Permit #2022070187
Permit Details
Status: COED
| Parcel Id: 07-11-31-7063-00760-0040 |
| CONDITIONED SPACE: 1906 sqft |
| GARAGE: 400 sqft |
| OPENED PORCH (WITH ROOF) : 20 sqft |
| Total Square Footage: 2326 sqft |
| Block: 00760 |
| Subdivision: 2174 - SECTION 63-ZEBULAHS TRAIL |
| Job Phone: 407-432-2344 |
| Location Address: 13 ZEBULON PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/26/2022 |
| NOC: RECORDED |
| Applicant name: WADE GILMER JURNEY JR |
| Owner: NATIONAL HOME CORPORATION |
|
Address 4850 TAMIAMI TRAIL NORTH NAPLES, FL 34103 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤240,539.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
NATIONAL HOME CORPORATION
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1080 HOLCOMB BRIDGE ROAD , |
BLDG 100 - 330 ROSWELL , GA 30076 |
CBC1257700 (Exp: 08/31/2026) | 471-817-1259 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/03/2023 | FINAL APPROVED | RSIMS |
| Note: 5/3/23: On hold waiting on AHU breaker change to correct size. Virtual received at @ 15:40. 5/2/2023 - PREVIOUS INSPECTION NOTES 5/2/23: Item 1 remains unresolved. Need the actual heater sticker that is supplied with the heater core applied to the labeled as required. 5/1/2023 - PREVIOUS INSPECTION NOTES 5/1/23: 1). AHU is missing heater label as required by Manufacturer. (written on label of AHU). Breaker size could not be verified. 2). AHU - hole in floor for lineset/condensate drain is not sealed as required. (seal with fire retardant material) 3). Range anti-tip device is not installed. 4). Dryer exhaust - screen must be removed as required to prevent fire. 5). Garage - ceiling penetration for Lineset/Condensate drain piping must be sealed with a fire retardant material. 6). All three bath tubs - rubber seal at front apron must be trimmed tight to corners & affixed properly as required to prevent water /moisture from getting under tub/into walls. 7). Water heater relief valve discharge pipe is too long. (Must be minimum 1.5" / Maximum 6" above drain pan) | |||
| BLD - BUILDING FINAL | 05/02/2023 | Disapproved - NO FEE | RSIMS |
| Note: 5/2/23: Item 1 remains unresolved. Need the actual heater sticker that is supplied with the heater core applied to the labeled as required. 5/1/2023 - PREVIOUS INSPECTION NOTES 5/1/23: 1). AHU is missing heater label as required by Manufacturer. (written on label of AHU). Breaker size could not be verified. 2). AHU - hole in floor for lineset/condensate drain is not sealed as required. (seal with fire retardant material) 3). Range anti-tip device is not installed. 4). Dryer exhaust - screen must be removed as required to prevent fire. 5). Garage - ceiling penetration for Lineset/Condensate drain piping must be sealed with a fire retardant material. 6). All three bath tubs - rubber seal at front apron must be trimmed tight to corners & affixed properly as required to prevent water /moisture from getting under tub/into walls. 7). Water heater relief valve discharge pipe is too long. (Must be minimum 1.5" / Maximum 6" above drain pan) | |||
| ROW - STORMWATER FINAL | 05/02/2023 | APPROVED | PFLANAGAN |
| Note: ALL CORRECTIONS MADE ----------------------------------------------------------------- 5/1/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN ALL DIRT OUT OF CULVERT 2) NEED TO PICK UP ALL CONSTRUCTION DEBRIS OUT OF THE DRIVEWAY 3) NEED TO HAVE SAW CUTS IN THE DRIVEWAY BEFORE THIS PASSES | |||
| U -UTILITY RESIDENTIAL FINAL | 05/01/2023 | FINAL APPROVED | JHARDING |
| ROW - STORMWATER FINAL | 05/01/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO CLEAN ALL DIRT OUT OF CULVERT 2) NEED TO PICK UP ALL CONSTRUCTION DEBRIS OUT OF THE DRIVEWAY 3) NEED TO HAVE SAW CUTS IN THE DRIVEWAY BEFORE THIS PASSES | |||
