Permit #2022061358
Permit Details
Status: COED
| Parcel Id: 07-11-31-7033-00150-0190 |
| CONDITIONED SPACE: 1311 sqft |
| CONDITIONED SPACE: 1311 sqft |
| GARAGE: 499 sqft |
| GARAGE: 499 sqft |
| OPENED PORCH (WITH ROOF) : 58 sqft |
| OPENED PORCH (WITH ROOF) : 58 sqft |
| OPENED PORCH (WITH ROOF) : 158 sqft |
| OPENED PORCH (WITH ROOF) : 158 sqft |
| Total Square Footage: 4052 sqft |
| Block: 00150 |
| Subdivision: 2184 - SECTION 33-ROYAL PALMS |
| Job Phone: 386-585-2654 |
| Location Address: 17 REGIS LN |
| Type: DU - DUPLEX |
| Issue Date: 07/14/2022 |
| NOC: RECORDED |
| Applicant name: DESIDERIO CARLOS CARREIRO |
| Owner: ANDRE RICK & AMY ANDRE |
|
Address 470 LOFTUS STREET NEW BEDFORD, MA 02746 |
| Lot: 0190 |
| Contracted Stated Job Value: ¤200,000.00 |
| Job Description: DUPLEX |
Contractor
RED LINE CONSTRUCTION CO
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6 COMMERCIAL CT PALM COAST, FL 32137 |
CGC1527392 (Exp: 08/31/2026) | 386-585-2654 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
DESIDERIO CARLOS CARREIRO
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6 COMMERCIAL CT PALM COAST, FL 32137 |
CGC1527392 (Exp: 08/31/2026) | 386-585-2654 |
FERNANDO M FARIA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
23 FREELAND LANE PALM COAST, FL 32137 |
RF11067823 (Exp: 08/31/2027) | 386-569-4336 |
MAXIM BUDNIK
| Status | Location Address | State License Number | Phone |
| ACTIVE |
9788 HALSEY RD JACKSONVILLE, FL 32246 |
EC13007415 (Exp: 08/31/2026) | 904-509-7306 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 10/24/2023 | FINAL APPROVED | JWALKER |
| Note: New inspection due to canceled inspection 10/19/2023 - PREVIOUS INSPECTION NOTES 1. Missing vaccum breakers at the exterior hose bibs. 2. Rear porch outlet, and the front porch outlet at unit A are not GFI protected. 3. The Energy calculations for the AHU in Unit A do not match. 4. Toilet Bases both units need to be sealed to floor. 5. Missing water hammer at the dishwasher water supply pipes both units. 6. Smoke detectors are not communicating with one another. When one is alarm triggers all smoke are to sound an alarm. UNIT B 7. Outlet next to the water heater is not resetting. 8. Kitchen counter top 2nd out let from the sink has no power. Dining room area outlet no power. 9. Dishwasher outlet is required to be GFI protected. 10. No hot water at the kitchen sink. 11. Toilet not flushing, and low pressure at the shower. | |||
| BLD - BUILDING FINAL | 10/23/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 10/19/2023 - PREVIOUS INSPECTION NOTES 1. Missing vaccum breakers at the exterior hose bibs. 2. Rear porch outlet, and the front porch outlet at unit A are not GFI protected. 3. The Energy calculations for the AHU in Unit A do not match. 4. Toilet Bases both units need to be sealed to floor. 5. Missing water hammer at the dishwasher water supply pipes both units. 6. Smoke detectors are not communicating with one another. When one is alarm triggers all smoke are to sound an alarm. UNIT B 7. Outlet next to the water heater is not resetting. 8. Kitchen counter top 2nd out let from the sink has no power. Dining room area outlet no power. 9. Dishwasher outlet is required to be GFI protected. 10. No hot water at the kitchen sink. 11. Toilet not flushing, and low pressure at the shower. | |||
| BLD - BUILDING FINAL | 10/19/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 1. Missing vaccum breakers at the exterior hose bibs. 2. Rear porch outlet, and the front porch outlet at unit A are not GFI protected. 3. The Energy calculations for the AHU in Unit A do not match. 4. Toilet Bases both units need to be sealed to floor. 5. Missing water hammer at the dishwasher water supply pipes both units. 6. Smoke detectors are not communicating with one another. When one is alarm triggers all smoke are to sound an alarm. UNIT B 7. Outlet next to the water heater is not resetting. 8. Kitchen counter top 2nd out let from the sink has no power. Dining room area outlet no power. 9. Dishwasher outlet is required to be GFI protected. 10. No hot water at the kitchen sink. 11. Toilet not flushing, and low pressure at the shower. | |||
| ROW - FINAL INSPECTION | 10/19/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ------------------------------------------------------------------------------ 10/18/2023 - PREVIOUS INSPECTION NOTES STILL NEED TOCLEAN ALL CONSTRUCTION DEBRIS AND TRASH FROM THE VACANT LOT ------------------------------------------------------------------------------- 10/16/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN ALL TRASH AND ALL CONSTRUCTION DEBRIS FROM THE VACANT LOT TO THE RIGHT OF YOURS ------------------------------------------------------------------------------- 10/12/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN ALL TRASH AND ALL CONSTRUCTION DEBRIS FROM THE VACANT LOT TO THE RIGHT OF YOURS AND ALL CONCRETE THAT IS ON THE DRIVEWAY PLEASE CLEAN ALL DIRT OUT OF CULVERTS AGAIN BEFORE CALLING FOR THE NEXT INSPECTION | |||
