I want to search for...

Permit #2022070317

Permit Details

Status: COED

Parcel Id: 07-11-31-7030-00080-0020
CONDITIONED SPACE: 1215 sqft
GARAGE: 396 sqft
Total Square Footage: 1611 sqft
Block: 00080
Subdivision: 2154 - SECTION 30-ROYAL PALMS
Job Phone: 407-432-2344
Location Address: 25 RAELAND LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/26/2022
NOC: RECORDED
Applicant name: WADE GILMER JURNEY JR
Owner: NATIONAL HOME CORPORATION

Address

4850 TAMIAMI TRAIL NORTH

NAPLES, FL 34103

Lot: 0020
Contracted Stated Job Value: ¤198,291.00
Job Description: Single Family Residence
Type: CN

Contractor

NATIONAL HOME CORPORATION
Status Location Address Mailing Address State License Number Phone
INACTIVE

1080 HOLCOMB BRIDGE ROAD

,

BLDG 100 - 330

ROSWELL , GA 30076

CBC1257700 (Exp: 08/31/2026) 471-817-1259

Sub Contractors

DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JASON PATRICK RIBOCK
Status Location Address State License Number Phone
INACTIVE

620 E PINE ST

, 0

ES12001313 (Exp: 08/31/2026) 407-625-0257
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
RANDALL SCOTT ROSENFELD
Status Location Address State License Number Phone
ACTIVE