| BLD - BUILDING FINAL | 05/01/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 5/1/23: 1). AHU is missing heater label as required by Manufacturer. (written on label of AHU). Breaker size could not be verified. 2). AHU - hole in floor for lienset/condensate drain is not sealed as required. (seal with fire retardant material) 3). Range anti-tip device is not installed. 4). Dryer exhaust - screen must be removed as required to prevent fire. 5). Garage - ceiling penetration for Lineset/Condensate drain piping must be sealed with a fire retardant material. 6). All three bath tubs - rubber seal at front apron must be trimmed tight to corners & affixed properly as required to prevent water /moisture from getting under tub/into walls. 7). Water heater relief valve discharge pipe is too long. (Must be minimum 1.5" / Maximum 6" above drain pan) | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/27/2023 | APPROVED | PFLANAGAN |
| Note: 4/25/2023 - PREVIOUS INSPECTION NOTES 1) THE SOD CAN NOT BE ON THE FENCE ON ETHER SIDE 2) SOD A EDGE OF PAVEMENT NEEDS TO BE BELOW EDGE OF PAVEMENT 3) SOD ON LEFT SIDE AT PROPERTY LINE IN THE ROAD SIDE SWALE NEEDS TO MATCH GRADE ADJACENT TO YOURS | |||
| ROW - FINAL APRON (AFTER POUR) | 04/27/2023 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/25/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) THE SOD CAN NOT BE ON THE FENCE ON ETHER SIDE 2) SOD A EDGE OF PAVEMENT NEEDS TO BE BELOW EDGE OF PAVEMENT 3) SOD ON LEFT SIDE AT PROPERTY LINE IN THE ROAD SIDE SWALE NEEDS TO MATCH GRADE ADJACENT TO YOURS | |||
| FINAL SURVEY (OFFICE USE ONLY) | 04/25/2023 | APPROVED | PFLANAGAN |
| U - SEWER TIE IN | 04/05/2023 | APPROVED | MGIBSON |
| U-CROSS CONNECTION | 03/28/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/28/2023 | APPROVED | PFLANAGAN |
| Note: ALL CORRECTIONS MADE IT'S THE CONTRACTORS RESPONSIBILITY TO CHECK THE CULVERT PIPE ELEVATIONS BEFORE POURING CONCRETE FOR THE DRIVEWAY. -------------------------------------------------------------------------------------------------- 3/27/2023 - PREVIOUS INSPECTION NOTES ** 03/27/23 ** 03/20/23 NOT READY TO POUR CORRECTIONS THAT HAVE TO BE MADE ** STILL NEED TO HAVE A MINIMUM OF 6 INCHES OF CONCRETE IN APRON AT EDGE OF ROAD. ** FOOTERS AT END OF MITERED ENDS NEED TO BE DUG OUT TO A MINIMUM OF 6" IN DEPTH ** RIGHT SIDE CULVERT PIPE MITERS NOT EQUAL, NEED TO REFORM TO MEET MINIMUM DISTANCE REQUIREMENT ** NOTE CULVERT ELEVATION IS GOOD AT THE TIME OF INSPECTION** ________________________________________________________________________________________________________________________ 3/23/2023 - PREVIOUS INSPECTION NOTES 3/22/2023 - PREVIOUS INSPECTION NOTES ** 03/20/23 NOT READY TO POUR NO CORRECTIONS HAVE BEEN MADE ** FOOTERS AT END OF MITERED ENDS NEED TO BE DUG OUT TO A MINIMUM OF 6" IN DEPTH ** RIGHT SIDE CULVERT PIPE MITERS NOT EQUAL, NEED TO REFORM TO MEET MINIMUM DISTANCE REQUIREMENT ** NEEDS MORE COMPACTION AROUND CULVERT PIPE. ** NEED A MINIMUM OF 6" ACROSS EDGE OF ROAD NEED TO CHIP OVER POUR AWAY FROM GARAGE OPENING AS A MINIMUM OF 4 INCHES OF CONCRETE IS REQUIRED ABOVE THE ROW ___________________________________________________________________________________________________________________________ 3/20/2023 - PREVIOUS INSPECTION NOT ** 03/20/23 NOT READY TO POUR ** FOOTERS AT END OF MITERED ENDS NEED TO BE DUG OUT TO A MINIMUM OF 6" IN DEPTH ** RIGHT SIDE CULVERT PIPE MITERS NOT EQUAL, NEED TO REFORM TO MEET MINIMUM DISTANCE REQUIREMENT ** NEEDS MORE COMPACTION AROUND CULVERT PIPE. ** NEED A MINIMUM OF 6" ACROSS EDGE OF ROAD. _______________________________________________________________________________________________________________________ 3/16/2023 - PREVIOUS INSPECTION NOTES ** 03/16/23 NOT READY TO POUR FOOTERS AT END OF MITERED ENDS NEED TO BE DUG OUT TO A MINIMUM OF 6" IN DEPTH RIGHT SIDE CULVERT PIPE MITERS NOT EQUAL, NEED TO REFORM TO MEET MINIMUM DISTANCE REQUIREMENT NEEDS MORE COMPACTION AROUND CULVERT PIPE. NEED A MINIMUM OF 6" ACROSS EDGE OF ROAD. **SEE ATTACHED PHOTOS** | |||
