Permit #2022070492
Permit Details
Status: COED
| Parcel Id: 48-11-31-1710-00000-0380 |
| GARAGE: 1214 sqft |
| CONDITIONED SPACE: 4040 sqft |
| SCREEN PORCH (SOLID ROOF) : 860 sqft |
| OPENED PORCH (WITH ROOF) : 80 sqft |
| Total Square Footage: 6194 sqft |
| Block: 00000 |
| Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II |
| Job Phone: 386-445-2012 |
| Location Address: 4 SCARLET OAK CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/27/2022 |
| NOC: RECORDED |
| Applicant name: JOHN NICHOLAS CORDASCI |
| Owner: FORBES ALAN & SUSAN H&W |
|
Address 2 MIDDEN LANE PALM COAST, FL 32137 |
| Lot: 0380 |
| Contracted Stated Job Value: ¤728,581.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SKYWAY BUILDERS INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 354786 PALM COAST, FL 32135 |
CBC1263769 (Exp: 08/31/2024) | 386-445-2012 |
Sub Contractors
MARK JOHN LUTCZA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
26 ROYAL LEAF LANE PALM COAST, FL 32164 |
EC13005145 (Exp: 08/31/2026) | 386-586-0770 |
RICHARD GARY WILSON JR
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
1504 OLD MOODY BLVD BUNNELL, FL 32110 |
UNIT 6 BUNNELL, FL 32110 |
CAC1817645 (Exp: 08/31/2026) | 386-586-6290 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 11/13/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/13/23 INSPECTORS NOTESPOKE WITH JOHN AND DETERMINED THAT THE EXCAVATED AREA WAS DONE BY THE POOL COMPANY TO INSTALL A GAS TANK FOR THE POOL SYSTEM. THEY WILL BE RESPONSIBLE FOR REPAIRING, FILLING IN, SODDDING AND GRADING THE EXCAVATED AREA AS A CONDITION FOR ROW FINAL PASSAGE. OTHER CORRECTIONS MADE. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. __________________________________________________________________________________________________________________________ 11/9/2023 - PREVIOUS INSPECTION NOTES 11/09/23 Need to fix washout off the rear left structure corner going to property line. You will need to have the excavated area repaired and regraded to flow. You need to fix the broken chunk of curb. you will need to sod the rear property line wher it is bare all the way over to the left property line. See photos for reference The right side of the property line needs one additional line of sod to extend all the way to the end of the property, next to the pine needles. There's a crack on the right side of the Curb and GUTTER, and two holes need to be repaired in front of the driveway with a hot patch. | |||
| U -UTILITY RESIDENTIAL FINAL | 11/09/2023 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 11/09/2023 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 11/09/23 Need to fix washout off the rear left structure corner going to property line. You will need to have the excavated area repaired and regraded to flow. You need to fix the broken chunk of curb. you will need to sod the rear property line wher it is bare all the way over to the left property line. See photos for reference The right side of the property line needs one additional line of sod to extend all the way to the end of the property, next to the pine needles. There's a crack on the right side of the Curb and GUTTER, and two holes need to be repaired in front of the driveway with a hot patch. | |||
| ROW - FINAL APRON (AFTER POUR) | 11/09/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/09/23 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. Curb will need to be fixed before ROW final passage | |||
| BLD - BUILDING FINAL | 11/09/2023 | FINAL APPROVED | BTAYLOR |
| U-CROSS CONNECTION | 11/09/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: reclaim irrigation-no cross connection | |||
| ELEVATION CERTIFICATE-FINAL APPROVAL | 10/24/2023 | APPROVED - AS NOTED | JMYERS |