234 N WHITNEY ST

PALM COAST, FL 32084

CAC1816641 (Exp: 08/31/2026) 904-599-0082

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 06/30/2023 FINAL APPROVED JWALKER
Note: 6/29/2023 - PREVIOUS INSPECTION NOTES 6/29/23 BELOW LISTED CORRECTIONS HAVE NOT BEEN MADE. 6/27/2023 - PREVIOUS INSPECTION NOTES 6/27/23 Corrections listed below have not been made. 6/26/2023 - PREVIOUS INSPECTION NOTES 6/26/23 Energy calculations not onsite. Lock out not corrected. New inspection due to canceled inspection 5/19/2023 - PREVIOUS INSPECTION NOTES 1. Garge outlets are to be GFI protected. 2. Right side garage wall the outlet is pulling out of the wall. 3. The Heat pump breaker at the outdoor disconnect is a 30 amp the unit calls for a 25 amp max circuit breaker. 4. The smoke detectors are sounding a low battery or system trouble singnal and will need to be fully tested at the reinspection. 5. Please have a full set of approved energy calculations onsite. The set in the job box was incomplete, out of order, 6. The water heater lock out at the electrical panel is missing the locking device.
BLD - BUILDING FINAL 06/29/2023 Disapproved -FEE REQUIRED JWALKER
Note: 6/29/23 BELOW LISTED CORRECTIONS HAVE NOT BEEN MADE. 6/27/2023 - PREVIOUS INSPECTION NOTES 6/27/23 Corrections listed below have not been made. 6/26/2023 - PREVIOUS INSPECTION NOTES 6/26/23 Energy calculations not onsite. Lock out not corrected. New inspection due to canceled inspection 5/19/2023 - PREVIOUS INSPECTION NOTES 1. Garge outlets are to be GFI protected. 2. Right side garage wall the outlet is pulling out of the wall. 3. The Heat pump breaker at the outdoor disconnect is a 30 amp the unit calls for a 25 amp max circuit breaker. 4. The smoke detectors are sounding a low battery or system trouble singnal and will need to be fully tested at the reinspection. 5. Please have a full set of approved energy calculations onsite. The set in the job box was incomplete, out of order, 6. The water heater lock out at the electrical panel is missing the locking device.
BLD - BUILDING FINAL 06/27/2023 Disapproved -FEE REQUIRED JWALKER
Note: 6/27/23 Corrections listed below have not been made. 6/26/2023 - PREVIOUS INSPECTION NOTES 6/26/23 Energy calculations not onsite. Lock out not corrected. New inspection due to canceled inspection 5/19/2023 - PREVIOUS INSPECTION NOTES 1. Garge outlets are to be GFI protected. 2. Right side garage wall the outlet is pulling out of the wall. 3. The Heat pump breaker at the outdoor disconnect is a 30 amp the unit calls for a 25 amp max circuit breaker. 4. The smoke detectors are sounding a low battery or system trouble singnal and will need to be fully tested at the reinspection. 5. Please have a full set of approved energy calculations onsite. The set in the job box was incomplete, out of order, 6. The water heater lock out at the electrical panel is missing the locking device.
BLD - BUILDING FINAL 06/26/2023 Disapproved -FEE REQUIRED JWALKER
Note: 6/26/23 Energy calculations not onsite. Lock out not corrected. New inspection due to canceled inspection 5/19/2023 - PREVIOUS INSPECTION NOTES 1. Garge outlets are to be GFI protected. 2. Right side garage wall the outlet is pulling out of the wall. 3. The Heat pump breaker at the outdoor disconnect is a 30 amp the unit calls for a 25 amp max circuit breaker. 4. The smoke detectors are sounding a low battery or system trouble singnal and will need to be fully tested at the reinspection. 5. Please have a full set of approved energy calculations onsite. The set in the job box was incomplete, out of order, 6. The water heater lock out at the electrical panel is missing the locking device.
BLD - BUILDING FINAL 06/20/2023 CANCELLED BY APPLICANT WEB
Note: 5/19/2023 - PREVIOUS INSPECTION NOTES 1. Garge outlets are to be GFI protected. 2. Right side garage wall the outlet is pulling out of the wall. 3. The Heat pump breaker at the outdoor disconnect is a 30 amp the unit calls for a 25 amp max circuit breaker. 4. The smoke detectors are sounding a low battery or system trouble singnal and will need to be fully tested at the reinspection. 5. Please have a full set of approved energy calculations onsite. The set in the job box was incomplete, out of order, 6. The water heater lock out at the electrical panel is missing the locking device.
U -UTILITY RESIDENTIAL FINAL 06/20/2023 FINAL APPROVED LFITZGERALD
Note: 6/13/2023 - PREVIOUS INSPECTION NOTES change out square nut type sewervclean out at side of house tobflush mount/pep tankstill needing pumps-utility informed 5/19/2023 - PREVIOUS INSPECTION NOTES no pep panel or pumps in tank-city utility informed/change out sewer clean out cap to a flush type and lower flush to grades at side house location
U -UTILITY RESIDENTIAL FINAL 06/13/2023 Disapproved -FEE REQUIRED LFITZGERALD
Note: change out square nut type sewervclean out at side of house tobflush mount/pep tankstill needing pumps-utility informed 5/19/2023 - PREVIOUS INSPECTION NOTES no pep panel or pumps in tank-city utility informed/change out sewer clean out cap to a flush type and lower flush to grades at side house location