| ROW- PRE-APRON (PRE-POUR) | 03/27/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 03/27/23 ** 03/20/23 NOT READY TO POUR CORRECTIONS THAT HAVE TO BE MADE ** STILL NEED TO HAVE A MINIMUM OF 6 INCHES OF CONCRETE IN APRON AT EDGE OF ROAD. ** FOOTERS AT END OF MITERED ENDS NEED TO BE DUG OUT TO A MINIMUM OF 6" IN DEPTH ** RIGHT SIDE CULVERT PIPE MITERS NOT EQUAL, NEED TO REFORM TO MEET MINIMUM DISTANCE REQUIREMENT ** NOTE CULVERT ELEVATION IS GOOD AT THE TIME OF INSPECTION** ________________________________________________________________________________________________________________________ 3/23/2023 - PREVIOUS INSPECTION NOTES 3/22/2023 - PREVIOUS INSPECTION NOTES ** 03/20/23 NOT READY TO POUR NO CORRECTIONS HAVE BEEN MADE ** FOOTERS AT END OF MITERED ENDS NEED TO BE DUG OUT TO A MINIMUM OF 6" IN DEPTH ** RIGHT SIDE CULVERT PIPE MITERS NOT EQUAL, NEED TO REFORM TO MEET MINIMUM DISTANCE REQUIREMENT ** NEEDS MORE COMPACTION AROUND CULVERT PIPE. ** NEED A MINIMUM OF 6" ACROSS EDGE OF ROAD NEED TO CHIP OVER POUR AWAY FROM GARAGE OPENING AS A MINIMUM OF 4 INCHES OF CONCRETE IS REQUIRED ABOVE THE ROW ___________________________________________________________________________________________________________________________ 3/20/2023 - PREVIOUS INSPECTION NOT ** 03/20/23 NOT READY TO POUR ** FOOTERS AT END OF MITERED ENDS NEED TO BE DUG OUT TO A MINIMUM OF 6" IN DEPTH ** RIGHT SIDE CULVERT PIPE MITERS NOT EQUAL, NEED TO REFORM TO MEET MINIMUM DISTANCE REQUIREMENT ** NEEDS MORE COMPACTION AROUND CULVERT PIPE. ** NEED A MINIMUM OF 6" ACROSS EDGE OF ROAD. _______________________________________________________________________________________________________________________ 3/16/2023 - PREVIOUS INSPECTION NOTES ** 03/16/23 NOT READY TO POUR FOOTERS AT END OF MITERED ENDS NEED TO BE DUG OUT TO A MINIMUM OF 6" IN DEPTH RIGHT SIDE CULVERT PIPE MITERS NOT EQUAL, NEED TO REFORM TO MEET MINIMUM DISTANCE REQUIREMENT NEEDS MORE COMPACTION AROUND CULVERT PIPE. NEED A MINIMUM OF 6" ACROSS EDGE OF ROAD. **SEE ATTACHED PHOTOS** | |||
| ROW- PRE-APRON (PRE-POUR) | 03/23/2023 | CANCELLED BY APPLICANT | EMADISON |
| Note: 3/22/2023 - PREVIOUS INSPECTION NOTES ** 03/20/23 NOT READY TO POUR NO CORRECTIONS HAVE BEEN MADE ** FOOTERS AT END OF MITERED ENDS NEED TO BE DUG OUT TO A MINIMUM OF 6" IN DEPTH ** RIGHT SIDE CULVERT PIPE MITERS NOT EQUAL, NEED TO REFORM TO MEET MINIMUM DISTANCE REQUIREMENT ** NEEDS MORE COMPACTION AROUND CULVERT PIPE. ** NEED A MINIMUM OF 6" ACROSS EDGE OF ROAD NEED TO CHIP OVER POUR AWAY FROM GARAGE OPENING AS A MINIMUM OF 4 INCHES OF CONCRETE IS REQUIRED ABOVE THE ROW ___________________________________________________________________________________________________________________________ 3/20/2023 - PREVIOUS INSPECTION NOT ** 03/20/23 NOT READY TO POUR ** FOOTERS AT END OF MITERED ENDS NEED TO BE DUG OUT TO A MINIMUM OF 6" IN DEPTH ** RIGHT SIDE CULVERT PIPE MITERS NOT EQUAL, NEED TO REFORM TO MEET MINIMUM DISTANCE REQUIREMENT ** NEEDS MORE COMPACTION AROUND CULVERT PIPE. ** NEED A MINIMUM OF 6" ACROSS EDGE OF ROAD. _______________________________________________________________________________________________________________________ 3/16/2023 - PREVIOUS INSPECTION NOTES ** 03/16/23 NOT READY TO POUR FOOTERS AT END OF MITERED ENDS NEED TO BE DUG OUT TO A MINIMUM OF 6" IN DEPTH RIGHT SIDE CULVERT PIPE MITERS NOT EQUAL, NEED TO REFORM TO MEET MINIMUM DISTANCE REQUIREMENT NEEDS MORE COMPACTION AROUND CULVERT PIPE. NEED A MINIMUM OF 6" ACROSS EDGE OF ROAD. **SEE ATTACHED PHOTOS** | |||
