Permit #2022070492

Permit Details

Status: COED

Parcel Id: 48-11-31-1710-00000-0380
GARAGE: 1214 sqft
CONDITIONED SPACE: 4040 sqft
SCREEN PORCH (SOLID ROOF) : 860 sqft
OPENED PORCH (WITH ROOF) : 80 sqft
Total Square Footage: 6194 sqft
Block: 00000
Subdivision: 2087 - ESTATES AT GRAND HAVEN PHASE II
Job Phone: 386-445-2012
Location Address: 4 SCARLET OAK CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/27/2022
NOC: RECORDED
Applicant name: JOHN NICHOLAS CORDASCI
Owner: FORBES ALAN & SUSAN H&W

Address

2 MIDDEN LANE

PALM COAST, FL 32137

Lot: 0380
Contracted Stated Job Value: ¤728,581.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

SKYWAY BUILDERS INC
Status Location Address State License Number Phone
INACTIVE

PO BOX 354786

PALM COAST, FL 32135

CBC1263769 (Exp: 08/31/2024) 386-445-2012

Sub Contractors

MARK JOHN LUTCZA
Status Location Address State License Number Phone
ACTIVE

26 ROYAL LEAF LANE

PALM COAST, FL 32164

EC13005145 (Exp: 08/31/2026) 386-586-0770
RICHARD GARY WILSON JR
Status Location Address Mailing Address State License Number Phone
ACTIVE

