Permit #2022070431
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00140-0050 |
| CONDITIONED SPACE: 1906 sqft |
| GARAGE: 400 sqft |
| OPENED PORCH (WITH ROOF) : 20 sqft |
| Total Square Footage: 2326 sqft |
| Block: 00140 |
| Subdivision: 2211 - SECTION 59-SEMINOLE PARK |
| Job Phone: 407-432-2344 |
| Location Address: 4 SEA SHIP PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/01/2022 |
| NOC: RECORDED |
| Applicant name: WADE GILMER JURNEY JR |
| Owner: NATIONAL HOME CORPORATION |
|
Address 4850 TAMIAMI TRAIL N NAPLES, FL 34103 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤239,639.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
NATIONAL HOME CORPORATION
| Status | Location Address | Mailing Address | State License Number | Phone |
| INACTIVE |
1080 HOLCOMB BRIDGE ROAD , |
BLDG 100 - 330 ROSWELL , GA 30076 |
CBC1257700 (Exp: 08/31/2026) | 471-817-1259 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/02/2023 | FINAL APPROVED | MKRASKI |
| BLD - BUILDING FINAL | 05/01/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 4/26/2023 - PREVIOUS INSPECTION NOTES 4-26-23 1. Bedroom down stairs outlet have open grounds. 5-1-23 1. Bedroom down stairs outlet have open grounds. | |||
| U -UTILITY RESIDENTIAL FINAL | 05/01/2023 | FINAL APPROVED | JHARDING |
| Note: 4/25/2023 - PREVIOUS INSPECTION NOTES Not ready. | |||
| ROW - STORMWATER FINAL | 04/27/2023 | APPROVED | PFLANAGAN |
| Note: ALL CORRECTION MADE ----------------------------------------------------------------------- 4/26/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN DIRT OUT OF CULVERT PIPE 2) NEED TO PICK UP ALL TRASH AND CONSTRCTION DEBRIS FROM LOT AND VACANT TO THE RIGHT OF YOUR 3) NEED TO REMOVE FORM BOARD FROM BACK ENTRY WAY | |||
| U -UTILITY RESIDENTIAL FINAL | 04/26/2023 | CANCELLED BY APPLICANT | JHARDING |
| Note: Not ready. | |||
| ROW - STORMWATER FINAL | 04/26/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO CLEAN DIRT OUT OF CULVERT PIPE 2) NEED TO PICK UP ALL TRASH AND CONSTRCTION DEBRIS FROM LOT AND VACANT TO THE RIGHT OF YOUR 3) NEED TO REMOVE FORM BOARD FROM BACK ENTRY WAY | |||
| BLD - BUILDING FINAL | 04/26/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 4-26-23 1. Bedroom down stairs outlet have open grounds. | |||
| ROW - FINAL APRON (AFTER POUR) | 04/25/2023 | APPROVED | PFLANAGAN |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/25/2023 | APPROVED | PFLANAGAN |
| Note: 4/21/2023 - PREVIOUS INSPECTION NOTES 1) ALL SOD ELEVATIONS AGAINST THE HOUSE NEED TO BE 4" BELOW FFE 2) THE RIGHT SIDE DRAINAGE NEED TO BE A COMMON SWALE AT THE PROPERTY LINE DO TO THE VACANT | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/25/2023 | APPROVED | PFLANAGAN |
| ROW- PROJECT STATUS | 04/24/2023 | APPROVED | PFLANAGAN |
| Note: MEET GRADE GUY OUT TO LOOK AT GRADE OF COMMON SWALE ON RIGHT | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/21/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) ALL SOD ELEVATIONS AGAINST THE HOUSE NEED TO BE 4" BELOW FFE 2) THE RIGHT SIDE DRAINAGE NEED TO BE A COMMON SWALE AT THE PROPERTY LINE DO TO THE VACANT | |||
| U - SEWER TIE IN | 04/10/2023 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: MISSED INSPECTION, TAP COVERED UP AND GRADED | |||
| U-CROSS CONNECTION | 04/10/2023 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW- PRE-APRON (PRE-POUR) | 03/20/2023 | APPROVED | EMADISON |
| Note: ** 03/20/23 CORRECTIONS MADE READY TO POUR IN THE EVENT OF RAIN RECHECK ELEVATION AND COMPACTION ** MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ______________________________________________________________________________________________________________________ 3/16/2023 - PREVIOUS INSPECTION NOTES ** 03/16/23 NEEDS TO BE A MINIMUM OF 6" DEPTH ACROSS FRONT EDGE OF ROAD | |||
| ROW- PRE-APRON (PRE-POUR) | 03/16/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: ** 03/16/23 NEEDS TO BE A MINIMUM OF 6" DEPTH ACROSS FRONT EDGE OF ROAD | |||
| ELECTRIC - EARLY POWER | 03/15/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 3/14/2023 - PREVIOUS INSPECTION NOTES 3-14-23 1. Outlet on backside of house needs to be safed off. 3-15-23 1. Emailed FPl at 12:38. | |||
| ELECTRIC - EARLY POWER | 03/14/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 3-14-23 1. Outlet on backside of house needs to be safed off. | |||
| ELECTRIC - EARLY POWER | 02/22/2023 | CANCELLED BY APPLICANT | WEB |
| U - SEWER TIE IN | 02/22/2023 | CANCELLED BY APPLICANT | WEB |
| ROW- PRE-APRON (PRE-POUR) | 02/22/2023 | CANCELLED BY APPLICANT | WEB |
| PEP TANK INSTALLATION REQUEST | 02/22/2023 | APPROVED | TSCHWEERS |
| U-CROSS CONNECTION | 02/22/2023 | CANCELLED BY APPLICANT | WEB |
| INSULATION | 02/09/2023 | APPROVED | BTAYLOR |