| ROW- PRE-APRON (PRE-POUR) | 03/22/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 03/20/23 NOT READY TO POUR NO CORRECTIONS HAVE BEEN MADE ** FOOTERS AT END OF MITERED ENDS NEED TO BE DUG OUT TO A MINIMUM OF 6" IN DEPTH ** RIGHT SIDE CULVERT PIPE MITERS NOT EQUAL, NEED TO REFORM TO MEET MINIMUM DISTANCE REQUIREMENT ** NEEDS MORE COMPACTION AROUND CULVERT PIPE. ** NEED A MINIMUM OF 6" ACROSS EDGE OF ROAD NEED TO CHIP OVER POUR AWAY FROM GARAGE OPENING AS A MINIMUM OF 4 INCHES OF CONCRETE IS REQUIRED ABOVE THE ROW ___________________________________________________________________________________________________________________________ 3/20/2023 - PREVIOUS INSPECTION NOT ** 03/20/23 NOT READY TO POUR ** FOOTERS AT END OF MITERED ENDS NEED TO BE DUG OUT TO A MINIMUM OF 6" IN DEPTH ** RIGHT SIDE CULVERT PIPE MITERS NOT EQUAL, NEED TO REFORM TO MEET MINIMUM DISTANCE REQUIREMENT ** NEEDS MORE COMPACTION AROUND CULVERT PIPE. ** NEED A MINIMUM OF 6" ACROSS EDGE OF ROAD. _______________________________________________________________________________________________________________________ 3/16/2023 - PREVIOUS INSPECTION NOTES ** 03/16/23 NOT READY TO POUR FOOTERS AT END OF MITERED ENDS NEED TO BE DUG OUT TO A MINIMUM OF 6" IN DEPTH RIGHT SIDE CULVERT PIPE MITERS NOT EQUAL, NEED TO REFORM TO MEET MINIMUM DISTANCE REQUIREMENT NEEDS MORE COMPACTION AROUND CULVERT PIPE. NEED A MINIMUM OF 6" ACROSS EDGE OF ROAD. **SEE ATTACHED PHOTOS** | |||
| ROW- PRE-APRON (PRE-POUR) | 03/20/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 03/20/23 NOT READY TO POUR ** FOOTERS AT END OF MITERED ENDS NEED TO BE DUG OUT TO A MINIMUM OF 6" IN DEPTH ** RIGHT SIDE CULVERT PIPE MITERS NOT EQUAL, NEED TO REFORM TO MEET MINIMUM DISTANCE REQUIREMENT ** NEEDS MORE COMPACTION AROUND CULVERT PIPE. ** NEED A MINIMUM OF 6" ACROSS EDGE OF ROAD. _______________________________________________________________________________________________________________________ 3/16/2023 - PREVIOUS INSPECTION NOTES ** 03/16/23 NOT READY TO POUR FOOTERS AT END OF MITERED ENDS NEED TO BE DUG OUT TO A MINIMUM OF 6" IN DEPTH RIGHT SIDE CULVERT PIPE MITERS NOT EQUAL, NEED TO REFORM TO MEET MINIMUM DISTANCE REQUIREMENT NEEDS MORE COMPACTION AROUND CULVERT PIPE. NEED A MINIMUM OF 6" ACROSS EDGE OF ROAD. **SEE ATTACHED PHOTOS** | |||
| ROW- PRE-APRON (PRE-POUR) | 03/16/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: ** 03/16/23 NOT READY TO POUR FOOTERS AT END OF MITERED ENDS NEED TO BE DUG OUT TO A MINIMUM OF 6" IN DEPTH RIGHT SIDE CULVERT PIPE MITERS NOT EQUAL, NEED TO REFORM TO MEET MINIMUM DISTANCE REQUIREMENT NEEDS MORE COMPACTION AROUND CULVERT PIPE. NEED A MINIMUM OF 6" ACROSS EDGE OF ROAD. **SEE ATTACHED PHOTOS** | |||
| ELECTRIC - EARLY POWER | 03/15/2023 | APPROVED | RSIMS |
| Note: 3/14/2023 - PREVIOUS INSPECTION NOTES 3/14/23: 1). Front Left Bedroom closet light not safed off. | |||
| ELECTRIC - EARLY POWER | 03/14/2023 | Disapproved - NO FEE | RSIMS |
| Note: 3/14/23: 1). Front Left Bedroom closet light not safed off. | |||
| ELECTRIC - EARLY POWER | 02/22/2023 | CANCELLED BY APPLICANT | WEB |
| ROW- PRE-APRON (PRE-POUR) | 02/22/2023 | CANCELLED BY APPLICANT | WEB |
| PEP TANK INSTALLATION REQUEST | 02/22/2023 | APPROVED | TSCHWEERS |
| U-CROSS CONNECTION | 02/22/2023 | CANCELLED BY APPLICANT | WEB |