1504 OLD MOODY BLVD

BUNNELL, FL 32110

UNIT 6

BUNNELL, FL 32110

CAC1817645 (Exp: 08/31/2026) 386-586-6290
DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 11/13/2023 APPROVED - AS NOTED FSLADISH
Note: 11/13/23 INSPECTORS NOTESPOKE WITH JOHN AND DETERMINED THAT THE EXCAVATED AREA WAS DONE BY THE POOL COMPANY TO INSTALL A GAS TANK FOR THE POOL SYSTEM. THEY WILL BE RESPONSIBLE FOR REPAIRING, FILLING IN, SODDDING AND GRADING THE EXCAVATED AREA AS A CONDITION FOR ROW FINAL PASSAGE. OTHER CORRECTIONS MADE. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. __________________________________________________________________________________________________________________________ 11/9/2023 - PREVIOUS INSPECTION NOTES 11/09/23 Need to fix washout off the rear left structure corner going to property line. You will need to have the excavated area repaired and regraded to flow. You need to fix the broken chunk of curb. you will need to sod the rear property line wher it is bare all the way over to the left property line. See photos for reference The right side of the property line needs one additional line of sod to extend all the way to the end of the property, next to the pine needles. There's a crack on the right side of the Curb and GUTTER, and two holes need to be repaired in front of the driveway with a hot patch.
U -UTILITY RESIDENTIAL FINAL 11/09/2023 FINAL APPROVED LFITZGERALD
ROW - STORMWATER FINAL 11/09/2023 Disapproved -FEE REQUIRED FSLADISH
Note: 11/09/23 Need to fix washout off the rear left structure corner going to property line. You will need to have the excavated area repaired and regraded to flow. You need to fix the broken chunk of curb. you will need to sod the rear property line wher it is bare all the way over to the left property line. See photos for reference The right side of the property line needs one additional line of sod to extend all the way to the end of the property, next to the pine needles. There's a crack on the right side of the Curb and GUTTER, and two holes need to be repaired in front of the driveway with a hot patch.
ROW - FINAL APRON (AFTER POUR) 11/09/2023 APPROVED - AS NOTED FSLADISH
Note: 11/09/23 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. Curb will need to be fixed before ROW final passage
BLD - BUILDING FINAL 11/09/2023 FINAL APPROVED BTAYLOR
U-CROSS CONNECTION 11/09/2023 APPROVED - AS NOTED LFITZGERALD
Note: reclaim irrigation-no cross connection
ELEVATION CERTIFICATE-FINAL APPROVAL 10/24/2023 APPROVED - AS NOTED JMYERS
Note: The Final elevation certificate has been approved. Any EC signed after 11/1/23 must be on the new form.
ROW FIELD SURVEY /GRADING CERTIFICATION 10/24/2023 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
FINAL SURVEY (OFFICE USE ONLY) 10/23/2023 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED
FINAL SURVEY (OFFICE USE ONLY) 10/20/2023 Disapproved - NO FEE GBERTOLA
ROW- PRE-APRON (PRE-POUR) 08/18/2023 APPROVED PFLANAGAN
Note: READY FOR PAVERS ------------------------------------------------------------------- 8/1/2023 - PREVIOUS INSPECTION NOTES THIS DRIVEWAY WAS WIDEN SO HAD TO DO NEW PRE POUR READY TO POUR PAVER RESTRAINTS, BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEED TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ---------------------------------------------------------------------------------------------------------- 7/31/2023 - PREVIOUS INSPECTION NOTES CANCELLED DO TO WATER IN POURING AREA -------------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES CANCELLING DO TO NOT READY FOR INSPECTION WATER IN FOOTER AND APRON --------------------------------------------------------------------------------- 7/6/2023 - PREVIOUS INSPECTION NOTES READY TO POUR PAVER RESTRAINTS, CURBING AND APRON ONLY. ALL CONCRETE NEED TO BE 3000PSI WITH FIBER TO MEET CITY'S STARDARTS. BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEED TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- PRE-APRON (PRE-POUR) 08/17/2023 CANCELLED BY APPLICANT WEB
Note: 8/1/2023 - PREVIOUS INSPECTION NOTES THIS DRIVEWAY WAS WIDEN SO HAD TO DO NEW PRE POUR READY TO POUR PAVER RESTRAINTS, BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEED TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ---------------------------------------------------------------------------------------------------------- 7/31/2023 - PREVIOUS INSPECTION NOTES CANCELLED DO TO WATER IN POURING AREA -------------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES CANCELLING DO TO NOT READY FOR INSPECTION WATER IN FOOTER AND APRON --------------------------------------------------------------------------------- 7/6/2023 - PREVIOUS INSPECTION NOTES READY TO POUR PAVER RESTRAINTS, CURBING AND APRON ONLY. ALL CONCRETE NEED TO BE 3000PSI WITH FIBER TO MEET CITY'S STARDARTS. BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEED TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ELECTRIC - EARLY POWER 08/08/2023 APPROVED - AS NOTED BTAYLOR
Note: 7/19/2023 - PREVIOUS INSPECTION NOTES 8-8-23 1. Emailed FPL at 9:34.
ROW- PRE-APRON (PRE-POUR) 08/01/2023 PARTIALLY APPROVED PFLANAGAN
