I want to search for...

Permit #2022061674

Permit Details

Status: COED

Parcel Id: 29-10-31-5540-00000-1530
GARAGE: 759 sqft
OPENED PORCH (WITH ROOF) : 841 sqft
CONDITIONED SPACE: 3544 sqft
OPENED PORCH (WITH ROOF) : 60 sqft
Total Square Footage: 5204 sqft
Block: 00000
Subdivision: 1005 - SANCTUARY SUBDIVISION
Job Phone: 386-315-4087
Location Address: 35 OLD OAK DR S
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/09/2022
NOC: RECORDED
Applicant name: BRIAN CHRISTOPHER MULLEN
Owner: DYER DIANE M

Address

112 OAK STREET

FLAGLER BEACH, FL 32136

Lot: 1530
Contracted Stated Job Value: ¤470,000.00
Job Description: Single Family Residence
Type: CN

Contractor

FIVE STAR ROOFING
Status Location Address State License Number Phone
INACTIVE

PO BOX 351158

PALM COAST, FL

CGC049971 (Exp: 08/31/2026) 386-385-8504

Sub Contractors

DANIEL P HUCKS
Status Location Address State License Number Phone Fax
CANCEL

400 N. U.S. 1

Ormond Beach, FL 32174

CAC029376 (Exp: 08/31/2024) 386-672-8494 386-673-7856
DENNIS GENE GAINEY
Status Location Address State License Number Phone Fax
INACTIVE

P.O. BOX 1203

Bunnell, FL 32110

CFC046004 (Exp: 08/31/2026) (386) 437-5637 386-437-3012
JOHN EDWARD GAMBONE
Status Location Address Mailing Address State License Number Phone
ACTIVE

15 HARGROVE LN

PALM COAST, FL 32137

1G

PALM COAST, FL 32137

EC13006037 (Exp: 08/31/2026) 386-586-9144
LEONARD E GASPARY
Status Location Address Phone Fax
INACTIVE

