Permit #2022061708
Permit Details
Status: COED
| Parcel Id: 07-11-31-7064-00040-0100 |
| CONDITIONED SPACE: 1985 sqft |
| GARAGE: 978 sqft |
| OPENED PORCH (WITH ROOF) : 190 sqft |
| OPENED PORCH (WITH ROOF) : 324 sqft |
| Total Square Footage: 3477 sqft |
| Block: 00040 |
| Subdivision: 2178 - SECTION 64-LAGUNA FOREST |
| Job Phone: (386)931-2568 |
| Location Address: 3 LLOVERA PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/28/2022 |
| NOC: RECORDED |
| Applicant name: PETER JOSEPH LYDEN |
| Owner: BEGTRUP THOMAS & LORI H&W |
|
Address 43 SEVEN WONDERS TRL PALM COAST, FL 32164 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
DEL CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1009 BUNNELL, FL 32110 |
CBC1253392 (Exp: 08/31/2024) | 386-931-2568 |
Sub Contractors
SHAWN MICHAEL HISS
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1315 LPGA BLVD HOLLY HILL, FL 32117 |
CAC1813585 (Exp: 08/31/2026) | (386)672-8688 |
CHRISTOPHER DANIEL FULTON
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2 MARKET PLACE PALM COAST, FL 32137 |
UNIT D PALM COAST, FL 32137 |
CCC1331939 (Exp: 08/31/2026) | 386-445-7945 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
PETER JOSEPH LYDEN
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
PO BOX 1009 KEY WEST, FL 33040 |
EC0002436 (Exp: 08/31/2024) | (386)437-3323 | (386)437-3323 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/04/2023 | FINAL APPROVED | RSIMS |
| Note: 11/16/2023 - PREVIOUS INSPECTION NOTES 11/16/23: * Model number for the installed Condensing unit does not match Energy Calcs submitted. 11/15/2023 - PREVIOUS INSPECTION NOTES 11/15/23: 1). Energy calcs not on site for inspection. 2). Breaker for AHU is incorrect size. (30min/30max)(50 amp installed). 3). Range anti-tip device is not installed. 4). Right side: Hole in CMU at low voltage needs to be sealed. 5). Back lanai: hole in CMU at higher oulet needs to be sealed. 6). flexible conduit (for future) on left side of the house coming down from the soffit needs to be properly sealed. 7). Holes in ceiling at garage door opener control wires need to be sealed. 2/14/23: Need revision submitted to & approved by the City for the different underlayment installed & shingles loaded on roof. Roofing worksheet listg GAF shingles & interwrap underlayment. Atlas prestine shingles are loaded & self adhering underlayment was installed. | |||
| BLD - BUILDING FINAL | 11/16/2023 | Disapproved - NO FEE | RSIMS |
| Note: 11/16/23: * Model number for the installed Condensing unit does not match Energy Calcs submitted. 11/15/2023 - PREVIOUS INSPECTION NOTES 11/15/23: 1). Energy calcs not on site for inspection. 2). Breaker for AHU is incorrect size. (30min/30max)(50 amp installed). 3). Range anti-tip device is not installed. 4). Right side: Hole in CMU at low voltage needs to be sealed. 5). Back lanai: hole in CMU at higher oulet needs to be sealed. 6). flexible conduit (for future) on left side of the house coming down from the soffit needs to be properly sealed. 7). Holes in ceiling at garage door opener control wires need to be sealed. 2/14/23: Need revision submitted to & approved by the City for the different underlayment installed & shingles loaded on roof. Roofing worksheet listg GAF shingles & interwrap underlayment. Atlas prestine shingles are loaded & self adhering underlayment was installed. | |||
| BLD - BUILDING FINAL | 11/15/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 11/15/23: 1). Energy calcs not on site for inspection. 2). Breaker for AHU is incorrect size. (30min/30max)(50 amp installed). 3). Range anti-tip device is not installed. 4). Right side: Hole in CMU at low voltage needs to be sealed. 5). Back lanai: hole in CMU at higher oulet needs to be sealed. 6). flexible conduit (for future) on left side of the house coming down from the soffit needs to be properly sealed. 7). Holes in ceiling at garage door opener control wires need to be sealed. 2/14/23: Need revision submitted to & approved by the City for the different underlayment installed & shingles loaded on roof. Roofing worksheet listg GAF shingles & interwrap underlayment. Atlas prestine shingles are loaded & self adhering underlayment was installed. | |||