Note: THIS DRIVEWAY WAS WIDEN SO HAD TO DO NEW PRE POUR READY TO POUR PAVER RESTRAINTS, BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEED TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ---------------------------------------------------------------------------------------------------------- 7/31/2023 - PREVIOUS INSPECTION NOTES CANCELLED DO TO WATER IN POURING AREA -------------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES CANCELLING DO TO NOT READY FOR INSPECTION WATER IN FOOTER AND APRON --------------------------------------------------------------------------------- 7/6/2023 - PREVIOUS INSPECTION NOTES READY TO POUR PAVER RESTRAINTS, CURBING AND APRON ONLY. ALL CONCRETE NEED TO BE 3000PSI WITH FIBER TO MEET CITY'S STARDARTS. BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEED TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- PAVER RESTRAINTS 08/01/2023 APPROVED PFLANAGAN
Note: READY TO POUR PAVER RESTRAINTS --------------------------------------------------------------------------- 7/31/2023 - PREVIOUS INSPECTION NOTES CANCELLED DO TO WATER ION POURING AREA ---------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES CANCELLING DO TO NOT READY FOR INSPECTION WATER IN FOOTER AND APRON
ROW- PAVER RESTRAINTS 07/31/2023 CANCELLED BY APPLICANT PFLANAGAN
Note: CANCELLED DO TO WATER ION POURING AREA ---------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES CANCELLING DO TO NOT READY FOR INSPECTION WATER IN FOOTER AND APRON
ROW- PRE-APRON (PRE-POUR) 07/31/2023 CANCELLED BY APPLICANT PFLANAGAN
Note: CANCELLED DO TO WATER IN POURING AREA -------------------------------------------------------------------------------- 7/28/2023 - PREVIOUS INSPECTION NOTES CANCELLING DO TO NOT READY FOR INSPECTION WATER IN FOOTER AND APRON --------------------------------------------------------------------------------- 7/6/2023 - PREVIOUS INSPECTION NOTES READY TO POUR PAVER RESTRAINTS, CURBING AND APRON ONLY. ALL CONCRETE NEED TO BE 3000PSI WITH FIBER TO MEET CITY'S STARDARTS. BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEED TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- PRE-APRON (PRE-POUR) 07/28/2023 CANCELLED BY APPLICANT PFLANAGAN
Note: CANCELLING DO TO NOT READY FOR INSPECTION WATER IN FOOTER AND APRON --------------------------------------------------------------------------------- 7/6/2023 - PREVIOUS INSPECTION NOTES READY TO POUR PAVER RESTRAINTS, CURBING AND APRON ONLY. ALL CONCRETE NEED TO BE 3000PSI WITH FIBER TO MEET CITY'S STARDARTS. BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEED TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- PAVER RESTRAINTS 07/28/2023 CANCELLED BY APPLICANT PFLANAGAN
Note: CANCELLING DO TO NOT READY FOR INSPECTION WATER IN FOOTER AND APRON
GRAVITY SEWER TEST 07/21/2023 APPROVED AGAETANO
U - SEWER TIE IN 07/21/2023 APPROVED AGAETANO
ELECTRIC-TUG 07/20/2023 APPROVED AGAETANO
ELECTRIC - EARLY POWER 07/19/2023 CANCELLED BY APPLICANT AGAETANO
ROW- PAVER RESTRAINTS 07/06/2023 APPROVED - AS NOTED PFLANAGAN
Note: PAVER RESTRAINTS LOOK GOOD AT THIS TIME
ROW- PRE-APRON (PRE-POUR) 07/06/2023 PARTIALLY APPROVED PFLANAGAN
Note: READY TO POUR PAVER RESTRAINTS, CURBING AND APRON ONLY. ALL CONCRETE NEED TO BE 3000PSI WITH FIBER TO MEET CITY'S STARDARTS. BEFORE THE NEXT PRE POUR INSPECTION ALL PAVER BASE NEED TO BE SPREAD AND COMPACTED WITH NO PAVERS LAID AT THE TIME OF INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- PRE-APRON (PRE-POUR) 07/05/2023 CANCELLED BY APPLICANT WEB
ROW- PAVER RESTRAINTS 07/05/2023 CANCELLED BY APPLICANT WEB
INSULATION 05/05/2023 APPROVED TSTAUFFACHER
LATH/BRICK/ WATER BARRIER 05/05/2023 APPROVED TSTAUFFACHER
ALL ROUGH 04/24/2023 APPROVED TSTAUFFACHER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/21/2023 APPROVED TSTAUFFACHER
Note: 1/26/2023 - PREVIOUS INSPECTION NOTES Missing bearing post under double truss pre plans Load bearing walls missing SP4s on jack studs per detail Bearing wall near side door left side missing SP top and bottom Truss engineering and decking is approved.
ROOF VALLEY & METAL 01/26/2023 APPROVED TSTAUFFACHER
WALL SHEATHING 01/26/2023 APPROVED TSTAUFFACHER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 01/26/2023 Disapproved - NO FEE TSTAUFFACHER
Note: Missing bearing post under double truss pre plans Load bearing walls missing SP4s on jack studs per detail Bearing wall near side door left side missing SP top and bottom Truss engineering and decking is approved.
ELEV CERT-FOUNDATION APPROVAL 11/15/2022 APPROVED JMYERS
FOUND SURVEY APPROVED (OFFICE) 11/15/2022 APPROVED TBAKER
TIE BEAM / LINTEL 11/04/2022 APPROVED LMILLER
MONOLITHIC SLAB 10/18/2022 APPROVED AGAETANO
Note: 10/17/2022 - PREVIOUS INSPECTION NOTES 10/14/2022 - PREVIOUS INSPECTION NOTES 10-17-2022 Compaction test not on site.
MONOLITHIC SLAB 10/17/2022 Disapproved - NO FEE AGAETANO
Note: 10/14/2022 - PREVIOUS INSPECTION NOTES 10-17-2022 Compaction test not on site.
MONOLITHIC SLAB 10/14/2022 CANCELLED BY APPLICANT AGAETANO
PLUMBING 1ST ROUGH UNDERGROUND 10/12/2022 APPROVED DCUSHING
WATER METER INSTALLATION REQUEST 09/22/2022 APPROVED CSTONE

