I want to search for...
Permit #2022070284
Permit Details
Status: COED
| Parcel Id: 07-11-31-7058-00600-0190 |
| CONDITIONED SPACE: 1517 sqft |
| GARAGE: 394 sqft |
| Total Square Footage: 1911 sqft |
| Block: 00600 |
| Subdivision: 2215 - SECTION 58-SEMINOLE PARK |
| Job Phone: 407-432-2344 |
| Location Address: 20 SELBORNE PATH |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/26/2022 |
| NOC: RECORDED |
| Applicant name: WADE GILMER JURNEY JR |
| Owner: NATIONAL HOME CORP |
|
Address 4850 TAMIAMI TRAIL NORTH NAPLES, FL 34103 |
| Lot: 0190 |
| Contracted Stated Job Value: ¤209,353.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
NATIONAL HOME CORPORATION
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1080 HOLCOMB BRIDGE ROAD , |
BLDG 100 - 330 ROSWELL , GA 30076 |
CBC1257700 (Exp: 08/31/2026) | 471-817-1259 |
Sub Contractors
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JASON PATRICK RIBOCK
| Status | Location Address | State License Number | Phone |
| INACTIVE |
620 E PINE ST , 0 |
ES12001313 (Exp: 08/31/2026) | 407-625-0257 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
RANDALL SCOTT ROSENFELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
234 N WHITNEY ST PALM COAST, FL 32084 |
CAC1816641 (Exp: 08/31/2026) | 904-599-0082 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/02/2023 | FINAL APPROVED | MKRASKI |
| Note: 5/1/2023 - PREVIOUS INSPECTION NOTES 4/24/2023 - PREVIOUS INSPECTION NOTES 4-24-23 1. No hot water. 2.A/C not running. 3. Garbage disposal switch does not work. A/C equipment installed is carrier energy cals say bryant? 5-1-23 1. Garbage disposal switch does not work. 2. Kitchen light does not work. | |||
| BLD - BUILDING FINAL | 05/01/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 4/24/2023 - PREVIOUS INSPECTION NOTES 4-24-23 1. No hot water. 2.A/C not running. 3. Garbage disposal switch does not work. A/C equipment installed is carrier energy cals say bryant? 5-1-23 1. Garbage disposal switch does not work. 2. Kitchen light does not work. | |||
| ROW - STORMWATER FINAL | 05/01/2023 | APPROVED | PFLANAGAN |
| Note: 4/25/2023 - PREVIOUS INSPECTION NOTES PLEASE READY NOTE DATED 4/24/23 FOR ALL CORRECTIONS NOTHING DONE SINCE LAST INSPECTION ----------------------------------------------------------------------------------------------- 4/24/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS AROUND YOUR LOT AND IN THE VACANTS BEHIND YOUR LOT AND ACROSS THE STREET 2) NEED TO REPAIR THE SWALE ACROSSED THE STREET MORE ALL BARE AREAS NEED TO HAVE BAHIA SOD AND ALL SOD NEED TO MATCH THE EXISTING GRADE SURROUNDING IT 3) NEED TO ADD SEED AND STRAW ON ALL BARE AREAS ON THE VACANT BEHIND YOURS | |||
| ROW - STORMWATER FINAL | 04/25/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: PLEASE READY NOTE DATED 4/24/23 FOR ALL CORRECTIONS NOTHING DONE SINCE LAST INSPECTION ----------------------------------------------------------------------------------------------- 4/24/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS AROUND YOUR LOT AND IN THE VACANTS BEHIND YOUR LOT AND ACROSS THE STREET 2) NEED TO REPAIR THE SWALE ACROSSED THE STREET MORE ALL BARE AREAS NEED TO HAVE BAHIA SOD AND ALL SOD NEED TO MATCH THE EXISTING GRADE SURROUNDING IT 3) NEED TO ADD SEED AND STRAW ON ALL BARE AREAS ON THE VACANT BEHIND YOURS | |||
| U -UTILITY RESIDENTIAL FINAL | 04/24/2023 | FINAL APPROVED | JHARDING |
| ROW - STORMWATER FINAL | 04/24/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS AROUND YOUR LOT AND IN THE VACANTS BEHIND YOUR LOT AND ACROSS THE STREET 2) NEED TO REPAIR THE SWALE ACROSSED THE STREET MORE ALL BARE AREAS NEED TO HAVE BAHIA SOD AND ALL SOD NEED TO MATCH THE EXISTING GRADE SURROUNDING IT 3) NEED TO ADD SEED AND STRAW ON ALL BARE AREAS ON THE VACANT BEHIND YOURS | |||
| BLD - BUILDING FINAL | 04/24/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 4-24-23 1. No hot water. 2.A/C not running. 3. Garbage disposal switch does not work. A/C equipment installed is carrier energy cals say bryant? | |||
| ROW - FINAL APRON (AFTER POUR) | 04/21/2023 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/21/2023 | APPROVED | PFLANAGAN |
