I want to search for...
Permit #2022070276
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-00520-0030 |
| CONDITIONED SPACE: 2704 sqft |
| GARAGE: 896 sqft |
| OPENED PORCH (WITH ROOF) : 68 sqft |
| OPENED PORCH (WITH ROOF) : 226 sqft |
| Total Square Footage: 3894 sqft |
| Block: 00520 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: 386-931-5935 |
| Location Address: 22 BUNKER LN |
| Type: DU - DUPLEX |
| Issue Date: 07/26/2022 |
| NOC: RECORDED |
| Applicant name: RYAN JAMES PERRY |
| Owner: HOLNESS, DANA |
|
Address 5444 ARLINGTON AVE BRONX, NY 10471 |
|
Address #APT G53 BRONX, NY 10471 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤400,000.00 |
| Job Description: DUPLEX |
| Type: CN |
Contractor
WATERSIDE HOMES RENOVATIONS AND DESIGNS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
RYAN JAMES PERRY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
10 BISCAYNE DRIVE PALM COAST, FL 32137 |
CBC1263021 (Exp: 08/31/2026) | 386-931-5395 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
DILLON CARRERAS
| Status | Location Address | State License Number |
| ACTIVE |
3504 LUNDY ROAD PALATKA, FL 32177 |
EC13010133 (Exp: 08/31/2026) |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/07/2023 | Approval - Private Provider | PPROVIDER |
| Note: 8/4/2023 2:18:46 PM- PREVIOUS INSPECTION NOTES | |||
| U -UTILITY RESIDENTIAL FINAL | 08/04/2023 | FINAL APPROVED | DHANEY |
| BLD - BUILDING FINAL | 08/04/2023 | CANCELLED BY APPLICANT | WEB |
| BLD - BUILDING FINAL | 08/04/2023 | Disapproved- Private Provider | PPROVIDER |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/03/2023 | APPROVED - AS NOTED | RGROSS |
| Note: After further review the pitch on the culvert is the difference in the rib of the pipe that will not significantly impact the flow of stormwater. Therefore being approved as-noted. 7/25/2023 - PREVIOUS INSPECTION NOTES 7/25/23= ON THE RIGHT SIDE CULVERT PIPE WATER IS RUNNING IN THE WRONG DIRECTION SWALE PLAN DETAIL WATER GOES FROM THE RIGHT SIDE TO THE LEFT SIDE The subject lots drainage must not negatively impact any adjacent property. ON THE BACK YARD RIGHT SIDE WATER WILL DRAING IN TO THE NEIGHBORING LOT | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/03/2023 | APPROVED - AS NOTED | RGROSS |
| Note: See note on Final Survey As-noted. Inspector Notes from Inspection 9463 After further review the pitch on the culvert is the difference in the rib of the pipe that will not significantly impact the flow of stormwater. Therefore being approved as-noted. 7/25/2023 - PREVIOUS INSPECTION NOTES 7/25/23= ON THE RIGHT SIDE CULVERT PIPE WATER IS RUNNING IN THE WRONG DIRECTION SWALE PLAN DETAIL WATER GOES FROM THE RIGHT SIDE TO THE LEFT SIDE The subject lots drainage must not negatively impact any adjacent property. ON THE BACK YARD RIGHT SIDE WATER WILL DRAING IN TO THE NEIGHBORING LOT | |||
| ROW - FINAL INSPECTION | 08/03/2023 | APPROVED | RGROSS |
| Note: Inspector Notes from Inspection 9272 On site with sub who will clean culvert ends before closing. Inspector Notes from Inspection 9465 See note on Final Survey As-noted. Inspector Notes from Inspection 9463 After further review the pitch on the culvert is the difference in the rib of the pipe that will not significantly impact the flow of stormwater. Therefore being approved as-noted. 7/25/2023 - PREVIOUS INSPECTION NOTES 7/25/23= ON THE RIGHT SIDE CULVERT PIPE WATER IS RUNNING IN THE WRONG DIRECTION SWALE PLAN DETAIL WATER GOES FROM THE RIGHT SIDE TO THE LEFT SIDE The subject lots drainage must not negatively impact any adjacent property. ON THE BACK YARD RIGHT SIDE WATER WILL DRAING IN TO THE NEIGHBORING LOT | |||
| ROW - FINAL APRON (AFTER POUR) | 08/03/2023 | APPROVED - AS NOTED | RGROSS |
| Note: On site with sub who will clean culvert ends before closing. Inspector Notes from Inspection 9465 See note on Final Survey As-noted. Inspector Notes from Inspection 9463 After further review the pitch on the culvert is the difference in the rib of the pipe that will not significantly impact the flow of stormwater. Therefore being approved as-noted. 7/25/2023 - PREVIOUS INSPECTION NOTES 7/25/23= ON THE RIGHT SIDE CULVERT PIPE WATER IS RUNNING IN THE WRONG DIRECTION SWALE PLAN DETAIL WATER GOES FROM THE RIGHT SIDE TO THE LEFT SIDE The subject lots drainage must not negatively impact any adjacent property. ON THE BACK YARD RIGHT SIDE WATER WILL DRAING IN TO THE NEIGHBORING LOT | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 07/25/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: 7/25/23= ON THE RIGHT SIDE CULVERT PIPE WATER IS RUNNING IN THE WRONG DIRECTION SWALE PLAN DETAIL WATER GOES FROM THE RIGHT SIDE TO THE LEFT SIDE The subject lots drainage must not negatively impact any adjacent property. ON THE BACK YARD RIGHT SIDE WATER WILL DRAING IN TO THE NEIGHBORING LOT | |||