| ROW - FINAL INSPECTION | 10/18/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: STILL NEED TOCLEAN ALL CONSTRUCTION DEBRIS AND TRASH FROM THE VACANT LOT ------------------------------------------------------------------------------- 10/16/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN ALL TRASH AND ALL CONSTRUCTION DEBRIS FROM THE VACANT LOT TO THE RIGHT OF YOURS ------------------------------------------------------------------------------- 10/12/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN ALL TRASH AND ALL CONSTRUCTION DEBRIS FROM THE VACANT LOT TO THE RIGHT OF YOURS AND ALL CONCRETE THAT IS ON THE DRIVEWAY PLEASE CLEAN ALL DIRT OUT OF CULVERTS AGAIN BEFORE CALLING FOR THE NEXT INSPECTION | |||
| ROW - FINAL INSPECTION | 10/16/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO CLEAN ALL TRASH AND ALL CONSTRUCTION DEBRIS FROM THE VACANT LOT TO THE RIGHT OF YOURS ------------------------------------------------------------------------------- 10/12/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN ALL TRASH AND ALL CONSTRUCTION DEBRIS FROM THE VACANT LOT TO THE RIGHT OF YOURS AND ALL CONCRETE THAT IS ON THE DRIVEWAY PLEASE CLEAN ALL DIRT OUT OF CULVERTS AGAIN BEFORE CALLING FOR THE NEXT INSPECTION | |||
| ROW - FINAL INSPECTION | 10/12/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO CLEAN ALL TRASH AND ALL CONSTRUCTION DEBRIS FROM THE VACANT LOT TO THE RIGHT OF YOURS AND ALL CONCRETE THAT IS ON THE DRIVEWAY PLEASE CLEAN ALL DIRT OUT OF CULVERTS AGAIN BEFORE CALLING FOR THE NEXT INSPECTION | |||
| U -UTILITY RESIDENTIAL FINAL | 10/12/2023 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 no irrigation-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 10/11/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/11/2023 | APPROVED | PFLANAGAN |
| Note: THE FIELD SHOWS NO SWALE ON THE LEFT SIDE OF HOUSE BUT THE 10' OFF SETS SAYS IT WILL NOT IMPACT THE ADJACENT LOT At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. -------------------------------------------------------------------------------------- 10/10/2023 - PREVIOUS INSPECTION NOTES NEED TO CUT GRASS SO I CAN SEE GRADE OF THE LOT BETTER CODE 15-108 (d) Excessive growth of grass, weeds, or brush and other overgrowth means grass or weeds or brush, or bushes, or shrubs, or trees, or vines, or flowering plants and other living plant life that is allowed to grow in a wild and unkempt manner not in keeping with the neighborhood. ----------------------------------------------------------------------------------------------- 10/5/2023 - PREVIOUS INSPECTION NOTES THIS INSPECTION IS DONE AFTER THE FINAL SURVEY IS PASSED | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/10/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: NEED TO CUT GRASS SO I CAN SEE GRADE OF THE LOT BETTER CODE 15-108 (d) Excessive growth of grass, weeds, or brush and other overgrowth means grass or weeds or brush, or bushes, or shrubs, or trees, or vines, or flowering plants and other living plant life that is allowed to grow in a wild and unkempt manner not in keeping with the neighborhood. ----------------------------------------------------------------------------------------------- 10/5/2023 - PREVIOUS INSPECTION NOTES THIS INSPECTION IS DONE AFTER THE FINAL SURVEY IS PASSED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/10/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. -------------------------------------------------------------------- 10/6/2023 - PREVIOUS INSPECTION NOTES 10/5/2023 - PREVIOUS INSPECTION NOTES 1) THE SOD ELEVATIONS AGAINST THE HOUSE ALL NEED TO BE 4" BELOW FFE OF THE STRUCTURE 2) THE RIGHT CULVERT INVERT IS OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL THAT WAS PROVIDED CULVERT NEEDS TO BE WITH IN A .10 +/- | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/06/2023 | CANCELLED BY APPLICANT | PFLANAGAN |
| Note: 10/5/2023 - PREVIOUS INSPECTION NOTES 1) THE SOD ELEVATIONS AGAINST THE HOUSE ALL NEED TO BE 4" BELOW FFE OF THE STRUCTURE 2) THE RIGHT CULVERT INVERT IS OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL THAT WAS PROVIDED CULVERT NEEDS TO BE WITH IN A .10 +/- | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/05/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) THE SOD ELEVATIONS AGAINST THE HOUSE ALL NEED TO BE 4" BELOW FFE OF THE STRUCTURE 2) THE RIGHT CULVERT INVERT IS OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL THAT WAS PROVIDED CULVERT NEEDS TO BE WITH IN A .10 +/- | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/05/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: THIS INSPECTION IS DONE AFTER THE FINAL SURVEY IS PASSED | |||
