I want to search for...

Permit #2022061711

Permit Details

Status: COED

Parcel Id: 07-11-31-7035-00020-0110
CONDITIONED SPACE: 2670 sqft
GARAGE: 559 sqft
OPENED PORCH (WITH ROOF) : 47 sqft
OPENED PORCH (WITH ROOF) : 300 sqft
Total Square Footage: 3576 sqft
Block: 00020
Subdivision: 2172 - SECTION 35-BELLE TERRE
Job Phone: (386)931-2568
Location Address: 4 BURNING BUSH PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/22/2022
NOC: RECORDED
Applicant name: PETER JOSEPH LYDEN
Owner: MALINOWSKI JACK & LUCY H&W

Address

10 RODAK CIRCLE

EDISON, NJ 08817

Lot: 0110
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

DEL CONSTRUCTION INC.
Status Location Address State License Number Phone
INACTIVE

PO BOX 1009

BUNNELL, FL 32110

CBC1253392 (Exp: 08/31/2024) 386-931-2568

Sub Contractors

CHRISTOPHER DANIEL FULTON
Status Location Address Mailing Address State License Number Phone
ACTIVE

2 MARKET PLACE

PALM COAST, FL 32137

UNIT D

PALM COAST, FL 32137

CCC1331939 (Exp: 08/31/2026) 386-445-7945
SHAWN MICHAEL HISS
Status Location Address State License Number Phone
ACTIVE

1315 LPGA BLVD

HOLLY HILL, FL 32117

CAC1813585 (Exp: 08/31/2026) (386)672-8688
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
PETER JOSEPH LYDEN
Status Location Address State License Number Phone Fax
INACTIVE