| U - SEWER TIE IN | 02/22/2023 | CANCELLED BY APPLICANT | WEB |
| INSULATION | 02/09/2023 | APPROVED | TSTAUFFACHER |
| Note: Inspector Notes from Inspection 2420 2/6/23: Check wall sheathing at 2nd floor bathroom vent stacks (previously listed item 9) for zip tape & foam/wire mesh repair. Check at insulation. 2/2/2023 - PREVIOUS INSPECTION NOTES 2/2/23: INSPECTION STOPPED! INCOMPLETE INSPECTION! NOT READY. 1). Incomplete plans in permit box. Missing energy calculations/mechanical plan. 2). No service feed. 3). No water pressure 4). No 5ft. head pressure 5). Kitchen smoke detector too close to cooking appliance. 6). Missing nail plate at WM pan drain. 7). 1st floor bathroom exhaust fan not installed. 8). Outlet/switch box on 2nd floor hanging out of ceiling from wires. 9). Wall sheathing on 2nd floor damaged for plumbing vent installation. BUILDING INSPECTORS ARE NOT REQUIRED TO CREATE PUNCH LISTS FOR CONTRACTORS. PLEASE CHECK ALL FOR CODE COMPLIANCE BEFORE CALLING IN FOR INSPECTION. | |||
| ALL ROUGH | 02/06/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 2/6/23: Check wall sheathing at 2nd floor bathroom vent stacks (previously listed item 9) for zip tape & foam/wire mesh repair. Check at insulation. 2/2/2023 - PREVIOUS INSPECTION NOTES 2/2/23: INSPECTION STOPPED! INCOMPLETE INSPECTION! NOT READY. 1). Incomplete plans in permit box. Missing energy calculations/mechanical plan. 2). No service feed. 3). No water pressure 4). No 5ft. head pressure 5). Kitchen smoke detector too close to cooking appliance. 6). Missing nail plate at WM pan drain. 7). 1st floor bathroom exhaust fan not installed. 8). Outlet/switch box on 2nd floor hanging out of ceiling from wires. 9). Wall sheathing on 2nd floor damaged for plumbing vent installation. BUILDING INSPECTORS ARE NOT REQUIRED TO CREATE PUNCH LISTS FOR CONTRACTORS. PLEASE CHECK ALL FOR CODE COMPLIANCE BEFORE CALLING IN FOR INSPECTION. | |||
| ALL ROUGH | 02/02/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 2/2/23: INSPECTION STOPPED! INCOMPLETE INSPECTION! NOT READY. 1). Incomplete plans in permit box. Missing energy calculations/mechanical plan. 2). No service feed. 3). No water pressure 4). No 5ft. head pressure 5). Kitchen smoke detector too close to cooking appliance. 6). Missing nail plate at WM pan drain. 7). 1st floor bathroom exhaust fan not installed. 8). Outlet/switch box on 2nd floor hanging out of ceiling from wires. 9). Wall sheathing on 2nd floor damaged for plumbing vent installation. BUILDING INSPECTORS ARE NOT REQUIRED TO CREATE PUNCH LISTS FOR CONTRACTORS. PLEASE CHECK ALL FOR CODE COMPLIANCE BEFORE CALLING IN FOR INSPECTION. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/27/2023 | APPROVED | RSIMS |
| Note: Inspector Notes from Inspection 2320 1/13/23: Please have below resolved before next inspection. Persuant to the Contractor's News letter and Florida Building Codes 319.1 & 501.2 (& Emergency Services) - You must have the job box mounted out front. Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum lettering. (New construction - marking the windows with flourescent or reflective paint/other is acceptable). 1/11/2023 - PREVIOUS INSPECTION NOTES 1/11/23: 1). Right side of the house - Large hole at rebar needs wire lath covering, / Hole at low voltage wires needs to be sealed. 2). Back of the house - holes at outlet and hose bibb need to be sealed. | |||
| ROW - DRAINAGE | 01/17/2023 | APPROVED | GBERTOLA |
| Note: 1/17/23= CORRECTION WERE MADE 1/9/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO KEEP TEMPORARY PIPE CLEAR AT ALL TIMES DURING THE CONSTRUCTION 2) NEED TO MOVE PORTER JOHN OUT OF SWALE 3) NEED TO CLEAN ALL DIRT OUT OF SWALE AT HOUSE # 15 NEXT INSPECTION ON 1/17/2023 | |||
