I want to search for...
Permit #2022061345
Permit Details
Status: COED
| Parcel Id: 29-10-31-5540-00000-0330 |
| CONDITIONED SPACE: 4039 sqft |
| GARAGE: 979 sqft |
| OPENED PORCH (WITH ROOF) : 1128 sqft |
| Total Square Footage: 6146 sqft |
| Block: 00000 |
| Subdivision: 1005 - SANCTUARY SUBDIVISION |
| Job Phone: (386)931-6530 |
| Location Address: 60 OLD OAK DR S |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/11/2022 |
| NOC: RECORDED |
| Applicant name: HUGO A CAMACHO |
| Owner: COSTA MANUEL D & ROSA F H&W |
|
Address 2 CAITLIN COURT PALM COAST, FL 32137 |
| Lot: 0330 |
| Contracted Stated Job Value: ¤700,000.00 |
| Job Description: Single Family House |
| Type: CN |
Contractor
IDEAL HOMES AT PALM COAST, INC.
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 353639 PALM COAST, FL 32137 |
CBC1250774 (Exp: 08/31/2026) | (386)446-5161 | (386)447-0238 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
CHRISTOPHER DANIEL FULTON
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2 MARKET PLACE PALM COAST, FL 32137 |
UNIT D PALM COAST, FL 32137 |
CCC1331939 (Exp: 08/31/2026) | 386-445-7945 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
THOMAS A REGULA
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
11320 PHILLIPS PKWY DRIVE E JACKSONVILLE, FL 32256 |
CMC1250075 (Exp: 08/31/2026) | 904-278-0339 | 904-278-0366 |
MARK B SOWERS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
609 FOURTH ST BUNNELL, FL 32110 |
35616 (Exp: 08/31/2026) | 386-225-1753 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/02/2024 | FINAL APPROVED | JWALKER |
| GAS FINAL | 03/21/2024 | FINAL APPROVED | JWALKER |
| WINDOW NAILING | 03/21/2024 | APPROVED | JWALKER |
| Note: 04-05-2023 Window nailing will be added for the front entry door and master bed double door window at top | |||
| U-CROSS CONNECTION | 02/14/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: well irrigation-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 02/14/2024 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/09/2024 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/09/2024 | APPROVED | EMADISON |
| ROW - STORMWATER FINAL | 02/09/2024 | APPROVED | EMADISON |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - FINAL APRON (AFTER POUR) | 02/09/2024 | APPROVED | EMADISON |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/09/2023 | APPROVED | GBERTOLA |
| Note: 11/9/23= READY FOR PAVERS READY TO POUR WHEN INSTALLING THE SUB-BASE OR PAVER BASE SAND, CALL FOR A NEW INSPECTION ONCE COMPACTION IS DONE. THE BASE CAN NO LONGER BE LEFT IN A PILE ON-SITE AND MUST BE SPREAD AND COMPACTED BEFORE THE SECOND PART OF A PRE-POUR FOR PAVERS CAN BE APPROVED. | |||
| ROW- PAVER RESTRAINTS | 09/05/2023 | APPROVED | GBERTOLA |
| Note: READY TO POUR | |||
| ROW- PRE-APRON (PRE-POUR) | 09/05/2023 | APPROVED - AS NOTED | GBERTOLA |
| Note: READY TO POUR WHEN INSTALLING THE SUB-BASE OR PAVER BASE SAND, CALL FOR A NEW INSPECTION ONCE COMPACTION IS DONE. THE BASE CAN NO LONGER BE LEFT IN A PILE ON-SITE AND MUST BE SPREAD AND COMPACTED BEFORE THE SECOND PART OF A PRE-POUR FOR PAVERS CAN BE APPROVED. | |||
| ELECTRIC - EARLY POWER | 09/05/2023 | APPROVED | AGAETANO |
| ELECTRIC-TUG | 08/10/2023 | APPROVED | AGAETANO |
| GRAVITY SEWER TEST | 06/23/2023 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 06/23/2023 | APPROVED | MGIBSON |
| LATH/BRICK/ WATER BARRIER | 06/05/2023 | APPROVED | AGAETANO |
| INSULATION | 04/18/2023 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2420 Inspector Notes from Inspection 2467 02-06-2023 Contractor will provide manufacturer's secs fro no battons to be installed prior to final. 04-05-2023 1. No service. Check at early power. 2. UFER ground not visible. Contractor will install when service is installed. Rebar is visible. 3. Window nailing will be added for the front entry door and master bed double door window at top. | |||
| ALL ROUGH | 04/05/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: Inspector Notes from Inspection 2467 02-06-2023 Contractor will provide manufacturer's secs fro no battons to be installed prior to final. 04-05-2023 1. No service. Check at early power. 2. UFER ground not visible. Contractor will install when service is installed. Rebar is visible. 3. Window nailing will be added for the front entry door and master bed double door window at top. | |||
| GAS ROUGH | 04/05/2023 | APPROVED | MGIBSON |
| ROOF VALLEY & METAL | 02/06/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 02-06-2023 Contractor will provide manufacturer's secs fro no battons to be installed prior to final. | |||
| WALL SHEATHING | 01/10/2023 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/10/2023 | APPROVED | AGAETANO |
| TIE BEAM / LINTEL | 12/05/2022 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2250 Inspector Notes from Inspection 2280 09-27-2022 Please submit revision for the change in ceiling height. 11-7-2022 UFER indicated in stem wall on left side of garage wall. UFER will be visible at TUG. | |||
| FOUND SURVEY APPROVED (OFFICE) | 11/29/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 11/07/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: Inspector Notes from Inspection 2280 09-27-2022 Please submit revision for the change in ceiling height. 11-7-2022 UFER indicated in stem wall on left side of garage wall. UFER will be visible at TUG. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/19/2022 | APPROVED | MGIBSON |