| Note: 4/20/2023 - PREVIOUS INSPECTION NOTES NOT ABLE TO DO INSPECTION THERE IS NO ADDRESS OR PERMIT BOX PRESENT NEED TO ABLE TO SEE ADDRESS FROM STREET ------------------------------------------------------------------------------------------------------------ 3/27/2023 - PREVIOUS INSPECTION NOTES ** 03/27/23 YOU NEED TO SCHEDULE YOUR FINAL SURVEY ONCE FINAL SURVEY HAS BEEN SUBMITTED AND APPROVED YOUR FIELD SURVEY WILL BE CONDUCTED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/20/2023 | APPROVED | PFLANAGAN |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/20/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NOT ABLE TO DO INSPECTION THERE IS NO ADDRESS OR PERMIT BOX PRESENT NEED TO ABLE TO SEE ADDRESS FROM STREET ------------------------------------------------------------------------------------------------------------ 3/27/2023 - PREVIOUS INSPECTION NOTES ** 03/27/23 YOU NEED TO SCHEDULE YOUR FINAL SURVEY ONCE FINAL SURVEY HAS BEEN SUBMITTED AND APPROVED YOUR FIELD SURVEY WILL BE CONDUCTED. | |||
| ELECTRIC - EARLY POWER | 04/18/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 4/13/2023 - PREVIOUS INSPECTION NOTES 4/6/2023 - PREVIOUS INSPECTION NOTES 3/27/2023 - PREVIOUS INSPECTION NOTES 3/15/2023 - PREVIOUS INSPECTION NOTES 3/14/2023 - PREVIOUS INSPECTION NOTES 3-14-23 1. Microwave outlet needs to be safed off. outlet needs to completly covered so terminals can not be touched. 3-27-23 1. Microwave outlet needs to be safed off. outlet needs to completly covered so terminals can not be touched. 2. LOAD SIDE CONDUCTORS SHOULD NOT BE CONNECTED UNTIL POWER IS RELEASED TO HOUSE. 4-6-23 1. Microwave outlet needs to be safed off. outlet needs to completly covered so terminals can not be touched. 4-13-23 1. LOAD SIDE CONDUCTORS SHOULD NOT BE CONNECTED UNTIL POWER IS RELEASED TO HOUSE. 4-18-23 1. Emailed FPL at 12:12. | |||
| ELECTRIC - EARLY POWER | 04/13/2023 | Disapproved -FEE REQUIRED | BTAYLOR |
| Note: 4/6/2023 - PREVIOUS INSPECTION NOTES 3/27/2023 - PREVIOUS INSPECTION NOTES 3/15/2023 - PREVIOUS INSPECTION NOTES 3/14/2023 - PREVIOUS INSPECTION NOTES 3-14-23 1. Microwave outlet needs to be safed off. outlet needs to completly covered so terminals can not be touched. 3-27-23 1. Microwave outlet needs to be safed off. outlet needs to completly covered so terminals can not be touched. 2. LOAD SIDE CONDUCTORS SHOULD NOT BE CONNECTED UNTIL POWER IS RELEASED TO HOUSE. 4-6-23 1. Microwave outlet needs to be safed off. outlet needs to completly covered so terminals can not be touched. 4-13-23 1. LOAD SIDE CONDUCTORS SHOULD NOT BE CONNECTED UNTIL POWER IS RELEASED TO HOUSE. | |||
| ELECTRIC - EARLY POWER | 04/06/2023 | Disapproved -FEE REQUIRED | BTAYLOR |
| Note: 3/27/2023 - PREVIOUS INSPECTION NOTES 3/15/2023 - PREVIOUS INSPECTION NOTES 3/14/2023 - PREVIOUS INSPECTION NOTES 3-14-23 1. Microwave outlet needs to be safed off. outlet needs to completly covered so terminals can not be touched. 3-27-23 1. Microwave outlet needs to be safed off. outlet needs to completly covered so terminals can not be touched. 2. LOAD SIDE CONDUCTORS SHOULD NOT BE CONNECTED UNTIL POWER IS RELEASED TO HOUSE. 4-6-23 1. Microwave outlet needs to be safed off. outlet needs to completly covered so terminals can not be touched. | |||
| ELECTRIC - EARLY POWER | 03/27/2023 | Disapproved -FEE REQUIRED | BTAYLOR |
| Note: 3/15/2023 - PREVIOUS INSPECTION NOTES 3/14/2023 - PREVIOUS INSPECTION NOTES 3-14-23 1. Microwave outlet needs to be safed off. outlet needs to completly covered so terminals can not be touched. 3-27-23 1. Microwave outlet needs to be safed off. outlet needs to completly covered so terminals can not be touched. 2. LOAD SIDE CONDUCTORS SHOULD NOT BE CONNECTED UNTIL POWER IS RELEASED TO HOUSE. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/27/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 03/27/23 YOU NEED TO SCHEDULE YOUR FINAL SURVEY ONCE FINAL SURVEY HAS BEEN SUBMITTED AND APPROVED YOUR FIELD SURVEY WILL BE CONDUCTED. | |||
| U-CROSS CONNECTION | 03/27/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/22/2023 | APPROVED | EMADISON |