| U -UTILITY RESIDENTIAL FINAL | 11/15/2023 | FINAL APPROVED | JHARDING |
| Note: Inspector Notes from Inspection 9035 No cross connections. | |||
| ROW - STORMWATER FINAL | 11/08/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/08/23 ONE SMALL AREA RIGHT SIDE SWALE IS A LITTLE HIGH. CM IS IN THE PROCESS OF CORRECTING IT. APPROVING THIS INSPECTION AS NOTED THAT THIS WILL BE COMPLETED TODAY. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 11/07/23 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED. THE SWALE HAS BEEN LOWER TO ALLOW FLOW BUT YOU WILL HAVE TO PROPERLY SLOPE IT. YOU HAVE BASICALLY CREATED A GULLY, THIS DOES NOT MATCH SWALE PLAN DIAGRAM SPECS. I WILL PASS THIS FIELD SURVEY AS NOTED, BUT THE SWALE WILL NEED TO BE FIXED CORRECTLY BEFORE ROW FINAL PASSAGE. PHOTO FOR REFERENCE. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 11/07/23 AFTER RESHOOTING CULVERT PIPE AND FINDING PIPE WAS WITHIN TOLERANCE ELEVATION NUMBERS ON REVISED SURVEY NOW REFLECT FIELD ELEVATIONS. ________________________________________________________________________________________________________________________ 10/31/2023 - PREVIOUS INSPECTION NOTES 1) THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL THAT WAS PROVIDED 2) THE ROADSIDE SWALE IS NOT FLOWING IN THE RIGHT DIRECTION THAT THE SWALE PLAN SHOWS ---------------------------------------------------------------------------------------- 10/27/2023 - PREVIOUS INSPECTION NOTES 10/27/23 THIS APPEARS TO BE THE WRONG FINAL SURVEY FOR THIS ADDRESS. PLEASE SURESUBMIT THE CORRECT FINAL SURVEY. THE STREET REFERENCED IN FRONT IS SLOGAN NOT LLOVERA PL. | |||
| ROW - FINAL APRON (AFTER POUR) | 11/08/2023 | APPROVED | FSLADISH |
| Note: 11/08/23 PIPE IS GOOD. CUTS MADE. CULVERT CLEAR. HOT PATCH COMPLETED. Inspector Notes from Inspection 9465 11/07/23 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED. THE SWALE HAS BEEN LOWER TO ALLOW FLOW BUT YOU WILL HAVE TO PROPERLY SLOPE IT. YOU HAVE BASICALLY CREATED A GULLY, THIS DOES NOT MATCH SWALE PLAN DIAGRAM SPECS. I WILL PASS THIS FIELD SURVEY AS NOTED, BUT THE SWALE WILL NEED TO BE FIXED CORRECTLY BEFORE ROW FINAL PASSAGE. PHOTO FOR REFERENCE. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 11/07/23 AFTER RESHOOTING CULVERT PIPE AND FINDING PIPE WAS WITHIN TOLERANCE ELEVATION NUMBERS ON REVISED SURVEY NOW REFLECT FIELD ELEVATIONS. ________________________________________________________________________________________________________________________ 10/31/2023 - PREVIOUS INSPECTION NOTES 1) THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL THAT WAS PROVIDED 2) THE ROADSIDE SWALE IS NOT FLOWING IN THE RIGHT DIRECTION THAT THE SWALE PLAN SHOWS ---------------------------------------------------------------------------------------- 10/27/2023 - PREVIOUS INSPECTION NOTES 10/27/23 THIS APPEARS TO BE THE WRONG FINAL SURVEY FOR THIS ADDRESS. PLEASE SURESUBMIT THE CORRECT FINAL SURVEY. THE STREET REFERENCED IN FRONT IS SLOGAN NOT LLOVERA PL. | |||
| LATH/BRICK/ WATER BARRIER | 11/08/2023 | APPROVED | RSIMS |