| STEM WALL FOUNDATION | 09/27/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: 09-27-2022 Please submit revision for the change in ceiling height. | |||
| DOWN CELL | 09/27/2022 | CANCELLED BY INSPECTOR | AGAETANO |
| Note: Inspector Notes from Inspection 2280 09-02-2022 Please provide a revision to the building department for the three rebars in the stem wall areas. 09-27-2022 - This inspection is not needed. Stem wall inspection is needed. | |||
| STEM WALL FOUNDATION | 09/02/2022 | APPROVED - AS NOTED | AGAETANO |
| Note: 09-02-2022 Please provide a revision to the building department for the three rebars in the stem wall areas. | |||
| WATER METER INSTALLATION REQUEST | 07/22/2022 | APPROVED | CSTONE |
| WILDLIFE CHECK - ENVIRONMENTAL | 07/05/2022 | APPROVED | JMYERS |
Review History
| Department | Status | Date In | Date Out |
| GAS | COMPLETE | 02/14/2024 | 02/15/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 02/08/2024 | 02/09/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 03/30/2023 | 03/30/2023 |
| Note: Marked INFORMATION By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Need to obtain letter from Gas company that if the capacity for the fireplace is not enough; then they would be willing to switch to a 2lb system prior to final inspection. -Chris Piscitelli | |||
| GAS | COMPLETE | 03/29/2023 | 03/30/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| GAS | HOLD | 03/27/2023 | 03/27/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Gas piping size for grill and fireplace are not large enough for capacity. Revise piping size per Table 402.4(32) FBC Fuel Gas 2020 7Th edition | |||
| GAS | HOLD | 03/23/2023 | 03/23/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide material and pipe size for Generator. also clarify pipe sizes on drawing for stubout, fireplace, grill, and cooktop. Draw arrows to sizes or mark individual pipes. | |||
| ENGIN1 | COMPLETE | 11/29/2022 | 11/29/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/29/2022 | 11/29/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/03/2022 | 10/03/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 09/26/2022 | 09/26/2022 |
| Note: Marked INFORMATION By: MARGA DEFREITAS - - MDEFREITAS@PALMCOASTGOV.COM PLANS NEED TO BE DIGITAL | |||
| ELEC | COMPLETE | 07/06/2022 | 07/06/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/06/2022 | 07/06/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/27/2022 | 06/27/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 06/24/2022 | 07/05/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Staff conducted a site visit on 7/5/22 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot. | |||
| PLFM | COMPLETE | 06/24/2022 | 06/28/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM According to the Site Plan/Survey the structure does not fall within the SFHA. No elevation certificates are required. | |||
| BLD | COMPLETE | 06/22/2022 | 06/24/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 06/22/2022 | 06/23/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 06/22/2022 | 06/27/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit electrical load calcs. 2. Submit a riser diagram for generator and manufacture specs | |||
| ENGIN1 | COMPLETE | 06/22/2022 | 06/23/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/22/2022 | 06/29/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 06/22/2022 | 06/23/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Plans show R30 insulation in attic. Energy Calcs say R20. Revise to match | |||
| SW1 | COMPLETE | 06/22/2022 | 06/27/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/22/2022 | 06/24/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide the width and material of walkway on right side of house on site plan/survey |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 04/01/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/01/2024 |
| CONNECTION FEES | ¤25.00 | 07/11/2022 |
| WATER-METER | ¤467.09 | 07/11/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/11/2022 |
| INSPECTION - RESIDENTIAL | ¤1,925.00 | 07/11/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤546.00 | 07/11/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 07/11/2022 |
| IMPACT FEE FIRE | ¤388.65 | 07/11/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 07/11/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/11/2022 |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | 07/11/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 07/11/2022 |
| SURCHARGE FS 533.721 | ¤20.36 | 07/11/2022 |
| SURCHARGE - FS 468.631 | ¤30.54 | 07/11/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/11/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/11/2022 |
| SW ENG PRE APRON | ¤30.00 | 07/11/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/11/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/11/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤96.72) | 07/11/2022 |
| SEWER INSPECTION | ¤25.00 | 07/11/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 07/11/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 07/11/2022 |
| SITE PLAN 30 | ¤30.00 | 07/11/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,583.50 |