U -UTILITY RESIDENTIAL FINAL 05/19/2023 Disapproved - NO FEE LFITZGERALD
Note: no pep panel or pumps in tank-city utility informed/change out sewer clean out cap to a flush type and lower flush to grades at side house location
BLD - BUILDING FINAL 05/19/2023 Disapproved - NO FEE JWALKER
Note: 1. Garge outlets are to be GFI protected. 2. Right side garage wall the outlet is pulling out of the wall. 3. The Heat pump breaker at the outdoor disconnect is a 30 amp the unit calls for a 25 amp max circuit breaker. 4. The smoke detectors are sounding a low battery or system trouble singnal and will need to be fully tested at the reinspection. 5. Please have a full set of approved energy calculations onsite. The set in the job box was incomplete, out of order, 6. The water heater lock out at the electrical panel is missing the locking device.
ROW - FINAL APRON (AFTER POUR) 05/18/2023 APPROVED GBERTOLA
Note: CORRECTION WERE MADE AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW FIELD SURVEY /GRADING CERTIFICATION 05/18/2023 APPROVED GBERTOLA
Note: 5/18/23= FINAL SURVEY WAS NOT APPROVE BY STORMWATER INSPECTOR. AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW - STORMWATER FINAL 05/18/2023 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION EVERYTHING LOOK GOOD
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/15/2023 APPROVED BBEMBRY
Note: 5/10/2023 - PREVIOUS INSPECTION NOTES DRAINAGE IS IMPACTING THE LOTS THAT ARE ADJACENT TO YOUR LEFT AND RIGHT LOTS
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/10/2023 Disapproved - NO FEE PFLANAGAN
Note: DRAINAGE IS IMPACTING THE LOTS THAT ARE ADJACENT TO YOUR LEFT AND RIGHT LOTS
U - SEWER TIE IN 04/19/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U-CROSS CONNECTION 04/19/2023 APPROVED - AS NOTED LFITZGERALD
Note: no irrigation-no cross connection
ROW- PRE-APRON (PRE-POUR) 03/20/2023 APPROVED GBERTOLA
Note: 3/20/23=AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL _______________________________________________________________________________________________________________________ 3/17/2023 - PREVIOUS INSPECTION NOTES The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. SECTION 300.01 ROADSIDE SWALE AND CULVERT #3 CULVERT PIPE IS OUT OF TOLERANCE..PLEASE RESET THE CULVERT PIPE ACCORDING SWALE PLAN – Pipe Elevation: Driveway culverts are to be installed at the elevation indicatedin the swale plan within the tolerance stated on the swale plan with a slope not toexceed 0.10 feet against the drainage flow. It is the builder/owner's responsibility toconfirm elevations/locations of culvert placement. (A)(B)(C)(D) Citation(s): A.Land Development Code Technical Manual, Drawing 300.C (1)B.Land Development Code Technical Manual, Drawing 300.C (10)C.Land Development Code Technical Manual, Drawing 300.E (11)D.Land Development Code Technical Manual, Section 300.01 (C)(3)
ROW- PRE-APRON (PRE-POUR) 03/17/2023 Disapproved -FEE REQUIRED GBERTOLA
Note: The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. SECTION 300.01 ROADSIDE SWALE AND CULVERT #3 CULVERT PIPE IS OUT OF TOLERANCE..PLEASE RESET THE CULVERT PIPE ACCORDING SWALE PLAN – Pipe Elevation: Driveway culverts are to be installed at the elevation indicatedin the swale plan within the tolerance stated on the swale plan with a slope not toexceed 0.10 feet against the drainage flow. It is the builder/owner's responsibility toconfirm elevations/locations of culvert placement. (A)(B)(C)(D) Citation(s): A.Land Development Code Technical Manual, Drawing 300.C (1)B.Land Development Code Technical Manual, Drawing 300.C (10)C.Land Development Code Technical Manual, Drawing 300.E (11)D.Land Development Code Technical Manual, Section 300.01 (C)(3)
ELECTRIC - EARLY POWER 03/15/2023 APPROVED JWALKER
Note: 3/14/2023 - PREVIOUS INSPECTION NOTES Contractor used cable outlet cover protectors which have an exposed metal cable connector that could become engergized. Please install proper blank outlet covers to properly safe off.
GRAVITY SEWER TEST 03/14/2023 APPROVED - AS NOTED MGIBSON
Note: C/M NEEDS TO SCHEDUAL U-SEWER TIE IN FOR3/15/23, THIS WAS A VIRTUAL INSPECTION
ELECTRIC - EARLY POWER 03/14/2023 Disapproved - NO FEE JWALKER
Note: Contractor used cable outlet cover protectors which have an exposed metal cable connector that could become engergized. Please install proper blank outlet covers to properly safe off.
PEP TANK INSTALLATION REQUEST 03/14/2023 APPROVED TSCHWEERS
INSULATION 02/15/2023 APPROVED JWALKER
Note: 2/9/2023 - PREVIOUS INSPECTION NOTES 2/9/23 1. The return sizes listed below have not been corrected see duct drawing for correct sizes. Or submitt a revision to the building department for the as built. 1. The returns for all bedrooms are not the correct sizes. The returns cut above the bedroom doors cannot be exposed 2x4 and must be covered with metal track or a transfer grille. Ensure sizes match duct drawing. 2. The bathroom exhaust fan ducts have not been connected. Use correct 3" to 4" connector. 3. Install a nail plate at the AHU 6-2 wire at the top plate in the AHU closet.