| Note: The Final elevation certificate has been approved. Any EC signed after 11/1/23 must be on the new form. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 10/24/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| FINAL SURVEY (OFFICE USE ONLY) | 10/23/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| FINAL SURVEY (OFFICE USE ONLY) | 10/20/2023 | Disapproved - NO FEE | GBERTOLA |
| ROW- PRE-APRON (PRE-POUR) | 08/18/2023 | APPROVED | PFLANAGAN |
| Note: READY FOR PAVERS ------------------------------------------------------------------- 8/1/2023 - PREVIOUS INSPECTION NOTES THIS DRIVEWAY WAS WIDEN SO HAD TO DO NEW PRE POUR READY TO POUR PAVER RESTRAINTS, BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEED TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ---------------------------------------------------------------------------------------------------------- 7/31/2023 - PREVIOUS INSPECTION NOTES CANCELLED DO TO WATER IN POURING AREA -------------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES CANCELLING DO TO NOT READY FOR INSPECTION WATER IN FOOTER AND APRON --------------------------------------------------------------------------------- 7/6/2023 - PREVIOUS INSPECTION NOTES READY TO POUR PAVER RESTRAINTS, CURBING AND APRON ONLY. ALL CONCRETE NEED TO BE 3000PSI WITH FIBER TO MEET CITY'S STARDARTS. BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEED TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/17/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 8/1/2023 - PREVIOUS INSPECTION NOTES THIS DRIVEWAY WAS WIDEN SO HAD TO DO NEW PRE POUR READY TO POUR PAVER RESTRAINTS, BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEED TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ---------------------------------------------------------------------------------------------------------- 7/31/2023 - PREVIOUS INSPECTION NOTES CANCELLED DO TO WATER IN POURING AREA -------------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES CANCELLING DO TO NOT READY FOR INSPECTION WATER IN FOOTER AND APRON --------------------------------------------------------------------------------- 7/6/2023 - PREVIOUS INSPECTION NOTES READY TO POUR PAVER RESTRAINTS, CURBING AND APRON ONLY. ALL CONCRETE NEED TO BE 3000PSI WITH FIBER TO MEET CITY'S STARDARTS. BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEED TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC - EARLY POWER | 08/08/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 7/19/2023 - PREVIOUS INSPECTION NOTES 8-8-23 1. Emailed FPL at 9:34. | |||
| ROW- PRE-APRON (PRE-POUR) | 08/01/2023 | PARTIALLY APPROVED | PFLANAGAN |
| Note: THIS DRIVEWAY WAS WIDEN SO HAD TO DO NEW PRE POUR READY TO POUR PAVER RESTRAINTS, BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEED TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ---------------------------------------------------------------------------------------------------------- 7/31/2023 - PREVIOUS INSPECTION NOTES CANCELLED DO TO WATER IN POURING AREA -------------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES CANCELLING DO TO NOT READY FOR INSPECTION WATER IN FOOTER AND APRON --------------------------------------------------------------------------------- 7/6/2023 - PREVIOUS INSPECTION NOTES READY TO POUR PAVER RESTRAINTS, CURBING AND APRON ONLY. ALL CONCRETE NEED TO BE 3000PSI WITH FIBER TO MEET CITY'S STARDARTS. BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEED TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PAVER RESTRAINTS | 08/01/2023 | APPROVED | PFLANAGAN |
| Note: READY TO POUR PAVER RESTRAINTS --------------------------------------------------------------------------- 7/31/2023 - PREVIOUS INSPECTION NOTES CANCELLED DO TO WATER ION POURING AREA ---------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES CANCELLING DO TO NOT READY FOR INSPECTION WATER IN FOOTER AND APRON | |||
| ROW- PAVER RESTRAINTS | 07/31/2023 | CANCELLED BY APPLICANT | PFLANAGAN |