| U-CROSS CONNECTION | 10/05/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ROW- PRE-APRON (PRE-POUR) | 08/28/2023 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING CONCRETE FOR DRIVEWAY. ALL CONCRETE MUST BE A MINIMUM OF 3000PSI WITH FIBER OR METAL MESH IN THE CONCRETE TO MEET CITY'S STANDARTS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC - EARLY POWER | 07/26/2023 | APPROVED | JWALKER |
| Note: 7/21/2023 - PREVIOUS INSPECTION NOTES Electrical riser does not match what is installed | |||
| ELECTRIC - EARLY POWER | 07/21/2023 | Disapproved - NO FEE | MKRASKI |
| Note: Electrical riser does not match what is installed | |||
| FIREWALL FINAL | 07/06/2023 | Disapproved - NO FEE | JWALKER |
| Note: Ceilings have been sheet rocked, blowin insulation has been installed, Unable to access the fire wall. | |||
| FIREWALL FINAL | 07/06/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 7/6/23 Meeting with contractor onsite. Contractor pushed back blowin insulation revealing fire resistant markings on the 5/8" sheet rock. 7/6/2023 - PREVIOUS INSPECTION NOTES Ceilings have been sheet rocked, blowin insulation has been installed, Unable to access the fire wall. | |||
| GRAVITY SEWER TEST | 07/05/2023 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 REMOVE ALL VEGITATION FROM SLAB BEFORE SLAB INPECTION | |||
| U - SEWER TIE IN | 07/05/2023 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 05/19/2023 | APPROVED | CSTONE |
| LATH/BRICK/ WATER BARRIER | 05/11/2023 | APPROVED | RMARTIN |
| Note: 5/8/2023 - PREVIOUS INSPECTION NOTES 1. Front of the building at the lower part of the corners. Spray foam has been used to attach the corner beads. The foam will need to be removed as this will not allow for correct stucco depth. 2. Install wire mesh to fill the holes in the CMU wall at the electrical panel area. 3. Scrape foam at window areas to allow for correct stucco fill. | |||
| LATH/BRICK/ WATER BARRIER | 05/08/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. Front of the building at the lower part of the corners. Spray foam has been used to attach the corner beads. The foam will need to be removed as this will not allow for correct stucco depth. 2. Install wire mesh to fill the holes in the CMU wall at the electrical panel area. 3. Scrape foam at window areas to allow for correct stucco fill. | |||
| INSULATION | 05/05/2023 | APPROVED | JWALKER |
| ALL ROUGH | 05/03/2023 | APPROVED | TSTAUFFACHER |
| Note: 4/28/2023 - PREVIOUS INSPECTION NOTES 1. The electrical riser installed is not matching the submitted and approved riser diagram on page 2 of 5 of the prints. please submitt a revision to the building department for the changes. 2. The resseced lights above the shower / tub areas are to marked suitable for wet locations. 3. Tub piping in unit B is leaking. 4. Unit A 5' head test is not holding water. 5. The boot flashing at the electrical mast is not the correct size and is not seal properly. 6. The windows and the sliding glass doors product approvals do not match the FL approved product numbers submitted to the building depart. Please submitt a revision to the building department for the changes.. Inspection stopped. | |||
| ALL ROUGH | 04/28/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. The electrical riser installed is not matching the submitted and approved riser diagram on page 2 of 5 of the prints. please submitt a revision to the building department for the changes. 2. The resseced lights above the shower / tub areas are to marked suitable for wet locations. 3. Tub piping in unit B is leaking. 4. Unit A 5' head test is not holding water. 5. The boot flashing at the electrical mast is not the correct size and is not seal properly. 6. The windows and the sliding glass doors product approvals do not match the FL approved product numbers submitted to the building depart. Please submitt a revision to the building department for the changes.. Inspection stopped. | |||
| ALL ROUGH | 04/26/2023 | CANCELLED BY APPLICANT | WEB |
| ALL ROUGH | 04/26/2023 | CANCELLED BY APPLICANT | BTAYLOR |
| WALL SHEATHING | 04/24/2023 | APPROVED | JWALKER |