| Note: ** 03/22/23 CORRECTIONS MADE READY TO POUR IN THE EVENT OF RAIN RECHECK CULVERT AND COMPACTION ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL _______________________________________________________________________________________________________________________ 3/20/2023 - PREVIOUS INSPECTION NOTES **03/20/23 ALL CONCRETE OVER POUR AT GARAGE ABUTTMENT NEEDS TO BE CHIPPED AWAY MINIMUM OF 4" OF CONCRETE IN ALL AREAS ABOVE ROW ** NEED TO HAVE 12" FLAT ON BOTH SIDES OF CULVERT PIPE ** NEEDS TO BE A 4/1 SLOPE FROM HOUSE SIDE OF CULVERT. ** NEED TO REMOVE LARGE PALM STUMP AND ROOTS FROM POUR AREA WHICH WAS NOT LISTED IN PREVIOUS SPECTION 3/16/2023 - PREVIOUS INSPECTION NOTES **03/16/23 ALL CONCRETE OVER POUR AT GARAGE ABUTTMENT NEEDS TO BE CHIPPED AWAY MINIMUM OF 4" OF CONCRETE IN ALL AREAS ABOVE ROW CULVERT PIPE SHOULD BE FILLED AND COMPACTED HALFWAY UP PIPE AT SPRING LINE NEED TO HAVE 12" FLAT ON BOTH SIDES OF CULVERT PIPE NEEDS TO BE A 4/1 SLOPE FROM HOUSE SIDE OF CULVERT. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/20/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: **03/20/23 ALL CONCRETE OVER POUR AT GARAGE ABUTTMENT NEEDS TO BE CHIPPED AWAY MINIMUM OF 4" OF CONCRETE IN ALL AREAS ABOVE ROW ** NEED TO HAVE 12" FLAT ON BOTH SIDES OF CULVERT PIPE ** NEEDS TO BE A 4/1 SLOPE FROM HOUSE SIDE OF CULVERT. ** NEED TO REMOVE LARGE PALM STUMP AND ROOTS FROM POUR AREA WHICH WAS NOT LISTED IN PREVIOUS SPECTION ________________________________________________________________________________________________________________________ 3/16/2023 - PREVIOUS INSPECTION NOTES **03/16/23 ALL CONCRETE OVER POUR AT GARAGE ABUTTMENT NEEDS TO BE CHIPPED AWAY MINIMUM OF 4" OF CONCRETE IN ALL AREAS ABOVE ROW CULVERT PIPE SHOULD BE FILLED AND COMPACTED HALFWAY UP PIPE AT SPRING LINE NEED TO HAVE 12" FLAT ON BOTH SIDES OF CULVERT PIPE NEEDS TO BE A 4/1 SLOPE FROM HOUSE SIDE OF CULVERT. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/16/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: **03/16/23 ALL CONCRETE OVER POUR AT GARAGE ABUTTMENT NEEDS TO BE CHIPPED AWAY MINIMUM OF 4" OF CONCRETE IN ALL AREAS ABOVE ROW CULVERT PIPE SHOULD BE FILLED AND COMPACTED HALFWAY UP PIPE AT SPRING LINE NEED TO HAVE 12" FLAT ON BOTH SIDES OF CULVERT PIPE NEEDS TO BE A 4/1 SLOPE FROM HOUSE SIDE OF CULVERT. | |||
| ELECTRIC - EARLY POWER | 03/15/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 3/14/2023 - PREVIOUS INSPECTION NOTES 3-14-23 1. Microwave outlet needs to be safed off. outlet needs to completly covered so terminals can not be touched. | |||
| ELECTRIC - EARLY POWER | 03/14/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 3-14-23 1. Microwave outlet needs to be safed off. | |||
| GRAVITY SEWER TEST | 03/01/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 03/01/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 02/09/2023 | APPROVED | BTAYLOR |
| LATH/BRICK/ WATER BARRIER | 01/26/2023 | APPROVED | TSTAUFFACHER |
| Note: New inspection due to canceled inspection 12/29/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 11/28/2022 - PREVIOUS INSPECTION NOTES 11-28-22 Not ready. Workers on site. 12/22/22 ROOF SHEATHING/BRACES/TIES SHOULD BE PASSED BEFORE M.E.P ARE DONE 12-29-22 Wood sheathing at gables needs WEATHER RESISTANT BARRIER (TYVEC/TAPE/etc.) PER MANUFACTURER SPECS AND ASTM SPECS | |||
| ALL ROUGH | 01/03/2023 | APPROVED | BTAYLOR |
| LATH/BRICK/ WATER BARRIER | 01/03/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 12/29/2022 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 11/28/2022 - PREVIOUS INSPECTION NOTES 11-28-22 Not ready. Workers on site. 12/22/22 ROOF SHEATHING/BRACES/TIES SHOULD BE PASSED BEFORE M.E.P ARE DONE 12-29-22 Wood sheathing at gables needs WEATHER RESISTANT BARRIER (TYVEC/TAPE/etc.) PER MANUFACTURER SPECS AND ASTM SPECS | |||
| LATH/BRICK/ WATER BARRIER | 12/29/2022 | Disapproved - NO FEE | LMILLER |