| Note: 11/8/23: Approved based on existing finish conditions of proper sealing of the exterior perimeters, etc. & the ability to visually verify the installation of stucco stop where required. 10/10/2023 - PREVIOUS INSPECTION NOTES 10/10/23: Front door installation & lath was never inspected/viewed prior to stucco application as previously,noted & formally explained to Builder on site at the time of the first partial inspection. 3/15/2023 - PREVIOUS INSPECTION NOTES 3/15/23: As requested this is a majority partial approved. The front door will need to be inspected after door arrival/installation. Stucco stop at door frame will need to be inspected prior to any stucco on the entry face wall (only). 3/13/2023 - PREVIOUS INSPECTION NOTES 3/13/23: 1). Front door is not installed so there is no lath/stucco stop installed around the frame. 2). Wire lath is installed vertically on both sides of every window and door. Must be installed horizontally. Note: Address is faded & barely visible from the street as required by 319.1/501.2. -- Please mark appropriately & plan to mark windows once Lath/Brick is approved & stucco is started. Inspector Notes from Inspection 2467 2/14/23: Need revision submitted to & approved by the City for the different underlayment installed & shingles loaded on roof. Roofing worksheet listg GAF shingles & interwrap underlayment. Atlas prestine shingles are loaded & self adhering underlayment was installed. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/07/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/07/23 AFTER RESHOOTING CULVERT PIPE AND FINDING PIPE WAS WITHIN TOLERANCE ELEVATION NUMBERS ON REVISED SURVEY NOW REFLECT FIELD ELEVATIONS. ________________________________________________________________________________________________________________________ 10/31/2023 - PREVIOUS INSPECTION NOTES 1) THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL THAT WAS PROVIDED 2) THE ROADSIDE SWALE IS NOT FLOWING IN THE RIGHT DIRECTION THAT THE SWALE PLAN SHOWS ---------------------------------------------------------------------------------------- 10/27/2023 - PREVIOUS INSPECTION NOTES 10/27/23 THIS APPEARS TO BE THE WRONG FINAL SURVEY FOR THIS ADDRESS. PLEASE SURESUBMIT THE CORRECT FINAL SURVEY. THE STREET REFERENCED IN FRONT IS SLOGAN NOT LLOVERA PL. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/07/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/07/23 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED. THE SWALE HAS BEEN LOWER TO ALLOW FLOW BUT YOU WILL HAVE TO PROPERLY SLOPE IT. YOU HAVE BASICALLY CREATED A GULLY, THIS DOES NOT MATCH SWALE PLAN DIAGRAM SPECS. I WILL PASS THIS FIELD SURVEY AS NOTED, BUT THE SWALE WILL NEED TO BE FIXED CORRECTLY BEFORE ROW FINAL PASSAGE. PHOTO FOR REFERENCE. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 11/07/23 AFTER RESHOOTING CULVERT PIPE AND FINDING PIPE WAS WITHIN TOLERANCE ELEVATION NUMBERS ON REVISED SURVEY NOW REFLECT FIELD ELEVATIONS. ________________________________________________________________________________________________________________________ 10/31/2023 - PREVIOUS INSPECTION NOTES 1) THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL THAT WAS PROVIDED 2) THE ROADSIDE SWALE IS NOT FLOWING IN THE RIGHT DIRECTION THAT THE SWALE PLAN SHOWS ---------------------------------------------------------------------------------------- 10/27/2023 - PREVIOUS INSPECTION NOTES 10/27/23 THIS APPEARS TO BE THE WRONG FINAL SURVEY FOR THIS ADDRESS. PLEASE SURESUBMIT THE CORRECT FINAL SURVEY. THE STREET REFERENCED IN FRONT IS SLOGAN NOT LLOVERA PL. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/31/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL THAT WAS PROVIDED 2) THE ROADSIDE SWALE IS NOT FLOWING IN THE RIGHT DIRECTION THAT THE SWALE PLAN SHOWS ---------------------------------------------------------------------------------------- 10/27/2023 - PREVIOUS INSPECTION NOTES 10/27/23 THIS APPEARS TO BE THE WRONG FINAL SURVEY FOR THIS ADDRESS. PLEASE SURESUBMIT THE CORRECT FINAL SURVEY. THE STREET REFERENCED IN FRONT IS SLOGAN NOT LLOVERA PL. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 10/27/2023 | Disapproved - NO FEE | FSLADISH |
| Note: 10/27/23 THIS APPEARS TO BE THE WRONG FINAL SURVEY FOR THIS ADDRESS. PLEASE SURESUBMIT THE CORRECT FINAL SURVEY. THE STREET REFERENCED IN FRONT IS SLOGAN NOT LLOVERA PL. | |||