400 NORTH US HWY #1

ORMOND BEACH, FL 32174

(386)672-8494 (386)673-7856

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/08/2024 FINAL APPROVED AGAETANO
Note: 2/7/2024 - PREVIOUS INSPECTION NOTES 2/7/24 1. Can not lower attic access to check attic 2. Duct work goin into attic in garage needs to be sealed better where it meets ceiling 3. Cook top requires breaker lock 4. Double oven requires a breaker lock Stopped inspection not ready NEC 422.31 2/2/2024 - PREVIOUS INSPECTION NOTES 02-02-2024 1. Lanai OUTLETS NOT gfci protected. 2. Energy calcs Design Information not on site. 3. No hot water. 4. Garage outlets not GFCI protected. 5. Holes in garage. Check all. 6. Kitchen GFCI circuits not indicated in kitchen. Inspection stopped. A full inspection is required.
BLD - BUILDING FINAL 02/07/2024 Disapproved -FEE REQUIRED MKRASKI
Note: 2/7/24 1. Can not lower attic access to check attic 2. Duct work goin into attic in garage needs to be sealed better where it meets ceiling 3. Cook top requires breaker lock 4. Double oven requires a breaker lock Stopped inspection not ready 2/2/2024 - PREVIOUS INSPECTION NOTES 02-02-2024 1. Lanai OUTLETS NOT gfci protected. 2. Energy calcs Design Information not on site. 3. No hot water. 4. Garage outlets not GFCI protected. 5. Holes in garage. Check all. 6. Kitchen GFCI circuits not indicated in kitchen. Inspection stopped. A full inspection is required.
ROW - FINAL INSPECTION 02/07/2024 APPROVED EMADISON
U-CROSS CONNECTION 02/05/2024 APPROVED DHANEY
BLD - BUILDING FINAL 02/02/2024 Disapproved - NO FEE AGAETANO
Note: 02-02-2024 1. Lanai OUTLETS NOT gfci protected. 2. Energy calcs Design Information not on site. 3. No hot water. 4. Garage outlets not GFCI protected. 5. Holes in garage. Check all. 6. Kitchen GFCI circuits not indicated in kitchen. Inspection stopped. A full inspection is required.
U -UTILITY RESIDENTIAL FINAL 02/02/2024 Disapproved - NO FEE DHANEY
Note: Need sewer clean outs lowerd to ground level . (Note you will also need to call in Cross CN. Insp. . )
U -UTILITY RESIDENTIAL FINAL 02/02/2024 FINAL APPROVED DHANEY
Note: 2/1/2024 - PREVIOUS INSPECTION NOTES Need sewer clean outs lowerd to ground level . (Note you will also need to call in Cross CN. Insp. . )
ROW - FINAL APRON (AFTER POUR) 02/01/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW - STORMWATER FINAL 01/31/2024 APPROVED - AS NOTED EMADISON
Note: ** 01/31/24 SOD LAID IN PLACE ALONG FENCE TO CONTAIN BARK MULCH OF THE RIGHT SIDE ** HOA approved the landscaping between the two properties along the right side property line. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 Landscaping along the property lines were approved by the HOA where there is no easement between houses. 1/24/2024 - PREVIOUS INSPECTION NOTES
ROW FIELD SURVEY /GRADING CERTIFICATION 01/30/2024 APPROVED - AS NOTED RGROSS
Note: Builder takes full responsibility for any future drainage issues that were approved by the HOA. 1/24/2024 - PREVIOUS INSPECTION NOTES ** 01/24/24 "Sec 300.03 C1f Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way (the swale area, between the edge of pavement and the property line)." ** AREAS NOTED ALONG RIGHT SIDE PROPERTY LINE AND ACROSS REAR PROPERTY LINE ALONG FENCE
ROW FIELD SURVEY /GRADING CERTIFICATION 01/24/2024 Disapproved - NO FEE EMADISON
Note: ** 01/24/24 "Sec 300.03 C1f Flat work, i.e., slabs, walkways, hardscaping, patios, decking or AC pads are not allowed in any utility easements. Additionally, decorative objects, columns, light poles, mulch, stones, plantings or landscaping of any kind, is not allowed in the Right of Way (the swale area, between the edge of pavement and the property line)." ** AREAS NOTED ALONG RIGHT SIDE PROPERTY LINE AND ACROSS REAR PROPERTY LINE ALONG FENCE
FINAL SURVEY (OFFICE USE ONLY) 01/24/2024 APPROVED EMADISON
FINAL SURVEY (OFFICE USE ONLY) 01/18/2024 Disapproved - NO FEE EMADISON
Note: ** 01/18/24 NEED TO INDICATE IF BOTH ADJACENT LOTS ARE IEITHER VACANT OR IMPROVED LOTS ** IF IMPROVED NEED TO PROVIDE THE FINISH FLOOR ELEVATION OF THE LOT
ROW- PRE-APRON (PRE-POUR) 11/21/2023 APPROVED - AS NOTED EMADISON
Note: ** 11/21/23 READY TO SET PAVERS ___________________________________________________________________________________________________________________ 11/15/2023 - PREVIOUS INSPECTION NOTES ** 11/15/23 ENSURE PAVER RESTRAINTS ARE A MINIMUM OF 8 INCHES DEEP BEFORE YOU POUR ** READY TO POUR APRON AND PAVER RESTRAINTS ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED
ROW- PAVER RESTRAINTS 11/15/2023 APPROVED - AS NOTED EMADISON
Note: ** 11/15/23 ENSURE PAVER RESTRAINTS ARE A MINIMUM OF 8 INCHES DEEP BEFORE YOU POUR ** READY TO POUR APRON AND PAVER RESTRAINTS ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC)
ROW- PRE-APRON (PRE-POUR) 11/15/2023 PARTIALLY APPROVED EMADISON