| Note: Inspector Notes from Inspection 2460 11/28/2022 - PREVIOUS INSPECTION NOTES 11-28-22 Not ready. Workers on site. 12/22/22 ROOF SHEATHING/BRACES/TIES SHOULD BE PASSED BEFORE M.E.P ARE DONE 12-29-22 Wood sheathing at gables needs WEATHER RESISTANT BARRIER (TYVEC/TAPE/etc.) PER MANUFACTURER SPECS AND ASTM SPECS | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/22/2022 | APPROVED - AS NOTED | RMARTIN |
| Note: 11/28/2022 - PREVIOUS INSPECTION NOTES 11-28-22 Not ready. Workers on site. 12/22/22 ROOF SHEATHING/BRACES/TIES SHOULD BE PASSED BEFORE M.E.P ARE DONE | |||
| ELECTRIC-TUG | 12/14/2022 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 12/01/2022 | APPROVED | BTAYLOR |
| WALL SHEATHING | 11/28/2022 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/28/2022 | Disapproved - NO FEE | BTAYLOR |
| Note: 11-28-22 Not ready. Workers on site. | |||
| FOUND SURVEY APPROVED (OFFICE) | 11/22/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 11/16/2022 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 11/04/2022 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/03/2022 | APPROVED | BTAYLOR |
| WATER METER INSTALLATION REQUEST | 09/15/2022 | APPROVED | TCHURCHILL |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 02/08/2023 | 02/09/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/22/2022 | 11/22/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/22/2022 | 11/22/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/15/2022 | 07/20/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/15/2022 | 07/18/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/15/2022 | 07/15/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/12/2022 | 10/04/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/08/2022 | 07/12/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 07/08/2022 | 07/11/2022 |
| Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com | |||
| ELEC | COMPLETE | 07/08/2022 | 07/11/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/08/2022 | 07/12/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/08/2022 | 07/14/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/08/2022 | 07/11/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 07/08/2022 | 07/14/2022 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE PROPOSED ELEVATIONS ON ALL FOUR CORNERS OF HOUSE | |||
| ZON | COMPLETE | 07/08/2022 | 07/13/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/03/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/03/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/03/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/13/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/13/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/13/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/13/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 04/13/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 04/13/2023 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 07/26/2022 |
| IMPACT FEE FIRE | ¤388.65 | 07/26/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 07/26/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/26/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 07/26/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/26/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 07/26/2022 |
| SURCHARGE FS 533.721 | ¤6.54 | 07/26/2022 |
| SURCHARGE - FS 468.631 | ¤9.81 | 07/26/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/26/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/26/2022 |
| SW ENG PRE APRON | ¤30.00 | 07/26/2022 |
| CONNECTION FEES | ¤1,077.88 | 07/26/2022 |
| WATER- TURN ON | ¤25.00 | 07/26/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/26/2022 |
| INSPECTION - RESIDENTIAL | ¤577.50 | 07/26/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤163.80 | 07/26/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/26/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/26/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 07/26/2022 |
| SEWER CREDIT | (¤2,065.97) | 07/26/2022 |
| SEWER INSPECTION | ¤25.00 | 07/26/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 07/26/2022 |
| WATER CREDIT | (¤358.82) | 07/26/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 07/26/2022 |
| SITE PLAN 30 | ¤30.00 | 07/26/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤15,894.05 |