| LATH/BRICK/ WATER BARRIER | 10/10/2023 | Disapproved - NO FEE | RSIMS |
| Note: 10/10/23: Front door installation & lath was never inspected/viewed prior to stucco application as previously,noted & formally explained to Builder on site at the time of the first partial inspection. 3/15/2023 - PREVIOUS INSPECTION NOTES 3/15/23: As requested this is a majority partial approved. The front door will need to be inspected after door arrival/installation. Stucco stop at door frame will need to be inspected prior to any stucco on the entry face wall (only). 3/13/2023 - PREVIOUS INSPECTION NOTES 3/13/23: 1). Front door is not installed so there is no lath/stucco stop installed around the frame. 2). Wire lath is installed vertically on both sides of every window and door. Must be installed horizontally. Note: Address is faded & barely visible from the street as required by 319.1/501.2. -- Please mark appropriately & plan to mark windows once Lath/Brick is approved & stucco is started. Inspector Notes from Inspection 2467 2/14/23: Need revision submitted to & approved by the City for the different underlayment installed & shingles loaded on roof. Roofing worksheet listg GAF shingles & interwrap underlayment. Atlas prestine shingles are loaded & self adhering underlayment was installed. | |||
| U-CROSS CONNECTION | 10/10/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| ROW- PAVER RESTRAINTS | 09/01/2023 | APPROVED | PFLANAGAN |
| Note: THIS WAS THE WRONG INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 09/01/2023 | APPROVED | PFLANAGAN |
| Note: READY FOR PAVERS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ---------------------------------------------------------------------------------------------- 8/21/2023 - PREVIOUS INSPECTION NOTES READY TO POUR APRON AND PAVER RESTRAINTS ONLY. BEFORE THE NEXT PRE POUR ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING CONCRETE FOR DRIVEWAY. ALL CONCRETE MUST BE A MINIMUM OF 3000PSI WITH FIBER OR METAL MESH IN THE CONCRETE TO MEET CITY'S STANDARTS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ---------------------------------------------------------------------------------------------------- 6/29/2023 - PREVIOUS INSPECTION NOTES CANCELLED DO TO CONTRACTOR DOES NOT HAVE THE SITE PLAN THAT SHOW A PAVER DRIVEWAY OR A PAVER DETAIL SO WE CAN INSPECT THE JOB CORRECTLY -------------------------------------------------------------------------------------- 6/23/2023 - PREVIOUS INSPECTION NOTES Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. THIS IS NOT READY FOR INSPECTION DO TO WATER IN POURING AREA AND DRIVEWAY WAY IS NOT FORMED FOR CONCRETE | |||
| ROW- PAVER RESTRAINTS | 08/21/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/21/2023 | PARTIALLY APPROVED | PFLANAGAN |
| Note: READY TO POUR APRON AND PAVER RESTRAINTS ONLY. BEFORE THE NEXT PRE POUR ALL PAVER BASE NEEDS TO BE SPREAD AND COMPACTED WITH NO PAVERS. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING CONCRETE FOR DRIVEWAY. ALL CONCRETE MUST BE A MINIMUM OF 3000PSI WITH FIBER OR METAL MESH IN THE CONCRETE TO MEET CITY'S STANDARTS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ---------------------------------------------------------------------------------------------------- 6/29/2023 - PREVIOUS INSPECTION NOTES CANCELLED DO TO CONTRACTOR DOES NOT HAVE THE SITE PLAN THAT SHOW A PAVER DRIVEWAY OR A PAVER DETAIL SO WE CAN INSPECT THE JOB CORRECTLY -------------------------------------------------------------------------------------- 6/23/2023 - PREVIOUS INSPECTION NOTES Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. THIS IS NOT READY FOR INSPECTION DO TO WATER IN POURING AREA AND DRIVEWAY WAY IS NOT FORMED FOR CONCRETE | |||
| U - SEWER TIE IN | 08/21/2023 | APPROVED | MGIBSON |
| ROW- PRE-APRON (PRE-POUR) | 06/29/2023 | CANCELLED BY APPLICANT | PFLANAGAN |