INSULATION 02/09/2023 Disapproved -FEE REQUIRED JWALKER
Note: 2/9/23 1. The return sizes listed below have not been corrected see duct drawing for correct sizes. Or submitt a revision to the building department for the as built. 1. The returns for all bedrooms are not the correct sizes. The returns cut above the bedroom doors cannot be exposed 2x4 and must be covered with metal track or a transfer grille. Ensure sizes match duct drawing. 2. The bathroom exhaust fan ducts have not been connected. Use correct 3" to 4" connector. 3. Install a nail plate at the AHU 6-2 wire at the top plate in the AHU closet.
ALL ROUGH 02/02/2023 APPROVED - AS NOTED JWALKER
Note: 1. The returns for all bedrooms are not the correct sizes. The returns cut above the bedroom doors cannot be exposed 2x4 and must be covered with metal track or a transfer grille. Ensure sizes match duct drawing. 2. The bathroom exhaust fan ducts have not been connected. Use correct 3" to 4" connector. 3. Install a nail plate at the AHU 6-2 wire at the top plate in the AHU closet.
LATH/BRICK/ WATER BARRIER 01/11/2023 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/03/2023 APPROVED JWALKER
Note: 12/9/2022 - PREVIOUS INSPECTION NOTES Truss T9 left side missing 1 of 2 required heta straps. Truss EJ72 Heta straps are to have 9 fasteners per anchor. Truss T2 the heta missing fasteners. Cross bracing for center area of the trusses is not installed. See detail TB05 on page D2 of the prints. The continuous bottom chord bracing also not installed detail TB05. Rear hip roof has a missed row of nailing truss T1.
ROOF VALLEY & METAL 12/13/2022 APPROVED JWALKER
WALL SHEATHING 12/09/2022 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/09/2022 Disapproved - NO FEE JWALKER
Note: Truss T9 left side missing 1 of 2 required heta straps. Truss EJ72 Heta straps are to have 9 fasteners per anchor. Truss T2 the heta missing fasteners. Cross bracing for center area of the trusses is not installed. See detail TB05 on page D2 of the prints. The continuous bottom chord bracing also not installed detail TB05. Rear hip roof has a missed row of nailing truss T1.
FOUND SURVEY APPROVED (OFFICE) 11/28/2022 APPROVED TBAKER
TIE BEAM / LINTEL 11/23/2022 APPROVED DCUSHING
MONOLITHIC SLAB 11/18/2022 APPROVED DCUSHING
PLUMBING 1ST ROUGH UNDERGROUND 11/16/2022 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 11/01/2022 APPROVED CSTONE
ROW - DRAINAGE 10/25/2022 APPROVED GBERTOLA
Note: 10/25/22= CORRECTION WERE MADE i will remove the stop work on the city permit ....................................................................................................................................................................... 10/20/2022 - PREVIOUS INSPECTION NOTES 10/20/22= i spoke to the builder and ask mefor a couple days NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR WILL RETURN+10/25/22 ................................................................................................................................................................................................. 10/19/2022 - PREVIOUS INSPECTION NOTES 10/19/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR WILL RETURN+10/20/22 ................................................................................................................................................................................................................ 10/18/2022 - PREVIOUS INSPECTION NOTES 10/18/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR WILL RETURN+10/19/22 ................................................................................................................................................................................................................................... 10/17/2022 - PREVIOUS INSPECTION NOTES 10/17/22=need to open the front swale, NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR WILL RETURN+10/18/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 10/14/2022 - PREVIOUS INSPECTION NOTES THERE IS A PIPE ON SITE BUT NOT INSTALLED ------------------------------------------------------------------------- 10/13/2022 - PREVIOUS INSPECTION NOTES 10/13/22= STOP WORK ORDER IS IN EFFECT NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 10/14/22 10/12/2022 - PREVIOUS INSPECTION NOTES Drainage still not open. 10/11/2022 - PREVIOUS INSPECTION NOTES 10/11/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 10/12/22 PICTURES ATTACHED 10/10/2022 - PREVIOUS INSPECTION NOTES 10/10/22=NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. STOP WORK ORDER IS IN EFFECT inspector be back 10/11/22 10/7/2022 - NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW 10/7/22=MONDAY 10/10/22= I WILL ADDING STOP WORK ORDER ON THIS CONSTRUCTION SITE
