I want to search for...
Permit #2022061373
Permit Details
Status: COED
| Parcel Id: 07-11-31-7029-00410-0080 |
| Total Square Footage: 28 sqft |
| Block: 00410 |
| Subdivision: 2209 - SECTION 29-ROYAL PALMS |
| Job Phone: (386)328-5509 |
| Location Address: 15 RYBAR LN |
| Type: RF - REROOF |
| Issue Date: 06/23/2022 |
| NOC: RECORDED |
| Applicant name: NEAL STRICKLAND |
| Owner: ONEIL JOANNE B LIFE ESTATE |
|
Address 15 RYBAR LN PALM COAST, FL 32164 |
| Lot: 0080 |
| Contracted Stated Job Value: ¤16,550.00 |
| Job Description: REROOF |
| Type: CN |
Contractor
NEAL STRICKLAND ROOFING INC
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 428 EAST PALATKA, FL 32131 |
CCC026483 (Exp: 08/31/2024) | (386)328-5509 | (386)328-5866 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROOF FINAL | 08/10/2022 | FINAL APPROVED | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION THIS IS A REINSPECTION The lefts side front and back last panels have had holes drilled into the remove and sealed with caulk. Remove damaged panels and install new panels. Left side gable end a wood screw was used to secure the drip end. remove and install approved fastener. Please provide the manufacture fastening instruction. The lap joints may need to be fastened. 8/2/22 As listed above please provide the manufactures installation instructions for fastening. Other items have been corrected. 8/5/22 Installation instructions not onsite. | |||
| ROOF FINAL | 08/05/2022 | Disapproved - NO FEE | JWALKER |
| Note: THIS IS A REINSPECTION THIS IS A REINSPECTION The lefts side front and back last panels have had holes drilled into the remove and sealed with caulk. Remove damaged panels and install new panels. Left side gable end a wood screw was used to secure the drip end. remove and install approved fastener. Please provide the manufacture fastening instruction. The lap joints may need to be fastened. 8/2/22 As listed above please provide the manufactures installation instructions for fastening. Other items have been corrected. 8/5/22 Installation instructions not onsite. | |||
| ROOF FINAL | 08/02/2022 | Disapproved - NO FEE | JWALKER |
| Note: THIS IS A REINSPECTION The lefts side front and back last panels have had holes drilled into the remove and sealed with caulk. Remove damaged panels and install new panels. Left side gable end a wood screw was used to secure the drip end. remove and install approved fastener. Please provide the manufacture fastening instruction. The lap joints may need to be fastened. 8/2/22 As listed above please provide the manufactures installation instructions for fastening. Other items have been corrected. | |||
| ROOF FINAL | 07/20/2022 | Disapproved - NO FEE | JWALKER |
| Note: The lefts side front and back last panels have had holes drilled into the remove and sealed with caulk. Remove damaged panels and install new panels. Left side gable end a wood screw was used to secure the drip end. remove and install approved fastener. Please provide the manufacture fastening instruction. The lap joints may need to be fastened. | |||
| ROOF AFFIDAVIT | 07/18/2022 | APPROVED | MRAMOS |
| ROOF IN PROGRESS- MIDROOF | 07/13/2022 | APPROVED | JWALKER |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/23/2022 |
| INSPECTION - RESIDENTIAL | ¤60.00 | 06/23/2022 |
| SURCHARGE FS 533.721 | ¤2.00 | 06/23/2022 |
| SURCHARGE - FS 468.631 | ¤2.00 | 06/23/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤94.00 |