Note: ** 11/15/23 ENSURE PAVER RESTRAINTS ARE A MINIMUM OF 8 INCHES DEEP BEFORE YOU POUR ** READY TO POUR APRON AND PAVER RESTRAINTS ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED
ELECTRIC - EARLY POWER 08/14/2023 APPROVED AGAETANO
Note: 8/11/2023 - PREVIOUS INSPECTION NOTES 08-11-2023 Bonding loop not connected.
ELECTRIC - EARLY POWER 08/11/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 08-11-2023 Bonding loop not connected.
LATH/BRICK/ WATER BARRIER 06/09/2023 APPROVED TSTAUFFACHER
INSULATION 05/26/2023 APPROVED AGAETANO
Note: Inspector Notes from Inspection 2420 New inspection due to canceled inspection New inspection due to canceled inspection 5/9/2023 - PREVIOUS INSPECTION NOTES 05-09-2023 1. Ground rods not proper distance. NEC 250. 2. Insulation installed in garage and ceilings. Please remove for wiring and plumbing inspection. 3. No head test. 5' head pressure test failed P2503.5.1 4. Electrical panel has been relocated to the hallway and a sub panel added. Please revise and submit to the building department. Please have revision on site for inspection. 5. Mechanical drawings not on site. Inspection stopped. 05-18-2023 Energy calcs not on site. Please have on site prior to next inspection.
ALL ROUGH 05/18/2023 APPROVED - AS NOTED AGAETANO
Note: New inspection due to canceled inspection New inspection due to canceled inspection 5/9/2023 - PREVIOUS INSPECTION NOTES 05-09-2023 1. Ground rods not proper distance. NEC 250. 2. Insulation installed in garage and ceilings. Please remove for wiring and plumbing inspection. 3. No head test. 5' head pressure test failed P2503.5.1 4. Electrical panel has been relocated to the hallway and a sub panel added. Please revise and submit to the building department. Please have revision on site for inspection. 5. Mechanical drawings not on site. Inspection stopped. 05-18-2023 Energy calcs not on site. Please have on site prior to next inspection.
ALL ROUGH 05/17/2023 CANCELLED BY APPLICANT WEB
Note: 5/9/2023 - PREVIOUS INSPECTION NOTES 05-09-2023 1. Ground rods not proper distance. NEC 250. 2. Insulation installed in garage and ceilings. Please remove for wiring and plumbing inspection. 3. No head test. 5' head pressure test failed P2503.5.1 4. Electrical panel has been relocated to the hallway and a sub panel added. Please revise and submit to the building department. Please have revision on site for inspection. 5. Mechanical drawings not on site. Inspection stopped.
ALL ROUGH 05/17/2023 CANCELLED BY APPLICANT WEB
Note: New inspection due to canceled inspection 5/9/2023 - PREVIOUS INSPECTION NOTES 05-09-2023 1. Ground rods not proper distance. NEC 250. 2. Insulation installed in garage and ceilings. Please remove for wiring and plumbing inspection. 3. No head test. 5' head pressure test failed P2503.5.1 4. Electrical panel has been relocated to the hallway and a sub panel added. Please revise and submit to the building department. Please have revision on site for inspection. 5. Mechanical drawings not on site. Inspection stopped.
ALL ROUGH 05/09/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 05-09-2023 1. Ground rods not proper distance. NEC 250. 2. Insulation installed in garage and ceilings. Please remove for wiring and plumbing inspection. 3. No head test. 5' head pressure test failed P2503.5.1 4. Electrical panel has been relocated to the hallway and a sub panel added. Please revise and submit to the building department. Please have revision on site for inspection. 5. Mechanical drawings not on site. Inspection stopped.
WALL SHEATHING 05/08/2023 APPROVED FWILLIS
ROOF VALLEY & METAL 02/27/2023 APPROVED TSTAUFFACHER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/22/2023 APPROVED AGAETANO
Note: 1/30/2023 - PREVIOUS INSPECTION NOTES 1/27/2023 - PREVIOUS INSPECTION NOTES 1/26/2023 - PREVIOUS INSPECTION NOTES 01-26-2023 1. Down cells not exposed. 2. Truss layout not on site. Please organize engineering packet. 01-27-2023 Truss layout is too small and blurry to read. Please provide a large readable truss layout for inspection. 01-30-2023 1. Truss repair packet for trusses: E7H, G7, G9, G11, G13, G15, G17, G19, J1H, EH7, J3H, J5H, R7H, R22 not submitted to the building department for review. 2. G7, G9,G11, G13, G15, G17, G19 not installed as per plans. Truss repair indicates continuus and to the peak. 3. J3H, J5H, R7H - no notes on truss repair. Inspector will reinspect following building department review of truss repair. 4. A5 truss repair not nailed as per truss repair specs.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/30/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 1/27/2023 - PREVIOUS INSPECTION NOTES 1/26/2023 - PREVIOUS INSPECTION NOTES 01-26-2023 1. Down cells not exposed. 2. Truss layout not on site. Please organize engineering packet. 01-27-2023 Truss layout is too small and blurry to read. Please provide a large readable truss layout for inspection. 01-30-2023 1. Truss repair packet for trusses: E7H, G7, G9, G11, G13, G15, G17, G19, J1H, EH7, J3H, J5H, R7H, R22 not submitted to the building department for review. 2. G7, G9,G11, G13, G15, G17, G19 not installed as per plans. Truss repair indicates continuus and to the peak. 3. J3H, J5H, R7H - no notes on truss repair. Inspector will reinspect following building department review of truss repair. 4. A5 truss repair not naile as per truss repair specs.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/27/2023 Disapproved -FEE REQUIRED AGAETANO