| Note: CANCELLED DO TO WATER ION POURING AREA ---------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES CANCELLING DO TO NOT READY FOR INSPECTION WATER IN FOOTER AND APRON | |||
| ROW- PRE-APRON (PRE-POUR) | 07/31/2023 | CANCELLED BY APPLICANT | PFLANAGAN |
| Note: CANCELLED DO TO WATER IN POURING AREA -------------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES CANCELLING DO TO NOT READY FOR INSPECTION WATER IN FOOTER AND APRON --------------------------------------------------------------------------------- 7/6/2023 - PREVIOUS INSPECTION NOTES READY TO POUR PAVER RESTRAINTS, CURBING AND APRON ONLY. ALL CONCRETE NEED TO BE 3000PSI WITH FIBER TO MEET CITY'S STARDARTS. BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEED TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/28/2023 | CANCELLED BY APPLICANT | PFLANAGAN |
| Note: CANCELLING DO TO NOT READY FOR INSPECTION WATER IN FOOTER AND APRON --------------------------------------------------------------------------------- 7/6/2023 - PREVIOUS INSPECTION NOTES READY TO POUR PAVER RESTRAINTS, CURBING AND APRON ONLY. ALL CONCRETE NEED TO BE 3000PSI WITH FIBER TO MEET CITY'S STARDARTS. BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEED TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PAVER RESTRAINTS | 07/28/2023 | CANCELLED BY APPLICANT | PFLANAGAN |
| Note: CANCELLING DO TO NOT READY FOR INSPECTION WATER IN FOOTER AND APRON | |||
| GRAVITY SEWER TEST | 07/21/2023 | APPROVED | AGAETANO |
| U - SEWER TIE IN | 07/21/2023 | APPROVED | AGAETANO |
| ELECTRIC-TUG | 07/20/2023 | APPROVED | AGAETANO |
| ELECTRIC - EARLY POWER | 07/19/2023 | CANCELLED BY APPLICANT | AGAETANO |
| ROW- PAVER RESTRAINTS | 07/06/2023 | APPROVED - AS NOTED | PFLANAGAN |
| Note: PAVER RESTRAINTS LOOK GOOD AT THIS TIME | |||
| ROW- PRE-APRON (PRE-POUR) | 07/06/2023 | PARTIALLY APPROVED | PFLANAGAN |
| Note: READY TO POUR PAVER RESTRAINTS, CURBING AND APRON ONLY. ALL CONCRETE NEED TO BE 3000PSI WITH FIBER TO MEET CITY'S STARDARTS. BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEED TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 07/05/2023 | CANCELLED BY APPLICANT | WEB |
| ROW- PAVER RESTRAINTS | 07/05/2023 | CANCELLED BY APPLICANT | WEB |
| INSULATION | 05/05/2023 | APPROVED | TSTAUFFACHER |
| LATH/BRICK/ WATER BARRIER | 05/05/2023 | APPROVED | TSTAUFFACHER |
| ALL ROUGH | 04/24/2023 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/21/2023 | APPROVED | TSTAUFFACHER |
| Note: 1/26/2023 - PREVIOUS INSPECTION NOTES Missing bearing post under double truss pre plans Load bearing walls missing SP4s on jack studs per detail Bearing wall near side door left side missing SP top and bottom Truss engineering and decking is approved. | |||
| ROOF VALLEY & METAL | 01/26/2023 | APPROVED | TSTAUFFACHER |
| WALL SHEATHING | 01/26/2023 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/26/2023 | Disapproved - NO FEE | TSTAUFFACHER |
| Note: Missing bearing post under double truss pre plans Load bearing walls missing SP4s on jack studs per detail Bearing wall near side door left side missing SP top and bottom Truss engineering and decking is approved. | |||
| ELEV CERT-FOUNDATION APPROVAL | 11/15/2022 | APPROVED | JMYERS |
| FOUND SURVEY APPROVED (OFFICE) | 11/15/2022 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 11/04/2022 | APPROVED | LMILLER |
| MONOLITHIC SLAB | 10/18/2022 | APPROVED | AGAETANO |
| Note: 10/17/2022 - PREVIOUS INSPECTION NOTES 10/14/2022 - PREVIOUS INSPECTION NOTES 10-17-2022 Compaction test not on site. | |||
| MONOLITHIC SLAB | 10/17/2022 | Disapproved - NO FEE | AGAETANO |
| Note: 10/14/2022 - PREVIOUS INSPECTION NOTES 10-17-2022 Compaction test not on site. | |||
| MONOLITHIC SLAB | 10/14/2022 | CANCELLED BY APPLICANT | AGAETANO |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/12/2022 | APPROVED | DCUSHING |