| ALL ROUGH | 02/01/2023 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2460 1/4/2023 - PREVIOUS INSPECTION NOTES 1-4-23 1. Second floor strapping not started. Need to read detail pages. 01/26/2023-Load bearing wall downstairs calls for hard nails or case hards since there is no uplift. Check at all rough | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/26/2023 | APPROVED - AS NOTED | TSTAUFFACHER |
| Note: 1/4/2023 - PREVIOUS INSPECTION NOTES 1-4-23 1. Second floor strapping not started. Need to read detail pages. 01/26/2023-Load bearing wall downstairs calls for hard nails or case hards since there is no uplift. Check at all rough | |||
| LATH/BRICK/ WATER BARRIER | 01/13/2023 | APPROVED | BTAYLOR |
| Note: 1/11/2023 - PREVIOUS INSPECTION NOTES 1-11-23 1. Holes on right side and rear need lath or foam to fill. | |||
| LATH/BRICK/ WATER BARRIER | 01/11/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 1-11-23 1. Holes on right side and rear need lath or foam to fill. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/04/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 1-4-23 1. Second floor strapping not started. Need to read detail pages. | |||
| ROOF VALLEY & METAL | 01/03/2023 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/03/2023 | CANCELLED BY APPLICANT | WEB |
| ELECTRIC-TUG | 12/15/2022 | APPROVED | BTAYLOR |
| WALL SHEATHING | 12/13/2022 | APPROVED | BTAYLOR |
| TIE BEAM / LINTEL | 11/17/2022 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 11/15/2022 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 11/08/2022 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/04/2022 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 11/04/2022 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 09/20/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 04/20/2023 | 04/20/2023 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM SUBMIT FBC 2020 BLOWER DOOR TEST FORM | |||
| MECH | COMPLETE | 02/08/2023 | 02/09/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/14/2022 | 11/15/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/14/2022 | 11/14/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/21/2022 | 07/21/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/13/2022 | 10/17/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/12/2022 | 07/15/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 07/12/2022 | 07/13/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | COMPLETE | 07/12/2022 | 07/12/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/12/2022 | 07/13/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/12/2022 | 07/13/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/12/2022 | 07/12/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Orientation of Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition | |||
| SW1 | COMPLETE | 07/12/2022 | 07/18/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/12/2022 | 07/18/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/03/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/03/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/13/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/13/2023 |
| CONTRACTOR CHANGE | ¤40.00 | 04/13/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 04/13/2023 |
| REINSPECTION FEE | ¤40.00 | 04/13/2023 |
| SURCHARGE FS 533.721 | ¤7.38 | 08/01/2022 |
| SURCHARGE - FS 468.631 | ¤11.08 | 08/01/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/01/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/01/2022 |
| SW ENG PRE APRON | ¤30.00 | 08/01/2022 |
| WATER- TURN ON | ¤25.00 | 08/01/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/01/2022 |
| INSPECTION - RESIDENTIAL | ¤660.00 | 08/01/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤187.20 | 08/01/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 08/01/2022 |
| IMPACT FEE FIRE | ¤388.65 | 08/01/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 08/01/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 08/01/2022 |
| IMPACT FEE TRANSPORTATION | ¤1,764.00 | 08/01/2022 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/01/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 08/01/2022 |
| CONNECTION FEES | ¤1,077.88 | 08/01/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/01/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/01/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤52.92) | 08/01/2022 |
| SEWER CREDIT | (¤1,342.00) | 08/01/2022 |
| SEWER INSPECTION | ¤25.00 | 08/01/2022 |
| SEWER CAPITAL FACILITY | ¤4,939.76 | 08/01/2022 |
| WATER CAPITAL FACILITY FEE | ¤3,626.50 | 08/01/2022 |
| SITE PLAN 30 | ¤30.00 | 08/01/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤16,954.85 |