022 06/23/2022
Note: Held By: HALEIGH HAND - - Please upload a utility application
ELEC COMPLETE 06/22/2022 06/23/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 HOLD 06/22/2022 06/23/2022
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Survey/Site Plan incomplete - no benchmark, center of road elevations, site spot grades, etc
LOCATE COMPLETE 06/22/2022 06/29/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 06/22/2022 06/23/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 06/22/2022 06/27/2022
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE A NEW SITE PLAN THAT HAS ELEVATIONS
ZON HOLD 06/22/2022 06/27/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Your site plan / survey needs to include all of the above:Some information is still missing Site plan information that Zoning Dept. is looking for: Address of lot, Section, lot, and block. Width and length of property All easements on property Square footage of entire lot Width of walk way and driveway and materials Impervious ratio %- we would only ask for this if it’s close to meeting the maximum impervious for the zoning district of the lot Include the Ac pads and all other pads or patios with dimensions All legal description information with map book and page number All Flood zones if multiple on property please include on site plan, Map Panel Number All setbacks Front, Rear, and both sides - the setbacks should be provided from the CLOSEST point of the structure to the described property lines Please make sure Site plan and landscape and floor plan all match. Back porch missing from Survey.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG - INSPECTION 20 ¤20.00 09/01/2023
SW ENG - INSPECTION 20 ¤20.00 09/01/2023
SW ENG - INSPECTION 20 ¤20.00 09/01/2023
SW ENG - INSPECTION 20 ¤20.00 09/01/2023
SW ENG - INSPECTION 20 ¤20.00 09/01/2023
SW ENG - INSPECTION 20 ¤20.00 09/01/2023
SW ENG - INSPECTION 20 ¤20.00 09/01/2023
SW ENG - INSPECTION 20 ¤20.00 09/01/2023
SW ENG - INSPECTION 20 ¤20.00 09/01/2023
SW ENG - INSPECTION 20 ¤20.00 09/01/2023
CONTRACTOR CHANGE ¤40.00 09/01/2023
CONTRACTOR CHANGE ¤20.00 09/01/2023
CONTRACTOR CHANGE ¤20.00 09/01/2023
PLAN REVIEW - REVISION ¤32.50 09/01/2023
PLAN REVIEW - REVISION ¤32.50 09/01/2023
CONNECTION FEES ¤2,155.76 07/20/2022
07/20/2022
07/20/2022
WATER- TURN ON ¤50.00 07/20/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/20/2022
INSPECTION - RESIDENTIAL ¤962.50 07/20/2022
PLAN REVIEW - RESIDENTIAL ¤273.00 07/20/2022
3% FIRE IMPACT FEE CREDIT (¤23.32) 07/20/2022
IMPACT FEE FIRE ¤777.30 07/20/2022
IMPACT FEE PARKS ¤2,910.26 07/20/2022
IMPACT FEE SCHOOL ¤7,200.00 07/20/2022
IMPACT FEE TRANSPORTATION ¤2,738.00 07/20/2022
WATER -IRRIGATION INSPECTION ¤50.00 07/20/2022
3% PARKS IMPACT FEE CREDIT (¤87.31) 07/20/2022
SURCHARGE FS 533.721 ¤10.49 07/20/2022
SURCHARGE - FS 468.631 ¤15.73 07/20/2022
SW ENG - FOUNDATION SURVEY ¤20.00 07/20/2022
SW ENG INSPECTION 80 ¤80.00 07/20/2022
SW ENG PRE APRON ¤30.00 07/20/2022
SW ENG - REVIEW 20 ¤20.00 07/20/2022
SW ENG RES REVIEW 200 ¤200.00 07/20/2022
3% TRANS IMPACT FEE CREDIT (¤82.14) 07/20/2022
SEWER CREDIT (¤2,932.00) 07/20/2022
SEWER INSPECTION ¤25.00 07/20/2022
SEWER CAPITAL FACILITY ¤9,879.52 07/20/2022
WATER CAPITAL FACILITY FEE ¤7,253.00 07/20/2022
SITE PLAN 30 ¤30.00 07/20/2022
Fees Total Due: ¤0.00 Total Paid: ¤31,930.79