PO BOX 1009

KEY WEST, FL 33040

EC0002436 (Exp: 08/31/2024) (386)437-3323 (386)437-3323

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 01/12/2024 FINAL APPROVED JSTEWART
Note: 1/10/2024 - PREVIOUS INSPECTION NOTES 1/10/24- 1. Please Identify heater installed at AHU...FBC.R. M1303.1 MUST IDENTIFY MAXIMUM OVER CURRENT BREAKER SIZE ON AIR HANDLER AND OR CONDENSOR UNIT WITH FACTORY APPLIED LABEL. 2. Outlet in shelf next to refridgerator needs to be GFCI Protected..210.8-A, ALL 120 VOLT SINGLE PHASE 15 AND 20 AMP RECEPTICLES INSTALLED IN LOCATIONS SPECIFIED IN 1 TROUGH 8 SHALL HAVE GFCI PROTECTION 3. Outlet in Master toilet room for bidet needs GFCI Protected..210.8-A, ALL 120 VOLT SINGLE PHASE 15 AND 20 AMP RECEPTICLES INSTALLED IN LOCATIONS SPECIFIED IN 1 TROUGH 8 SHALL HAVE GFCI PROTECTION 4. Please obtain a revision of Energy calcs for ODU, Numbers dont match on equipment. 5. Please uncover all smoke detectors for inspection.
ROW - STORMWATER FINAL 01/11/2024 APPROVED - AS NOTED RGROSS
Note: Per builder, sod will be placed around raised water meter. 1/10/2024 - PREVIOUS INSPECTION NOTES NEED TO REMOVE ALL STRAW OUT OF RIGHT OF WAY ALSO THE UTILITYS WAS THERE AND HAD THE LEFT SIDE OF DRIVEWAY TORE UP NEED TO SEE FINISH PRODUCT OF THE GRADING OF THAT AREA BEFORE PASSING ---------------------------------------------------------------------------------- 1/8/2024 - PREVIOUS INSPECTION NOTES THE CULVERT PIPE STILL NEEDS ALL DIRT OUT OF IT NEED TO SEED AND STRAW ALL BARE AREAS ON THE LEFT SIDE OF HOUSE IN THE VACANT ----------------------------------------------------------------------------------- 12/22/2023 - PREVIOUS INSPECTION NOTES ** 12/22/23 NEED TO CLEAN OUT CULVERT PIPE PLUGGED WITH SEDIMENT ** NEED SOD IN (ROW) ON LEFT SIDE NEEDS TO BLEND TO MATCH EXISTING GRADE ON DOWNSTREAM SIDE ** ASPHALT HOT PATCH ROAD REPAIR REQUIRED ACROSS DRIVEWAY AT EDGE OF ROAD A MINIMUM OF 12 INCHES WIDE BY WIDTH OF DRIVEWAY
ROW - STORMWATER FINAL 01/10/2024 Disapproved - NO FEE PFLANAGAN
Note: NEED TO REMOVE ALL STRAW OUT OF RIGHT OF WAY ALSO THE UTILITYS WAS THERE AND HAD THE LEFT SIDE OF DRIVEWAY TORE UP NEED TO SEE FINISH PRODUCT OF THE GRADING OF THAT AREA BEFORE PASSING ---------------------------------------------------------------------------------- 1/8/2024 - PREVIOUS INSPECTION NOTES THE CULVERT PIPE STILL NEEDS ALL DIRT OUT OF IT NEED TO SEED AND STRAW ALL BARE AREAS ON THE LEFT SIDE OF HOUSE IN THE VACANT ----------------------------------------------------------------------------------- 12/22/2023 - PREVIOUS INSPECTION NOTES ** 12/22/23 NEED TO CLEAN OUT CULVERT PIPE PLUGGED WITH SEDIMENT ** NEED SOD IN (ROW) ON LEFT SIDE NEEDS TO BLEND TO MATCH EXISTING GRADE ON DOWNSTREAM SIDE ** ASPHALT HOT PATCH ROAD REPAIR REQUIRED ACROSS DRIVEWAY AT EDGE OF ROAD A MINIMUM OF 12 INCHES WIDE BY WIDTH OF DRIVEWAY
BLD - BUILDING FINAL 01/10/2024 Disapproved - NO FEE JSTEWART
Note: 1/10/24- 1. Please Identify heater installed at AHU...FBC.R. M1303.1 MUST IDENTIFY MAXIMUM OVER CURRENT BREAKER SIZE ON AIR HANDLER AND OR CONDENSOR UNIT WITH FACTORY APPLIED LABEL. 2. Outlet in shelf next to refridgerator needs to be GFCI Protected..210.8-A, ALL 120 VOLT SINGLE PHASE 15 AND 20 AMP RECEPTICLES INSTALLED IN LOCATIONS SPECIFIED IN 1 TROUGH 8 SHALL HAVE GFCI PROTECTION 3. Outlet in Master toilet room for bidet needs GFCI Protected..210.8-A, ALL 120 VOLT SINGLE PHASE 15 AND 20 AMP RECEPTICLES INSTALLED IN LOCATIONS SPECIFIED IN 1 TROUGH 8 SHALL HAVE GFCI PROTECTION 4. Please obtain a revision of Energy calcs for ODU, Numbers dont match on equipment. 5. Please uncover all smoke detectors for inspection.
U-CROSS CONNECTION 01/08/2024 APPROVED DHANEY
Note: 12/21/2023 - PREVIOUS INSPECTION NOTES 7/13/2023 - PREVIOUS INSPECTION NOTES Meter pits full of dirt - can not see backflow for cross connection Insp. . Pits need cleaned . Water meter pit still needs cleaned .
ROW - STORMWATER FINAL 01/08/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: THE CULVERT PIPE STILL NEEDS ALL DIRT OUT OF IT NEED TO SEED AND STRAW ALL BARE AREAS ON THE LEFT SIDE OF HOUSE IN THE VACANT ----------------------------------------------------------------------------------- 12/22/2023 - PREVIOUS INSPECTION NOTES ** 12/22/23 NEED TO CLEAN OUT CULVERT PIPE PLUGGED WITH SEDIMENT ** NEED SOD IN (ROW) ON LEFT SIDE NEEDS TO BLEND TO MATCH EXISTING GRADE ON DOWNSTREAM SIDE ** ASPHALT HOT PATCH ROAD REPAIR REQUIRED ACROSS DRIVEWAY AT EDGE OF ROAD A MINIMUM OF 12 INCHES WIDE BY WIDTH OF DRIVEWAY