| FIREWALL DRYWALL NAILING | 04/04/2023 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2460 3/8/2023 The 1/2 drywall draft stop in the attic will need to have framing added to the truss to support the rock. The truss web members are further apart then the minimum 2' o.c. framing needed to support the drywall. 2/24/2023 - PREVIOUS INSPECTION NOTES Enigneering passed. Down cells passed. 1. Truss 13 unit a garage left CMU wall heta straps missing fasteners. 2. Bearing walls in separating the garage and living area have not been consturcted as per the details. 3. The Fire wall has not been constructed as per the details. Please construct the two areas listed above as per the prints or submitt a revision to the building department for any changes. Roof decking has missed nailing listed on the roof valley inspection | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 03/08/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 3/8/2023 The 1/2 drywall draft stop in the attic will need to have framing added to the truss to support the rock. The truss web members are further apart then the minimum 2' o.c. framing needed to support the drywall. 2/24/2023 - PREVIOUS INSPECTION NOTES Enigneering passed. Down cells passed. 1. Truss 13 unit a garage left CMU wall heta straps missing fasteners. 2. Bearing walls in separating the garage and living area have not been consturcted as per the details. 3. The Fire wall has not been constructed as per the details. Please construct the two areas listed above as per the prints or submitt a revision to the building department for any changes. Roof decking has missed nailing listed on the roof valley inspection | |||
| ROOF VALLEY & METAL | 02/27/2023 | APPROVED | KSANDOE |
| Note: 2/24/2023 - PREVIOUS INSPECTION NOTES Roof deck needs to be nailed down at Truss T04 rear porch area, Truss 15 unit A left side garage, and Unit A Above window at the bedroom near the garage. | |||
| ROOF VALLEY & METAL | 02/24/2023 | Disapproved - NO FEE | JWALKER |
| Note: Roof deck needs to be nailed down at Truss T04 rear porch area, Truss 15 unit A left side garage, and Unit A Above window at the bedroom near the garage. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/24/2023 | Disapproved - NO FEE | JWALKER |
| Note: Enigneering passed. Down cells passed. 1. Truss 13 unit a garage left CMU wall heta straps missing fasteners. 2. Bearing walls in separating the garage and living area have not been consturcted as per the details. 3. The Fire wall has not been constructed as per the details. Please construct the two areas listed above as per the prints or submitt a revision to the building department for any changes. Roof decking has missed nailing listed on the roof valley inspection | |||
| TIE BEAM / LINTEL | 12/07/2022 | APPROVED - AS NOTED | JWALKER |
| Note: 11/29/2022 - PREVIOUS INSPECTION NOTES 1. Multiple missed dowels and down rods. 2. Multiple dowels that were drilled into place have not drilled the required minimum of 6" into the concrete and set in epoxy. 3. Where the walls step up the contractor dropped pieces of rebar into the down cells and tied to the dowels to give the appearance of a down rod. Down rods are to be continous from the top of the wall to the bottom of the wall where the down rod connects to the dowel. CHECK ALL. 4. Window opening on the left side wall has not been installed. Drawing have been highlighted. 12/7/22 The bath window listed above. Please submitt a revision to the building department for this change. Contractor is approved to pour down cells at risk revision is not accepted. Check for revison at roof brace inspection. | |||
| TIE BEAM / LINTEL | 12/01/2022 | CANCELLED BY APPLICANT | JWALKER |
| Note: 11/29/2022 - PREVIOUS INSPECTION NOTES 1. Multiple missed dowels and down rods. 2. Multiple dowels that were drilled into place have not drilled the required minimum of 6" into the concrete and set in epoxy. 3. Where the walls step up the contractor dropped pieces of rebar into the down cells and tied to the dowels to give the appearance of a down rod. Down rods are to be continous from the top of the wall to the bottom of the wall where the down rod connects to the dowel. CHECK ALL. 4. Window opening on the left side wall has not been installed. Drawing have been highlighted. | |||
| TIE BEAM / LINTEL | 11/29/2022 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 1. Multiple missed dowels and down rods. 2. Multiple dowels that were drilled into place have not drilled the required minimum of 6" into the concrete and set in epoxy. 3. Where the walls step up the contractor dropped pieces of rebar into the down cells and tied to the dowels to give the appearance of a down rod. Down rods are to be continous from the top of the wall to the bottom of the wall where the down rod connects to the dowel. CHECK ALL. 4. Window opening on the left side wall has not been installed. Drawings have been Highlighted. | |||
| FOUND SURVEY APPROVED (OFFICE) | 11/14/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 10/25/2022 | APPROVED | JWALKER |
| Note: 10/24/2022 - PREVIOUS INSPECTION NOTES Remove roots from footings. Right side footing and front proch area. Marked the drawings. Slab needs to be tamped down due to overthrown soil during piping install. | |||
| MONOLITHIC SLAB | 10/24/2022 | Disapproved - NO FEE | JWALKER |