| Note: CANCELLED DO TO CONTRACTOR DOES NOT HAVE THE SITE PLAN THAT SHOW A PAVER DRIVEWAY OR A PAVER DETAIL SO WE CAN INSPECT THE JOB CORRECTLY -------------------------------------------------------------------------------------- 6/23/2023 - PREVIOUS INSPECTION NOTES Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. THIS IS NOT READY FOR INSPECTION DO TO WATER IN POURING AREA AND DRIVEWAY WAY IS NOT FORMED FOR CONCRETE | |||
| ELECTRIC - EARLY POWER | 06/28/2023 | APPROVED | RSIMS |
| Note: 6/22/2023 - PREVIOUS INSPECTION NOTES 6/22/23: 1). Wires at kitchen walls are not safed off properly. 2). Kitchen floor outlet is missing a cover. 3). Two gang box at the top of the right wall after entry is missing a cover. 4). All recessed light fixtures are missing fixturers or covers. | |||
| PEP TANK INSTALLATION REQUEST | 06/23/2023 | APPROVED | CSTONE |
| ROW- PRE-APRON (PRE-POUR) | 06/23/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: Sec. 900.09f Permittee shall be charged an additional fee for each re-inspection required should permittee call for an inspection and NOT be prepared for the requested inspection. THIS IS NOT READY FOR INSPECTION DO TO WATER IN POURING AREA AND DRIVEWAY WAY IS NOT FORMED FOR CONCRETE | |||
| ELECTRIC - EARLY POWER | 06/22/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 6/22/23: 1). Wires at kitchen walls are not safed off properly. 2). Kitchen floor outlet is missing a cover. 3). Two gang box at the top of the right wall after entry is missing a cover. 4). All recessed light fixtures are missing fixturers or covers. | |||
| INSULATION | 04/19/2023 | APPROVED | RSIMS |
| Note: 4/13/2023 - PREVIOUS INSPECTION NOTES 4/13/23: Front door installation checked. Insulation approved. Door is not tape sealed around perimeter as required. It will also need stucco stop around perimeter before we can approve the window Nailing Inspection for this door since the Lath/ Brick Inspection was already approved. Insulation: 1). Missing firestop at all horizontal wire runs over 10ft per FBC 302.11- Required Locations (1.2. Horizontally at intervals not exceeding 10 feet (3048 mm)). (Marked with FS on studs where required). | |||
| INSULATION | 04/13/2023 | Disapproved - NO FEE | RSIMS |
| Note: 4/13/23: Front door installation checked. Insulation approved. Door is not tape sealed around perimeter as required. It will also need stucco stop around perimeter before we can approve the window Nailing Inspection for this door since the Lath/ Brick Inspection was already approved. Insulation: 1). Missing firestop at all horizontal wire runs over 10ft per FBC 302.11- Required Locations (1.2. Horizontally at intervals not exceeding 10 feet (3048 mm)). (Marked with FS on studs where required). | |||
| ALL ROUGH | 03/27/2023 | APPROVED | BTAYLOR |
| LATH/BRICK/ WATER BARRIER | 03/15/2023 | PARTIALLY APPROVED | RSIMS |
| Note: 3/15/23: As requested this is a majority partial approved. The front door will need to be inspected after door arrival/installation. Stucco stop at door frame will need to be inspected prior to any stucco on the entry face wall (only). 3/13/2023 - PREVIOUS INSPECTION NOTES 3/13/23: 1). Front door is not installed so there is no lath/stucco stop installed around the frame. 2). Wire lath is installed vertically on both sides of every window and door. Must be installed horizontally. Note: Address is faded & barely visible from the street as required by 319.1/501.2. -- Please mark appropriately & plan to mark windows once Lath/Brick is approved & stucco is started. Inspector Notes from Inspection 2467 2/14/23: Need revision submitted to & approved by the City for the different underlayment installed & shingles loaded on roof. Roofing worksheet listg GAF shingles & interwrap underlayment. Atlas prestine shingles are loaded & self adhering underlayment was installed. | |||