U -UTILITY RESIDENTIAL FINAL 01/08/2024 FINAL APPROVED DHANEY
Note: 12/21/2023 - PREVIOUS INSPECTION NOTES Water meter pit needs cleaned '
U -UTILITY RESIDENTIAL FINAL 12/22/2023 Disapproved - NO FEE DHANEY
Note: Water meter pit needs cleaned '
U-CROSS CONNECTION 12/22/2023 Disapproved -FEE REQUIRED DHANEY
Note: 7/13/2023 - PREVIOUS INSPECTION NOTES Meter pits full of dirt - can not see backflow for cross connection Insp. . Pits need cleaned . Water meter pit still needs cleaned .
ROW - FINAL APRON (AFTER POUR) 12/22/2023 APPROVED EMADISON
ROW - STORMWATER FINAL 12/22/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 12/22/23 NEED TO CLEAN OUT CULVERT PIPE PLUGGED WITH SEDIMENT ** NEED SOD IN (ROW) ON LEFT SIDE NEEDS TO BLEND TO MATCH EXISTING GRADE ON DOWNSTREAM SIDE ** ASPHALT HOT PATCH ROAD REPAIR REQUIRED ACROSS DRIVEWAY AT EDGE OF ROAD A MINIMUM OF 12 INCHES WIDE BY WIDTH OF DRIVEWAY
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/21/2023 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 12/21/2023 APPROVED EMADISON
ROW- PRE-APRON (PRE-POUR) 12/19/2023 APPROVED GBERTOLA
Note: 8/21/2023 - PREVIOUS INSPECTION NOTES NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB-BASE OR PAVER BASE SAND AND COMPACTION IS DONE BASE CAN NO LONGER BE ON SITE IN A PILE. BASE MUST BE SPREAD AND COMPACTED FOR THE SECOND PART OF A PRE-POUR FOR PAVER’S TO BE APPROVED. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAINS THE BUILDER SHOULD DOUBLE-CHECK THE CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300E RESIDENTIAL CULVERT DETAIL
ROW- PAVER RESTRAINTS 11/30/2023 APPROVED GBERTOLA
Note: READY FOR PAVERS
ROW- PAVER RESTRAINTS 08/21/2023 APPROVED GBERTOLA
Note: READY TO POUR
ROW- PRE-APRON (PRE-POUR) 08/21/2023 PARTIALLY APPROVED GBERTOLA
Note: NEED TO CALL FOR A NEW INSPECTION WHEN YOU INSTALL THE SUB-BASE OR PAVER BASE SAND AND COMPACTION IS DONE BASE CAN NO LONGER BE ON SITE IN A PILE. BASE MUST BE SPREAD AND COMPACTED FOR THE SECOND PART OF A PRE-POUR FOR PAVER’S TO BE APPROVED. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAINS THE BUILDER SHOULD DOUBLE-CHECK THE CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300E RESIDENTIAL CULVERT DETAIL
ELECTRIC - EARLY POWER 07/24/2023 APPROVED - AS NOTED AGAETANO
Note: 07-24-2023 FPL notified at 8:32 am
GRAVITY SEWER TEST 07/14/2023 APPROVED MGIBSON
U-CROSS CONNECTION 07/14/2023 Disapproved - NO FEE DHANEY
Note: Meter pits full of dirt - can not see backflow for cross connection Insp. . Pits need cleaned .
U - SEWER TIE IN 07/14/2023 APPROVED MGIBSON
PEP TANK INSTALLATION REQUEST 06/23/2023 APPROVED CSTONE
LATH/BRICK/ WATER BARRIER 05/18/2023 APPROVED JSTEWART
Note: 5/11/2023 - PREVIOUS INSPECTION NOTES 5/11/2023 previous note not rectified..... please seal Holes in block Garage side wall. 3/30/2023 - PREVIOUS INSPECTION NOTES 3/30/2023--Not ready Incomplete. Missing door transom windoe, Missing window in Lanai, service door in lanai not Meshed. all 3 areas require Mesh. please seal Holes in block Garage side wall.
INSULATION 05/12/2023 APPROVED JSTEWART
Note: 5/10/2023 - PREVIOUS INSPECTION NOTES Unidentified wire in closet next to laundry room needs a home.
LATH/BRICK/ WATER BARRIER 05/11/2023 Disapproved -FEE REQUIRED JSTEWART
Note: 5/11/2023 previous note not rectified..... please seal Holes in block Garage side wall. 3/30/2023 - PREVIOUS INSPECTION NOTES 3/30/2023--Not ready Incomplete. Missing door transom windoe, Missing window in Lanai, service door in lanai not Meshed. all 3 areas require Mesh. please seal Holes in block Garage side wall.
INSULATION 05/10/2023 Disapproved - NO FEE KSANDOE
Note: Unidentified wire in closet next to laundry room needs a home.
ALL ROUGH 05/02/2023 APPROVED JSTEWART
Note: 4/17/2023 - PREVIOUS INSPECTION NOTES 4/17/2023---No meter box installed, service lines not installed, no ground. Garage exterior lights not installed (romex is in rafters). Outlet in garage block wall not installed Romex in rafters. Metal electric boxes need to be grounded. Nail plate at liquid lines that run horizontal to vertical nail pattern. Missing transom window front door, and breakfast nook window. Please have product aproval onsite and window manufacturer Anchoring specs onsite. Window Anchoring needs to be exposed and open for inspection. STOPPED INSPECTION. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. WORK SHALL BE ACCESSABLE UNTIL APPROVED BY THE BUILDING OFFICIAL 110.1