ROW - DRAINAGE 10/20/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 10/20/22= i spoke to the builder and ask mefor a couple days NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR WILL RETURN+10/25/22 ................................................................................................................................................................................................. 10/19/2022 - PREVIOUS INSPECTION NOTES 10/19/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR WILL RETURN+10/20/22 ................................................................................................................................................................................................................ 10/18/2022 - PREVIOUS INSPECTION NOTES 10/18/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR WILL RETURN+10/19/22 ................................................................................................................................................................................................................................... 10/17/2022 - PREVIOUS INSPECTION NOTES 10/17/22=need to open the front swale, NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR WILL RETURN+10/18/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 10/14/2022 - PREVIOUS INSPECTION NOTES THERE IS A PIPE ON SITE BUT NOT INSTALLED ------------------------------------------------------------------------- 10/13/2022 - PREVIOUS INSPECTION NOTES 10/13/22= STOP WORK ORDER IS IN EFFECT NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 10/14/22 10/12/2022 - PREVIOUS INSPECTION NOTES Drainage still not open. 10/11/2022 - PREVIOUS INSPECTION NOTES 10/11/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 10/12/22 PICTURES ATTACHED 10/10/2022 - PREVIOUS INSPECTION NOTES 10/10/22=NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. STOP WORK ORDER IS IN EFFECT inspector be back 10/11/22 10/7/2022 - NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW 10/7/22=MONDAY 10/10/22= I WILL ADDING STOP WORK ORDER ON THIS CONSTRUCTION SITE
ROW - DRAINAGE 10/19/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 10/19/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR WILL RETURN+10/20/22 ................................................................................................................................................................................................................ 10/18/2022 - PREVIOUS INSPECTION NOTES 10/18/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR WILL RETURN+10/19/22 ................................................................................................................................................................................................................................... 10/17/2022 - PREVIOUS INSPECTION NOTES 10/17/22=need to open the front swale, NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR WILL RETURN+10/18/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 10/14/2022 - PREVIOUS INSPECTION NOTES THERE IS A PIPE ON SITE BUT NOT INSTALLED ------------------------------------------------------------------------- 10/13/2022 - PREVIOUS INSPECTION NOTES 10/13/22= STOP WORK ORDER IS IN EFFECT NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 10/14/22 10/12/2022 - PREVIOUS INSPECTION NOTES Drainage still not open. 10/11/2022 - PREVIOUS INSPECTION NOTES 10/11/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 10/12/22 PICTURES ATTACHED 10/10/2022 - PREVIOUS INSPECTION NOTES 10/10/22=NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. STOP WORK ORDER IS IN EFFECT inspector be back 10/11/22 10/7/2022 - NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW 10/7/22=MONDAY 10/10/22= I WILL ADDING STOP WORK ORDER ON THIS CONSTRUCTION SITE
ROW - DRAINAGE 10/18/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 10/18/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR WILL RETURN+10/19/22 ................................................................................................................................................................................................................................... 10/17/2022 - PREVIOUS INSPECTION NOTES 10/17/22=need to open the front swale, NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR WILL RETURN+10/18/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 10/14/2022 - PREVIOUS INSPECTION NOTES THERE IS A PIPE ON SITE BUT NOT INSTALLED ------------------------------------------------------------------------- 10/13/2022 - PREVIOUS INSPECTION NOTES 10/13/22= STOP WORK ORDER IS IN EFFECT NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 10/14/22 10/12/2022 - PREVIOUS INSPECTION NOTES Drainage still not open. 10/11/2022 - PREVIOUS INSPECTION NOTES 10/11/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 10/12/22 PICTURES ATTACHED 10/10/2022 - PREVIOUS INSPECTION NOTES 10/10/22=NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. STOP WORK ORDER IS IN EFFECT inspector be back 10/11/22 10/7/2022 - NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW 10/7/22=MONDAY 10/10/22= I WILL ADDING STOP WORK ORDER ON THIS CONSTRUCTION SITE