| LATH/BRICK/ WATER BARRIER | 03/13/2023 | Disapproved - NO FEE | RSIMS |
| Note: 3/13/23: 1). Front door is not installed so there is no lath/stucco stop installed around the frame. 2). Wire lath is installed vertically on both sides of every window and door. Must be installed horizontally. Note: Address is faded & barely visible from the street as required by 319.1/501.2. -- Please mark appropriately & plan to mark windows once Lath/Brick is approved & stucco is started. Inspector Notes from Inspection 2467 2/14/23: Need revision submitted to & approved by the City for the different underlayment installed & shingles loaded on roof. Roofing worksheet listg GAF shingles & interwrap underlayment. Atlas prestine shingles are loaded & self adhering underlayment was installed. | |||
| ROOF VALLEY & METAL | 02/14/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 2/14/23: Need revision submitted to & approved by the City for the different underlayment installed & shingles loaded on roof. Roofing worksheet listg GAF shingles & interwrap underlayment. Atlas prestine shingles are loaded & self adhering underlayment was installed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/31/2023 | FINAL APPROVED | BTAYLOR |
| Note: 1/17/2023 - PREVIOUS INSPECTION NOTES 1/17/23: INSPECTION STOPPED! 1). No APPROVED plans in box or on-site for inspection. 107.3.1 (Approved documents must be kept on-site for inspections). No MiTek documents in box or on-site either. Also, Persuant to the Contractor's News letter and Florida Building Codes 319.1 & 501.2 (& Emergency Services) - You must have the job box mounted out front. Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum contrasting color lettering. (New construction - marking the windows with flourescent or reflective paint/other is acceptable). | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/31/2023 | APPROVED | BTAYLOR |
| WALL SHEATHING | 01/17/2023 | APPROVED | RSIMS |
| Note: 1/17/23: House in full CMU with no wall sheathing. Approved to move inspection process | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/17/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 1/17/23: INSPECTION STOPPED! 1). No APPROVED plans in box or on-site for inspection. 107.3.1 (Approved documents must be kept on-site for inspections). No MiTek documents in box or on-site either. Also, Persuant to the Contractor's News letter and Florida Building Codes 319.1 & 501.2 (& Emergency Services) - You must have the job box mounted out front. Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum contrasting color lettering. (New construction - marking the windows with flourescent or reflective paint/other is acceptable). | |||
| FOUND SURVEY APPROVED (OFFICE) | 01/11/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 12/01/2022 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 11/15/2022 | APPROVED | MKRASKI |
| GRAVITY SEWER TEST | 10/27/2022 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 C/M TO SCHEDUAL GRAVITY SEWER FOR 10/27/22 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/26/2022 | APPROVED - AS NOTED | MGIBSON |
| Note: C/M TO SCHEDUAL GRAVITY SEWER FOR 10/27/22 | |||
| WATER METER INSTALLATION REQUEST | 10/19/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 11/30/2023 | 12/01/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 11/21/2023 | 11/27/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Chosen equipment on heatload exceeds the maximum of 1.15 times the load calculated.per R403.7.1.2.1 FBC Energy Conservation 2020 7TH Edition | |||
| ENGIN1 | COMPLETE | 11/06/2023 | 11/06/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/06/2023 | 11/07/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/06/2023 | 11/06/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/13/2023 | 07/14/2023 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/07/2023 | 07/07/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 07/07/2023 | 07/07/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM New site plan has different benchmark than original. Please confirm which benchmark is being used. | |||