ALL ROUGH 04/17/2023 Disapproved - NO FEE JSTEWART
Note: 4/17/2023---No meter box installed, service lines not installed, no ground. Garage exterior lights not installed (romex is in rafters). Outlet in garage block wall not installed Romex in rafters. Metal electric boxes need to be grounded. Nail plate at liquid lines that run horizontal to vertical nail pattern. Missing transom window front door, and breakfast nook window. Please have product aproval onsite and window manufacturer Anchoring specs onsite. Window Anchoring needs to be exposed and open for inspection. STOPPED INSPECTION. DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. WORK SHALL BE ACCESSABLE UNTIL APPROVED BY THE BUILDING OFFICIAL 110.1
LATH/BRICK/ WATER BARRIER 03/30/2023 Disapproved - NO FEE JSTEWART
Note: 3/30/2023--Not ready Incomplete. Missing door transom windoe, Missing window in Lanai, service door in lanai not Meshed. all 3 areas require Mesh. please seal Holes in block Garage side wall.
ROOF VALLEY & METAL 03/10/2023 APPROVED JSTEWART
ROOF SHEATHING / BRACES/TIES/DOWN CELL 03/06/2023 APPROVED JSTEWART
Note: 2/21/2023 - PREVIOUS INSPECTION NOTES 2/21/2023- Framers onsite, engineering not ready. Okay to tape Zip roof seam lines. stopped inspection
WALL SHEATHING 02/21/2023 APPROVED JSTEWART
ROOF SHEATHING / BRACES/TIES/DOWN CELL 02/21/2023 Disapproved - NO FEE JSTEWART
Note: 2/21/2023- Framers onsite, engineering not ready. Okay to tape Zip roof seam lines. stopped inspection
FOUND SURVEY APPROVED (OFFICE) 01/11/2023 APPROVED TBAKER
TIE BEAM / LINTEL 11/23/2022 APPROVED FWILLIS
MONOLITHIC SLAB 10/27/2022 APPROVED FWILLIS
PLUMBING 1ST ROUGH UNDERGROUND 10/24/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 10/19/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 01/09/2024 01/09/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 12/18/2023 12/18/2023
Note: Marked INFORMATION By: LIBBY MUSGROVE - (386)986-3780 - LMUSGROVE@PALMCOASTGOV.COM Cannot process final survey due to open ROW inspection that needs to be answered
MECH HOLD 11/30/2023 12/01/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Chosen equipment on heatload exceeds the maximum of 1.15 times the load calculated.per R403.7.1.2.1 FBC Energy Conservation 2020 7TH Edition. (Previous equipment was 2 speed compressor. Current is single speed.)
SW1 COMPLETE 07/10/2023 07/17/2023
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON COMPLETE 07/10/2023 07/10/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM widened driveway and added pavers
ENGIN1 COMPLETE 07/10/2023 07/11/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 03/09/2023 03/09/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 02/21/2023 02/23/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 01/09/2023 01/11/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/09/2023 01/09/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 08/01/2022 08/01/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON HOLD 07/28/2022 07/28/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide new landscape plan showing the AC location change
ZON HOLD 07/21/2022 07/21/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM No new site plan submitted showing the AC pad not encroaching in 5ft easement AC pad encroaching in 5ft utility easement
MECH COMPLETE 07/21/2022 07/21/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SWALE COMPLETE 07/13/2022 10/13/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 07/11/2022 07/14/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 07/11/2022 07/12/2022
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC COMPLETE 07/11/2022 07/11/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/11/2022 07/13/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 07/11/2022 07/13/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
SW1 COMPLETE 07/11/2022 07/18/2022
Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM
ZON HOLD 07/11/2022 07/15/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please submit a darker copy of landscape plan. When it is scanned we cannot see all required plantings and trees to approve. AC pad encroaching in 5ft utility easement Horizontal banding must wrap corner on right side
MECH HOLD 07/11/2022 07/11/2022
Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM This is the correct review. Previous was completed in error. Provide Duct layout signed by the AC contractor