ROW - DRAINAGE 10/17/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 10/17/22=need to open the front swale, NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR WILL RETURN+10/18/22 ,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,,, 10/14/2022 - PREVIOUS INSPECTION NOTES THERE IS A PIPE ON SITE BUT NOT INSTALLED ------------------------------------------------------------------------- 10/13/2022 - PREVIOUS INSPECTION NOTES 10/13/22= STOP WORK ORDER IS IN EFFECT NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 10/14/22 10/12/2022 - PREVIOUS INSPECTION NOTES Drainage still not open. 10/11/2022 - PREVIOUS INSPECTION NOTES 10/11/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 10/12/22 PICTURES ATTACHED 10/10/2022 - PREVIOUS INSPECTION NOTES 10/10/22=NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. STOP WORK ORDER IS IN EFFECT inspector be back 10/11/22 10/7/2022 - NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW 10/7/22=MONDAY 10/10/22= I WILL ADDING STOP WORK ORDER ON THIS CONSTRUCTION SITE
ROW - DRAINAGE 10/14/2022 Disapproved -FEE REQUIRED PFLANAGAN
Note: THERE IS A PIPE ON SITE BUT NOT INSTALLED ------------------------------------------------------------------------- 10/13/2022 - PREVIOUS INSPECTION NOTES 10/13/22= STOP WORK ORDER IS IN EFFECT NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 10/14/22 10/12/2022 - PREVIOUS INSPECTION NOTES Drainage still not open. 10/11/2022 - PREVIOUS INSPECTION NOTES 10/11/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 10/12/22 PICTURES ATTACHED 10/10/2022 - PREVIOUS INSPECTION NOTES 10/10/22=NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. STOP WORK ORDER IS IN EFFECT inspector be back 10/11/22 10/7/2022 - NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW 10/7/22=MONDAY 10/10/22= I WILL ADDING STOP WORK ORDER ON THIS CONSTRUCTION SITE
ROW - DRAINAGE 10/13/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 10/13/22= STOP WORK ORDER IS IN EFFECT NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 10/14/22 10/12/2022 - PREVIOUS INSPECTION NOTES Drainage still not open. 10/11/2022 - PREVIOUS INSPECTION NOTES 10/11/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 10/12/22 PICTURES ATTACHED 10/10/2022 - PREVIOUS INSPECTION NOTES 10/10/22=NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. STOP WORK ORDER IS IN EFFECT inspector be back 10/11/22 10/7/2022 - NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW 10/7/22=MONDAY 10/10/22= I WILL ADDING STOP WORK ORDER ON THIS CONSTRUCTION SITE
ROW - DRAINAGE 10/12/2022 Disapproved -FEE REQUIRED RGROSS
Note: Drainage still not open. 10/11/2022 - PREVIOUS INSPECTION NOTES 10/11/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 10/12/22 PICTURES ATTACHED 10/10/2022 - PREVIOUS INSPECTION NOTES 10/10/22=NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. STOP WORK ORDER IS IN EFFECT inspector be back 10/11/22 10/7/2022 - NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW 10/7/22=MONDAY 10/10/22= I WILL ADDING STOP WORK ORDER ON THIS CONSTRUCTION SITE
ROW - DRAINAGE 10/11/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 10/11/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 10/12/22 PICTURES ATTACHED 10/10/2022 - PREVIOUS INSPECTION NOTES 10/10/22=NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. STOP WORK ORDER IS IN EFFECT inspector be back 10/11/22 10/7/2022 - NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW 10/7/22=MONDAY 10/10/22= I WILL ADDING STOP WORK ORDER ON THIS CONSTRUCTION SITE
ROW - DRAINAGE 10/10/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 10/10/22=NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW BUILDER NEEDS TO OPEN DRIANAGE ACROSS THE FRONT SWALE ROW NEED A PIPE ON THE GROUND MINIMUN 12 INCH, SWALE NEED TO BE OPENED, MAINTAINED AT THE END OF EVERY DAY. STOP WORK ORDER IS IN EFFECT inspector be back 10/11/22 10/7/2022 - NEED TO MOVE THE PORTA POTTY INSIDE YOUR PROPERTY OUT OF THE ROW 10/7/22=MONDAY 10/10/22= I WILL ADDING STOP WORK ORDER ON THIS CONSTRUCTION SITE
ROW - DRAINAGE 10/07/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 10/7/22=MONDAY I WILL ADDING STOP WORK ORDER ON THIS CONSTRUCTION SITE
ROW - DRAINAGE 10/05/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 10/5/22=NOTHING HAS BEEN DONE SINCE THE LAST INSPECTION, NEED TO READ THE INPECTOR NOTE INSPECTOR BE BACK ON 10/7/22 '''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''''' 9/28/2022 - PREVIOUS INSPECTION NOTES 9/28/2022 - PREVIOUS INSPECTION NOTES Swale draiange across the front of the construction site is blocked. Drainage needs opened ASAP
ROW - DRAINAGE 09/30/2022 Disapproved -FEE REQUIRED GBERTOLA
Note: 9/28/2022 - PREVIOUS INSPECTION NOTES Swale draiange across the front of the construction site is blocked. Drainage needs opened ASAP
ROW - DRAINAGE 09/28/2022 Disapproved -FEE REQUIRED RGROSS
Note: Swale draiange across the front of the construction site is blocked. Drainage needs opened ASAP