| BLD | COMPLETE | 02/21/2023 | 02/22/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/09/2023 | 01/11/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/09/2023 | 01/09/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/21/2022 | 07/21/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 07/21/2022 | 07/21/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/21/2022 | 07/21/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/13/2022 | 10/13/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/11/2022 | 07/14/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 07/11/2022 | 07/11/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need smoke alarm inside of bed 2. FRC 2020 314, 315 2. Need combo smoke alarm outside of bedrooms 2 and 3. FRC 2020 314, 315 | |||
| ENGIN1 | COMPLETE | 07/11/2022 | 07/13/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/11/2022 | 07/13/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/11/2022 | 07/11/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide Duct layout signed by the AC contractor | |||
| SW1 | COMPLETE | 07/11/2022 | 07/18/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/11/2022 | 07/15/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please submit a darker copy of landscape plan. When it is scanned we cannot see all required plantings and trees to approve. | |||
| CUSVC | COMPLETE | 07/11/2022 | 07/12/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| CUSVC | HOLD | 07/08/2022 | 07/08/2022 |
| Note: Held By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM NO APPLICATION ATTACHED | |||
| CUSVC | HOLD | 07/07/2022 | 07/07/2022 |
| Note: Held By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM NO APPLICATION FOR UTILITIES ATTACHED. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 12/05/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 12/05/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/05/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/05/2023 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 12/05/2023 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 12/05/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 12/05/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 12/05/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/30/2023 |
| CONNECTION FEES | ¤1,077.88 | 07/28/2022 |
| WATER- TURN ON | ¤25.00 | 07/28/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/28/2022 |
| INSPECTION - RESIDENTIAL | ¤962.50 | 07/28/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤273.00 | 07/28/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 07/28/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/28/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 07/28/2022 |
| SURCHARGE FS 533.721 | ¤10.49 | 07/28/2022 |
| SURCHARGE - FS 468.631 | ¤15.73 | 07/28/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/28/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/28/2022 |
| SW ENG PRE APRON | ¤30.00 | 07/28/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 07/28/2022 |
| IMPACT FEE FIRE | ¤388.65 | 07/28/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 07/28/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/28/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/28/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/28/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 07/28/2022 |
| SEWER CREDIT | (¤1,700.00) | 07/28/2022 |
| SEWER INSPECTION | ¤25.00 | 07/28/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 07/28/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 07/28/2022 |
| SITE PLAN 30 | ¤30.00 | 07/28/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤17,113.41 |