Review History

Department Status Date In Date Out
MECH COMPLETE 10/26/2023 10/27/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
PLFM COMPLETE 10/20/2023 10/24/2023
Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Final elevation certificate has been approved.
ENGIN1 COMPLETE 07/21/2023 07/21/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 07/21/2023 07/21/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 07/21/2023 07/21/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/15/2022 11/15/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
PLFM COMPLETE 11/15/2022 11/15/2022
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. Please provide Final prior to receiving CO.
ZON COMPLETE 11/15/2022 11/15/2022
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
PLFM COMPLETE 07/26/2022 07/27/2022
Note: Released By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM The construction elevation certificate has been approved. Please provide foundation and final prior to receiving CO.
ELEC COMPLETE 07/20/2022 07/21/2022
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 07/20/2022 07/20/2022
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
PLFM HOLD 07/20/2022 07/20/2022
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM Comment not addressed: B4 has the incorrect panel number, it is supposed to be 12035C0137
ENGIN1 COMPLETE 07/20/2022 07/20/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 07/20/2022 07/26/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
PLFM HOLD 07/18/2022 07/19/2022
Note: Held By: JORDAN MYERS, C.F.M - (386)986-2320 - JMYERS@PALMCOASTGOV.COM B4 has the incorrect panel number it is 12035C0137, please correct. C2g is missing the box checked for measurement. Section D the architect needs to date as well as sign on top of the seal.
BLD COMPLETE 07/12/2022 07/15/2022
Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM
CUSVC COMPLETE 07/12/2022 07/13/2022
Note: Released By: HALEIGH HAND - -
ELEC HOLD 07/12/2022 07/13/2022
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Need to show mini split on load calcs and submit a 300 amp riser diagram
ENGIN1 COMPLETE 07/12/2022 07/13/2022
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
LOCATE COMPLETE 07/12/2022 07/14/2022
Note: Released By: CANDACE STONE - - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 07/12/2022 07/13/2022
Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 07/12/2022 07/18/2022
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 07/12/2022 07/18/2022
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please show left side setback from the front corner to left side property line on site plan

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 11/10/2023
PLAN REVIEW - REVISION ¤32.50 11/09/2023
CONNECTION FEES ¤25.00 07/27/2022
3% FIRE IMPACT FEE CREDIT (¤11.66) 07/27/2022
IMPACT FEE FIRE ¤388.65 07/27/2022
IMPACT FEE PARKS ¤1,455.13 07/27/2022
IMPACT FEE SCHOOL ¤3,600.00 07/27/2022
IMPACT FEE TRANSPORTATION ¤3,224.00 07/27/2022
3% PARKS IMPACT FEE CREDIT (¤43.65) 07/27/2022
SURCHARGE FS 533.721 ¤21.18 07/27/2022
SURCHARGE - FS 468.631 ¤31.77 07/27/2022
SW ENG - FOUNDATION SURVEY ¤20.00 07/27/2022
SW ENG INSPECTION 80 ¤80.00 07/27/2022
SW ENG PRE APRON ¤30.00 07/27/2022
SW ENG - REVIEW 20 ¤20.00 07/27/2022
SW ENG RES REVIEW 200 ¤200.00 07/27/2022
3% TRANS IMPACT FEE CREDIT (¤96.72) 07/27/2022
SEWER INSPECTION ¤25.00 07/27/2022
SITE PLAN 30 ¤30.00 07/27/2022
WATER-METER ¤467.09 07/27/2022
WATER-METER ¤388.04 07/27/2022
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/27/2022
INSPECTION - RESIDENTIAL ¤2,004.75 07/27/2022
PLAN REVIEW - RESIDENTIAL ¤568.62 07/27/2022
Fees Total Due: ¤0.00 Total Paid: ¤12,509.70