| WATER METER INSTALLATION REQUEST | 09/22/2022 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 10/26/2023 | 10/27/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 10/20/2023 | 10/24/2023 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved. | |||
| ENGIN1 | COMPLETE | 07/21/2023 | 07/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/21/2023 | 07/21/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/21/2023 | 07/21/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/15/2022 | 11/15/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 11/15/2022 | 11/15/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. Please provide Final prior to receiving CO. | |||
| ZON | COMPLETE | 11/15/2022 | 11/15/2022 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 07/26/2022 | 07/27/2022 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The construction elevation certificate has been approved. Please provide foundation and final prior to receiving CO. | |||
| ELEC | COMPLETE | 07/20/2022 | 07/21/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/20/2022 | 07/20/2022 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 07/20/2022 | 07/20/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Comment not addressed: B4 has the incorrect panel number, it is supposed to be 12035C0137 | |||
| ENGIN1 | COMPLETE | 07/20/2022 | 07/20/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/20/2022 | 07/26/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 07/18/2022 | 07/19/2022 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM B4 has the incorrect panel number it is 12035C0137, please correct. C2g is missing the box checked for measurement. Section D the architect needs to date as well as sign on top of the seal. | |||
| BLD | COMPLETE | 07/12/2022 | 07/15/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 07/12/2022 | 07/13/2022 |
| Note: Released By: HALEIGH HAND - - | |||
| ELEC | HOLD | 07/12/2022 | 07/13/2022 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need to show mini split on load calcs and submit a 300 amp riser diagram | |||
| ENGIN1 | COMPLETE | 07/12/2022 | 07/13/2022 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 07/12/2022 | 07/14/2022 |
| Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/12/2022 | 07/13/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/12/2022 | 07/18/2022 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/12/2022 | 07/18/2022 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please show left side setback from the front corner to left side property line on site plan |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/10/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 11/09/2023 |
| CONNECTION FEES | ¤25.00 | 07/27/2022 |
| 3% FIRE IMPACT FEE CREDIT | (¤11.66) | 07/27/2022 |
| IMPACT FEE FIRE | ¤388.65 | 07/27/2022 |
| IMPACT FEE PARKS | ¤1,455.13 | 07/27/2022 |
| IMPACT FEE SCHOOL | ¤3,600.00 | 07/27/2022 |
| IMPACT FEE TRANSPORTATION | ¤3,224.00 | 07/27/2022 |
| 3% PARKS IMPACT FEE CREDIT | (¤43.65) | 07/27/2022 |
| SURCHARGE FS 533.721 | ¤21.18 | 07/27/2022 |
| SURCHARGE - FS 468.631 | ¤31.77 | 07/27/2022 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/27/2022 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/27/2022 |
| SW ENG PRE APRON | ¤30.00 | 07/27/2022 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/27/2022 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/27/2022 |
| 3% TRANS IMPACT FEE CREDIT | (¤96.72) | 07/27/2022 |
| SEWER INSPECTION | ¤25.00 | 07/27/2022 |
| SITE PLAN 30 | ¤30.00 | 07/27/2022 |
| WATER-METER | ¤467.09 | 07/27/2022 |
| WATER-METER | ¤388.04 | 07/27/2022 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/27/2022 |
| INSPECTION - RESIDENTIAL | ¤2,004.75 | 07/27/2022 |
| PLAN REVIEW - RESIDENTIAL | ¤568.62 | 07/27/2022 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤12,509.70 |