| LATH/BRICK/ WATER BARRIER | 01/13/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 1/13/23: Please have below resolved before next inspection. Persuant to the Contractor's News letter and Florida Building Codes 319.1 & 501.2 (& Emergency Services) - You must have the job box mounted out front. Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum lettering. (New construction - marking the windows with flourescent or reflective paint/other is acceptable). 1/11/2023 - PREVIOUS INSPECTION NOTES 1/11/23: 1). Right side of the house - Large hole at rebar needs wire lath covering, / Hole at low voltage wires needs to be sealed. 2). Back of the house - holes at outlet and hose bibb need to be sealed. | |||
| LATH/BRICK/ WATER BARRIER | 01/11/2023 | Disapproved - NO FEE | RSIMS |
| Note: 1/11/23: Persuant to Contractor's Letter and Per Florida Building Codes 319.1 & 501.2 (& Emergency Services) - You must have the job box mounted out front. Address must be marked on the exterior of the home & be visible from the street with 4" tall minimum lettering. (Marking the window with flourescent/reflective paint/other is acceptable) 1). Right side of the house - Large hole at rebar needs wire lath covering, / Hole at low voltage wires needs to be sealed. 2). Back of the house - holes at outlet and hose bibb need to be sealed. | |||
| ROW - DRAINAGE | 01/09/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO KEEP TEMPORARY PIPE CLEAR AT ALL TIMES DURING THE CONSTRUCTION 2) NEED TO MOVE PORTER JOHN OUT OF SWALE 3) NEED TO CLEAN ALL DIRT OUT OF SWALE AT HOUSE # 15 NEXT INSPECTION ON 1/17/2023 | |||
| ELECTRIC-TUG | 12/19/2022 | APPROVED | RSIMS |
| ROOF VALLEY & METAL | 12/13/2022 | APPROVED | BTAYLOR |
| WALL SHEATHING | 12/13/2022 | APPROVED | BTAYLOR |
| Note: 12/12/2022 - PREVIOUS INSPECTION NOTES 12/7/22: Wall sheathing is covered with house wrap so the nailing pattern can not be checked. * Need to remove house wrao. * you may be able to arrange for spot checking where at least one section on each wall will need to be exposed to check for consistency. Plan to be present for the re-inspection if this option is chosen. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/12/2022 | Disapproved - NO FEE | RSIMS |
| Note: 12/12/22: Roof sheathing / Braces / Down Cell / Framing / Truss Engineering - Checked & approved. Ties - Disapproved 1). Truss F7 (5th in series) has a bucket that is missing nails. 2). 2nd floor trusses at back wall have brackets that are not nailed fully/properly. (marked on stud below) | |||
| WALL SHEATHING | 12/12/2022 | Disapproved - NO FEE | RSIMS |
| Note: 12/12/22: Wall sheathing is covered with house wrap so the nailing pattern can not be checked. * Need to remove house wrao. * you may be able to arrange for spot checking where at least one section on each wall will need to be exposed to check for consistency. Plan to be present for the re-inspection if this option is chosen. | |||
| TIE BEAM / LINTEL | 11/21/2022 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 11/15/2022 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 11/15/2022 | APPROVED | TBAKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/14/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 11/14/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 10/25/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/15/2023 | 02/15/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 02/14/2023 | 02/14/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please rename your files correctly | |||