| ELECTRIC - EARLY POWER | 07/06/2023 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 06/30/2023 | APPROVED - AS NOTED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| U - SEWER TIE IN | 06/02/2023 | APPROVED | MGIBSON |
| U-CROSS CONNECTION | 06/02/2023 | APPROVED | DHANEY |
| GRAVITY SEWER TEST | 06/02/2023 | Approval - Private Provider | PPROVIDER |
| PEP TANK INSTALLATION REQUEST | 04/18/2023 | APPROVED | TSCHWEERS |
| Note: 3/6/2023 3:16:02 PM- PREVIOUS INSPECTION NOTES 3/6/2023 Exterior needs to be completed. | |||
| PEP TANK INSTALLATION REQUEST | 03/06/2023 | Disapproved - NO FEE | TSCHWEERS |
| Note: 3/6/2023 Exterior needs to be completed. | |||
| INSULATION | 02/23/2023 | Approval - Private Provider | PPROVIDER |
| FIREWALL FINAL | 02/21/2023 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 02/21/2023 | Approval - Private Provider | PPROVIDER |
| FIREWALL DRYWALL NAILING | 01/27/2023 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 01/26/2023 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 12/27/2022 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/27/2022 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 12/27/2022 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 10/26/2022 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 10/18/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 09/26/2022 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 09/16/2022 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 08/24/2022 | APPROVED | CSTONE |
| Note: THIS IS A REINSPECTION ADDED ON 8/23/2022 8:18:55 AM lot not clear | |||
| WATER METER INSTALLATION REQUEST | 08/19/2022 | Disapproved - NO FEE | CSTONE |
| Note: lot not clear |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 08/07/2023 | 08/07/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please correct your file names. | |||
| ENGIN1 | COMPLETE | 10/17/2022 | 10/18/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/17/2022 | 10/17/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/19/2022 | 07/26/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 07/19/2022 | 07/19/2022 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM please mark through and make it clear what services the PP is going to provide- both are marked. (the last ones submitted were accepted becuase the permits were issued, but they were not correct) | |||
| ZON | COMPLETE | 07/19/2022 | 07/20/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/12/2022 | 10/03/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/08/2022 | 07/12/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 07/08/2022 | 07/11/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 07/08/2022 | 07/11/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/08/2022 | 07/12/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/08/2022 | 07/14/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/08/2022 | 07/11/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 07/08/2022 | 07/14/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO MAKE A COMMON SWALE ON BOTHH PROPERTY LINES | |||
| ZON | HOLD | 07/08/2022 | 07/13/2022 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM please label rooms correctly on floor plan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 08/07/2023 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 08/07/2023 |
| INSPECTION - RESIDENTIAL | ¤1,100.00 | 07/26/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤312.00 | 07/26/2022 |
| CONNECTION FEES | ¤2,155.76 | 07/26/2022 |
| 07/26/2022 | ||
| WATER- TURN ON | ¤50.00 | 07/26/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/26/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤23.32) | 07/26/2022 |
| IMPACT FEE FIRE | ¤777.30 | 07/26/2022 |
| IMPACT FEE PARKS | ¤2,910.26 | 07/26/2022 |
| IMPACT FEE SCHOOL | ¤7,200.00 | 07/26/2022 |
| IMPACT FEE TRANSPORTATION | ¤2,738.00 | 07/26/2022 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 07/26/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤87.31) | 07/26/2022 |
| SURCHARGE FS 533.721 | ¤11.90 | 07/26/2022 |
| SURCHARGE - FS 468.631 | ¤17.85 | 07/26/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/26/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/26/2022 |
| SW ENG PRE APRON | ¤30.00 | 07/26/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/26/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/26/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤82.14) | 07/26/2022 |
| SEWER CREDIT | (¤4,782.75) | 07/26/2022 |
| SEWER INSPECTION | ¤25.00 | 07/26/2022 |
| SEWER CAPITAL FACILITY | ¤9,879.52 | 07/26/2022 |
| WATER CAPITAL FACILITY FEE | ¤7,253.00 | 07/26/2022 |
| SITE PLAN 30 | ¤30.00 | 07/26/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤30,160.07 |