Note: 1/26/2023 - PREVIOUS INSPECTION NOTES 01-26-2023 1. Down cells not exposed. 2. Truss layout not on site. Please organize engineering packet. 01-27-2023 Truss layout is too small and blurry to read. Please prov ide a large readable truss layout for inspection.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/26/2023 Disapproved - NO FEE AGAETANO
Note: 01-26-2023 1. Down cells not exposed. 2. Truss layoiut not on site. Please organize engineering packet.
FOUND SURVEY APPROVED (OFFICE) 01/25/2023 APPROVED TBAKER
TIE BEAM / LINTEL 10/24/2022 APPROVED AGAETANO
Note: 10/21/2022 - PREVIOUS INSPECTION NOTES 10-21-2022 Two missed down cells. Noted on drawings.
TIE BEAM / LINTEL 10/21/2022 Disapproved - NO FEE AGAETANO
Note: 10-21-2022 Two missed down cells. Noted on drawings.
WILDLIFE CHECK - ENVIRONMENTAL 10/04/2022 APPROVED JMYERS
MONOLITHIC SLAB 09/19/2022 APPROVED AGAETANO
PLUMBING 1ST ROUGH UNDERGROUND 09/14/2022 APPROVED MGIBSON
GRAVITY SEWER TEST 09/14/2022 APPROVED MGIBSON
U - SEWER TIE IN 09/14/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 09/01/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
SW1 COMPLETE 08/24/2023 09/05/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 08/15/2023 08/15/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC COMPLETE 05/11/2023 05/12/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 02/27/2023 03/01/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 02/27/2023 03/01/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 02/26/2023 02/27/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Wrong product approval number. Nothing comes up when that number is typed in.
BLD COMPLETE 02/01/2023 02/01/2023
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/25/2023 01/25/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/25/2023 01/25/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 12/08/2022 12/12/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD COMPLETE 11/28/2022 12/02/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
BLD COMPLETE 10/10/2022 10/10/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
ZON COMPLETE 08/03/2022 08/03/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
MECH COMPLETE 08/03/2022 08/04/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 08/03/2022 08/03/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON HOLD 08/02/2022 08/03/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Repeat comment: Color sheet: There can only be one body color. Please remove one. and resubmit color sheet for approval
MECH HOLD 08/02/2022 08/03/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs need to be signed by the builder 2. Provide Duct layout signed by AC contractor (Third Request)
PLENV COMPLETE 08/02/2022 08/02/2022
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Approved After Action Report has been accepted.
ZON HOLD 07/26/2022 07/26/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Please correct site plan as the turn around is not meeting the Land development code. I spoke to my Supervisor and turn around can not exceed 9 x 18 the. So where it measures 19 it will have to be reduced to no more than nine. This will allow parking space for one car. Please adjust plans accordingly. Color sheet Only one color allowed for base of the home please resubmit.
MECH HOLD 07/25/2022 07/25/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs need to be signed by the builder 2. Provide Duct layout signed by AC contractor (Second Request)
ZON HOLD 07/25/2022 07/26/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Please submit the letter of the HOA through the portal it needs to be on record with the permit. Please also include the new color sheet as two colors for the base arwe not allowed choose one and resubmit. Color sheet: There can only be one body color. Please remove one.
PLENV HOLD 07/25/2022 07/25/2022
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Staff is waiting on the Approved After Action Report from FWC.
SW1 COMPLETE 07/25/2022 08/01/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/25/2022 07/25/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
PLENV HOLD 07/20/2022 07/20/2022