| ENGIN1 | COMPLETE | 11/14/2022 | 11/15/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/14/2022 | 11/14/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/19/2022 | 07/20/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/15/2022 | 07/15/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/15/2022 | 07/15/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM landscape plan: Foundation planting need to be along the front of the foundation. | |||
| BLD | COMPLETE | 07/15/2022 | 07/18/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/07/2022 | 07/12/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 07/07/2022 | 07/07/2022 |
| Note: Released By: CYNTHIA SCHWEERS - - CSCHWEERS@PALMCOASSTGOV.COM | |||
| ELEC | COMPLETE | 07/07/2022 | 07/08/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/07/2022 | 07/07/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/07/2022 | 07/12/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/07/2022 | 07/08/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy Calculations. Not submitted. There is a property appraisers page in its place. | |||
| SW1 | COMPLETE | 07/07/2022 | 07/13/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/07/2022 | 07/11/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Landscape plan: please add *Six Shrubs shall be planted on each side of the home facing the street. In the rear wrap the corners with 3 shrubs on each corner . Rear faces Belle Terre. Eight shrubs shall be planted in front of home and four shrubs planted on each side of the home. Elevations plans: Banding around Windows and doors All windows and doors facing public right of way must have banding. | |||
| SWALE | COMPLETE | 07/07/2022 | 09/28/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/03/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/03/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/13/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/13/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/13/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/13/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/13/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/13/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/13/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 04/13/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 04/13/2023 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 07/26/2022 |
| IMPACT FEE FIRE | ¤388.65 | 07/26/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 07/26/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/26/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 07/26/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/26/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 07/26/2022 |
| SURCHARGE FS 533.721 | ¤7.41 | 07/26/2022 |
| SURCHARGE - FS 468.631 | ¤11.12 | 07/26/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/26/2022 |
| CONNECTION FEES | ¤1,077.88 | 07/26/2022 |
| WATER- TURN ON | ¤25.00 | 07/26/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/26/2022 |
| INSPECTION - RESIDENTIAL | ¤662.75 | 07/26/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤187.98 | 07/26/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/26/2022 |
| SW ENG PRE APRON | ¤30.00 | 07/26/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/26/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/26/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 07/26/2022 |
| SEWER INSPECTION | ¤25.00 | 07/26/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 07/26/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 07/26/2022 |
| SITE PLAN 30 | ¤30.00 | 07/26/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,450.45 |