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 01/16/2024
RECORDING FEE REIMBURSE DOC ¤44.00 01/16/2024
REINSPECTION FEE ¤40.00 01/16/2024
SW ENG REINSPECTION 20 ¤20.00 01/16/2024
SW ENG REINSPECTION 20 ¤20.00 01/16/2024
PLAN REVIEW - REVISION ¤32.50 01/16/2024
REINSPECTION RESIDENTIAL ¤40.00 01/16/2024
CONNECTION FEES ¤1,077.88 08/22/2022
SW ENG - REVIEW 20 ¤20.00 08/22/2022
SW ENG RES REVIEW 200 ¤200.00 08/22/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 08/22/2022
SEWER CREDIT (¤850.00) 08/22/2022
SEWER INSPECTION ¤25.00 08/22/2022
SEWER CAPITAL FACILITY ¤4,939.76 08/22/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 08/22/2022
SITE PLAN 30 ¤30.00 08/22/2022
SURCHARGE FS 533.721 ¤3.83 08/22/2022
SURCHARGE - FS 468.631 ¤5.74 08/22/2022
SW ENG - FOUNDATION SURVEY ¤20.00 08/22/2022
SW ENG INSPECTION 80 ¤80.00 08/22/2022
SW ENG PRE APRON ¤30.00 08/22/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 08/22/2022
WATER -IRRIGATION INSPECTION ¤25.00 08/22/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 08/22/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 08/22/2022
IMPACT FEE FIRE ¤388.65 08/22/2022
IMPACT FEE PARKS ¤1,455.13 08/22/2022
IMPACT FEE SCHOOL ¤3,600.00 08/22/2022
WATER- TURN ON ¤25.00 08/22/2022
ADJUSTMENT 50% (¤602.75) 08/22/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 08/22/2022
INSPECTION - RESIDENTIAL ¤915.75 08/22/2022
PLAN REVIEW - RESIDENTIAL ¤259.74 08/22/2022
Fees Total Due: ¤0.00 Total Paid: ¤17,177.50