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Staff is waiting on the Approved After Action Report from FWC.
BADMIN INFORMATION 07/14/2022 07/14/2022
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Rename your files according to our document submittal requirements outlined on the permit portal. Upload the documents to the correct document type category (elevation A is used for model homes , any plan sheets should be uploaded under PLANS)
BADMIN INFORMATION 07/14/2022 07/14/2022
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Same comment as previously stated. ALL documents needs to be corrected.
ZON HOLD 07/14/2022 07/15/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Repeat comments: Site plan: List the materials for the driveway. Please provide sets backs from the house to property line as I will not be approving the pool in this permit. Turn around: The Land Development Code requires that driveways either be "standard" - leading to a garage, circular or can have "turnarounds" and the City recognizes turnarounds as parking space size, which is 9’ wide by 18’ long. Additionally, the driveway/turnaround cannot be located within 5 feet of the side property line. Please adjust driveway accordling to meet the turnaround requirement. Color sheet: There can only be one body color. Please remove one.
ELEC COMPLETE 07/13/2022 07/13/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
PLENV HOLD 06/30/2022 07/05/2022
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Staff conducted a site visit on 7/5/22 and found multiple Gopher Tortoise burrows. Please either provide a Gopher Tortoise survey by a QEP that shows the burrow is not within 25ft of construction activities or an approved After Action Report from FWC after relocation activities have been completed.
BLD COMPLETE 06/29/2022 07/07/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 06/29/2022 07/01/2022
Note: Released By: HALEIGH HAND - -
ELEC HOLD 06/29/2022 06/29/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need to reference the 2017 NEC 2. Submit a riser diagram for the generator 3. Submit manufacture specs for generator
ENGIN1 COMPLETE 06/29/2022 06/29/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 06/29/2022 07/05/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH HOLD 06/29/2022 07/01/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs need to be signed by the builder 2. Provide Duct layout signed by AC contractor
SW1 COMPLETE 06/29/2022 07/07/2022
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON HOLD 06/29/2022 06/30/2022
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: List the materials for the driveway. Please provide sets backs from the house to property line as I will not be approving the pool in this permit. Turn around: The Land Development Code requires that driveways either be "standard" - leading to a garage, circular or can have "turnarounds" and the City recognizes turnarounds as parking space size, which is 9’ wide by 18’ long. Additionally, the driveway/turnaround cannot be located within 5 feet of the side property line. Please adjust driveway accordling to meet the turnaround requirement. Elevation: Banding around Corners: Banding must wrap corners at least two feet Look at left side elevation. Color sheet: There can only be one body color. Please remove one.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 02/08/2024
PLAN REVIEW - REVISION ¤32.50 02/08/2024
REINSPECTION RESIDENTIAL ¤40.00 02/08/2024
REINSPECTION RESIDENTIAL ¤40.00 02/08/2024
REINSPECTION RESIDENTIAL ¤40.00 02/08/2024
REINSPECTION RESIDENTIAL ¤40.00 01/27/2023
PLAN REVIEW - REVISION ¤32.50 01/24/2023
PLAN REVIEW - REVISION ¤32.50 01/24/2023
PLAN REVIEW - REVISION ¤32.50 01/24/2023
PLAN REVIEW - REVISION ¤32.50 01/24/2023
WATER-METER ¤467.09 08/09/2022
ADJUSTMENT 50% (¤844.55) 08/09/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 08/09/2022
INSPECTION - RESIDENTIAL ¤1,292.50 08/09/2022
PLAN REVIEW - RESIDENTIAL ¤366.60 08/09/2022
CONNECTION FEES ¤25.00 08/09/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 08/09/2022
IMPACT FEE FIRE ¤388.65 08/09/2022
IMPACT FEE PARKS ¤1,455.13 08/09/2022
IMPACT FEE SCHOOL ¤3,600.00 08/09/2022
IMPACT FEE TRANSPORTATION ¤3,224.00 08/09/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 08/09/2022
SURCHARGE FS 533.721 ¤5.21 08/09/2022
SURCHARGE - FS 468.631 ¤7.82 08/09/2022
SW ENG - FOUNDATION SURVEY ¤20.00 08/09/2022
SW ENG INSPECTION 80 ¤80.00 08/09/2022
SW ENG PRE APRON ¤30.00 08/09/2022
SW ENG - REVIEW 20 ¤20.00 08/09/2022
SW ENG RES REVIEW 200 ¤200.00 08/09/2022
3% TRANS IMPACT FEE CREDIT (¤96.72) 08/09/2022
SEWER INSPECTION ¤25.00 08/09/2022
SEWER CAPITAL FACILITY ¤4,939.76 08/09/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 08/09/2022
SITE PLAN 30 ¤30.00 08/09/2022
Fees Total Due: ¤0.00 Total Paid: ¤19,199.18