Review History

Department Status Date In Date Out
MECH COMPLETE 02/14/2023 02/14/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/28/2022 11/28/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 11/28/2022 11/28/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM No zoning changes
BADMIN INFORMATION 11/14/2022 11/14/2022
Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM INCORRECT FOUNDATION SURVEY ADDRESS
SW1 COMPLETE 07/15/2022 07/20/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/15/2022 07/18/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 07/15/2022 07/20/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SW1 HOLD 07/13/2022 07/13/2022
Note: Held By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM need all proposed elevation at 20 ft intervals across front of property
SWALE COMPLETE 07/12/2022 10/05/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 07/08/2022 07/12/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 07/08/2022 07/11/2022
Note: Released By: LISA ASBILL - - lasbill@palmcoastgov.com
ELEC COMPLETE 07/08/2022 07/11/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/08/2022 07/12/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 07/08/2022 07/14/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 07/08/2022 07/11/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 07/08/2022 07/13/2022
Note: Held By: GABRIEL BERTOLA - (386)225-3840 - GBERTOLA@PALMCOASTGOV.COM The Lot Grading Plan must identify how any low spots on the property(including property lines) are drained. (J)
ZON COMPLETE 07/08/2022 07/14/2022
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 06/30/2023
REINSPECTION RESIDENTIAL ¤40.00 06/30/2023
REINSPECTION RESIDENTIAL ¤40.00 06/30/2023
REINSPECTION FEE ¤40.00 06/30/2023
PLAN REVIEW - REVISION ¤32.50 04/13/2023
REINSPECTION RESIDENTIAL ¤40.00 04/13/2023
SW ENG REINSPECTION 30 ¤30.00 04/13/2023
CONTRACTOR CHANGE ¤20.00 04/13/2023
CONTRACTOR CHANGE ¤40.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG - INSPECTION 20 ¤20.00 04/13/2023
SW ENG INSPECTION 80 ¤80.00 07/26/2022
SW ENG PRE APRON ¤30.00 07/26/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 07/26/2022
IMPACT FEE FIRE ¤388.65 07/26/2022
IMPACT FEE PARKS ¤1,455.13 07/26/2022
IMPACT FEE SCHOOL ¤3,600.00 07/26/2022
IMPACT FEE TRANSPORTATION ¤1,764.00 07/26/2022
WATER -IRRIGATION INSPECTION ¤25.00 07/26/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 07/26/2022
CONNECTION FEES ¤1,077.88 07/26/2022
WATER- TURN ON ¤25.00 07/26/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/26/2022
INSPECTION - RESIDENTIAL ¤547.25 07/26/2022
PLAN REVIEW - RESIDENTIAL ¤155.22 07/26/2022
SW ENG - REVIEW 20 ¤20.00 07/26/2022
SW ENG RES REVIEW 200 ¤200.00 07/26/2022
3% TRANS IMPACT FEE CREDIT (¤52.92) 07/26/2022
SEWER CREDIT (¤1,147.00) 07/26/2022
SEWER INSPECTION ¤25.00 07/26/2022
SEWER CAPITAL FACILITY ¤4,939.76 07/26/2022
WATER CAPITAL FACILITY FEE ¤3,626.50 07/26/2022
SITE PLAN 30 ¤30.00 07/26/2022
SURCHARGE FS 533.721 ¤6.23 07/26/2022
SURCHARGE - FS 468.631 ¤9.34 07/26/2022
SW ENG - FOUNDATION SURVEY ¤20.00 07/26/2022
Fees Total Due: ¤0.00 Total Paid: ¤17,402.23