| Note: Remove roots from footings. Right side footing and front proch area. Marked the drawings. Slab needs to be tamped down due to overthrown soil during piping install. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 09/19/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: REMOVE ALL VEGITATION FROM SLAB BEFORE SLAB INPECTION | |||
| WATER METER INSTALLATION REQUEST | 09/09/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 10/05/2023 | 10/09/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 09/29/2023 | 10/02/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition | |||
| BADMIN | COMPLETE | 09/29/2023 | 09/29/2023 |
| Note: Released By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM NOC EXPIRED. CAN NOT SCHEDULE FINAL SURVEY INSPECTION | |||
| ELEC | COMPLETE | 07/24/2023 | 07/25/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/02/2023 | 05/03/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 05/02/2023 | 05/03/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 03/06/2023 | 03/07/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/20/2022 | 12/21/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/14/2022 | 11/14/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/14/2022 | 11/14/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/11/2022 | 07/11/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/08/2022 | 07/12/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/08/2022 | 07/13/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/08/2022 | 07/08/2022 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM The minimum required front setback for duplex zoning is 25'. Please submit site plan that adheres to this minimum. | |||
| BADMIN | INFORMATION | 07/05/2022 | 07/05/2022 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM COMPLETE OWNER INFORMATION ON UTILITY APPLICATION RENAME TO UTILITY APPLICATION. REMOVE ADDRESS FROM FILE NAME | |||
| BADMIN | INFORMATION | 07/05/2022 | 07/05/2022 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM COMPLETE OWNER INFORMATION ON UTILITY APPLICATION | |||
| CUSVC | COMPLETE | 07/05/2022 | 07/07/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| SWALE | COMPLETE | 06/23/2022 | 09/21/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/23/2022 | 06/24/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | HOLD | 06/23/2022 | 06/23/2022 |
| Note: Held By: HALEIGH HAND - - Please upload a utility application. | |||
| ELEC | COMPLETE | 06/23/2022 | 06/23/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/23/2022 | 06/23/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/23/2022 | 06/29/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/23/2022 | 06/23/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/23/2022 | 06/27/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/23/2022 | 06/24/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide walkway material and width on site plan/survey |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 10/24/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 10/24/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/24/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 10/24/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 10/24/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 10/24/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 10/24/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 10/24/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 10/24/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 10/24/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/14/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/14/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤82.14) | 07/14/2022 |
| SEWER CREDIT | (¤5,099.24) | 07/14/2022 |
| SEWER INSPECTION | ¤25.00 | 07/14/2022 |
| SEWER CAPITAL FACILITY | ¤9,879.52 | 07/14/2022 |
| WATER CREDIT | (¤179.74) | 07/14/2022 |
| WATER CAPITAL FACILITY FEE | ¤7,253.00 | 07/14/2022 |
| SITE PLAN 30 | ¤30.00 | 07/14/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤23.32) | 07/14/2022 |
| IMPACT FEE FIRE | ¤777.30 | 07/14/2022 |
| IMPACT FEE PARKS | ¤2,910.26 | 07/14/2022 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 07/14/2022 |
| IMPACT FEE TRANSPORTATION | ¤2,738.00 | 07/14/2022 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 07/14/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤87.31) | 07/14/2022 |
| SURCHARGE FS 533.721 | ¤10.49 | 07/14/2022 |
| SURCHARGE - FS 468.631 | ¤15.73 | 07/14/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/14/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/14/2022 |
| SW ENG PRE APRON | ¤30.00 | 07/14/2022 |
| CONNECTION FEES | ¤2,155.76 | 07/14/2022 |
| WATER- TURN ON | ¤50.00 | 07/14/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/14/2022 |
| INSPECTION - RESIDENTIAL | ¤962.50 | 07/14/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤273.00 | 07/14/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤29,523.81 |